Laserfiche WebLink
Version Changes <br />Ver. #: Description of Chanqes <br />1.1 CLIENT COMMENTS -ADDED LED LIGHT TO <br />FOYER CEILING <br />E N NARSM <br />LENNAR TAMPA DIVSION <br />4600 W CYPRESS ST, SUITE 200 <br />TAMPA, FL 33607 <br />813.574.5700 <br />2386 GARFIELD <br />GENERAL NOTES: <br />THE FOLLOWING TECHINCAL CODES <br />SHALL APPLY: <br />5TH EDITION (2014) FLORIDA BUILDING CODE, PLUMBING, <br />MECHANICAL, FUEL GAS, ENERGY EFFICIENCY, <br />ACCESSIBILITY, AND 2008 <br />NATIONAL ELECTRICAL CODES <br />5TH EDITION (2014) FBC PLUMBING SECTION 604 <br />1. TANK TYPE WATER CLOSET VOLUME <br />1.6 GALLONS <br />2. WATER -FLOW RATE. <br />PUBLIC FACILITIES LAV 0.5 G.P.M. <br />PRIVATE FACILITIES LAV 2.2 G.P.M. <br />SHOWER HEADS 2.5 G.P.M. <br />3. ALL PLUMBING WATER LINES <br />TO BE CPVC <br />VTR LOCATIONS ARE APPROXIMATE AND MAY CHANGE <br />DUE TO JOBSITE CONDITIONS <br />THE FOLLOWING SHALL COMPLY WITH THE 5TH EDITION <br />(2014) FBC RESIDENTIAL CODE <br />PORCHES AND BALCONIES ALL WORK SHALL COMPLY WITH PRIEV, <br />CHAP. 3 CODES FLOR*;"t BUILDING CODE, <br />NATIONAL ELECTPK ' CODE, <br />HANDRAILS - CHAP. 3 AND THE C17 Y OF r..EPHYRHI <br />❑ GUARDRAILS - CHAP. 3 ORDINANCES <br />7 <br />STAIRS - CHAP. 3 <br />CHIMNEY & FIREPLACE <br />VIE °% AT <br />CHAP. 10 <br />CITY OF zephl'yPLAMS <br />❑ EGRESS WINDOWS <br />�XANY{I E� <br />CHAP. 3 <br />4. ALL OPENINGS SHALL COMPLY WITH 5TH EDITION <br />(2014) FBC WIND LOADS AS STATED <br />BELOW. ATTACHMENTS OF WINDOWS, <br />DOORS, SLIDING GLASS DOORS <br />AND O.H. GARAGE DOORS ARE TO DELEGATED <br />THE MANUFACTURER OF THESE ITEMS. THE <br />MANUFACTURER OF THESE ITEMS <br />SHALL SUBMIT ATTACHMENTS FOR <br />SITE INSTALLATION. <br />SEE ATTACHED SPECIFICATION SHEETS FOR <br />MANUFACTURERS DESIGN CRITERIA AND <br />INSTALLATION METHODS FOR WINDOWS, <br />DOORS, SLIDING GLASS DOORS, OVERHEAD <br />GARAGE DOORS, AND ROOFING. <br />5. ALL DOORS INTERIOR & EXTERIOR ARE <br />6'-8" UNLESS OTHERWISE NOTED <br />ALL SHOWER ENCLOSURES TO BE <br />TEMPERED GLASS <br />6. ALL WINDOWS WITHIN 24" OF DOORS <br />(INTERIOR & EXTERIOR) AND WITHIN <br />18" OF FLR TO BE TEMPERED GLASS. <br />(SECTION R308) <br />INDEX OF DRAWINGS <br />SHT NO: <br />TITLE <br />A <br />COVER SHEET <br />Al <br />FOUNDATION PLAN <br />A2 <br />1ST AND 2ND FLOOR PLAN <br />A3 <br />DETAILS <br />A4.A <br />2ND FLOOR - ROOF FRAMING PLAN A <br />A4.13 <br />2ND FLOOR - ROOF FRAMING PLAN B <br />A5.A <br />EXTERIOR ELEVATIONS & ROOF PLAN A <br />A5.13 <br />EXTERIOR ELEVATIONS & ROOF PLAN B <br />A6 <br />1ST & 2ND FLOOR ELECTRICAL PLAN <br />A7 <br />INTERIOR ELEVATIONS <br />SNO <br />STRUCTURAL NOTES <br />SN1 <br />STRUCTURAL NOTES <br />S3M/S <br />FOUNDATION DETAILS <br />S4 <br />FRAME WALL DETAILS <br />S5 <br />ROOF FRAMING DETAILS <br />S6M/S <br />WALL SECTION DETAILS <br />S7 <br />GABLE END DETAILS <br />SS <br />RETRO FIT DETAILS <br />ST <br />STAIR DETAILS <br />S11 <br />PRECAST DETAILS <br />S12 <br />PRECAST DETAILS <br />PA1.0 <br />PRODUCT APPROVAL INFO <br />PA1.1 <br />PRODUCT APPROVAL INFO <br />PA1.2 <br />PRODUCT APPROVAL INFO <br />PA1.3 <br />PRODUCT APPROVAL INFO <br />PA1.4 <br />PRODUCT APPROVAL INFO <br />PA1.5 <br />PRODUCT APPROVAL INFO <br />WP1.0 <br />WATERPROOFING DETAILS <br />SH1.0 <br />HURRICANE SHUTTERS <br />SH1.1 <br />HURRICANE SHUTTERS <br />SH1.2 <br />HURRICANE SHUTTERS <br />SH1.3 <br />HURRICANE SHUTTERS <br />SH1.4 <br />HURRICANE SHUTTERS <br />SH1.5 <br />HURRICANE SHUTTERS <br />SH1.6 <br />HURRICANE SHUTTERS <br />BUILDING TYPE: V RISK CATEGORY: II <br />NOTICE TO BUILDER <br />IT IS THE INTENT OF THIS DESIGNER THAT THESE PLANS <br />ARE ACCURATE AND ARE CLEAR ENOUGH FOR THE <br />LICENSED PROFESSONAL TO CONSTRUCT THIS PROJECT. IN <br />THE EVENT THAT SOMETHING IS UNCLEAR OR NEEDS <br />CLARIFICATION. .STOP..AND CALL THE DESIGNER LISTED IN <br />THIS TITLE PAGE. IT IS THE RESPONSIBILITY OF THE <br />LICENSED PROFESSIONAL THAT IS CONSTRUCTING THIS <br />PROJECT TO FULLY REVIEW THESE DOCUMENTS BEFORE <br />CONSTRUCTION BEGINS AND ANY AND ALL CORRECTIONS, <br />IF NEEDED, TO BE MADE BEFORE ANY WORK IS DONE. <br />= W <br />� U <br />w <br />W <br />~ <br />W z <br />LL <br />Q <br />�� Q <br />F <br />N <br />wow <br />°w <br />to <br />W Z J <br />— LL J <br />=mv< <br />U) <br />O <br />LO <br />ONz <br />"t} <br />-n° <br />= F- Z 0eJ� <br />C1 <br />LL =) <br />LL O -r <br />U) aryl' <br />M1gv VP,l' <br />C7 e <br />' f <br />In <br />( W D <br />--" <br />w <br />W_ <br />^N N LO <br />0 <br />W L °? U <br />MN d <br />to u m <br />.O M <br />O <br />LING <br />_ O <br />}� LL cc) <br />•� O o � Q <br />U <br />�tno, u W Q� <br />W L C co <br />W <br />❑w WQF— <br />QW W~ <br />JLL wLL Q Z w <br />¢ Q W(nU <br />ZZ)-gpulO(D <br />QQO_LL <br />Z <br />U)lx <br />Z QH-QQ <br />OOooZZ Q U <br />t� z <br />_j Lu a>YO <br />z <br />�W�HZ�Wa <br />LL oC1 <br />z' U <br />< <br />0w Z)OQ¢WQ <br />25 <br />ZcQ <br />O <br />LL <br />O <br />O <br />N <br />Z <br />O F- <br />> (n O <br />z <br />F�- co O <br />Q fn M <br />2 G7 <br />QwQLo <br />F-M <br />00 <br />Q U Q <br />Z I- <br />W <br />w <br />_! O <br />O <br />d0' <br />i <br />0 <br />N <br />04 <br />i <br />4 <br />0 <br />' <br />0 <br />U) <br />m <br />o <br />Q <br />> <br />LO <br />O <br />-0 <br />z z <br />z0 <br />w0E- <br />0W) <br />C%qt� <br />Q <br />U��o <br />� <br />g a <br />W <br />O <br />a = Q <br />LL <br />ZW~ <br />F- <br />v) <br />=r�z <br />v <br />Z J <br />Z <br />Zaf <br />�ZzLL <br />N <br />w 00 <br />O��W <br />0 <br />Q M <br />U�zz <br />Z (y <br />m<0 <br />Z <br />U <br />U <br />a <br />M_O <br />W <br />z <br />Z <br />W <br />M <br />`', <br />o <br />04 <br />LAST PLOT <br />DATE <br />Jun. 26, 17 <br />0 <br />COVER <br />SHEET <br />