Laserfiche WebLink
1 1/2" FILLER <br />O <br />M <br />0 <br />in <br />0 <br />in <br />1 1/2" FILLER <br />2'-9" y 2'-6" y T-6" >( T-0" <br />2'-0" , -1 1/2" FILLER <br />4" BACKSPLASH--i <br />REF SPACE <br />VERIFY W/ MANUF <br />HOOD <br />El <br />__1 <br />RANGE <br />2'-9" 2'-6" X-6" 3'-1 1/2" 2'-0" <br />1 1/2" FILLER 1 1/2" FILLER <br />1 KITCHEN <br />1 /2 = 1 -0 <br />HOLLYWOOD <br />STRIP LIGHTS <br />4 BACKSPLASH <br />30" HIGH <br />MIRROR <br />KNEE SPACE <br />T-0" 2'-6" 2'-9" <br />-2" FILLER 2 1/2" FILLER <br />5 MASTER BATH <br />1 /2 = 11-011 <br />PRE-ENGINEERED WD. TRUSSES AT <br />24" O.C. (SEE TRUSS DRAWINGS)— <br />R-30 BLOWN <br />INSULATION <br />ELEV AT 18'-0" <br />T.O.P. <br />Alk ELEV AT 10'-0" <br />2ND FLOOR FF <br />Al ELEV AT 8'-8" _ <br />T.O.M. <br />12 <br />0 <br />in <br />SHWR <br />HD -� <br />PRE-FAB <br />SHOWER PER <br />BUILDER <br />VALVE <br />4'-11" <br />6 �/2 <br />STER BATH1 - 1-0 <br />UNIT'2386 - B' - BUILDING SECTION <br />3/1611= 1'-011 <br />I WI <br />DW <br />OPEN TO <br />DINING ROOM <br />J, 2'-0" L T-0" 2'-3" LL <br />1 1/2" END PANEL 1 1/2" END PANEL <br />Dl/ <br />KITCHEN ISLAND <br />2 - 1 -0 <br />N <br />ap <br />to <br />N <br />- <br />ih <br />, <br />co <br />� <br />N <br />co <br />0 <br />0o <br />v <br />HOLLYWOOD <br />STRIP LIGHTS <br />30" HIGH <br />MIRROR <br />4" <br />BACKSPLASH <br />2'-6" 2'-6" <br />1" FILLER 1 1/2" FILLER <br />(DgA T H�,12 <br />FOOTING SIZES AND RE -BAR <br />WIRE SHELF <br />%I C. <br />ao <br />220 VOLT "HANSEN" BOX <br />r------ -----i r------ -----I <br />I I I I <br />14 1/2" X 16" <br />DRYER VENT ► I I <br />2X4 KNEE i RECESS <br />WALL TOP AT I I I I <br />34 1/2" I I I I <br />I I I I M <br />I I I I <br />I I I I <br />I I I I <br />I LI I <br />LI <br />3 KITCHEN„ <br />1 /2 - 1 -0 <br />CO <br />SHWR HD <br />WALL <br />PRE-FAB TUB o <br />PER BUILDER <br />o <br />ao <br />VALVE <br />SPIGOT 9 <br />o <br />X-4 1/2" 2'-9 1/2" <br />8 BATH #2 <br />4 �/2 <br />LITY <br />1 - 1 -0 <br />ELEV AT 18'-0" <br />T.O.P. <br />LOFT <br />ELEV AT 10'-01. y PRE-ENGINEERED <br />2ND FLOOR FF TRUSSES <br />ELEV AT 8'-8" — <br />T.O.M. <br />BRG WALL <br />GARAGE <br />ELEV AT 0'-0" _ <br />1ST FLOOR FF <br />SEE FOUNDATION PLAN FOR <br />FOOTING SIZES AND RE -BAR <br />UNIT '2386 FRONT SECTION <br />3/1611= 1'-011 <br />U) <br />=W <br />w <br />W <br />a <br />L <br />n <br />w d Q <br />> � - <br />H <br />Z o <br />M <br />N <br />wpUO <br />OJ <br />, <br />W Z � j <br />N W <br />u'f <br />co <br />QW�Q <br />= m <br />_ O <br />d <br />qZ <br />L0 <br />--W <br />Q Z 0 ✓_'Qli . <br />Q <br />��—W <br />'W <br />�z� <br />LL�W <br />�`,(O <br />��=p <br />d0 <br />i4a5, <br />W o <br />t 4 <br />W _j <br />co <br />=ohm <br />�� <br />Q <br />to <br />N Ln I'- E <br />` <br />W <br />L so 01 U <br />M <br />4— <br />N <br />N' <br />ff'' <br />V -0-0 a0 M <br />` L O <br />W <br />_ g <br />O u- a <br />�• m Q <br />'cn <br />U W a� <br />co E^ rn <br />W <br />L <br />W <br />wN W <br />ow C6 Wpm <br />WW <br />::JQO¢?�¢LQ�LUYzOawJZ <br />OFJO <br /><QU <br />L <br />OXCZOZ220E-H'WOOm<O�9OZ <br />Q Q <br />viw-�F5WWu5w<z <br />� <br />¢wfQ5wz � <br />_—jU <br />v�QOc <br />a� <br />LL <br />pW F- �W� <br />O=0ZgaQ <br />Q <br />LL O �QLL <br />0 <br />0 <br />N <br />Z LJJ <br />O t~- <br />>_(n(o0 <br />Z <br />(M O <br />Q � M <br />w <br />LL <br />w <br />Q�WyQui? <br />I— LL a- (Y) <br />QUQoo <br />Z I— <br />W <br />w <br />J O <br />0 <br />N <br />`° <br />M <br />0 <br />N <br />N <br />t� <br />4 <br />O <br />c <br />o <br />N o <br />>� <br />Lo <br />O <br />-0 <br />Z z <br />O <br />wrj) <br />N <br />wWo <br />�� <br />o <br />N <br />J <br />0Q <br />• — <br />LO <br />oWLU <br />F- <br />i--1 <br />U- <br />Z <br />X <br />ce <br />~mOQ <br />Z <br />I— = <br />'= <br />V <br />Z <br />Z J <br />(Qn <br />o <br />V<wo <br />m Z <br />a' <br />Z Z LL <br />W <br />W <br />O_gZ <br />O <br />Q M <br />U <br />LQz <br />z N <br />� o <br />Z <br />U <br />v <br />g <br />0 o <br />W <br />Cr <br />z <br />A7 <br />Q <br />W_ <br />W N <br />o <br />(Y) <br />LAST PLOT DATE <br />May. 23, 17 <br />O <br />B - INTERIOR <br />J I <br />ELEVATIONS <br />