Laserfiche WebLink
r, <br />GARAGE DOOR <br />DETAIL <br />2 <br />SCALE: 3/4"=1'-0" <br />WINDOW TRIM <br />DETAIL <br />1 <br />SCALE: 3/4"=1'-0" <br />12 <br />5 �/ <br />I nil <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. (TYP.) <br />12 <br />5:12 5 <br />0 <br />*35 SH . I�J u 35 SH <br />(2) 3068 <br />FIN. 1 ST FLOOR <br />REAR ELEVATION <br />SCALE: 1 /4"=1'-0" <br />BLDG. HEIGHT - <br />5:12 <br />0 <br />ROOF SHINGLES PER ✓ <br />COMMUNITY SPECS. <br />(TYP.) <br />4" WIDE STUCCO <br />BAND (+1) <br />5:12 <br />6" FASCIA (TYP.) <br />1 <br />T.O. MASONRY <br />T.O. WINDOW - - <br />- -- <br />- <br />- I <br />4" WIDE STUCCO <br />BAND (+1) <br />4" WIDE STUCCO <br />BAND (+1) <br />, <br />FRONT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. <br />5:12 (TYP.) <br />12 <br />5 <br />2 <br />i <br />i <br />i <br />1'-0" <br />TYP. <br />WIDE STUCCO <br />BAND (+1) <br />'WIDESTUCCO <br />B <br />BAND (+1) <br />. - <br />i <br />El�����0 <br />4" WIDE STUCCO 16070 GAR. DOOR <br />BAND (+1) <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />FINISH <br />.d:.:i .—es•:::�. <br />.•�rc`�r=s.;;; >:<:::�: �,. <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C 1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />011111 t a®ri,?,- <br />%e�% <br />®be�'Q��oOE SF®•.� <br />• <br />o 7 S� <br />S7 E F <br />Ir <br />W <br />�-_1 <br />�o° � <br />>o <br />a0 <br />U) 0 W <br />Q ::) W_ F- <br />_ J <br />Ir cr- T- <br />Y 0 F- Z <br />u-00cn <br />Z qZ Z F- Z_ <br />Ir J Q J <br />W 0- _ IL <br />�2ZLLw <br />�F-Qzo <br />ri <br />O N <br />n <br />o <br />O �¢ <br />Q <br />O <br />o <br />o <br />w U) <br />Z <br />O <br />A � <br />O <br />� <br />Z <br />o <br />�w <br />z� <br />ow <br />Q� <br />w <br />O_ <br />r <br />U <br />U) <br />w <br />a <br />cn <br />Z <br />O <br />w <br />d <br />�Z <br />aaaaa <br />m� <br />�F <br />�-tEC2 2 2021 <br />COMMUNITY: <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6120 <br />RELEASED: 12/29/21 <br />SHEET <br />A2. I <br />