My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
39567 Dawson Chase Dr
Zephyrhills
>
Building Department
>
Building Plans
>
39567 Dawson Chase Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 4:39:17 PM
Creation date
2/19/2025 10:04:38 AM
Metadata
Fields
Template:
Building Plans
Street #
39567
Location
Dawson Chase Dr
Contractor
Lennar Home LLC
Building Plans - Permit #
20520
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS BRACING DETAIL (TYP.)r <br />SCALE:NTS 7 <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MAY BE NAILED <br />w/ M IN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE <br />IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS---7 <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />BETWEEN EA. TRUSS <br />MAX & EACH END ALTERNATE <br />DIRECTION TYP. <br />(D <br />co <br />I <br />00 <br />C'4 <br />04 <br />C) <br />3 <br />tz <br />E <br />0 <br />_--z—WOOD TRUSS -J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />—TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />SCALE:NTS <br />DIAGONAL <br />AT 81-101" <br />MAX <br />*4 <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 1 <br />Od x <br />1 1/2" NAILS EACH <br />TB <br />PRE-ENG. TRUSS <br />CONT. ROOF SHEATHING AT TRUSS TOP --/ <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />TRUSS <br />ROOF <br />SEE SHEATHING <br />PLAN <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />'E '-'u <br />SHI <br />�AN <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP, <br />TRUSS <br />�7A <br />(2) 12D NAILS <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 <br />w/ (12) 1 Od NAILS <br />#2 SPF 48" O.C. W/ (4) <br />CENTERED AT <br />1 Od TOP & BOTTOM <br />SPLIT TO TIE <br />OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />4c 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-O"O.C. MAX. W/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT—/ CONC.MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />nFTA11 nn INITF=PIOP RF=APIK]r-, <br />SCALE:NTS <br />77 <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />OL VARIES <br />. ............................. <br />ROOF SHEATHING <br />x x <br />ATTACHED PER <br />NAILING SCHEDULE <br />2x4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d COMMON TRUSSES. <br />TOENAILS TO TOP SEE TRUSS PLAN <br />PLATE & (2) 12d END MIN. (2) 2X4 FOR CONNECTION <br />NAILS TO TRUSS SPFTOP INFORMATION. <br />BOTTOM CHORD PLATE <br />F <br />�14 <br />AkVARIES SEE PLAN <br />FOR WALL LOCATION <br />MIN. 2X4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />OIL SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />MIN. 2X4 #2 SYP P.T. PLATE <br />tr <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />SECTION <br />@ ENTRY <br />SCALE:NTS <br />SEE FLOOR PLAN <br />FOR COLUMN SIZI <br />& ADDITIONAL INF( <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w <br />O.S.B. FLITCH PI <br />TOP @TRUSSE <br />PLAN <br />U,N.O. ON ROOF <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMP80N <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 1 Od <br />NAILS TO BEAM <br />(2) 2x4's OR 44 w/ (2) 1 Od <br />SUPPORT COLUMN BUILT-UP <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 1 Od <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 1 Od <br />& (4) 114"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL <br />r4 <br />SCALE,NTS <br />SIMPSON HUC410 w/ (14) <br />L.SEE PLAN L. <br />I FOR CANTI <br />16d INTO HEADER & (6) — <br />10d INTO BEAM - SEE <br />ROOF PLAN FOR MORE <br />INFO <br />—SEE FLOOR PLAN FOR <br />COLUMN SIZE& BASE <br />OSB FLITCH PLATE <br />L <br />CONNECTION INFO <br />REQ'D ONLY WHEN <br />IND ICATED ON BM. <br />SCHEDULE/PLAN <br />____--7/16" <br />OSB FLITCH PLATE <br />SEE FLOOR PLAN <br />F 0 Rj <br />REQ'D ONLY WHEN <br />COLUMN SIZE& BASE <br />INDICATED ON BM. CONNECTION INFO _ <br />OPTION A SCHEDULE/PLAN OPTION B OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS18 W/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A F_� A <br />SEE PLAN FOR <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER <br />SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />Ae <br />COMMON BM. ATTACHMENT <br />SCALE: NTS <br />2X4 STUDS W/ SIMPSON <br />SP1 W/ (10) 1 Od NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 W/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 W/ <br />(14) 1 Od x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />r22"*� <br />CONNECTION <br />SCALE:NTS <br />SCALE: 3/4"=V-0" <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />ju <br />TRUSS <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />BM. SPLICE OVER <br />///—CENTER OF POST <br />MIDDLE <br />F SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS <br />4" O.C. INFO. <br />* MASONRY WALL BELOW: SIMPSON <br />H ETA1 6 w/ (9) 1 Od x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM * BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN -------- -0" O.C. <br />(24) 1 Od x 1 1/2" NAILS @ 4' <br />TO GABLE TRUSS <br />COMMON TRUSS <br />SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE rj_2—'� <br />SCALE: NTS <br />EXTERIORc <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />----SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL ENTRY FRONT WALL <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL <br />EACH TRUSS TO NAILER <br />w/ (3) 1 Od <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SCALE:NTS <br />ROOF AND EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />SIMPSON LUS26 W/ (8) 10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />Z <br />LUS26-2 W/ (8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />VERIFY WITH PLAN FOR <br />2X1 0 #2 SYP CONT. LEDGER W/ (3) <br />LOCATION AND DIRECTION <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH <br />BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW <br />ROOF <br />SCALE:NTS <br />LOW ROOF/WAL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 W/ (10) 1 Od <br />NAILS AT BASE & SIMPSON <br />SP2 W/ (12) 1 Od NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END (BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS1 2 w/ (14) 1 Od x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/----/ <br />Z- (2) 2XIS BLOCKING UNDER� FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 W/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP OUTK'39 <br />SCALE: NTS <br />DETAILS & SECTIONS <br />0 V <br />;Ei 1.0 <br />(N <br />V) (D <br />a) U_.) <br />4--J U-j <br />0 L.0 <br />I'T <br />E <br />0 <br />C) <br />0 Cn <br />0 c:> <br />Fn r-- <br />cli <br />LU <br />E <br />8 <br />(D <br />O)m m <br />-COU 21 <br />ai <br />wo, W <br />EC2 .0 " <br />0 0 C:, <br />(n <br />=Moo <br />'5 !2, <br />-le <br />< 0 <br />M <br />0 5- <br />0�'=' <br />0 73�' <br /><C' 8 <br />A I <br />MW. <br />U z LU IC11- 16� __0 z <br />1— �] 2 s <br />< <br />LU g"! A! <br />0 <br />LU G -K � 4-:-: <br />10 Z_ <br />0 T 4 < <br />U. <br />........ <br />_'��IWID C*C(om <br />Cap <br />_j <br />z <br />5 <br />0,- <br />0 <br />'10 <br />R 0 F 1- 5 _�' � <br />I/f/z <br />To the best of the Engineers knowledge. information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineers signature and seal is only for <br />t st <br />he ructural engineering portions of the drawing pages bearing <br />Engineers signature and sea[. <br />LENNAR <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />CZ <br />=0 <br />Z g <br />z <br />< <br />z a: L <br />Lu<g= <br />U�uo <br />0 <br />cr- <br />z W, <1 'Mt� <br />'=, ZZ z <br />2 01 <br />C, <br />uj <br />0 <br />'n <br />zz <br />9 <br />z <br />> <br />iQ:;'7 <br />F= <br />oz <br />5 <br />z <br />C: <br />k*'_'00 <br />Lij <br />2: <br />T-1 <br />U) <br />z <br />0 <br />-0 <br />C'6 <br />U <br />M <br />u) <br />_j <br />:;Fc <br />.9 <br />1� R 6 <br />� �4 P <br />7Y11 <br />HOS <br />� Pin 2 <br />LLJ <br />, 02 -0� <br />r'j <br />N <br />M <br />Z < 12 <br />ug-'<� <br />W <br />-.E: Lg' <br />z <br />S 2: u- <br />z <br />Uj <br />Ln <br />zp!i <br />��0_8 <br />R<zu <br />i.- WU <br />0 <br />09 <br />LU W <br />ro <br />V <br />< <br />z <br />z <br />ICA <br /><< <br />Rz <br />ca <br />0 <br />1.0 <br />06 <br />Z <br />15 <br />LU <br />r <br />< Fn <br />rn <br />T11 <br />In- <br />I Ln I <br />SCALE: AS NOTED <br />DATE 10/2/2018 <br />TECH: MJAMES <br />VERSION No' 4mO <br />SHEET NO. <br />D1 <br />= <br />
The URL can be used to link to this page
Your browser does not support the video tag.