Laserfiche WebLink
1x4 1/2" DRYWALL <br />DOOR JAMB (REFER 1x4 1/2" DRYWALL DOOR JAMB REFER <br />1x4 1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER <br />TO PRODUCT P.T. <br />TO PRODUCT TO PRODUCT <br />MAX <br />PROPER INSTALLATION <br />8„ <br />DO NOT DO THIS <br />2"x BOT. PLATE W/ (2)10d @ 6" O.C. <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN.% <br />1x4 <br />1 X 4 <br />#5 REBAR (TYP,) <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />2X BOTTOM PLATE W/ 8d 4" <br />1x4 P.T. <br />3-i/4" LONG X 3/16"to FURRING <br />3/16"� X 3" LONG FURRING (2) ROWS 3/16" x 3-1/2" <br />FURRING <br />#5 REBAR ` <br />' <br />AND NAILED W/ 8d COMMON @ <br />6" O.C. EDGES AND 12" O.C. FIELD <br />@ <br />O.C.; 2 ROWS STAGGERED <br />TAPCON. INTO <br />TAPCONS TAPCON @ 16" O.C. & 4" <br />STAGGERED @ 16" <br />X8 <br />NX8 <br />(TYP,) <br />` <br />BLOCK@ SPACING „ <br />1 DETAIL <br />O.C. 2-ROWS INTO 1x8 P.T. FROM EACH END w/ MIN. <br />2" EDGE DIST. ATTACH <br />'40 <br />2x BAND JOIST W/ FACE NAIL 10d <br />PER MANUFACTURE <br />MASONRY THROUGH 1-1 /2" DETAIL 1x8 w/ (2) ROWS 8d NALS <br />3 <br />�� <br />DETAIL <br />STD. <br />STD. 90^ ` �� <br />90° HOOK (TYP.) <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. STAGGERED 12" O.C. <br />@ <br />FILL SOLID <br />BOTH CELLS <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />3/16" x 3 -1/2" <br />TAPCON @ 16" <br />DOOR JAMB (REFER <br />1x4 P.T. TO PRODUCT <br />IMETAL <br />SEAT PLATE <br />O.C. & 4" FROM <br />DOOR JAMB (REFER <br />1/2" DRYWALL <br />NOTE: <br />EACH END W/ MIN <br />APPROVAL FOR CONN. <br />TO PRODUCT <br />1x4 <br />LAP SHEATHING TO <br />DOOR JAMB (REFER*Z"EDGE <br />TO PRODUCT DIST. <br />APPROVAL FOR CONN. 2x8 P.T. w/ (2) ROWS 3/16" <br />BOIST TYPICAOTTOM OF AND <br />APPROVAL FOR COx 3-1/2" TAPCON @ 16" 1x4 <br />(2) ROWS 3/16 x 3-1/2 O.C. & 4" FROM EACHFURRINGTAPCON <br />16" O.C. & END w/MIN. 2" EDGE DIST. <br />4' FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY wl <br />' - <br />NOTC @FIRST COURSE <br />@@ <br />SIMPSON HGAMIOKTA 12" O.C. <br />w/ (4)1/4xl 1/2" SDS SCREWS <br />.. AS REQ'D <br />MIN. 2" EDGE DIST. (2) ROWS 10dx3" <br />2x8 <br />` <br />INTO BAND JOIST & (4) 1/4"x2 3/4" <br />2x DETAIL <br />2 1 /4" DETAIL STAGGERED @ 12" O.C. 3-1 /4" DETAIL <br />±5^ <br />NOTCH WEB AT THE <br />FIRST 2 COURSES <br />` <br />TITEN INTO K.O. BLOCK <br />BUILDOUT OVER SIZE DOOR <br />-WINDOW ROUGH OPENINGS CC <br />FILLEDCELLPER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION <br />H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />UPLIFT CAPACITY = 805 # FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON (1 1/4" M IN. <br />A -A <br />= 1610 # FOR 2 STRAPS <br />FILL 1st 4 COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />SOLID W/GROUT <br />Tr 2-0" <br />8" <br />1 PLY PRE-ENGINEERED TRUSS <br />1 X 4 FURRING SOLID BLKG, AT TOP BTWN. <br />1/4" x 31/4" TAPCONS <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4)1/4"x1 1/2" SDS <br />• a <br />1/2" DRYWALL * <br />SCREWS & (5)1/4" x 2 1/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7)1/4"x2 1/4" TITEN = 2150 #) <br />2 x 8 45^ DIAGONAL (4)10d NAILS INTO <br />LEAVE A CUT OUT IN O.S.B. ON THE <br />BRACE(S) 2 x 8 BRACE/ BLKG. <br />INSIDE TO ALLOW FOR INSULATION <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />FOR OVERHANGS BETWEEN OVER 1 112" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />IN THIS AREA <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />CONTACT ENGINEER of RECORD FOR <br />FURTHER INSTRUCTIONS. • ° � ' ;'' ' <br />SCRIBE(NOTCH)POLY-CELL <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 <br />FACE OF ARCH W/ (3)10d NAILS <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />. <br />OVERRAN z , <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />N.T.S. <br />INSTALL WDW. SCREW ANCHO\_2x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />RETROFIT WALL OVERHANG DETAIL NTS <br />INTO ARCH BLKG. PER <br />INSTALLATION DETAILS A <br />4" MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />FOR OVERHANGS BETWEEN 3/4" TO 1 112" <br />-A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR <br />THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN, OF START OF ARCH <br />IF TRUSSES USED W/ 3 #6 X 4W' WOOD <br />) () <br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />NHANGS LESS THAN 3/4" - NO REPAIR REO'D. <br />OTE; FOROVER <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />(2)10d NAILS @ 8" O.C. <br />ARCH DETAIL <br />4 MAX. RAD. <br />USE (1) SIMPSON 1/2 HD TITEN (CENTERED) w/ <br />OAF TO TRUSS TOP CHORD <br />RygN <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />+ �FNOT <br />1'-0° .5�-0" <br />SCALE: N.T.S. <br />SS <br />12 <br />+ + H PLYWOOD SHEATHING <br />JACK TRUSS PROVIDED BY <br />TRUSS COMPANY OR PLAN <br />+ + <br />2x6 #2 SYP @ 24" O.C. <br />+ + <br />OlLfINISHFLOQR <br />2 <br />x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ + BLOCKING AS <br />e . .. <br />WITH <br />1/4" x 3 1/4" TAPCON (1 1/4" MIN. <br />B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />EMBEDMENT INTO K.) <br />�1/4n MAX <br />PER NAILING SCHEDULE <br />ALL <br />TO SUPPORT <br />TRUSS + <br />e • ° >.. #5 BAR <br />'' '► <br />BLOCK HEADER <br />t <br />SOLID BLKG. AT TOP BTWN. ARCH <br />2,-0„ 8„ <br />(5)12d NAILS SIMPSON <br />SOFFIT <br />+ + <br />+ <br />�. > <br />CENTERED W/ <br />9 H <br />1 X 4 FURRING <br />BLKG. & BUCK <br />2X6 TO 2X4 H2.5A w/ (10) <br />8d NAILS <br />2X4 SYP r ®t, <br />EACH TRUSS <br />o ° °> IN TOP o <br />> : ' KNOCKOUT / c� <br />° CHAIR BLOCK <br />— <br />8d NAILS @ 8" O.C. AT BUCK <br />PROVIDE 2 8 DIAG. BRACE B <br />2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ <br />s� a <br />CONNECTOR '� <br />_ .e <br />MONO FOOTING � • • <br />•' > e <br />x <br />(3) <br />° <br />SIZE AND REINF. PER PN <br />LA <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />SEE LINTEL <br />( <br />AND SECTION DETAILS -I <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY <br />SCHED. <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL e• ° ° <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO IT <br />.> <br />DIRT ? z <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />PRECAST LINTEL <br />° STANDARD o <br />e•'. , <br />*HOOK <br />4'-0" MAX SEE PLAN <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />> N <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4Yz' WOOD <br />FOR OVER HANG <br />FILLED CELL <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />�_ , �. - �• �., , _ • .� <br />INSTALL WDW, SCREW <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS <br />EQUAL EQUAL <br />WALL USE (2)1/4" X 3 1/2" TAPCONS AT 16" <br />,,'• "f ,• , ,• , s• <br />ANCHOR INTO ARCH BLKG. <br />THRU OSB INTO 2 x 8 <br />O.C. <br />PER INSTALLATION DETAILS <br />B-g <br />ARCH DETAIL K <br />SECTION @ ENTRY L <br />SECTION @ ROOF EXTENSION M <br />STEMWALL FOOTING SIZE AND <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" = V-0" SS <br />SCALE: 3/4" = V-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" = V-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />D SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />DRILL 3/4"4" MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />SIMPSON HTT4 w/ (18)10d x 1 <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />"SQUEEZED" <br />W.W.M. AT PERIMETER <br />1/2" NAILS TO STUDS & (1) - <br />COURSES TO PREVENT THE MORTAR FROM BEING OUT. <br />1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />(1) #5 BARS CONT. <br />5/8 DIA. ALL THREAD ROD <br />>- #5x6' EMBEDDED INTO EXISTING BOND BEAM <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL PER ANCHOR) <br />OCCURS <br />TOP WITH MIN. 3' <br />EPDXIED w/ SIMPSON SET <br />x <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. THE SAME SPACING <br />( <br />REINFORCING <br />COVER 6'-0" <br />EPDXY MIN. 6" EMBEDMENT & <br />O <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />F F <br />3' MIN. EDGE DISTANCE <br />Q FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS, <br />COURSE) EXPANSION STRIP <br />LU NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° <br />O v <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />, ; P <br />v a A <br />REINFORCING AS FOLLOWS: <br />• <br />SEALANT <br />P e �TI=III �=, T <br />< a 1 <br />BE JOINT. D T R <br />AC LOWER HALF OF MORTAR IN D JO N ONO FURROW. <br />— — — — — — <br />g — — = TT� <br />#5x6 EMBEDDED INTO <br />• PANEL REINFORCINGINT PLACE. <br />PRESS E 0 <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />- <br />6" MIN. LAP SPLICE W/ <br />PANEL <br />Illl <br />I I <br />o ° <br />I <br />c� z <br />EXISTING FOOTING (2) #5x6 IN CONC. <br />REINFORCING <br />° —I I <br />cn N FILLED CELL <br />SMOOTH. DO NO FURROW. <br />o <br />--�(—� <br />DRILL 3/4 x5 MIN. HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE o. jT7— <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6" MIN. LAP <br />p <br />O <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />NOTE: <br />° <br />ca Q <br />Cl) <br />REMAIN FREE OF MORTAR. <br />z <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION <br />NOTES. <br />04 g • v ' <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />e ° <br />a <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />\ ' (2) #5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. COVER EA. WAY <br />A SECTION <br />I) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />_ <br />SCALE: 3/4 - 1-0 <br />„_ , „ <br />SCALE: 3/4 -1-0 <br />FOR WIND SPEEDS UP TO 110 MPH", PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />1 <br />f���o,%,�OFE•SSIQ� <br />P<ffffflllElE'�E�\���\ <br />���� <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 <br />Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />H <br />_� E 00 <br />8 N tp or1 <br />N <br />i% <br />O O O 00 to J <br />M N r <br />LL d <br />vi <br />a <br />v' <br />LJL 22 LL <br />u! c`N') W LL <br />mO <br />�LL aa� <br />¢ R.r z O <br />Z <br />v 0F <br />@ co m Om <br />Lu <br />W <br />IL <br />04 <br />2E°'a' ¢,oa <br />to <br />Z <br />O <br />O@ N p tY p <br />N Q coZQ V J <br />W <br />U ❑I3❑ <br />(D <br />1 <br />z N o <br />o p <br />z � <br />o <br />z <br />J OC, <br />d <br />vn <br />M <br />z <br />o <br />Cn Y <br />w o <br />0 <br />,yam <br />U <br />� <br />0 <br />Ln <br />W � <br />Mal <br />U 00 <br />LU 0 <br />O 8 <br />=€, <br />U o "J, <br />U) , <br />Q a 0 <br />®0 <br />sm <br />o <br />W <br />M <br />M <br />J <br />y Z <br />o 5 <br />z <br />z <br />U_ <br />c6 E <br />O <br />zo <br />�o <br />., <br />z- <br />ze <br />m V <br />o <br />t <br />o <br />Nao <br />X U <br />d0 <br />'o <br />&Z <br />wW <br />¢Qo <br />L <br />. � <br />CO O <br />z <br />or <br />U <br />m0 <br />o <br />o- <br />Z <br />z <br />� J <br />c7 oy <br />4W <br />:Fo <br />U) <br />o� <br />o <br />U 3 <br />< <br />U <br />a <br />=� <br />a <br />a= <br />o <br />w� <br />>° <br />a <br />to <br />_< <br />°i� <br />0 04 <br />= <br />>� <br />J <br />L <br />� <br />^1 <br />W <br />� <br />�r <br />LL <br />> <br />O <br />CL <br />m <br />Cfl <br />� <br />W <br />= <br />Q <br />•� <br />J N <br />O <br />0 <br />o N <br />CD <br />r <br />ai <br />cEo <br />5 <br />T <br />M \ <br />vi cM <br />o <br />Z <br />Z <br />E O <br />N <br />@ <br />c <br />a <br />E <br />U 0 <br />a <br />Q p <br />c <br />c <br />JOB <br />NO: <br />20-2742 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />ISIS <br />