My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
39648 Dawson Chase Dr
Zephyrhills
>
Building Department
>
Building Plans
>
39648 Dawson Chase Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 6:32:43 PM
Creation date
2/19/2025 10:06:52 AM
Metadata
Fields
Template:
Building Plans
Street #
39648
Location
Dawson Chase Dr
Contractor
Lennar Homes
Building Plans - Permit #
21671
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I - I _--- 1' I 11 ! <br />YY/L-1UU` "l"[111\VVV vv"L <br />CROSS BRACING DETAIL (TYP.) 1 <br />SCALE:NTS <br />SEE ROOF PROVIDE 2X4 MIN. BLOCKING AT <br />PLAN SHEATHING Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />2X4 BLOCKING TYP. <br />BETWEEN TRUSSES TRUSS <br />SECT. A -A )P'A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING PACK <br />MAX 24" SPAN (EITHER PUSSES HIP <br />SIDE OR BOTH IF REQ'D) G.T <br />(2) 12D NAILS ---I' <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS E <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />2 MASONRY WALL 4 <br />SCALE:NTS <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL ENTRY FRONT WALL s <br />SCALE:NTS <br />TRUSS NOTES: TYP. HAND FRAMING ABOVE TRUSS <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONV. FRAMED RIDGE 2X4 STUDS & PLATES AT 2'-0" O.C.MAY BE NAILED EACH DIRECTION TYP. U.N.O. SIMPSON LSTA18 <br />IL L. <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MIN. (4) IL WHEN VERTICAL SCAB 2 x 6 w/ (12) 10d NAILS SEE PLAN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO #2 SPF 48„ SIMPSON HUC410 w/ (14) O.C. W/ (4) CENTERED AT 16d INTO HEADER & (1 FOR CANT. <br />2x8 BLOCKING NAILED @ 10d TOP & BOTTOM SPLIT TO TIE <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS EACH SIDE w/ 3 12d NAILS BEAMS TOGETHER 10d INTO BEAM - SEE <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES () OR SIMPSON H2.5A w/ ROOF PLAN FOR MORE <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD WHEN REQUIRED w/ (2) (10) 8d NAILS INFO <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & ON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH SEE FLOOR PLAN FOR <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION 1 1/2" N <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED COLUMN SIZE & BASE RECOSB FLITCH PLATE <br />SEE FLOOR PLAN CONNECTION INFO REQ''D ONLY WHEN 2x4 #2 SYP NAILER. NAIL <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER COLLAR TIE FOR COLUMN SIZE INDICATED ON BM. TO STUDS w/ (3)16d AT <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. EVERY 3rd & ADDITIONAL INFO. SCHEDULE/PLAN <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS RAFTER 7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR EACH STUD - TOENAIL7—PER <br />ROOF AND EXTERIOR <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING REQ'D ONLY WHEN COLUMN SIZE & BASE EACH TRUSS TO NAILER SHEATHING ATTACHED <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" OPTION A INDICATED SCHEDULE/ON BM OPTION B CONNECTION INFO OPTION C w/ (3)10d NAILING SCHEDULE <br />O.C. MAXIMUM. 2x4 SPF 2 (2) #7 x 3-1/2" <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER &SHALL BE ATTACHED w/ (3) 12d WOOD SCREW EACH SEE 2ND FLOOR WALL SECTION <br />NAILS AT EACH TRUSS INTERSECTION. CB TRUSS OR SIMPSOL COMMON B M . TO POST ATTACHMENT A <br />AT 48 FOR ADDITIONAL INFORMATION <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS w/ (10) 8d NAILS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT Tg AT " O.C. <br />SEE ROOF PLAN SCALE: 3/4"=1'-0" <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. Dg B FOR BEAM SIZE & BM. SPLICE OVER IF 2x DOUBLE LEDGER, <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS BEVEL CUTS CONNECTION INFO. CENTER OF POST ATTACH FIRST PLY <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS PRE-ENG. TRUSS (OPTIONAL) A A w/ (4) 16d NAILS TO EA. <br />F01 2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING SEE PLAN FOR END C TRUSS THEN <br />BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP T P OF AM ATTACH SECOND PLY <br />MAX & EACH END ALTERNATE w/ (3) ROWS OF 16d <br />CHORD AT ALL HAND FRAMED AREAS TYP. DIRECTION TYP. NAILS AT 24" O.C. <br />A <br />N <br />DIAGONAL 2x8 #2 SPF RIDGE BEAM <br />N AT 8'-0" WOOD SIMPSON LUS26 w/ (8) 10d NAILS <br />MAX TRUSS 2x6 #2 SYP RAFTERS FOR SPANS 4FT SIMPSON MTS18 w/ (14) OR IF 2 PLY TRUSS SIMPSON <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS 10d NAILS TYP. U.N.O. SEE PLAN FOR SIMPSON LUS26-2 w/ (8) 16d NAILS TO SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d CANTILEVER IF MTS18 w/ (14) LEDGER AND J/S6 FOR MORE INFO. <br />COLUMN FLOOS SIZE &N FOR INDICATED 10d NAILS VERIFY WITH PLAN FOR <br />o COMMON TOENAILS TO TIE BEAM ADDITIONAL INFO. \ TYP. U.N.O. - - - 2X10 #2 SYP CONT. LEDGER w/ (3) LOCATION AND DIRECTION <br />2X4 CONT. AT CONC. MASONRY <br />1/2" X 41/2" LAG SCREWS ATTACH <br />- (IF PARALLEL SEE 2/D2 FOR <br />T & B CHORD STEEL OR WOOD (WOOD COLUMN SHOWN) LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT BLOCKING INFO) <br />r <br />BEARING SUPPORT MIDDLE EACH SIDE OF G.T. INSTALL (4) LAG14"MASONRY WALL <br />o <br />Q <br />° SCREWS EACH SIDE) (TYPICAL) <br />A -A ALTERNATE BLOCKING CORNER SEE FOUNDATION SECTION AT LOW ROOF rg <br />DETAIL INTERIOR BEARING c 5„ PLAN FOR MORE INFO <br />SCALE: NTS <br />3 f <br />it'd jv <br />SCALE:NTS <br />COMMON BM. ATTACHMENTri8 <br />o WOOD TRUSS <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING SCALE:NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE: NTS <br />OL VARIES - 2x STUDS @ 16" O.C. <br />ROOF SHEATHING SEE 1/S5 FOR SEE PLAN FOR w/ SIMPSON SP1 w/ (10) 10d <br />ATTACHED PER ADDITIONAL <br />NAILS AT BASE & SIMPSON <br />2x4 #2 SPF BRACING @ NAILING SCHEDULE OUTLOOKER ��dON OILS AT INFO.VALLEY TRUSS SP2 w/ (12) 10d NAILS AT TOP <br />0 16" O.C. W/ 4 12d EXTERIOR SHEATHING INFO. <br />O`'� COMMON TRUSSES. ATTACHED PER 2x BLOCKING BETWEEN STUDS <br />3 TOENAILS TO TOP SEE TRUSS PLAN 2x4 STUDS w/ SIMPSON c TO TRUSS W/ 2 12d TOENAILS <br />Q PLATE & (2) 12d END NAILING SCHEDULE ( ) <br />STRUCTURAL SHEATHING MIN. (2) 2x4 FOR CONNECTION SP1 w/ (10) 10d NAILS EACH END (BETWEEN TRUSSES <br />NAILS TO TRUSS SPF TOP INFORMATION. AT BASE SEE J/S6 FOR (2) 12d NAILS TO EACH VERTICAL <br />�' ATTACHED PER NAILING GABL <br />BOTTOM CHORD PLATE MORE INFO. LOW ROOFMALL STUD) <br />a SCHEDULE SHEATHING ATTACHED <br />VARIES SEE PLAN PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />VARIES W/ FOR WALL LOCATION 2x4 BASE PLATE W/ 1/2" PLYWOOD NAILS @ 16" O.C. ALONG W/ <br />ROOF SLOPE SIMPSON LSTA30 w/ <br />_ - (22) 10d NAILS OR (2) 16d NAILS TO f SIMPSON MTS12 w/ (14) 10d x <br />WOOD WALL - _ Z - SIMPSON MTS12 w/ BELOW @ 16" O.C. <br />11 TRUSS/OMMONG s 1 1/2" NAILS TO BLOCKING <br />OR TRUSS. 2X4 CONT. W/ (2) MIN. 2x4 #2 SPF STUDS @ (14) 10d x 1 1/2 NAILS TYP TOP &BOTTOM - <br />FLOOR G <br />SEE PLAN 16d COMMONSNAIS EACH SHEOATH NG ATTACOHED BEOLOW @ 16"O CR <br />STUD TYP. T&B PER NAILING SCHEDULE & -• MASONRY WALL BELOW: SIMPSON <br />(3) 12d TOENAILS TO -- - a.. HETA16 w/ (9) 10d x 1 1/2" NAILS @ PLYWOOD <br />RTRUSS OOF SYSTEM TOP OF WALL PLATE BELOW - ----- -- _ _ _ - OORBOAM WALL BEAM BELOW: SIMPSON HTS20 w/ FLOORING <br />SEE PLAN FOR 4 -0 O.C. TO GABLE TRUSS <br />y SEE TRUSS PLAN a <br />o MIN. 2x4 #2 SYP P.T. PLATE 16" FLOOR SYSTEM FLOOR GIRDER (24) 10d x 1 1/2 NAILS @ 4 0 O.C. ---- - <br />i W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR TO GABLE TRUSS LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />°L MASONRY WALL SEE @ 3" FROM EACH END & DIRECTION CONNECTION Q COMMON TRUSS RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE 16" O.C. MAX. SEE ROOF PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />S H EAR T RAN S F E R INFO. SECTION @ FLOOR FOR CONNECTION CONNECTIONS TO G.T. 16d NAILS AT EACH END <br />N <br />EXTERIOR. WALL SECTION ENTRYr8N�CONNECTION 22 SECTION AT HIP GABLE 12 SECTION BUMP OUT 39 <br />SCALE: NTS SCALE:NTS SCALE: NTS SCALE: NTS SCALE:NTS <br />DETAILS & SECTIONS <br />zc') <br />o <br />zC) <br />z <br />Q <br />nj <br />V) U' <br />(1) <„ <br />a--+ w <br />�U — <br />0 w <br />v , ~ <br />U1 M <br />r- <br />m <br />F_ <br />006 <br />�O 'O M <br />! 1 <br />O LL c:) <br />�!� <br />o0000, <br />m iZ <br />¢m <br />m8. <br />Qo <br />N �O <br />O <br />(MVCD00 <br />MN�z <br />Z W w z <br />W <br />Z Q m`?� <br />LL�N�o�,, m <br />zU)E Q <br />W lltt <br />o <br />o d� <br />SE <br />�� Q°�i <br />Q O <br />C 0�' . <br />' Fl- •'� <br />////,I 'TOFESS\p <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />LENNAR <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />oZ <br />O <br />�o <br />fa <br />w<Ixtr <br />Zoo <br />�oujw <br />it T J <br />W <br />LL N <br />Q <br />z <br />oo© <br />n0 <br />} U i Z <br />F <br />Z <br />LU <br />�--� <br />(� <br />Z <br />O <br />- <br />06 <br />�a <br />U <br />= <br />U) <br />�0 <br />F <br />0 <br />c <br />ci <br />Vo <br />J <br />� <br />N <br />q Z <br />Z Z <br />$Nf- <br />Z <br />Z <br />�--� <br />J <br />In <br />lii <br />¢ <br />LU <br />Z <br />Z <br />U <br />RaF <br />W<g <br />OT <br />1,0 <br />z <br />� <br />��S <br />0 <br />(3)g <br />z <br />= <br />SCALE : AS NOTED <br />DATE : 7/31 /2018 <br />TECH: MJAM ES <br />VERSION N0. 4nO <br />SHEET NO. <br />D1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.