Laserfiche WebLink
I 1 ■ <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE HI OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />12 <br />PRE ENGINEERED <br />WOOD TRUSS @ 24" FIURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX, SHINGLE ROOF <br />SHINGLE ROOF <br />INSULATIO <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />ALUMINUM DRIP EDGE <br />PLAN <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />l 2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />— — <br />SEE SOFFIT SHEET <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />/ ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />J w PLYWOOD SHEATHING <br />. J <br />2X BLOCKING @ EA. WALL <br />0 <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />w <br />16" O.C. 2X S.P.F. STUDS <br />in = <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />0 U) <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE WI (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />J <br />_j w <br />LAYER 1/8" THICK. <br />COMMON @ 6" 0/C EDGES AND 12" O.C. FIELD <br />= <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA <_ 1000 <br />(�B�R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALS <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />7YOR <br />ETAL SEAT <br />ER PLAN 0 <br />FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB <br />8"x8"X16" CONC, KNOCKOUT <br />INSTALLATION PER <br />BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN <br />SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />CO <br />U- <br />v 4"x4" INSPECTION PORT AT <br />Cr <br />EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. <br />w <br />o <br />AT GARAGE CONTRACTOR <br />BASEBOARD <br />M <br />TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLABI <br />CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER <br />— NOTE: EXTEND DECO FINISH <br />MUNICIPALITY <br />411to 6" BELOW GRADE <br />c <br />iv <br />° - . ."a ' <br />Q a <br />'d <br />FINISH GRADE 00 <br />= I I I i Ei <br />' <br />a. <br />-- —_ <br />_ <br />00 <br />I i l h—IhI—III <br />III <br />6x6W1.4xW1.4� 'LII I LL— I <br />I I II <br />'''° <br />. d °; e <br />°�.11 <br />_�- o <br />111 II II I <br />z 'r <br />WWF OR FIBERMESH �� I1111 11111 111111 <br />III —T TIf <br />I <br />III <br />° ` <br />�° <br />I I II I II II r <br />�I—III <br />I <br />; I fT"'�� <br />STD.90°HOOK <br />(3) # 5 REBAR ON 3" CHAIR <br />. , ,III <br />(SEE DETAIL) <br />W/3" MIN. CLEARANCE <br />4" <br />1'-8" <br />TYP 2—STORY WALL SECTIONri <br />SCALE:3/4"=V-0" S6 <br />SIMP30N LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />STUD,.. <br />2nd FLOOR W, <br />BEAM/GIRDER <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL------ <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />{TE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN_�� <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />7MTO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />P,_AN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dxl 1/2" <br />O/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />1 R <br />PARALLEL TO MASONRY WALL SCALE. 3/4 -0 S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1 <br />2"x BOT. PLATE <br />(2)10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS: <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dxl 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />(6) 1/4" x 2 1/4" TITEN <br />SCREWS TO MANSONRY I� <br />WALL PER STRAP \ <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION, <br />B.U.C. <br />(8) 10d NAILS TO <br />STUD PER STRAP <br />FLOOR SYSTEM <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. 5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 wl (10) 10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />41 <br />I I I —III <br />=1 I f III— Q I —I IT 11 I=II'I- <br />-III, , I 11 I 1 __I 1111I I ICI 111 1 11I I II I II I I- C #5 CONT. ON 3" <br />8" V-8" 8' CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />x <br />PROVIDE <br />x <br />BLOCKING AS <br />REQUIRED PER <br />D <br />o SECTION X-X IF <br />u-j' NOT FULL <br />FHEIGHT SHEET - <br />HEIGHT <br />U) <br />z <br />G <br />FLOOR <br />SYST M <br />(2)- 2x TOP PLATE WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />BEYOND ATTACH PER NAILING SCHEDULE PANEL EDGES WILL NEED TO BE <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEArHING w <br />2 <br />SOLID 2x p <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING O <br />EDGES(SEE <br />OPENING <br />SECTION X- <br />o_ v <br />C <br />x <br />0: w <br />x <br />E <br />2x STUDS w <br />BEYOND. <br />SEE PLAN 0 <br />N <br />1[1 <br />11 <br />11 1 <br />1 �2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IA/AI I rl r\/A'rl^kl nlAnnARA <br />3/8" "S" = NAII <br />SPACING <br />S 3/4" <br />1/2"- <br />SINGLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTIGAI. BLOCKING <br />SECTION X-X <br />2x CRIPPLES @ — <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM Ya" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />Lu <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />J <br />PENETRATE SURFACE MORE THAN Ya". <br />? <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />C7 <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />LL = <br />C NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMM( <br />O <br />OD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />c=p <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />o <br />w/ 8d COMMON NAIL <br />oLu <br />w L O <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />F <br />> a p n <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />OO n <br />' 00 F m t <br />QG (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N w O LL <br />O ~ <br />MEMBER IF GABLE END <br />D <br />c <br />NOTE: <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"xl0" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />;4i <br />1 (2) 2x HEADER SEE PLAN <br />S4 INTERIOR HEADER: <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />ONLY 12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 10d x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT, PLATE <br />AXTFRi FLOOR TRUSS / <br />FNrA. qR i �RPAM <br />SEE PLAN FOR REQUIRED) \ <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W 1 AxW 1.4 <br />WWF OR FIBERMESH <br />C ° <br />..d °e'd q° <br />a. <br />-III—III—III II ° <br />II III IIIIIIIII a <br />RF1 <br />II=III=�1 <br />(3) # 5 REBAR ON 3" CHAIR 4" 1'-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131 X 2 1/2 <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE TH(.N 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />EA END <br />EA END <br />EA END <br />EA END <br />SIMPSON <br />1'4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />T-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />(3) <br />1 (3) <br />(2) <br />1 (3) <br />1 (2) LSTA30 <br />M JUL 2 1 2023 <br />S6 <br />PLYWOOD SHEATHING NAILED PER NAILING virtual Review Assist, inc <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFOplansReview completed and appro', <br />2X STUDS @ 16" O/C Rance with the 2620 FBC 7th 4 <br />for comp <br />7/8" STUCCO FINISH PER ASTM C. 926 by Debra Anne Klahr pX2300 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />@ WOOD 1 ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />FINISH GRADE 00 <br />V <br />S6 <br />cM <br />N <br />0 <br />N <br />rn <br />Ln <br />00 <br />LO <br />L <br />Q <br />ti <br />L' <br />Z <br />W <br />t <br />c <br />,,t <br />_ <br />O <br />W <br />Q <br />N <br />A, 0 LO - <br />�0 <br />_W <br />` <br />L o u <br />� 6 <br />no Cq <br />M"' <br />V) <br />V) <br />-0 �_ .PP. (MI, <br />CO <br />AV' E '� L 8 <br />0� V <br />pW a Q <br />t C)d� � <br />•V) <br />N <br />u LL.I QN ,A <br />o E� <br />7C) <br />>` m <br />v ^ C3a <br />W <br />W (D W <br />L(J (n W 0 <br />Wf-Q x�_j D_a�zW Z <br />xO�gJ(QO�D'(Q1i000LL JO <br />/Z�00 <br />Q U <br />Q F- H <br />?(YXJZT_�O -P <br />W 0-OX00mzz <br />0 O <br />0 Z <br />��a�i-nLULuuj<n==¢a J <br />¢o< uj 65of 0- <br />Ziwp2U <br />0 Q o 0 Q Z Q Q <br />a� <br />s� <br />0 <br />O <br />Z CV <br />OW <br />D I` <br />Q�C'70 <br />M <br />Q to <br />(n ILL ti <br />Ln <br />Z U <br />Z� <br />W <br />Ljj <br />O <br />CD <br />N <br />N <br />N <br />N <br />N <br />N <br />� r <br />04 <br />1 <br />C) <br />CV <br />C:)O <br />CV <br />O <br />O <br />O <br />006� <br />CO <br />v- <br />O <br />00 <br />— <br />O <br />CD <br />04 <br />O <br />0 <br />N <br />O <br />0 <br />CV <br />O <br />N <br />O <br />N <br />O <br />N <br />N <br />N <br />N <br />N <br />CV <br />N <br />LO <br />0)00 <br />N <br />O <br />LO <br />00 <br />O <br />(M <br />— <br />CV <br />O <br />I <br />1 <br />12 <br />it n <br />4 <br />O <br />O <br />0 <br />O <br />0 <br />0 <br />r- <br />O <br />CO <br />O <br />.N <br />N'^ <br />")0000000 <br />> <br />'t' <br />LO <br />L <br />e- <br />N <br />C0 <br />(O <br />rl- <br />Z Z <br />O <br />— Z _ <br />o� <br />Wv�> <br />13 W to <br />_ <br />�O�a <br />L� <br />V/ <br />7W�a <br />QZ <br />~CD0-2 <br />N <br />V <br />Z � uj <br />J <br />00 <br />W <br />�<Z0 <br />>-W 2 <br />w N <br />O-32z <br />>.. <br />UU)Z� <br />z <br />Z <br />�QO <br />C) <br />a <br />oU <br />� <br />�- <br />m <br />Q <br />z <br />z <br />Z <br />uj <br />WCf) <br />O <br />V' <br />LAST PLOT DATE <br />>Q <br />M a <br />May. 9, 23 <br />z <br />O <br />STRUCTURAL <br />J <br />DETAILS -MONO <br />