Laserfiche WebLink
0 <br />1/2" DRYWALL DOOR JAMB REFER 1x4 1/2" DRYWALL <br />ix4 1/2" DRYWALL DOOR JAMB (REFER 1x4 ( <br />, UNACCEPTABLE INSTALLTION <br />MAX. 8 <br />DOOR JAMB (REFER TO PRODUCT <br />P.T. To PRODUCT <br />TO PRODUCT APPROVAL FOR CONN. <br />PROPER INSTALLATION DO NOT DO THIS <br />2"x BOT. PLATE W/ (2)10d @ 6" o.C. <br />APPROVAL FOR CONN.911� <br />APPROVAL FOR CONN. 1x4 X 4 <br />*,1* #5 REBAR (TYP,) ' <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />1x4 P.T. 3/16" 0 X 3" LONG FURRING <br />FURRING � " <br />3-1/4" LONG X 3/16" FURRING (2) ROWS 3l16 x 3-1/2 <br />#5 REBAR ` <br />AND NAILED W/ 8d COMMON <br />6" O.C. EDGES AND 12" O.C. FE FIELD <br />2X BOTTOM PLATE W/ 8d @ 4" <br />O.C., 2 ROWS STAGGERED <br />TAPCONS <br />X8 <br />STAGGERED IN 16 <br />TAPCON. INTO TAPCON @ 16 O.C. & 4LL11X8 <br />(TYP,) <br />` 40 <br />I 1x8 P.T. FROM EACH END w/ MIN. <br />BLOCK@ SPACING " O.C. 2-ROWS INTO <br />1 DETAIL 2" EDGE DIST. ATTACH <br />2x BAND JOIST 10d <br />JOIST <br />PER MANUFACTURE MASONRY THROUGH 1-1 /211 DETAIL 1x8 w/ (2) ROWS 8d NALS 3" DETAIL <br />1. 1`STD. 90° HOOK (TYP.) <br />STD. 90] -i'` <br />SOLID <br />WI FACE NAIL <br />@TOP & TTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. STAGGERED @ 12" O.C. <br />BOTH HOOK (TYP.) <br />WEB NAILS 10d @ TRUSS VERT. <br />IN <br />3/16" x 3 -1/2" DOOR JAMB (REFER <br />TAPCON x 3 @ 16" ix4 P.T. TO PRODUCT <br />TAL SEAT PLATE <br />O.C. & 4" FROM DOOR JAMB (REFER <br />1/2" DRYWALLEllaDOOR <br />TE: <br />tB <br />APPROVAL FOR CONN. 1x4 <br />EACH END W/ MIN TO PRODUCT <br />P SHEATHING TO <br />JAMB (REFER <br />TO PRODUCT 2" EDGE DIST. APPROVAL FOR CONN. 2x8 P.T. w/ (2) ROWS 3/16"F <br />IAPPROVAL <br />FOR CONN. x 3-1/2" TAPCON @ 16" 1x4 <br />(2) ROWS 3/16 x 3-1/2 O.C. & 4" FROM EACH <br />FURRING <br />TAPCON @ 16" O.C. & END w/MIN. 2"EDGE DIST. <br />+2 NOTG @FIRST COURSE <br />MPSON HGAMIOKTA @ 12" O.C. <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />' - <br />w/ (4)1/4x1 1/2"SDS SCREWS <br />MIN. 2" EDGE DIST. 2x8 <br />2x P.T. AS REQ'D (2) ROWS 10dx3" <br />`` <br />INTO BAND JOIST & (4)1/4"x2 3/4" <br />2x DETAIL 2 1/4" DETAIL STAGGERED @ 12" 0' 3-1/4" DETAIL <br />+5A FIRST2CONOTCH URSES AT E <br />TITEN INTO K.O. BLOCK <br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />FILLED CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. <br />sCALE:N.T.s. SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />�S <br />scALE.N.T•s. <br />SS <br />2x8 P.T, BUCK -CONNECT TO BLOCK SECTION <br />UPLIFT CAPACITY <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. A -A <br />_ 16100 #FOR 2 STRAPS <br />FILL 1st4COURSES <br />EMBEDMENT INTO BILK.) 1/4" MAX <br />SOLID w/GRouT <br />n 2'-0" 81, <br />1 PLY PRE-ENGINEERED TRUSS <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. 1/4" x 31/4" TAPCONS <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4)1/4"x1 1/2" SDS <br />1/2" DRYWALL _ * <br />SCREWS & (5)1/4" x 21/4" TITEN (IF TRUSS <br />i <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 #) <br />2 x 8 45A DIAGONAL (4)10d NAILS INTO LEAVE A CUT OUT IN O.S.B. ON THE <br />". <br />BRACE(S) 2 x 8 BRACE/ BLKG. INSIDE TO ALLOW FOR INSULATION <br />7/16" OSB TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA 2 x 8 45 DIAGONAL BRACE AT EA. <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />SCRIBE (NOTCH) FACE OF ARCH W/ (3)10d NAILS <br />OVERHANG" �.� <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 AT EA. END <br />RETROFIT TRUSS DETAIL <br />..�. <br />� •.� ° <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />N.T.S. <br /><. <br />x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSBINSTALL WDW. SCREW ANCHO\_2 <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />RETROFIT WALL OVERHANG DETAIL NTS <br />INTO ARCH BLKG. PER 4" MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />IF TRUSSES USED W! 3 #6 X 4%" WOOD <br />) () <br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O,H. <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REO'D. <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />(2)10d NAILS @ 8" O.C. <br />4' MAX. RAID. <br />ARCH DETAIL <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ <br />xO�1 TO TRUSS TOP CHORD <br />qN <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />+ <F <br />�Ory <br />1 r-011 51-011 <br />SCALE: N.T.S. SS <br />12 <br />+ PLYWOOD SHEATHING <br />JACK TRUSS PROVIDED BY <br />+ + <br />TRUSS COMPANY OR PLAN <br />+ + <br />2x6 #2 SYP @ 24 O.C. <br />+ <br />INISH FLO <br />2 <br />x 8 BUCK - CONNECT TO BLOCK SECTION <br />+ + BLOCKING AS <br />• <br />' � ... • �.. <br />WITH <br />1/4" x 31/4" TAPCON (1 1/4" MIN. B B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />>•� •: D '.� <br />„ EMBEDMENT INTO K.) <br />/4 MAX <br />PER NAILING SCHEDULE <br />ALL <br />TO SUPPORT <br />TRUSS + SOFFIT <br />°, : ° .. e.. #5 BAR <br />d , • <br />BLOCK HEADER <br />2'_0" 8" <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5)12d NAILS SIMPSON <br />+ <br />P 4 <br />p 9 1.0 ° Is ° : CENTERED W/ g <br />BLKG. &BUCK <br />2X6 TO 2X4 H2.5A w/ (10) <br />2X4 SYP ► , s <br />> • • ° ' • •' '� IN TOP q <br />1 X 4 FURRING <br />8d NAILS <br />EACH TRUSS <br />D KNOCKOUT / CAI° <br />CHAIR BLOCK <br />—� s <br />8d NAILS @ 8" O.C. AT BUCK <br />PROVIDE 2 8 DIAG. BRACE B <br />2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ <br />CONNECTOR <br />MONO FOOTING ' <br />x <br />(3) <br />SIZE AND REINF. PER PLAN <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />SEE LINTEL <br />AND SECTION DETAILS -I <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY--/ <br />SGHED. <br />7 <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />% <br />CLEAN FILL � °. •° � <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />tENTER SO IT <br />.> <br />DIRT 6 z <br />TO BE INSTALLED <br />P. <br />BUILT UP PLWD. BUCK- <br />4'-0"MAX SEE PLAN <br />PRECAST LINTEL <br />° STANDARD o <br />°'. , <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />#5 BAR IN ° 99 HOOK N <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />FOR OVER HANG <br />FILLED CELL , -, , - L. <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />4' MAX. RAID. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />v A � . IV .- 1.• .R � : • ., <br />INSTALL WDW, SCREW <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL <br />WALL USE (2)1/4" X 31/2" TAPCONS AT 16" <br />� s � s s <br />, s� ' v % s , 't V e V V,' <br />ANCHOR INTO ARCH BLKG. <br />THRU OSB INTO 2 x 8 <br />O.C. <br />PER INSTALLATION DETAILS <br />B-B <br />ARCH DETAIL K <br />SECTION @ ENTRY L <br />SECTION @ ROOF EXTENSION M <br />STEMWALL FOOTING SIZE AND <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" =1'-0" SS <br />SCALE: 3/4" =1'-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" = V-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />D)SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />TOP SPACE BETWEEN EXISTING GROUT &NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />SIMPSON2" x 1 <br />MUST BE PACKED WITH NON -SHRINK GROUT USUALLY ± 2" <br />( ) <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />"SQUEEZED" <br />W.W.M. AT PERIMETER <br />1/8" NAILS STUDS & <br />NAILHTT4 U S & (1) <br />COURSES TO PREVENT THE MORTAR FROM BEING OUT. 1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />(1) #5 BARS CONT. <br />5/8" DIA. ALL THREAD ROD <br />L O <br />� <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />„ OCCURS <br />TOP WITH MIN. 3 <br />EPDXIED w! SIMPSON SET t <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. THE SAME SPACING <br />( REINFORCING <br />COVER 6�_011 <br />EPDXY MIN. 6" EMBEDMENT & <br />OC/) <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL (EVERY OTHER <br />F•F <br />3" MIN. EDGE DISTANCE <br />Q <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />U- I� <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />XD <br />A <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />, D <br />Uj aa- <br />REINFORCING AS FOLLOWS: <br />* SEALANT <br />D = - <br />-ITI--IT�(,TF- <br />v <br />< a <br />Q <br />j <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />* PANEL REINFORCING INTO PLACE. <br />e <br />g — — — 1— <br />�)—I I <br />U_ <br />U z <br />#5x6 EMBEDDED INTO <br />PRESS <br />6n MIN. LAP SPLICE W/ <br />EXISTING FOOTING <br />G 2 #5x6 IN CONC. <br />• COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />—_— <br />Ip-�IIi <br />—�T <br />¢ _ <br />cn � <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />D ° —I I �I <br />n — I <br />�+ <br />DRILL 3/4"x5" MIN. HOLE <br />B REQUIRING E -D T <br />F PLACE FULL MORTAR BED FOR JOINTS NOT RE U R NG PANEL REINFORCING 0 NO Q <br />ILAP <br />D. . D —I I <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH.GRADE <br />6 MIN. <br />p <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />REMAIN FREE OF MORTAR. NOTE: <br />" z \ <br />`. <br />T P SEE GLASS BLOCK INSTALLATION NOTES. <br />STRIKE JOINTS SMOOTH WHILE MORTAR IS TILL PLASTIC AND BEFORE FINAL SET. A THIS <br />H S 0 0 S C T I <br />• D <br />�_a <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />° ° <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />D . <br />(2) #5 REBAR. MIN. 3 <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. of COVER EA. WAY <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX, 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 3/4" =1'-0" <br />SCALE: 3/4" =1'-0" <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />i' <br />egaaaaAlPitrei <br />OWN <br />ca <br />, F E S S `0 <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained <br />within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />E. <br />U <br />4 ooamm <br />co � 00 <br />co Co <br />Ci MN�� <br />(0 <br />��LLLL <br />Q �a <br />0) '- -,J -- <br />�ww <br />LL _j d n. <br />04 N N M <br />NmLL 3 <br />W fn <br />° ago <br />Z aU)°' <br />13a <br />0W° <br />i. @ N <br />•m <br />m m 0 <br />W o r` � <br />W gE�o� <br />IL <br />M <br /><o °ate <br />z <br />Q m co 0 <br />N Z <br />< 0 <br />U J <br />Z d <br />111:1 C-1❑ <br />W <br />z N O <br />00 <br />Z <br />cOE3 <br />z o <br />(D <br />v <br />_! M <br />d N <br />U) U.)z v <br />^, `obw <br />vV1111111111111111 <br />_ LL <br />44'�JJ <br />T Vi Y <br />C� W o <br />°0 <br />c <br />N <br />o <br />� <br />U CO <br />w m <br />°I <br />— o g <br />=1 <br />U o <br />m <br />—® <br />m <br />W <br />M <br />M <br />w ¢ <br />zo <br />z <br />z <br />U_ <br />�" o <br />o° <br />wz <br />Z® <br />❑a <br />(O <br />a <br />N�o <br />g0 <br />a1 <br />j00 <br />00 <br />&¢ <br />ww <br />J <br />(t} <br />^ � <br />c z <br />20 <br />w0 <br />m 0 <br />o¢ <br />Z <br />QW <br />z <br />n• <br />LL <br />a z <br />� w <br />W <br />JCD <br />< <br />}O <br />O <br />O <br />81 <br />a <br />.0N <br />3: <br />>'cf' <br />L <br />rn <br />W <br />m <br />T_ <br />.' <br />LO <br />r1rr <br />.-. <br />> <br />O <br />Q <br />C: a L_j <br />^' m co <br />o <br />.� <br />_ <br />d' <br />L.n <br />r <br />r <br />o ^ <br />LO <br />fU <br />•,T T <br />M <br />r W N <br />o <br />Z <br />m <br />Z <br />z <br />E O IDr <br />cc <br />4. <br />E <br />U J Q p <br />c <br />J <br />JOB <br />NO : 20-1125 <br />SCALE : AS NOTED <br />SHEET NO. <br />SS <br />