Laserfiche WebLink
CROSS BRACING DETAIL (TYP.)_ <br />SCALE:NTS <br />TRUSS NOTES: <br />CONY. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />-EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />U <br />TB <br />PRE-ENG. TRUSS <br />2X4 BLOCKING <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. ----\ A I . <br />SEE ROOF <br />PLAN SHEATHING <br />fi <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. -r-- <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />➢A TRUSS <br />USSES <br />(2) 12D NAILS —i <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 <br />w/ (12) 10d NAILS <br />#2 SPF 48" O.C. W/ (4) <br />CENTERED AT <br />10d TOP & BOTTOM <br />SPLIT TO TIE <br />OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SCALE:NTS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w) <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYP I C <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />BEAM a@ RAISED ENTRY <br />MASONRY WALL 4 <br />SCALE:NTS <br />L.SEE PLAN I. <br />3IMPSON HUC410 w/ (14) <br />6d INTO HEADER & (6) FOR CANT. <br />Od INTO BEAM - SEE <br />2001` PLAN FOR MORE <br />NFO <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SC EDULDE/PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />A �—1 A <br />SEE PLAN FOR <br />SCALE: 3/4"=V-0" <br />BM. SPLICE OVER <br />CENTER OF POST <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL a@ ENTRY FRONT WALL <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL <br />EACH TRUSS TO NAILER <br />w/ (3)10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SCALE:NTS <br />ROOF AND EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />DIAGONAL <br />2x8 #2 SPF RIDGE BEAM <br />� <br />SIMPSON LUS26 w/ (8) 10d NAILS <br />AT 8'-0" <br />MAX <br />WOOD <br />TRUSS <br />•iC �C 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />SIMPSON MTS18 w/ (14) <br />OR IF 2 PLY TRUSS SIMPSON <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />10d NAILS TYP. U.N.O. <br />SEE PLAN FOR SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />CANTILEVER IF MTS18 <br />w/ (14) <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />COMMON TOENAILS TO TIE BEAM <br />SEE NOR P &N FOR <br />INDICATED 10d <br />TYP. <br />NAILS <br />U.N.O. <br />2X10 #2 SYP CONT. LEDGER w/ 3 <br />() <br />WITH <br />LOCATIONVERIFY <br />AND AN FOR <br />2X4 CONT. AT <br />CONC. MASONRY <br />ADDITIONAL INFO. <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />IF PARALLEL SEE 2/D2 FOR <br />T & B CHORD <br />OR WOOD <br />(WOOD COLUMN SHOWN) <br />MIDDLE <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />BLOCKING INFO) <br />BSTEEL <br />EARING SUPPORT <br />o. ° <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />° <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />A -A ALTERNATE BLOCKING <br />CORNER <br />SECTION AT <br />LOW ROOF 9 <br />SEE <br />FOUNDATION <br />DETAIL @ INTERIOR BEARING <br />° 511 PLAN FOR MORE INFO <br />SCALE:NTS <br />3 <br />SCALE:NTS <br />COMMON B M . ATTACHMENT 1 g <br />WOOD TRUSS <br />A <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SCALE:NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />STANDARD HEEL HEIGHT <br />SCALE:NTS <br />VARIES <br />2x STUDS @ 16" O.C. <br />ROOF SHEATHING <br />SEE 1/S5 FOR <br />SEE PLAN FOR <br />w/ SIMPSON SP1 w/ (10) 10d <br />ATTACHED PER <br />ADDITIONAL <br />dN AT <br />TRUSS <br />NAILS AT BASE & SIMPSON <br />2x4 #2 SPF BRACING @ <br />NAILING SCHEDULE <br />OUTLOOKER <br />OILS <br />4O <br />INFO.EY <br />SP2 w/ (12) 10d NAILS AT TOP <br />16" O.C. W/ (4) 12d <br />COMMON TRUSSES. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />INFO. <br />2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />2x4 STUDS w/ SIMPSON <br />IrNAILING SCHEDULE <br />TO TRUSS W/ (2) 12d TOENAILS <br />STRUCTURAL SHEATHING <br />PLATE & (2) 12d END <br />MIN. (2) 2x4 <br />FOR CONNECTION <br />SP1 w/ (10) 10d NAILS <br />EACH END ( BETWEEN TRUSSES <br />ATTACHED PER NAILING <br />NAILS TO TRUSS <br />BOTTOM CHORD <br />SPF TOP <br />INFORMATION. <br />AT BASE SEE J/S6 FOR <br />GABL <br />LOW ROOF/WALL <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />SCHEDULE <br />PLATE <br />MORE INFO. <br />TRUSS <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x BASE PLATE W/ (2) 12d <br />VARIES W/ <br />jjkVARIES SEE PLAN <br />FOR WALL LOCATION <br />2x4 BA E PLATE W/ <br />1/2" PLYWOOD <br />NAILS @ 16"O.C. ALONG W/ <br />ROOF SLOPE <br />SIMPSON LSTA30 w/ <br />MTS12 w/ (14) 10d x <br />(22) 10d NAILS OR <br />(2) 16d NAILS TO <br />1 1/2" NAILSIMPSON <br />TO BLOCKING <br />WOOD WALL <br />SIMPSON MTS12 w/ <br />EACH COMMON <br />BELOW @ S6"' O.C. <br />OR TRUSS. <br />2X4 CONT. W/ (2) <br />MIN. 2x4 #2 SPF STUDS @ <br />(14) 10d x 1 1/2" NAILS <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />SEE PLAN <br />16d COMMONS <br />y 16" O.C. W/ EXTERIOR <br />TO FLOOR GIRDER <br />NAILS EACH <br />SHEATHING ATTACHED <br />( <br />BELOW @ 16" O.C. <br />xx <br />STUD TYP. T&B <br />PER NAILING SCHEDULE & <br />• MASONRY WALL BELOW: SIMPSON <br />PLYWOOD <br />(3) 12d TOENAILS TO <br />a<. <br />HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />FLOORING <br />TRUSS OR <br />SEE PLAN FOR <br />PLATE BELOW <br />MASONRY WALL <br />a <br />4'-0" O.C. TO GABLE TRUSS <br />ROOF SYSTEM <br />TOP OF WALL <br />13; <br />OR BEAM <br />• BEAM BELOW: SIMPSON HTS20 w/ <br />MIN. 2x4 #2 SYP P.T. PLATE <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE TRUSS PLAN <br />as <br />(24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />W/ 1/2"X8" EPDXY ANCHOR <br />SEE PLAN FOR SEE PLAN FOR <br />TO GABLE TRUSS <br />LOW ROOF TRUSS W/ <br />(2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />DIRECTION CONNECTION <br />a <br />COMMON TRUSS <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE <br />16" O.C. MAX. <br />SEE ROOF PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER <br />INFO. <br />°� <br />SECTION @FLOOR <br />FOR CONNECTION <br />UF. <br />MANSPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL <br />SECTION <br />@ ENTRY s <br />CONNECTION 22 <br />SECTION <br />AT HIP GABLE 12 <br />SECTION BUMP OUT 39 <br />SCALE:NTS <br />SCALE:NTS <br />SCALE: NTS <br />SCALE:NTS <br />SCALE:NTS <br />DETAILS & SECTIONS <br />tceat� <br />=0 <br />.. <br />ffilp <br />10 <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained <br />within these <br />drawings comply with the 2017 <br />Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />1* <br />- 4 <br />E N amp <br />�8 <br />O V N # <br />O O m <br />C� <br />c' c a) <br />to J <br />+ ® <br />2 m <br />ILL N <br />LL LL a <br />� <br />c' <br />w vS <br />a w a � <br />z <br />��rn <br />o <br />tea) <br />Imo <br />C N �p <br />m <br />W <br />LL Z <br />�E�w <br />rn g N o <br />NQMz <br />��pa <br />U0J <br />z <br />° 0 <br />❑off <br />w <br />� <br />z o <br />� N <br />z � <br />z � <br />Q <br />� N, <br />� <br />z o <br />v, <br />u_ <br />T <br />�U <br />cfj <br />W O <br />� n <br />_ <br />0 <br />V <br />E <br />o <br />� <br />_ <br />� <br />v m <br />w <br />r— m E <br />O <br />1�.. <br />S ai <br />I <br />c � <br />tffil <br />of <br />C <br />J <br />w <br />z <br />M <br />¢ <br />o 3 <br />Z <br />J <br />U- <br />Q E <br />O <br />zo <br />o� <br />> o <br />z® <br />ca U <br />f C <br />— <br />E <br />N <br />�o <br />X U <br />a ox� <br /><WQ <br />Qo <br />a z <br />w <br />It <br />¢o <br />�w <br />r4 <br />Vi C <br />� <br />z <br />=, <br />ISz <br />y <br />m� <br />O <br />O <br />r <br />J <br />m <br />Q W <br />U) <br />�, <br />N <br />o¢ ° <br />Z z <br />5z <br />Q <br />WLL <br />as <br />a <br />nw <br />= <br />az <br />=3 <br />o <br />;o <br />z65 <br />a <br />° 3 <br />C <br />� N <br />.L <br />= <br />> Lo <br />� <br />L <br />rn <br />E <br />^' <br />W <br />� <br />c� <br />(M <br />M> <br />CD <br />� <br />r <br />Q <br />L <br />O <br />a. <br />CL <br />m <br />coC� <br />0 <br />O <br />o <br />CV <br />J <br />r <br />N <br />= <br />r <br />E <br />w <br />N T <br />O <br />@ <br />Z <br />E O <br />E <br />2 w <br />CID <br />a <br />0 - <br />¢ 0 <br />JOB <br />NO: <br />20-3567 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />D 1 <br />I r <br />F— --F-1,--T-I1: _, i 1 111 I : 1,. 111 h Li 11 IIJ..l ,. <br />