Laserfiche WebLink
211111111111 <br />INSULATION REQ. <br />LOCATION <br />R-VALUE / TYPE <br />EXT CONC WALL <br />R-4.1 HIGH PERM <br />EXT FRAME 2X4 <br />R-11/R-13 KRAFT FACED <br />EXT FRAME 2X6 <br />R-19 KRAFT FACED <br />CONDITIONED CEILING <br />R-30 BLOWN -IN <br />(INSTALL BAFFLES AT EAVE) <br />GARAGE SEPARATION <br />(GARAGE / LIVING) <br />R-11/R-13 KRAFT FACED <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />T-5" <br />(2)16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3)16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16-5" <br />(1) USP HTW20 OR (3)16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) USP HTW20 OR (4)16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2)16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2)16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3)16d TOENAILS <br />2" X 12" @ 24" O.C. <br />164" <br />(1) USP HTW20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />A/C UNIT <br />2 SHEET METAL <br />MEWS PER <br />BRACKET <br />B4) HURRICANE <br />RACKETS <br />3/8" DIAMETER CEMENT <br />ANCHORS, TYP 3" TO 5" <br />LONG <br />A/C PAD <br />A/C UNIT HOLD DOWN <br />SCALE: N.T.S. <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE+ <br />+ <br />+ + + <br />15/32" CDX <br />m <br />PLYWOOD OR <br />7/16" OSB <br />RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2 INCH NAIL LENGTH 2 INCH NAIL LENGTH <br />* FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />NOTE: <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ + <br />+ <br />+ + <br />+ + <br />+ + <br />+ + + + + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />'-0" (TYP.) <br />6'-0" <br />+ <br />6'-0" <br />+ + <br />+ + <br />+++ <br />+++ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />++ <br />+++ <br />+++++++++ <br />+ <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" <br />5000s 1.8/1.7 <br />p nel <br />wood panels <br />Two 3/4" wood panels or 2 x — <br />1-1/8" or two 1/2" <br />6000s 1.811.7 <br />,Hood panels <br />2 x —+ 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1 /8" or two 1/2" <br />602.0 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />902.0 <br />2 x — lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking <br />1/8" gap x <br />x <br />k 1j <br />FILL CELL STD. 90° HOOK BOND BEAMif <br />........ ...... <br />... . ................. <br />....... . ... <br />. . . . . . . . . . . . <br />Q STD. 90° <br />CONT. #5 <br />CONT. #5 � HOOK <br />BAR <br />BAR <br />OOC <br />#5 CONT. <br />� <br />.. <br />.... <br />FROM <br />TO HIGHEST <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @INT. BRG. WALL <br />N.T.S. <br />1/8" min. }Small gap 2" min. <br />2" <br />max. � 4 max. <br />Clinch nails <br />when <br />possible 1 <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener 2" min. <br />required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite - Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING %" GAP @ TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouthcuts. N.T.S. <br />- Under 2nd floor column w/ loads <br />N.T.S. higher than 1500lb. <br />SQUASH BLOCKS AT INTERIOR 64 27ME-1--f <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />1/16" <br />code for appropriate <br />details in <br />1--or--20 <br />One 10d box <br />areas=20 of high <br />t <br />sinker <br />lateral load. <br />T <br />nail each side <br />at bearing. <br />Boise Joist Blocking <br />l ISP. 3" /10d1 nails at 6" o c- <br />C`l'/ Provide adequate bearing <br />for each lapped joist. <br />Squash block 10d nails <br />(2x4 minimum) SECTION INT. BRG. WALL <br />Bearing wall, Versa -Lam LVL or N.T.S. <br />Glulam Beam <br />NO HOLES (EXCEPT MINIMUM SPACING = 2x GREATEST <br />KNOCKOUTS) ALLOWED DIMENSION OF LARGEST HOLE <br />IN BEARING ZONES D (KNOCKOUT EXEMPTS) <br />(see table below) D <br />(see table below) <br />DO NOT cut, notch K K <br />or drill flanges <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Web Stiffener Fastener Schedule <br />Joist Bearin Location <br />Series De th End Intermediate <br />® <br />BC15000s <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />BCI 6000s® <br />BC16500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC160s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC190s® <br />11-7/8" <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />Required on interior walls : - for vertical load transfer Plumbing <br />when load bearing -for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration.— <br />rl <br />6„ A 1 Z" ROUND HOLE MAY � 61 6'1 DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1 2" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 12" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE, THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAYBE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1J/2" ROUND KNOCKOUTS IN THE WEB MAYBE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAYBE SET WITH THE 1 2" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAYBE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />\nstall tight to top flange. <br />Jc <br />Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2"gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"4" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />p depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />USP <br />MUC <br />5/8"g <br />THRU <br />BOLT <br />Uc <br />MI <br />R TRUSS <br />OP PLATE <br />LC <br />TYPICAL USP MUGT15 TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL HUS INSTALLATION <br />EMBEDMENT <br />SCHEDULE FOR <br />=_ AND QUANTITY <br />)F FASTENERS <br />TYPICAL HTA 20-18 /HTA 20 <br />INSTALLATION <br />HTA 20-18 /HTA 20 <br />INSTALLATION @MID SPAN <br />NOTE: <br />LOCATION OF UPLIFT VALUE <br />SECOND RT16 IS BASED ON <br />S.P.F. <br />USP RT16 USING <br />16-8d x1 1/2" NAILS <br />UPLIFT = 1030# <br />TYPICAL RT16 INSTALLATION <br />MIN. <br />TYPICAL MTW INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENETERED @PIPE PVC OR SCH40 SLEEVE <br />A/C CHASE 4" PVC PENETRATION <br />SLEEVE THRU STEM <br />WALL <br />,,' ..... _.o .'... � „I�_Il.-..III,;,III-ICI-I� <br />I- <br />'�� <br />111=1 FINISP GRADE <br />-III-III-III=1 I �I II—I11=1 I =1 � 1=1 � I-1 <br />F <br />SLEEVE THRU STEM--/ <br />SEE PLAN FOR °• d .• .; . • <br />FOUNDATION INFO q <br />STEM FOUNDATION <br />GRADE REINF. SEE PLAN <br />d <br />iE .� X <br />� °a IIIII�II� III—'' <br />i <br />A/C CHASE 4" PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />L- SEE FND. PLN. <br />SIZE &REINF. <br />12" BELOW PIPE VERTICAL THRU FND. <br />GRADE_\ <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @PIPE PLUMBING LINE <br />PENETRATION <br />d <br />SEE FND. PLN. <br />SIZE &REINF. <br />PIPE PERPENDICULAR TO FND.IIF III <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @PIPE <br />PENETRATION PLUMBING LINE <br />a ° <br />I - <br />SEE FND. PLN. <br />SIZE &REINF. <br />I­fn <br />—00 <br />LL <br />_ <br />go <br />M <br />CC) <br />E 04 <br />co <br />CD 0 <br />> <br />zU) LL "It <br />LD <br />CN <br />0 <br />Uwo <br />5 <br />� J � <br />Q <br />� W � W <br />W Q <br />0Z(0 <br />wQp U) o <br />w LL � w T <br />w Z <br />W <br />=off H <br />Q <br />Vi U <br />2: CO <br />0 <br />rn � O U o <br />4- O u_ o � Q <br />.N U w Q� � <br />7W L <br />rn <br />ow � w°� <br />~Q WgJ W�~ <br />W w Zof z <br />V�Xo_ oQ� <br />����Z�pOQ�� <br />�p2F"Q°ZLLLL—JZZovoZo�oom=wwQ->nWWwAWWQoJ it 0 YzOZz"-pwa <br />OQ 0 =O p¢z Q <br />�Q� <br />O <br />N <br />Z <br />O� <br />_ (n O <br />0 <br />Q U) M 5 <br />li) <br />Q W Q Lq <br />aUa� <br />Z I­— <br />LLI <br />O <br />N N <br />N <br />O o <br />N L� <br />N � <br />O > <br />O z Z <br />W !n <br />N Q) z 1­­o�a <br />� <br />Q =moz <br />Z <br />�ZZ <br />Q D)Z Z <br />Z �QO <br />Z U <br />U <br />O 00- <br />W <br />Q <br />Z Z <br />Z <br />J <br />W � O <br />(u LAST PLOT DATE <br />Dec. 21, 16 <br />IQ <br />iO STRUCTURAL <br />— J i DETAILS <br />6„ A 1 Z" ROUND HOLE MAY � 61 6'1 DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1 2" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 12" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE, THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAYBE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1J/2" ROUND KNOCKOUTS IN THE WEB MAYBE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAYBE SET WITH THE 1 2" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAYBE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />\nstall tight to top flange. <br />Jc <br />Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2"gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"4" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />p depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />USP <br />MUC <br />5/8"g <br />THRU <br />BOLT <br />Uc <br />MI <br />R TRUSS <br />OP PLATE <br />LC <br />TYPICAL USP MUGT15 TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL HUS INSTALLATION <br />EMBEDMENT <br />SCHEDULE FOR <br />=_ AND QUANTITY <br />)F FASTENERS <br />TYPICAL HTA 20-18 /HTA 20 <br />INSTALLATION <br />HTA 20-18 /HTA 20 <br />INSTALLATION @MID SPAN <br />NOTE: <br />LOCATION OF UPLIFT VALUE <br />SECOND RT16 IS BASED ON <br />S.P.F. <br />USP RT16 USING <br />16-8d x1 1/2" NAILS <br />UPLIFT = 1030# <br />TYPICAL RT16 INSTALLATION <br />MIN. <br />TYPICAL MTW INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENETERED @PIPE PVC OR SCH40 SLEEVE <br />A/C CHASE 4" PVC PENETRATION <br />SLEEVE THRU STEM <br />WALL <br />,,' ..... _.o .'... � „I�_Il.-..III,;,III-ICI-I� <br />I- <br />'�� <br />111=1 FINISP GRADE <br />-III-III-III=1 I �I II—I11=1 I =1 � 1=1 � I-1 <br />F <br />SLEEVE THRU STEM--/ <br />SEE PLAN FOR °• d .• .; . • <br />FOUNDATION INFO q <br />STEM FOUNDATION <br />GRADE REINF. SEE PLAN <br />d <br />iE .� X <br />� °a IIIII�II� III—'' <br />i <br />A/C CHASE 4" PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />L- SEE FND. PLN. <br />SIZE &REINF. <br />12" BELOW PIPE VERTICAL THRU FND. <br />GRADE_\ <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @PIPE PLUMBING LINE <br />PENETRATION <br />d <br />SEE FND. PLN. <br />SIZE &REINF. <br />PIPE PERPENDICULAR TO FND.IIF III <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @PIPE <br />PENETRATION PLUMBING LINE <br />a ° <br />I - <br />SEE FND. PLN. <br />SIZE &REINF. <br />I­fn <br />—00 <br />LL <br />_ <br />go <br />M <br />CC) <br />E 04 <br />co <br />CD 0 <br />> <br />zU) LL "It <br />LD <br />CN <br />0 <br />Uwo <br />5 <br />� J � <br />Q <br />� W � W <br />W Q <br />0Z(0 <br />wQp U) o <br />w LL � w T <br />w Z <br />W <br />=off H <br />Q <br />Vi U <br />2: CO <br />0 <br />rn � O U o <br />4- O u_ o � Q <br />.N U w Q� � <br />7W L <br />rn <br />ow � w°� <br />~Q WgJ W�~ <br />W w Zof z <br />V�Xo_ oQ� <br />����Z�pOQ�� <br />�p2F"Q°ZLLLL—JZZovoZo�oom=wwQ->nWWwAWWQoJ it 0 YzOZz"-pwa <br />OQ 0 =O p¢z Q <br />�Q� <br />O <br />N <br />Z <br />O� <br />_ (n O <br />0 <br />Q U) M 5 <br />li) <br />Q W Q Lq <br />aUa� <br />Z I­— <br />LLI <br />O <br />N N <br />N <br />O o <br />N L� <br />N � <br />O > <br />O z Z <br />W !n <br />N Q) z 1­­o�a <br />� <br />Q =moz <br />Z <br />�ZZ <br />Q D)Z Z <br />Z �QO <br />Z U <br />U <br />O 00- <br />W <br />Q <br />Z Z <br />Z <br />J <br />W � O <br />(u LAST PLOT DATE <br />Dec. 21, 16 <br />IQ <br />iO STRUCTURAL <br />— J i DETAILS <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @PIPE PLUMBING LINE <br />PENETRATION <br />d <br />SEE FND. PLN. <br />SIZE &REINF. <br />PIPE PERPENDICULAR TO FND.IIF III <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @PIPE <br />PENETRATION PLUMBING LINE <br />a ° <br />I - <br />SEE FND. PLN. <br />SIZE &REINF. <br />I­fn <br />—00 <br />LL <br />_ <br />go <br />M <br />CC) <br />E 04 <br />co <br />CD 0 <br />> <br />zU) LL "It <br />LD <br />CN <br />0 <br />Uwo <br />5 <br />� J � <br />Q <br />� W � W <br />W Q <br />0Z(0 <br />wQp U) o <br />w LL � w T <br />w Z <br />W <br />=off H <br />Q <br />Vi U <br />2: CO <br />0 <br />rn � O U o <br />4- O u_ o � Q <br />.N U w Q� � <br />7W L <br />rn <br />ow � w°� <br />~Q WgJ W�~ <br />W w Zof z <br />V�Xo_ oQ� <br />����Z�pOQ�� <br />�p2F"Q°ZLLLL—JZZovoZo�oom=wwQ->nWWwAWWQoJ it 0 YzOZz"-pwa <br />OQ 0 =O p¢z Q <br />�Q� <br />O <br />N <br />Z <br />O� <br />_ (n O <br />0 <br />Q U) M 5 <br />li) <br />Q W Q Lq <br />aUa� <br />Z I­— <br />LLI <br />O <br />N N <br />N <br />O o <br />N L� <br />N � <br />O > <br />O z Z <br />W !n <br />N Q) z 1­­o�a <br />� <br />Q =moz <br />Z <br />�ZZ <br />Q D)Z Z <br />Z �QO <br />Z U <br />U <br />O 00- <br />W <br />Q <br />Z Z <br />Z <br />J <br />W � O <br />(u LAST PLOT DATE <br />Dec. 21, 16 <br />IQ <br />iO STRUCTURAL <br />— J i DETAILS <br />