Laserfiche WebLink
ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />v, <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ + <br />+ + + + + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />Backer and Filler Block Dimensions <br />BCIOJoist <br />Backer Block <br />Series <br />Thickness <br />Filler Block Thickness <br />3/4" or 7/8" <br />5000s 1.8/1.7 <br />wood panels <br />Two 3/4" wood panels or 2 x <br />— <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x _ + 5/8" or 3!4" wood panel <br />902.0 <br />2 x — lumber <br />Double 2 x _lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking ' <br />1/8" gap <br />x <br />FILL CELL <br />w <br />CONT. #5 > STD. 90° <br />BAR HOOK <br />STD. 900 HOOK <br />BOND BEAM <br />�— CONT. #5 <br />BAR <br />10 1 <br />4 An <br />45. <br />10 6 <br /><In <br />0 <br />IL <br />C, <br />Cz <br />> V) E <br />o <br />z <br />o <br />o <br />CCIL 01) <br />D <br />BOND BEAM STEP <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @INT. BRG. WALL <br />N.T.S. <br />1/8" min.) Small 2" min. <br />2" max gap <br />• � 4 max. <br />4 <br />Clinch nails <br />when <br />possible 1 <br />r2"�min. <br />t <br />1) Suppo <br />back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener 4" <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite required when indicated or max. <br />OF THE JOIST ASA REQUIRED LEAVING Yg" GAP TOP sides b 6". - Hangers with side nailing. <br />y- Hangerswithsidesnotcontaining t. WEB STIFFENER <br />DOUBLE JOIST CONNECTION top flangeuthcuts. <br />- Birdsmouth cuts. N.T.S. <br />--------- - -- -- - Under 2nd floor crlrrrnn w/ Inar'lc <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />1/16 <br />code for appropriate <br />details in <br />One 10d box <br />areas=20 of high <br />or=20 sinker <br />lateral load. <br />nail each side <br />„ <br />10 -0 <br />at bearing. <br />TANK -LESS W/H <br />Boise Joist Blocking <br />Use 3" (10d) nails at 6" o.c. <br />Load bearing walls � <br />higher than 15001b. <br />rt7 <br />t <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : -for vertical load transfer <br />when load bearing -for lateral suppo <br />when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Web Stiffener Fastener Schedule <br />Joist Bearin Location <br />Series De th End Intermediate <br />� <br />BGI5000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />BCI 6000s® <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90s® <br />11-7/8" <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />w/ (22) ' <br />NAILS 1 <br />5/8"0 <br />THRU <br />BOLT <br />SIMPSC <br />w/ (22) ' <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />LC <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />=AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />Joist <br />�When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3 to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />:�® LOCATION OF <br />SECOND H10A <br />SIMPSON H10A ° ° ° (WHEN <br />w/ (18)10d x 1 1/2 ° REQUIRED) <br />NAILS <br />UPLIFT =1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />TOP (2) #5's x 4'-0" <br />CENETERED @ PIPE <br />PENETRATION <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE01 <br />t t <br />Ink 14 0 <br />CY/ Provide adequate bearing I I — ' Q, • a' • a (— — "'III- ( <br />CORNER OF for each lapped joist. Use 10dx3' nails at 6'o.c. for all joist • `, • • . •� • �' �` � — � •' <br />blocking panel Non -stacking walls ° II I . • • jT�- I <br />HOME H C G Squash block •�--10d nails require additional consideration. °O '—r�— ��•-r� <br />GARAGE SIDE 00 o SECTION @INT. BRIG. WALL T� III �— FINI GRADE <br />(2x4 minimum) � �� ° <br />STUB -OUT 51-011 <br />FOR �_ �� - <br />� Bearing wall, Ver76LamLVL N.T.S. <br />1 0 0 9 -' Glulam Beam _ <br />GAS METER o � o � <br />0 0 —III-7i I � 111 <br />i••1 = NO HOLES (EXCEPT f SEE FND. PLN. <br />MINIMUM SPACING = 2x GREATEST Backer block (12" wide min.) .r.� <br />— KNOCKOUTS) ALLOWED DIMENSION OF LARGEST HOLE Nail with 10-10d nails. SIZE &REINF. <br />IN BEARING ZONES O <br />(see table below) (KNOCKOUT EXEMPTS) D Install tight to top flange. SLEEVE THRU STEM •" •. Tf` <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <• :° . r 12" BELOW <br />(see table below) GRADE PIPE VERTICAL THRU FND. <br />SEE PLAN FOR °• • . • , p . '• ° ° <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER DO NOT cut, notch Joist hanger FOUNDATION INFO °• a' <br />Q. <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER or drill flanges STEM FOUNDATION <br />a <br />** GAS CONNECTION DETAIL \ PVC OR SCH40 SLEEVE <br />GRADE TOP (2) #5's x 4'-0" <br />ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY** ., A 1/ ROUND HOLE MAY �� DO NOT CUT HOLES REINF. SEE PLAN CENETERED PIPE <br />6 6 6"" Filler block. @ <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN Nail with PENETRATION PLUMBING LINE <br />THE WEB. PROVIDE AT ROUND IN 10-10d nails. <br />LEAST 3" OF CLEARANCE CANTILEVERS. Backer block required where top °. � •, a .a ' � <br />FROM OTHER HOLES mount hanger load exceeds 250 lbs. � <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN Install tight to top flange. •O <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />Z" X 4" @ 16" O.C. <br />T-5" <br />(2)16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2)16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3)16d TOENAILS <br />2" X 10" 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4)16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2)16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2)16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3)16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15'-4" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HALES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7, 1%" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAYBE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BESET WITH THE 1Yz" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALL SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAYBE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />1/4"-2" gap <br />Backer Block <br />"Top. Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1!4"-2" gap at bot7. tom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />p depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />LA/C CHASE 4" PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP+ FND. PENETRATIONS <br />SCALE: N.T.S. <br />SEE FND. PLN. <br />SIZE &REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" <br />CENETERED @PIPE <br />PENETRATION <br />PVC OR SCH40 SLEEVE <br />PLUMBING LINE <br />.a <br />a <br />a a <br />a <br />.a <br />• r <br />SEE FND. PLN. <br />SIZE & REINF. <br />���,r��ataarrrr�s�gPO <br />74 <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 <br />Florida Building Cade - <br />Residentlal 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />a <br />a �sN <br />