Laserfiche WebLink
-o <br />co <br />rn <br />LO <br />L <br />0 <br />N <br />.�Q <br />Q <br />0 <br />J <br />00 <br />0 <br />I <br />i <br />J <br />Q <br />N <br />I"')') <br />LO <br />LO <br />0 <br />D- <br />(n <br />0 <br />0 <br />0 <br />J <br />M <br />0 <br />I <br />i <br />N <br />O <br />0 <br />ILD <br />LO <br />v <br />S <br />Q <br />0 <br />3 <br />Q <br />M <br />0 <br />i <br />cE <br />v <br />c <br />J <br />i <br />0 <br />0 <br />0 <br />LZ <br />0 <br />w: <br />0 <br />0 <br />a <br />N <br />N <br />Lc <br />45 <br />0 <br />d <br />s <br />v <br />YY/ L- I vu `W I l-V f 1 1 I AV v v "U <br />CROSS BRACING DETAIL (TYP.)r1 <br />SCALE:NTS <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. �-- <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />S <br />(2) 12D NAILS —' <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL r2 <br />SCALE: NTS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w) <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 1 Od <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1 Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 1 Od <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL 4 <br />SCALE: NTS <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @ ENTRY FRONT WALL s <br />SCALE: NTS <br />TRUSS NOTES: TYP. HAND FRAMING ABOVE TRUSS <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONV. FRAMED RIDGE 2X4 STUDS & PLATES AT 2'-0" O.C.MAY BE NAILED EACH DIRECTION TYP. U.N.O. SIMPSON LSTA18 <br />TRUSS PLATE INSTITUTE NOTE THAT THE COMBINED WIND AREA IS GREATER ( VERTICAL SCAB 2 x 6 w/ (12) 10d NAILS SEE PLAN <br />( ) w/ MIN. 4) 12d WHEN #2 SPF 48" O.C. W/ 4 SIMPSON HUC410 w/ (14) FOR CANT. <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO 2x8 BLOCKING NAILED () SPLIT CENTERED AT 16d INTO HEADER & (6) <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS @ 1 Od TOP & BOTTOM 10d INTO BEAM - SEE <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES EACH SIDE NAILS OR SIMPSON H2.5A w/ BEAMS TOGETHER ROOF PLAN FOR MORE <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD WHEN REQUIRED ww/ / (2) (10) 8d NAILS INFO <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & /2HTS20 w/ (24) 10d x 1 1" N <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION 1 1/2" NAILS EACH SEE FLOOR PLAN FOR <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN 2x4 #2 SYP NAILER. NAIL <br />COLLAR TIE FOR COLUMN SIZE INDICATED ON BM. TO STUDS w/ (3) 16d AT <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. 'k EVERY 3rd & ADDITIONAL INFO. IJ7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN EACH STUD - TOENAIL ROOF AND EXTERIOR LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING REQ'D ONLY WHEN COLUMN SIZE & BASE <br />RAFTER EACH TRUSS TO NAILER SHEATHING ATTACHED <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" OPTION A SCHEDULE/PLAN INDICATED <br />NBM OPTION B CONNECTION INFO OPTION C. <br />w/ (3) 10d PER NAILING SCHEDULE <br />O.C. MAXIMUM. 2x4 SPF 2 (2) #7 x 3-1/2" <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d WOOD SCREW EACH SEE 2ND FLOOR FOR ADDITIONAL WALLR SECTION <br />TION <br />NAILS AT EACH TRUSS INTERSECTION. CB TRUSS OR SIMPSON COMMON B M . TO POST ATTACHMENT A <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS H2.5A w/ (10) 8d NAILS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT TB AT 48" O.C. <br />SEE ROOF PLAN SCALE: 3/4"=1'-0" <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB B FOR BEAM SIZE & IF 2x DOUBLE LEDGER, <br />BM. SPLICE OVER <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS BEVEL CUTS CONNECTION INFO. ATTACH FIRST PLY <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS (OPTIONAL) CENTER OF POST w/ (4) 16d NAILS TO EA. <br />PRE-ENG. TRUSS A A END OF TRUSS THEN <br />2X4 BLOCKING SEE PLAN FOR ATTACH SECOND PLY <br />2X4 DIAGONAL AT 8'-O" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP TOP OF AM <br />MAX & EACH END ALTERNATE w/ (3) ROWS OF 16d <br />CHORD AT ALL HAND FRAMED AREAS TYP. o. o 0 0 0 �' o DIRECTION TYP. A NAILS AT 24" O.C. • <br />• <br />DI 8 --ONAL 2x8 #2 SPF RIDGE BEAM SIMPSON LUS26 w/ (8) 10d NAILS • <br />" WOOD <br />MAX TRUSS 2x6 #2 SYP RAFTERS FOR SPANS 4FT SIMPSON MTS18 w/ (14) OR IF 2 PLY TRUSS SIMPSON <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS 1 Od NAILS TYP. U.N.O. SEE PLAN FOR SIMPSON LUS26-2 w/ (8) 16d NAILS TO SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2'-0"0.C. MAX. w/ (3) 1 Od CANTILEVER IF MTS18 w/ (14) LEDGER AND J/S6 FOR MORE INFO. <br />COMMON TOENAILS TO TIE BEAM SEE FLOOR PLAN FOR INDICATED 10d NAILS VERIFY WITH PLAN FOR <br />COLUMN SIZE & 2X10 #2 SYP CONT. LEDGER w/ (3) <br />TYP. U.N.O. LOCATION AND DIRECTION <br />2X4 CONT. AT CONC. MASONRY ADDITIONAL INFO. 1/2" X 4 1/2" LAG SCREWS ATTACH (IF <br />T & B CHORD STEEL OR WOOD (WOOD COLUMN SHOWN) LAG SCREWS INTO END OF EACH BLOCKING <br />PARALLEL SEE 2/D2 FOR <br />FLOOR TRUSS, 24" O.C. MAX. (AT BLOCKING INFO) <br />BEARING SUPPORT MIDDLE <br />EACH SIDE OF G.T. INSTALL (4) LAG MASONRY WALL <br />SCREWS EACH SIDE) (TYPICAL) <br />A -A ALTERNATE BLOCKING CORNER SEE FOUNDATION SECTION AT LOW ROOF g <br />DETAIL @ INTERIOR BEARING 5" 3 PLAN FOR MORE INFO SCALE: NTS <br />SCALE: NTS COMMON B M . ATTACHMENT g <br />WOOD TRUSS <br />p` PROVIDE BLOCKING AT ALL TRUSS BEARING SCALE: NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE: NTS <br />jdk VARIES 2x STUDS @ 16" O.C. <br />c. crsr � z <br />ROOF SHEATHING SEE 1/S5 FOR w/ SIMPSON SP1 w/ (10) 1Od <br />ATTACHED PER — ADDITIONAL SEE PLAN FOR NAILS AT BASE & SIMPSON <br />NAILING SCHEDULE 'ti OUTLOOKER 8d NAILS AT VALLEY TRUSS a SP2 w/ (12) 1 Od NAILS AT TOP <br />2x4 #2 SPF BRACING @ 4" O.C. INFO. <br />EXTERIOR SHEATHING INFO. <br />16" O.C. W/ (4) 12d *1 �/L COMMON TRUSSES. � ATTACHED PER 2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP �— �L� SEE TRUSS PLAN 2x4 STUDS w/ SIMPSON NAILING SCHEDULE TO TRUSS W/ (2) 12d TOENAILS <br />PLATE & (2) 12d END MIN. (2) 2x4 j FOR CONNECTION SP1 w/ (10) 10d NAILS ti EACH END ( BETWEEN TRUSSES <br />STRUCTURAL SHEATHING NAILS TO TRUSS SPF TOP INFORMATION. AT BASE SEE J/S6 FOR N ti (2) 12d NAILS TO EACH VERTICAL <br />ATTACHED PER NAILING BOTTOM CHORD GABLE LOW ROOF/WALL <br />SCHEDULE PLATE MORE INFO. TRUSS STUD) <br />SHEATHING ATTACHED <br />VARIES SEE PLAN PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />if VARIES W/ � 2x4 BASE PLATE W/ NAILS @ 16" O.C. ALONG W/ <br />ROOF SLOPE FOR WALL LOCATION 1/2" PLYWOOD <br />SIMPSON LSTA30 w/ L '� � <br />(22) 1 Od NAILS OR (2) 16d NAILS TO SIMPSON MTS12 w/ (14) 1 Od x <br />EACH COMMON r r 1 1/2" NAILS TO BLOCKING <br />WOOD WALL - SIMPSON MTS12 w/ / BELOW @ 16" O.C. <br />MIN. 2x4 #2 SPF STUDS 14 1Od x 1 1/2" NAILS TRUSS/ FRAMING <br />OR TRUSS. 2X4 CONT. W/ (2) @ ( ) TYP TOP &BOTTOM <br />SEE PLAN 16d COMMONS A16" O.C. W/ EXTERIOR TO FLOOR GIRDER <br />NAILS EACH v`T SHEATHING ATTACHED BELOW @ 16" O.C. <br />r, <br />STUD TYP. T&B a PER NAILING SCHEDULE & • MASONRY WALL BELOW: SIMPSON - <br />(3) 12d TOENAILS TO HETA16 w/ (9) 1 Od x 1 1/2" NAILS @ RIPLYWOO <br />TRUSS OR MASONRY WALL SEE PLAN FOR PLATE BELOW a• <br />4'-0" O.C. TO GABLE TRUSS FLOORING <br />TOP OF WALL OR BEAM <br />ROOF SYSTEM BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN a „ <br />MIN. 2x4 #2 SYP P.T. PLATE 16" FLOOR SYSTEM FLOOR GIRDER (24) 10d x 1 1/2 NAILS @ 4-0 O.C. - - <br />W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR TO GABLE TRUSS LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE @ 3" FROM EACH END & DIRECTION CONNECTION COMMON TRUSS RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE p 16" O.C. MAX. �' SEE ROOF PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER INFO. ° SECTION aC� FLOOR FOR CONNECTION MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL SECTION ENTRY 8 CONNECTION r22'-�SECTION AT HIP GABLE 12 SECTION @cy BUMP OUT 39 <br />SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS <br />SCALE: NTS <br />DETAILS & SECTIONS <br />a+2 <br />N <br />N <br />d� <br />y uJ <br />Q� o <br />to f0 O +- <br />.N <br />y <br />y E s c <br />a 7 <br />H f7_ <br />C E <br />r'a <br />Lo <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained <br />within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and <br />seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Enginee s signature and seal. <br />v) <br />W v0 E <br />Q � <br />V 6O <br />G °� N <br />O <br />N <br />:3Ln <br />a C J <br />(� <br />LL w <br />w <br />Z <br />o <br />W 0 <br />W -�°j 0 <br />Z°no M <br />IL <br />m w <br />a �~ <br />F <br />aN <br />O U <br />R <br />U O <br />z <br />W <br />❑ ❑ <br />`) M � <br />L N � <br />0 <br />z .0 <br />N <br />Z n <br />CD <br />J <br />M <br />z <br />�-1 <br />` ' I l C <br />w V Q <br />4-1 <br />° <br />U <br />O w g <br />I <br />N <br />� <br />U <br />L J <br />— E <br />mi <br />= t <br />N - <br />I� <br />z <br />M <br />J <br />o3 <br />2. <br />z <br />< <br />LL <br />E <br />z a <br />ry <br />< o <br />Q p <br />U <br />_ <br />of <br />z® <br />oa <br />LO <br />- <br />� rC <br />�c <br />•o <br />o E <br />o <br />&a <br />S� <br />�< <br />Z <br />VJ <br />3a <br />� <br />m0 <br />z <br />Z <br />65 <br />m v <br />n m <br />z <br />0112 <br />< <br />z <br />W <br />cn <br />O <br />8p <br />4 <br />No <br />_w <br />m <br />o <br />w` <br />y� <br />o <br />c <br />L <br />> d' <br />J <br />LO <br />LO <br />Q <br />0 <br />0 <br />O <br />,- <br />U <br />U) <br />N <br />m <br />Co <br />Ln <br />41 O <br />M <br />I <br />M o <br />O <br />co <br />m N <br />LO <br />M <br />Q 0 <br />N <br />Y <br />O <br />M <br />r- V7 <br />Z <br />Z <br />c <br />E r <br />E <br />cc <br />a <br />U Q p <br />.i <br />JOB <br />NO: 23-06138 <br />SCALE : AS NOTED <br />SHEET NO. <br />D1 <br />