Laserfiche WebLink
(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />SHINGLE ROOF <br />INSULATION- <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />l 2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />w <br />PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />7) <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />16" O.C. 2X S.P.F. STUDS <br />W <br />0 = <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />O <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 1Od <br />U- w <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL = <br />uj <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA <_ 1000 <br />g R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />ER PLAN 0 <br />OR FELT <br />PAPER FOR <br />I <br />MOISTURE <br />1 <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />°. <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB <br />8"x8"X16" CONC. KNOCKOUT <br />INSTALLATION PER <br />BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN <br />SOLID W/GROUP <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />_.T�L <br />BAND JOIST TYPICAL <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />M <br />0 4"x4" INSPECTION PORT AT <br />EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. <br />w <br />C- <br />o AT GARAGE CONTRACTOR <br />BASEBOARD <br />C:) <br />TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB <br />CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER <br />NOTE: EXTEND DECO FINISH <br />MUNICIPALITY <br />4"to 6" BELOW GRADE <br />c <br />FINISH GRADE00 <br />MI — <br />-III <br />— — — - <br />= 111—III—II <br />- <br />' I <br />MI I I —III —III <br />III <br />—_ <br />_ _ _ <br />_ _ <br />I" <br />6x6 w1.4xw1.4 - I I —I I I —I I I —I I I —I I <br />III=III=III—III <br />I I°.°. <br />a°° <br />°. <br />I I I —III —III —III- _ <br />r <br />WWF OR FIBERMESH <br />III,EE�IIIIIIIIIIIIIIII <br />III <br />a <br />°. <br />-III — III — III O <br />Ell I <br />z <br />�'-1 I I, I <br />I III=1 <br />�III- <br />11=III=1 11=1 I <br />III III, I <br />'' <br />STD. 90`HOOK <br />(3} # 5 REBAR ON 3" CHAIR <br />-I <br />DETAIL)TD. <br />W/3" MIN. CLEARANCE <br />4" <br />1'-8" <br />TYP 2-STORY WALL SECTION .1 <br />SCALE:3/4"=1'-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2nd FL00 <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 1Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD e <br />/2nd FLOOR WALL <br />BAND JOIST V\ <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />END SHEATHING TO <br />)F BEAM OR GIRDER <br />kTE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL 'IT" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN • INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />O/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL Wi (2)1Odx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1'-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS@1 <br />2"x BOT. PLATE <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSEE <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-0" <br />FOR ADDITIONAL INFORMATION. <br />TRU <br />n <br />15/32" OSB — <br />EXPOSUREI <br />SHEATHING <br />%I,x <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />o SECTION X-X IF <br />� NOT FULL <br />HEIGHT SHEET-C <br />Z <br />G <br />FLOOR <br />SYST <br />M <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15/32" OSB <br />EXPOSUREI F <br />F <br />SHEATHING w <br />2 <br />SOLID 2x U) <br />BLOCKING @ ALL <br />C <br />C <br />SHEATHING O <br />� <br />EDGES (SEE <br />OPENING <br />SECTION X- <br />W <br />(- C)C <br />x <br />EW <br />x <br />E <br />2x STUDS w <br />BEYOND. <br />SEE PLAN O <br />O <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING <br />SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IAIAI I r1 r1/AT1^k1 n1A^MAAA <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />,�J! �S 3/4" S41s <br />1/2" <br />1/2" <br />/2„ <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/7/16" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />T�7 <br />SSFF 041 N <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM y" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN <br />F <br />Z <br />_ <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/8d COMMON NAIL <br />C7 <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8tl COMMON NAIL <br />u. = <br />© NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />O w <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />=n <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />o <br />w/ 8d COMMON NAIL <br />uj <br />W LL O <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />> ¢ O in <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />�-000 <br />u~i LL <br />@ (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N w O O ~ <br />MEMBER IF GABLE END <br />C/) W <br />NOTE: <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 <br />INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />RIBBONS pAXTF,S,� FLOOR TRUSS / <br />DETAIL FLOOR TRUSS o <br />SCALE: 1 1/2"=1'-O" S6 <br />NOTE: SEE TYPICAL WALL SEE SHEATHING <br />SECTION C/S3 FOR SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />112" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. 5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd 5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10) 10d 2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD (MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. TYPICAL TENSION 2600#.) <br />2X P.T. PLATE:::X 6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />I �A I I <br />-III III— ° I —III III- <br />(3) #5 CONT. ON 3" <br />1 8 1 1 -8 1 8 I CLEARANCEMIN. <br />INTERIOR 2-STORY FRAME SECTION rS <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=1'-O" <br />ADDITIONAL SLAB INFORMATION. <br />FNiyG°R BEA <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />' 5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB Wi 6x6 W! AxW 1.4 <br />WWF OR FIBERMESH <br />,C <br />CV <br />M <br />a, <br />-1IMII II Q � <br />I ,—IIIII III=1 I 1=� <br />(3) # 5 REBAR ON 3" CHAIR 4" 1'-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />M <br />S6 <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN ,131" X21/2" <br />• DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />1'-4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16, <br />(3) <br />(3) <br />(2) <br />(3) 1 <br />(2) LSTA30 <br />- PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />-2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />- APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10)10d NAILS <br />- AT EA. STUD <br />2X P.T. PLATE <br />- WEEP SCREED INSTALLED PER. MANUF. <br />FINISH GRADE <br />co <br />T <br />1111 I I o <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />V <br />S6 <br />WWI <br />\/'RA <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Edit, <br />by Debra Anne Mahr PX2300 <br />CN <br />O <br />�g n <br />6 <br />\ a. <br />O <br />Ln <br />y <br />g E <br />LL <br />xF ,a <br />Q <br />tv <br />w <br />LLI <br />z <br />I <br />Q <br />Ln <br />> 0 R 0 <br />� <br />W . <br />� ' 0 4i <br />N M <br />j� <br />O <br />O 0 u o <br />_ <br />g) 0 LL r� N Q <br />•Cn W 0 <br />QN � <br />L Q W <br />CL <br />i. <br />Ld W <br />° LLI Cn `'' W 0 F- <br />LUF'¢ W�Jr W�Yzof z <br />Q U <br />Q <br /><ax--IZ�� �"o°�-�� <br />Q L.L LL 'Z�J HQQ <br />= O O <br />O(nX 0 01 00coz= U <br />(nU,ll>(nW W'LLIz, > <0 <br />CL <br />Z <br />Q~wo���'Z�uj62L5 <br />0W ° _` °Yz�¢ <br />Q 0 ': ¢ <br />LL <br />ILL <br />2 <br />O <br />O <br />(V <br />z W <br />V <br />N <br />a�+ <br />C:)JLn <br />V) <br />N <br />Q W <br />Q Ln <br />Q <br />Q O <br />~ <br />ZLLJ <br />J O <br />110 <br />V_ <br />N <br />N <br />N <br />N <br />C14 <br />N <br />1 <br />r <br />O <br />1 <br />M <br />r <br />i <br />` d- <br />r <br />CV <br />CV <br />CV <br />CDOlo <br />0 <br />0�0 <br />CO <br />6 <br />r <br />T- <br />r <br />CO <br />V--r-- <br />r <br />� <br />0 <br />N <br />0 <br />0 <br />� <br />N <br />C) <br />N <br />C)r' <br />O <br />CD <br />N <br />N <br />O <br />N <br />O <br />CV <br />O <br />N <br />O` <br />O <br />O <br />r <br />O <br />r <br />CO <br />O <br />CV <br />r <br />M <br />CD <br />d <br />O <br />r <br />O <br />0) <br />O <br />CA <br />O <br />O <br />r <br />O <br />r <br />C14 <br />O <br />O <br />o <br />I <br />NLo <br />a) <br />i <br />� <br />r <br />O <br />N <br />O <br />o <br />0 <br />0 <br />0 <br />�.} <br />y <br />M <br />� <br />Z Z <br />O <br />�/ <br />0 W U) <br />O <br />Q <br />Oa=Q <br />Z <br />Z <br />LU <br />= <br />m O Z <br />H Z <br />�_ <br />O J <br />Z of <br />T"I <br />-Z <br />Z u- <br />w t\ <br />OJgz <br />O <br />00 <br />U�ZW <br />' <br />z ,- 4 <br />Q o <br />- <br />Z <br />U <br />Q <br />O"J <br />oa <br />Of <br />z <br />Q <br />z <br />z <br />w <br />J <br />Wco <br />N <br />N <br />N <br />LAST PLOT PATE <br />May. 8, 23 <br />STRUCTURAL <br />Z 0 <br />J <br />DETAILS —MONO <br />