Laserfiche WebLink
THIS DETAIL 0,NLY REFERS TO THE DIAMOND -MESH <br />EXPANDED rAETAL LATH ATTACHMENT, <br />METAL LATH - '"-)ALL SHEATHING <br />16G4w1-1`2"" LOI4GL ,114M"_1" CRC, N't <br />Twl I -ES S'" iO.0 '��EEC"T FrET'W.-EEC MAXI j - 1+ 1 ~" L1 r," 1" <br />"STUDS I� Iy�TEC� THUS:— I �:1FP�ET I I I w I ;�7,,QV`v'N) STAPLES . <br />7APLES IBE7A'EIEN GTUIDS'A'S SHOWN _-__.._...w.. r)M......_.,. uD,C.VERT INTO STUDS <br />110TESr THUS:--) <br />REV. 09.24.21 SCALE: 3'4" _ T-O"" <br />`DETAIL E ICEEDS THE RE,OtJIREMENTS FOR F'SC!R 70.71.1 LATH - <br />"ONLY APPLIES TO LENNAR T°.� -JA1 yA- <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS. <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4%1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESIVE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C 1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />5'-0" <br />STUB -OUT FOR <br />GAS METER O — <br />O <br />N <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />**ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY** <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />T-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2) 16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />1514" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />w <br />m <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />Rtf)GF I INF <br />+ + <br />+ + t + t + + + + <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + o <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ + + + + + + + + � <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ <br />+ <br />+ + <br />+ <br />+ -0" (TYP.) <br />+ <br />+ <br />+ + <br />+++ <br />+ + <br />+ + l <br />9�Fj- <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ + <br />+ <br />+ <br />+ <br />++++ <br />+ <br />+ + <br />++ + <br />++++++ + + <br />+ <br />+ + + + + +++++ <br />++ <br />++ <br />+ <br />+ + + + + + o <br />t + <br />+ + + ++ + + + + <br />++ <br />+ <br />+ + + + + + + + Ea <br />+ <br />+ + + + + + + + <br />+ + <br />++ <br />+++ <br />++ <br />+ <br />15/32" CDX I <br />PLYWOOD OR <br />7/16" OSB <br />-RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS <br />8d RING SHANK NAILS @ 6" O.C. EDGES & <br />8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113 INCH NOMINAL SHANK DIAMETER <br />0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH <br />16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH <br />2-3/8 INCH NAIL LENGTH <br />NOTE: FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" orp <br />5000s 1.8/1.7 <br />nel <br />wood panels <br />Two 3/4" wood panels or 2 x - <br />P <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x - + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x - + 5/8" or 3/4" wood panel <br />902.0 <br />2 x _ lumber <br />Double 2 x _ lumber <br />FILL CELLS STD. 90° HOOK BOND BEAM <br />CONT. #5 <br />BAR <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />1/8" min. 2" min. <br />)Small gap <br />2" <br />max. � 4 max. <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener required when indicated or <br />4" max. <br />2x : CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING Y8' GAP @ TOP sides by 6". - Hangers with sides not containing t. WEB STIFFENER <br />DOUBLE JOIST CONNECTION top flangeuthcuis. <br />- Birdsmouth cuts. N.T.S. <br />- Under 2nd floor column wi marl.- <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below. <br />consideration. Check <br />local building <br />code for appropriate <br />1/16" <br />details in <br />One 10d box <br />areas=20 of high <br />or=20 sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam O <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES -� <br />DO NOT cut, notch <br />or drill flanges <br />DOUBLE JOIST CONST <br />(Not required if both load <br />Filler bl <br />1/8" gap <br />Boise Joist Blocking <br />I E.... �n /i AA\ ,, H, .,. all ,. ,. <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : -for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below." <br />for each lapped joist. use i uaxs nans at n O.G. Tor an foist <br />blocking panel *Non -stacking walls <br />10d nails SECTION @INT. BRG. WALL require additional consideration.— <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />Zo ❑ Co <br />A 112" ROUND HOLE MAY DO NOT CUT HOLES <br />6' BE CUT ANYWHERE IN 6 6" „ <br />CANTILEVER LARGER THAN 12 <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1 Z" <br />Round Hole Dameter (ire) <br />2 <br />3' <br />4. <br />5 <br />6' <br />' <br />8 <br />8 "87'S <br />10� <br />11 <br />12 <br />13 <br />RectangularHo. e Side; (Ire) <br />L' <br />�- <br />10 <br />Ark"qI 161 'lis.fi <br />`3 f "' n Vft, <br />- ' <br />3 <br />42 <br />F- <br />1'-C <br />1" I „" <br />1T-3''"" <br />l <br />1 <br />l r <br />1 <br />1 <br />1 3" <br />..._ <br />1' ,, <br />"tl',,'_"t <br />l <br />2'-:1 <br />_.,__. <br />1 1 <br />..11 <br />4' <br />3 7 <br />_... <br />9"" <br />t.2"" <br />a �," <br />4, 9 <br />7"' <br />. 4v" <br />I <br />i °-U <br />1 ° l'' <br />T " <br />.i'-2"" <br />1-7 <br />2 -7 <br />ZF <br />^-1't"' <br />�.'_g" <br />s-m •7""." <br />C . 4°,a <br />—2 <br />20 <br />`1; "' <br />l "_ , <br />1 " ��"" <br />1 .2 <br />' '3 ,1, <br />W)"�u�1'` <br />4'-0" <br />4 "- l ('Ji " i <br />b"-1 .11 <br />11 1, <br />T" 'd�,1 m° '� <br />8" I'"p <br />24 <br />1" 0„ <br />.l,_I , <br />I "_28", <br />l 3" <br />2 " <br />wl" P ",, <br />4"-C <br />q'� <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUTOUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE %" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series Depth End Intermediate <br />� <br />BC15000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />BCI 6000s® <br />BCI6500s@ <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60e <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCl90su <br />11-7 " <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />w/ (22) <br />NAILS T <br />5/8" 0 <br />THRU <br />BOLT <br />SIMPSC <br />wl (22) <br />NAILS T <br />R TRUSS <br />'OP PLATE <br />I.0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. kJoist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Jc <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />:�® LOCATION OF <br />SECOND H10A <br />SIMPSON H10A (WHEN <br />w/ (18)10d x 1 1/2" ° REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE PVC OR SCH40 SLEEVE <br />A/C CHASE 4" PVC_ <br />VC PENETRATION <br />SLEEVE THRU STEM <br />WALL A' <br />a <br />„I 1-1 11, I I 1=r11=1 I l e a a I 1=i 11=1 I I, ,III- I <br />_III-1I I-11 I-1I I-1I I-1I I FINISH GRADE <br />Backer block (12" wide min.) =rl I I I I ITI I I I I I I IT= -III _ <br />Nail with 10-10d nails. - <br />Install tight to top flange. SLEEVE THRU STEM ° <br />SEE PLAN FOR °• Q . • . ° <br />FOUNDATION INFO d <br />STEM FOUNDATION <br />Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 Its. <br />Install tight to top flange. <br />1/4"-2" gap- <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />p depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />GRADE <br />REINF. SEE PLAN <br />wt, UNA, 4 rvl, <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />ILA <br />SEE FND, PLN. <br />SIZE & REINF. <br />12" BELOW PIPE VERTICAL THRU FND. <br />GRADE <br />PVC OR SCH40 SLEEVE <br />TOP (2) #5's x 4' 0" <br />CENTERED @ PIPE PLUMBING LINE <br />PENETRATION-\ <br />--- ----------r--------- <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />_ Q — o _ ° _ °a. <br />a ,a 11=111=111 <br />-III—III�—�I a / I —III —III- <br />4-4-- <br />SEE <br />FND. PLN. <br />ol SIZE & REINF. <br />JUN 7 7 202 <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2028 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />k <br />" <br />of r '�� <br />M <br />N <br />O <br />w <br />J DO <br />e p <br />_ <br />E <br />s ` <br />to <br />CD- 00 <br />yy [d� E <br />-3 v Al, �f ` 2 5 05 <br />to <br />ax <br />z <br />w <br />10 <br />-i <br />W <br />0 <br />z <br />Q <br />0 F: 6 <br />W L <br />O MMOP v <br />.4.. N, M <br />V) V -0 ov M <br />'r o 0 <br />` o <br />0 Lo: ° Q <br />•N._ wC3 T <br />QN <br />V V a <br />W <br />W W <br />Ow C w0~ <br />w~ Q �� J X< z 0Z Z <br />�02�¢O¢D:aLLU00�0 <br />elf Q U <br />Q <br /><aXQzX 0z20C]�Qp <br />� I- �- <br />awwwoZOo'OOmZz 2 <br />cnwo wrnwwWin=�¢�I <br />�ILLOz <br />Q~WpLUHFnzWWOo�O�o- <br />00Of 0 0 z < <br />O <br />w¢ i-¢w <br />N <br />0 <br />0 <br />N <br />0_W <br />UO <br />Cn C:) O <br />O <br />Q LI) J Ln <br />I;n ��" <br />z <br />Q LLJ Q Ln <br />Ce 'M't <br />G <br />Q G Q 00 <br />Z <br />LV <br />W <br />C) <br />N <br />M"CM <br />O <br />N <br />O <br />N <br />O <br />N <br />� <br />O <br />M <br />d' <br />CV <br />O <br />CV <br />O <br />CV <br />O <br />O <br />O <br />O <br />O <br />00C)T-- <br />co <br />00 <br />00 <br />O <br />N <br />O <br />O <br />04 <br />O <br />N <br />O <br />CV <br />C)O <br />N <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />N <br />M <br />N <br />M: <br />O <br />O <br />O <br />W <br />O <br />CV <br />Ce7 <br />CD <br />. O <br />CA <br />O <br />O <br />CV <br />O <br />0 <br />1 <br />�� <br />N U <br />L <br />� <br />O <br />N <br />O <br />co <br />0 <br />"I" <br />0 <br />LO <br />0 <br />(.0r` <br />0 <br />U <br />1 <br />CT <br />M <br />Z z <br />W <br />0Wo <br />(n <br />UJ <br />0 O <br />Q <br />v0>o <br />Q <br />CDa=Q <br />zO�~ <br />~co0Z <br />(D0 <br />tz III <br />J Z <br />z <br />TI <br />LO <br />LLl <br />OQ <br />O <br />U�ZW <br />__1 2 w <br />O <br />Z T <br />Z <br />�QO <br />U <br />0 <br />�MM <br />W <br />� <br />z <br />Z <br />z <br />lizi- <br />M <br />N <br />N <br />N <br />LAST PLOT DATE <br />May. 8, 23 <br />STRUCTURAL <br />.. <br />z 0 <br />J <br />DETAILS <br />