Laserfiche WebLink
3 <br />E <br />m <br />rn <br />LO <br />LO <br />v <br />0 <br />C� <br />a <br />0 <br />O <br />J <br />0 <br />cV <br />co <br />0 <br />I <br />i <br />J <br />m <br />LO <br />LO <br />v <br />0 <br />0 <br />0 <br />0 <br />J <br />N <br />C) <br />0 <br />I <br />r� <br />N <br />0 <br />LO <br />Ln <br />cnn <br />0 <br />i <br />o+ <br />Q <br />rh <br />0 <br />i <br />E <br />E <br />0 <br />x <br />v <br />J <br />a <br />0 <br />v <br />0 <br />J <br />LZ <br />N <br />0 <br />0 <br />0 <br />0 <br />a <br />M <br />0 <br />LO <br />as <br />0 <br />d <br />Z <br />W <br />S <br />a <br />m <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A —A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP <br />G.T <br />(2) 2x8 #2 SYP wr <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1 /4"x2 1 /4" TITENS EACH <br />I1IMI:I4_MT11 <br />V.,r ir.vvv..BEAM a@ RAISED ENTRY <br />CROSS BRACING DETAIL (TYP.)K*--j HIP/RIDGE BLOCKING DETAIL 2 MASONRY WALL K4 KNEEWALL @ ENTRY FRONT WALL r6 <br />SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS <br />_77 <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />TRUSS NOTES: <br />FRAMED RIDGE <br />MAY CONY. <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />-EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX & EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />w CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />WOOD TRUSS <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE: NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />TRUSS OR <br />/—ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL K7 <br />SCALE: NTS <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />TRUSS <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />w/ (12) 10d NAILS <br />CENTERED AT <br />SIMPSON HUC41Owl <br />16d INTO HEADER & <br />(14) <br />(1 <br />SEE PLAN L. <br />FOR CANT. <br />10d TOP & BOTTOM <br />SPLIT TO TIE <br />10d INTO BEAM - SEE <br />OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER <br />ROOF PLAN FOR MORE <br />(10) 8d NAILS <br />=4zz-v/ <br />INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" Q.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"0.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT—/ CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL a@ INTERIOR BEARING <br />SCALE: NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />OL VARIES <br />ROOF SHEATHING <br />ATTACHED PER <br />716" <br />NAILING SCHEDULE <br />2x4 #2 SPF BRACING @ <br />O.C. W/ (4) 12d <br />COMMON TRUSSES. <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />PLATE & (2) 12d END <br />MIN. (2) 2x4 <br />FOR CONNECTION <br />NAILS TO TRUSS <br />TEOP <br />F <br />INFORMATION. <br />BOTTOM CHORD <br />PSPAF <br />VARIES SEE PLAN <br />FOR WALL LOCATION <br />MIN. 2x4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />OL SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />; <br />MIN. 2x4 #2 SYP P.T. PLATE <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />' <br />SECTION <br />@ ENTRY 8 <br />SCALE: NTS <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE �7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />�T SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDUEDE/ON PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A A <br />SEE PLAN FOR <br />0 <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />COMMON BM. ATTACHMENT <br />SCALE: NTS <br />2x4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2x4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />i <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM <br />FLOOR GIRDER <br />SEE PLAN FOR <br />SEE PLAN FOR <br />DIRECTION <br />CONNECTION <br />SECTION @ FLOOR <br />CONNECTION <br />r22 <br />SCALE: NTS <br />SCALE: 3/4"=V-0" <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />lC <br />• <br />GABLE <br />TRUSS <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />BM. SPLICE OVER <br />q CENTER OF POST <br />8d NAILS AT <br />4" O.C. <br />SEE PLAN FOR <br />VALLEY TRUSS <br />INFO. <br />`—• MASONRY WALL BELOW: SIMPSON <br />�. HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM . BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN d°. (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />Q COMMON TRUSS <br />° SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE <br />SCALE: NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />W/ (3) 10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />• <br />• <br />SIMPSON LUS26 w/ (8) 10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />1/2" X 41/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />(IF PARALLEL SEE 2/D2 FOR <br />BLOCKING INFO) <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW ROOF g <br />SCALE: NTS <br />LOW ROOF/WALL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 w/ (10) 10d <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 10d NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/—' <br />L (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP DUT 39 <br />SCALE: NTS <br />DETAILS &SECTIONS <br />r� <br />C= <br />N c <br />C" <br />o <br />L <br />c �o <br />Lj <br />C.cc <br />pmX <br />�. CM <br />N tC O a.- <br />y <br />Q N � <br />2 d <br />a E t <br />do^Q <br />3 M <br />itt ai :u s <br />:® = r= <br />M <br />fl..' <br />�e3 &,P o vv/v <br />,,�� <br />• <br />Si <br />b �v <br />•; J �6"\ <br />V, <br />- <br />sr •. FL� - <br />lillll!! <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />a' � "41�'�ZrFj�(Ey <br />� �� 1 A �d'4 <br />. <br />W <br />O M ° <br />Q o a ° <br />o <br />NCWo <br />N r• <br />5coN <br />0 <br />_ Lo <br />H Cl)N � # <br />re LJi <br />iw01 to r M V <br />EL <br />Z MC <br />L O <br />CV CD O <br />H W 02 <br />.,t <br />Z N Z ° Q <br />coN <br />— <br />Z O U IL O <br />t <br />W ❑ ❑ <br />b 0 <br />N <br />z o � <br />_J <br />d <br />N <br />U) <br />N a <br />C3 <br />�o <br />1Il — U_ <br />a/ <br />T a <br />r..0 Y <br />U <br />Q) <br />O o <br />N <br />v N .) <br />ue.. <br />c� C <br />k� 8 <br />Imo... <br />u U a <br />c Y <br />—®mom <br />• <br />o <br />z <br />w <br />cMi <br />J <br />a <br />o�a <br />Z <br />2 <br />c E <br />o <br />a <br />E <br />m <br />a <br />20 <br />00 <br />a E <br />o <br />C.0 <br />&a <br />a <br />0< <br />L, <br />w� <br />o <br />�w <br />C <br />¢o <br />_�0 <br />mo <br />m J <br />�m <br />�w <br />�z <br />< <br />a< <br />g0 <br />W <br />to <br />CD 3 <br />o <br />w LL <br />a <br />w <br />o� <br />w <br />= 3 <br />w <br />0 <br />; <br />v <br />omio <br />00 <br />a <br />zla <br />3 <br />�O <br />0 <br />M <br />= <br />LOLO <br />rn <br />�L <br />Q <br />L <br />N <br />(0 <br />O <br />=; N <br />N <br />J <br />CD :co <br />O <br />Y <br />U) <br />m CIO <br />LO <br />Q� <br />O <br />04co <br />0 <br />04 <br />m <br />•OCD <br />LO <br />LO <br />L <br />T <br />E <br />M <br />w Cfl <br />N <br />o <br />O <br />@ <br />a <br />E <br />0 _j Q 0 <br />JOB <br />NO : 23-06128 <br />SCALE: AS NOTED <br />SHEET NO. <br />D1 <br />