Laserfiche WebLink
CROSS BRACING DETAIL (TYP.)r1 <br />SCALE: NTS <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 B FRAMED RIDGE <br />MAY <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MAY NAILED <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE w/ MINN.. 12d WHEN <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST IT LANDSS NEXT TO <br />PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />rri — 1wu `w ­l I I i 1v rrw <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 1 Od x <br />1 1/2" NAILS EACH <br />E. <br />TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX &EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. A. <br />SEE ROOF PROVIDE 2X4 MIN. BLOCKING AT <br />PLAN SHEATHING OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />2X4 BLOCKING TYP. <br />BETWEEN TRUSSES TRUSS <br />SECT. A -A %�A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING JACK <br />MAX 24" SPAN (EITHER USSES HIP <br />SIDE OR BOTH IF REQ'D) C. <br />(2) 12D NAILS <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 <br />w/ (12) 1Od NAILS <br />#2 SPF 48" O.C. W/ (4) <br />CENTERED AT <br />1 Od TOP & BOTTOM <br />SPLIT TO TIE <br />OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SCALE: NTS <br />(2) 2x8 #2 SYP w <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1 Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 1 Od <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM a@ RAISED ENTRY <br />MASONRY WALL 1 4 <br />SCALE: NTS <br />IIMPSON HUC410 w/ (14) SEE PLAN I. <br />FOR CANT. <br />6d INTO HEADER & (6) <br />Od INTO BEAM - SEE <br />iOOF PLAN FOR MORE <br />vFO <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDULE/PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT rA� <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />A F__� A <br />SEE PLAN FOR <br />SCALE: 3/4"=V-0" <br />BM. SPLICE OVER <br />CENTER OF POST <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @ ENTRY FRONT WALL 6 <br />SCALE: NTS <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />w/ (3) 10d 7—PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />I FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />DI 8 1 ONAL <br />2x8 #2 SPF RIDGE BEAMAT <br />SIMP50N LUS26 w/ (8) 10d NAILS <br />MAX <br />WOOD 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TRUSS 'i�' <br />SIMPSON MTS18 w/ (14) <br />OR IF 2 PLY TRUSS SIMPSON <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />10d NAILS TYP. U.N.O. <br />SEE PLAN FOR SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />CANTILEVER IF MTS18 <br />w/ (14) <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />COMMON TOENAILS TO TIE BEAM <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />INDICATED <br />10d <br />NAILS <br />. <br />2X10 #2 SYP CONTLEDGER w/ (3) <br />VERIFY WITH PLAN FOR <br />TYP. <br />U.N.O. <br />LOCATION AND DIRECTION <br />2X4 CONT. AT <br />CONC. MASONRY <br />ADDITIONAL INFO. <br />1/2" X 41/2" LAG SCREWS ATTACH <br />PARALLEL SEE 202 FOR <br />T & B CHORD <br />STEEL OR WOOD <br />SUPPORT <br />(WOOD COLUMN SHOWN) <br />MIDDLE <br />LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />BLOCKING <br />BLOCKING INFO) <br />BEARING <br />O <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />.O <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />A -A ALTERNATE BLOCKING <br />CORNER <br />SECTION AT <br />LOW ROOF rg <br />SEE <br />FOUNDATION <br />DETAIL @INTERIOR BEARING <br />° PLAN FOR MORE INFO <br />, <br />SCALE: NTS <br />3 <br />SCALE: NTS <br />COMMON B M ATTACHMENT 18 <br />WOOD TRUSS <br />. <br />A <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SCALE: NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />STANDARD HEEL HEIGHT <br />SCALE: NTS <br />OL VARIES <br />2x STUDS @ 16" O.C. <br />ROOF SHEATHING <br />SEE 1/S5 FOR <br />SEE PLAN FOR <br />w/ SIMPSON SP1 w/ 10 1 <br />( ) Od <br />ATTACHED PER <br />ADDITIONAL <br />8d NAILS AT VALLEY TRUSS <br />NAILS AT <br />2x4 #2 SPF BRACING @ <br />NAILING SCHEDULE <br />OUTLOOKER <br />4" O.C. INFO. <br />)AO <br />SP2 w/ 12 10d NAILS ATTOP <br />EXTERIOR SHEATHING <br />INFO. <br />16" O.C. W/ (4) 12d <br />COMMON TRUSSES. <br />ATTACHED PER <br />2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />2x4 STUDS w/ SIMPSON NAILING SCHEDULE <br />11 <br />TO TRUSS W/ (2) 12d TOENAILS <br />STRUCTURAL SHEATHING <br />PLATE & (2) 12d END <br />MIN. 2) 2x4 FOR CONNECTION <br />( <br />SP1 w/ 10 1Od NAILS <br />() <br />EACH END ( BETWEEN TRUSSES <br />ATTACHED PER NAILING <br />NAILS TO TRUSS <br />SPF TOP INFORMATION. <br />AT BASE SEE J/S6 FOR <br />GABL <br />LOW ROOF/WALL <br />(2) 12d NAILS TO EACH VERTICAL <br />SCHEDULE <br />BOTTOM CHORD <br />PLATE <br />MORE INFO. <br />TRUSS <br />SHEATHING ATTACHED <br />STUD) <br />PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />VARIES W/ <br />VARIES SEE PLAN <br />FOR WALL LOCATION <br />2x4 BASE PLATE W/ <br />1/2" PLYWOOD <br />NAILS @ 16" O.C. AL( Nj W/ <br />ROOF SLOPE <br />SIMPSON LSTA30 w/ <br />SIMPSON MTS12 w/ 14 10d x <br />(22) 10d NAILS OR <br />(2) 16d NAILS TO <br />1 1/2" NAILS TO BLOCKING <br />WOOD WALL <br />SIMPSON MTS12 w/ <br />EACH COMMON <br />BELOW @ 16" O.C. <br />OR TRUSS. 2X4 CONT. W/ (2) <br />MIN. 2x4 #2 SPF STUDS @ <br />(14) 1Od x 1 1/2" NAILS <br />TRUSS/ FRAMING <br />TYP TOP &BOTTOM <br />SEE PLAN 16d COMMONS <br />16" O.C. W/ EXTERIOR <br />TO FLOOR GIRDER <br />NAILS EACH <br />SHEATHING ATTACHED <br />BELOW @ 16" O.C. <br />a <br />xx <br />STUD TYP. T&B <br />PER NAILING SCHEDULE & <br />• MASONRY WALL BELOW: SIMPSON <br />PLYWOOD <br />(3) 12d TOENAILS TO <br />a<. HETA16 w/ (9) 1 Od x 1 1/2" NAILS @ <br />FLOORING <br />TRUSS OR <br />SEE PLAN FOR <br />PLATE BELOW <br />MASONRY WALL <br />, 4'-0" O.C. TO GABLE TRUSS <br />ROOF SYSTEM <br />TOP OF WALL <br />OR BEAM <br />• BEAM BELOW: SIMPSON HTS20 w/ <br />v <br />MIN. 2x4 #2 SYP P.T. PLATE <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE TRUSS PLAN <br />q,. (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />, 1p W/ 1/2"X8" EPDXY ANCHOR <br />SEE PLAN FOR SEE PLAN FOR <br />,. TO GABLE TRUSS <br />LOW ROOF TRUSS W/ <br />(2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />DIRECTION CONNECTION <br />a COMMON TRUSS <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE <br />16" O.C. MAX. <br />SEE ROOF PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER <br />INFO. <br />� �� <br />SECTION FLOOR <br />FOR CONNECTION <br />16d NAILS AT EACH END <br />@ <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL <br />SECTION <br />@ ENTRY s <br />CONNECTION 22 <br />SECTION <br />AT HIP GABLE 12 <br />SECTION @ BUMP OUT 39 <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />DETAILS <br />& SECTIONS <br />��::\G 126•� <br />FIL <br />OPESSIONP��� <br />�o <br />901/11lfIt111tt\\�0 <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained <br />within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />di <br />E 00 <br />O � N (ON00 <br />10 <br />J <br />LL N <br />� <br />LL LL a <br />W � <br />a LU <br />(L <br />Z ���, <br />� o <br />w1?O <br />N <br />m m ° <br />C �p <br />ET <br />o <br />z R N mo <br />N ¢Mz <br />x O <br />z ° U <br />`7 71 <br />W <br />z N O <br />z o <br />_l M <br />� N <br />M <br />N z <br />U o <br />Cz <br />w <br />n <br />U `_- <br />OL„ � <br />to c o <br />w. <br />W C <br />T s <br />8oil <br />of-' <br />= I' <br />_ <br />U 0 <br />¢ao <br />C <br />em <br />a <br />C <br />J <br />w <br />M <br />Cl) <br />¢ <br />o <br />z <br />< <br />QE <br />o <br />E <br />zo <br />os <br />�CU = <br />>� <br /><� <br />Za <br />u <br />wCL <br />F_ <br />E <br />KO <br />oa <br />aOz <br />a �U <br />�� <br />O <br />CV <br />0Q <br />¢ <br />az <br />L <br />t_ <br />_ <br />U <br />z <br />0 < <br />U <br />m o <br />Z <br />Z� <br />m <br />Q W <br />rn <br />o� <br />z <br />go <br />W <br />U-) <br />�o <br />�— <br />aLL <br />�3 <br />x <br />�� <br />o <br />V <br />uj <br />0< <br />> ° <br />a <br />0U1 <br />0 <br />2 CN <br />= <br />cr_ <br />L <br />^\ <br />m <br />W <br />'— <br />m <br />0 <br />M <br />O <br />> <br />M <br />Q <br />C <br />^^v <br />) / <br />mil/ <br />W m o <br />T <br />0O � <br />N <br />M <br />J <br />T <br />r <br />I M (,-tot <br />T <br />c c 0 N <br />d <br />z <br />:3M <br />E O v1 <br />N <br />z <br />C <br />a <br />U _ Q p <br />C <br />JOB <br />NO: 20-2752 <br />SCALE : AS NOTED <br />SHEET NO. <br />D1 <br />s '; <br />