Laserfiche WebLink
3 <br />w <br />I <br />/ <br />0 <br />�I <br />0 <br />0 <br />C> <br />0 <br />LO <br />r` <br />0 <br />0 <br />I <br />N <br />M <br />cV <br />N <br />0 <br />/ <br />v <br />Cr <br />O <br />i <br />Q <br />NO <br />O <br />1.21 <br />co <br />E: <br />0 <br />x <br />L <br />O <br />J <br />a <br />0 <br />J <br />N <br />O <br />L <br />J; <br />O <br />a <br />0 <br />a. <br />N <br />LO <br />L <br />v <br />0 <br />d <br />M <br />0 <br />0 <br />z <br />m <br />0 <br />SIMPSON HGAMV <br />W/ <br />(4)1/4"xl 1/2" SDS <br />SCREWS <br />TO BLOCKING & (� <br />1 /4 x2 3/4 <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) — <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ <br />SCHEDULE FOR SHEATHING DETAIL-7 (2)16d NAILS—� <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />MAX. 9" AND FASTENERS. (MIN. FIRST 4 BAYS) <br />UNSUPPORTED, <br />IF >9" SEE 10/S5 BACKNAIL w/ (2)16d NAILS —� <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. 2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />MAX 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S5 MAX 9, <br />BACKNAIL w/ (2)16d NAILS UNSUPPORTED, BACKNAIL w/ (2)16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING SCHEDULE FOR SHEATHING DETAIL IF >9" SEE 10/S5 SEE STRUCTURAL NOTES AND <br />45°± <br />/ <br />45' ± <br />SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO BRACE <br />SCHEDULE FOR <br />APPROX. 8" FROM <br />SHEATHING DETAIL 2x4 KICKER <br />2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT <br />@ 8'-0" 0/C. <br />EXTEND AT LEAST 90% OF <br />EACH JOINT W/ (3) 10d <br />"L" BRACE TO EXTEND <br />2x4 CROSS BRACE <br />WEB LENGTH & NOTCH AT <br />& TOE NAILS @ <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />(SEE TABLE BOTTOM CHORD ) <br />EA. END @ 48" O.C. •• <br />, EN <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. <br />GABLE TRUS5 <br />EACH JOINT w/ (3) 10d & <br />FROM LEDGER TO <br />• SILL <br />1/2" CDX PLYWOOD OR <br />(2)10d TOE NAILS @ EA. •• <br />BLOCKING <br />7/16" OSB SHEATHING <br />END <br />ATTACHED W/ 10d <br />GYPSUM WALL BOARDJ.. <br />GABLE TRUSS <br />NAILS @ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />1/2" CDX PLYWOOD OR 7/16" <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM <br />SHEATHING ATTACHED <br />10dX3" @ 3" O/C <br />CORD ATTACHED W/ (2)16d TOENAILS <br />w/ 1 <br />w/ 10d NAILS @ 6 O.C. <br />mu <br />THROUGH CHORD <br />2"x4" LEDGER (MATCH BOTTOM CHORD <br />EDGES AND 12" O.C. FIELD <br />INTO 2" 6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />DOUBLE TOP PLATE <br />EACH JOINT w/ (3)10d <br />2x4 CROSS BRACE APPROX. 8" <br />&(2) 10dTOE NAILS @ <br />FROM RIDGE FASTENED AT <br />EA. END <br />EACH JOINT w/ (3) 10d & (2)10d <br />(NOT REQ'D WHEN <br />TOE NAILS @ EA. END <br />GABLE IS 4'-1" OR <br />2x FRAME WALL (SEE WALL <br />SHORTER) <br />i <br />i�S< <br />SECTION FOR SIZE & SPACING) <br />2x4 PANEL BLOCKING <br />1/2" CDX PLYWOOD OR 7/16" <br />@ 48" 0/C FOR THE <br />i �� �� . 2 16d <br />( ) <br />OSB SHEATHING ATTACHED <br />FIRST (4) ROWS OF <br />. i <br />\ <br />W/ 10d NAILS @ 6" O.C. EDGES <br />TRUSSES FROM EA. <br />SNAILS <br />�� <br />AND 12 O.C. FIELD <br />END TYP. TOP & <br />BOTTOM ATTACHED <br />(2) 16d NAILS <br />W/ (2)16d TOENAILS <br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE if <br />2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />FASTEN WITH 10dx3" 4" 0/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES <br />@ 1/2" x 8" "J" BOLT @ 48" 0 C 2x4 "T" ON TOP OF PANEL <br />@ 48" O.C. I I INSTALLED PER MANUF. I I WEEP SCREED FROM EA. END TYP. TOP &BOTTOM BLOCKING, FASTEN WITH SIMPSON HGAI OKT w/ (4)1/4"xl 1/2" SIDS SCREWS TO <br />MOISTURE BARRIER SIMPSON META12 w/ (7)10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2)16d TOENAILS 10d 3" 4" O/C TRUSS & (4) 1/4"x3"SDS SCREWS TO PLATES AT 24" O.C. <br />1/2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROMyL <br />O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - <br />MOISTURE BARRIER <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER <br />SIMPSON META12 w/ (7) <br />ALTERNATE SIMPSON MSTAM24 w/ (7)10d NAILS <br />NOTE: IF EMBEDDED <br />10dx1 1/2" NAILS AT EA. <br />& (4) 1/4"x2 1/4" TITEN @ 4'4" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL <br />SECTION <br />TRUSS VERTICAL WEB (24" <br />1 <br />GABLE WEB SECTION <br />2 <br />WEB, USE MSTAM36 w/ (7) <br />O.C. MAX) w/ MIN. 4" <br />10d NAILS & (4)1/4"x2 1/4" <br />SCALE: N.T.S. <br />S5 <br />EMBEDMENT IN KO BLOCK <br />SCALE: N.T.S. <br />S5 <br />TITEN ON OUTSIDE <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />REFER TO DETAIL J <br />N <br />N <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />ON SHEET S5 FOR <br />r <br />r <br />X-BRACING, AND TOP <br />SEE STRUCTURAL <br />CHORD BLOCKING <br />N <br />- <br />NOTES AND NAILING <br />INFORMATION <br />CO <br />SCHEDULE FOR <br />SHEATHING DETAIL BACKNAIL w/ <br />WOOD TRUSSES <br />`° <br />_ <br />00 <br />00 <br />(2)16d NAILS <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />2x4 RAT RUN BRACING <br />x <br />1112" <br />RIDGE FASTENED AT <br />AT 24" O.C. ON TOP OF <br />EACH JOINT w/ (3) <br />BOTT. CHORD FOR 4 <br />10d & (TOE <br />TRUSS SPANS <br />ATTACHED W/2-16d <br />E <br />NAILS @ EA. END <br />@A <br />AT EA. TRUSS JOINT <br />(2) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 6" LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />OF STAGGERED 10d COMMON WIRE NAILS <br />OF STAGGERED 30d COMMON WIRE NAILS <br />STAGGERED 30d COMMON WIRE NAILS <br />@ 48" O/C FOR THE • (Z) 16d NAILS <br />2x4 BLOCKING @ 24" <br />(D = 0.148", L = 3") OR EQUAL <br />(D = 0.207", L = 41/2") OR EQUAL <br />(D = 0.207", L = 41 /2") OR EQUAL <br />FIRST (4) ROWS OF <br />O/C w/ (2)16d <br />TRUSSES FROM EA. <br />TOENAILS @ EA. END <br />NOTES: <br />END TYP. TOP & <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 5 1/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />MASONRY WALL <br />OF THE COLUMN <br />(SPACE AS SHOWN FOR 3-PLY) <br />w/ (2)16d TOENAILS <br />ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />OF THE LAST LAMINATION (SPACE AS SHOWN FOR 3-PLY) <br />EXT. WALL CONN. 3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION <br />NON - LOAD BEARING LOCATION COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF <br />D B.U.C., SAME NUMBER OF ROWS, SAME SPACING) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: 3/4"=V-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS A8 <br />11NIMUM 2x <br />'ROSS BRACING <br />SEE PLAN FOR <br />OCATIONS) TOENAIL <br />(2) 16d NA <br />(2)16d PER <br />JOINT <br />....,.., .,.,. ,., 2"x4" MIN. SEE M/35 <br />CROSS BRACING DETAIL J <br />SCALE: N.T.S. SrJ <br />12" <br />SH SCHEDULE <br />TTACHMENT <br />t SYP BLK'G @ 16" O.C. <br />Ix0.131" <br />AILS EA. SIDE <br />2x4 #2 SYP w/ 10d <br />X0.131"@8"0.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL 10 <br />SCALE: N.T.S. S rJ <br />GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S. <br />SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S5 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR <br />7/16" OSB SHEATHING <br />ATTACHED w/ 10d NAILS <br />@ 6" O.C. EDGES AND 12" <br />O.C. FIELD <br />-2x4'T' ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />10dx3" @ 4" O/C <br />x @ SIMPSON SP2 w/ (12)10d <br />2x4 LEDGER (MATCH BOTTOM CHORD DBL. TOP PLATE NAILS AT EACH STUD <br />SLOPE OF ADJACENT TRUSS) STUD WALL (SEE TYP. SEC.) <br />SECTION 3 SECTION 4 <br />SCALE: N.T.S. S5 SCALE: N.T.S. �S5 <br />REV. 06.08.22 <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S5 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 10d NAILS @ 6" O.C. <br />E GES AND 12" O.C. FIELD <br />JACK TRUSS <br />SEE PLAN FOR <br />CONNECTION <br />2x4 "T" ON TOP OF PANEL-/ <br />L <br />BLOCKING, FASTEN WITH <br />2x4 BLOCKING W/ <br />77 <br />10dx3" @ 4" O/C <br />(2)12d TOENAILS <br />TI N SEC 0 <br />9 <br />SCALE: N.T.S.E, <br />SCJ <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />'-MINIMUM (2)16d PER JOINT \-MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />SCALE: N.T.S. <br />6" OVERLAP <br />"L" BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />8d @ 6"O/C <br />WOOD TRUSSES <br />SIMPSON HGAM10KTA W/ (4) <br />1/4"x1 1/2" SIDS SCREWS TO <br />BLOCKING & (4)1/4"X2 3/4" <br />TITEN TO CMU <br />2 x 4 BLOCKING w/ (2)10d <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />0 <br />z <br />7 a <br />BRACING w/ (3) 10d x 3" AT I = <br />• EACH CONN. @ 24" 0/C <br />MOISTURE BARRIER <br />BOND BEAM <br />_MASONRY WALL <br />ARCHITECTURAL FINISH <br />EXT. WALL CONN. NON - LOAD <br />BEARING LOCATION (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />L BRACE <br />(1) 2"x4" (U.N.O.) <br />L BRACE <br />2"4" (U.N.O.) <br />L BRACE <br />24" <br />0'0" - T-0" <br />T-0" - 6-0" <br />6'-0" & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 10&3" NAILS @ 4" 0/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGA10KT w/ (4) 1/4"xi 1/2" SDS <br />SCREWS TO TRUSS & (4) 1/4"x3" SDS SCREWS <br />TO PLATES (TYP.) <br />STUDS @ 16" O.C. <br />GABLE END BRACING DETAIL SCALE: 34'=1'-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />TRUSS <br />SIMPSON SP2 w/ (12) <br />10d NAILS AT EACH <br />STUD <br />END JACK <br />1 V-0" MAX. <br />CL <br />0 <br />a <br />CORNER JACK <br />Y <br />, <br />W <br />z <br />X <br />0 <br />0 <br />HIP FRAMING REFERENCE PLAN <br />20'-0" MAX <br />"X" BRACE SEE DET. J/S5 <br />2x4 BLOCKING 2x4'7 BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />10d NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 "T" BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />"L" BRACE ATTACHED 16d NAIL <br />W/ IC NAILS @ 4" 0'. <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL-6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" 0/C GABLE TRUSS <br />TRUSS VERTICAL <br />(2) 2"x8" "L" BRACE <br />FASTENED WITH (3) <br />16d PER SIDE <br />SCISSOR GABLE "T" BRACE <br />AS PER HIB 91 SCALE: N.T.S. S5 <br />20'-0" MAX <br />CONTINUOUS BOTTW CHORD BRACING 2X4 MIN. <br />� F- <br />NOTE: ZTOP CHORD 2X4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING <br />ZBOTTOM <br />@ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING <br />BAYS <br />THAT MY BE REQUIRED <br />CHORD GABLE END BRACING <br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT <br />@ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACING DETAIL <br />SCALE: N.T.S. <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />CO. <br />dF= <br />:I* W <br />--om ac <br />LL <br />C d <br />CCo " <br />N -C7 C4 Z <br />dasd <br />E .. c <br />y <br />as., W. a <br />� <br />3 3 i <br />tn �. <br />_ <br />®, v <br />w <br />6 <br />N <br />0 <br />i <br />a <br />i <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />W11- <br />14 <br />0 E <br />o <br />I' <br />V <br />N <br />'o r- N r <br />00 <br />0� <br />��Co N <br />r- r- u� <br />( <br />N O <br />C_-, V <br />- <br />� u-- ul <br />W <br />o <br />Z <br />m � °' <br />t r6 0O Z <br />�' <br />j 'C6 CV CO O <br />0 <br />W <br />��pjO' m <br />Z <br />w <br />N N Z ¢ J <br />ZN <br />O <br />U 0 U) <br />W <br />❑❑ <br />N M <br />a� <br />L N <br />Q <br />< <br />13 <br />Ln <br />z ca <br />v <br />o <br />+--J <br />ru <br />W <br />� <br />U <br />m <br />O <br />W oOft <br />U a <br />W J <br />.... <br />— E <br />— <br />3 <br />L 6 <br />V o N <br />Y <br />®® <br />o <br />� <br />w <br />M <br />M <br />Z ¢ <br />Z <br />Z <br />.J <br />E <br />zo <br />os <br />a, <br />o <br />Zo <br />I- t6 <br />a 0 <br />11' <br />X U <br />-0-0 <br />7 <br />zO� <br />o <br />co ra <br />m� <br />o <br />�� <br />z <br />a <br />Qo <br />w <br />wJ <br />o <br />`Ro <br />m� <br />o0 <br />Z <br />m� <br />J <br />>aZ <br />w <br />°oa <br />zz <br />go <br />cn <br />� <br />wEEa <br />�w <br />W <br />Cn <br />ao <br />o� <br />1k <br />3 <br />Zw <br />=0 <br />�� <br />o <br />ch <br />v <br />w< <br />zl< <br />;o <br />a <br />0 <br />3 <br />Q <br />J <br />'U <br />O <br />rn <br />2 <br />m <br />� <br />^1 <br />i <br />O <br />(0 <br />N <br />L <br />0 <br />N <br />Q <br />Y 07 <br />0 <br />U)CL <br />O <br />ILL <br />Y <br />N <br />� <br />m o <br />I.C) <br />� <br />� <br />Q <br />N <br />T <br />">' <br />CD I 0 <br />O <br />Z <br />co <br />ZQ <br />E N <br />f6 <br />a <br />E o <br />U <br />�, <br />-moo <br />Q p <br />JOB <br />NO: <br />23-04907 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />S5 <br />