My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
3278 Lytton Hall Dr
Zephyrhills
>
Building Department
>
Building Plans
>
3278 Lytton Hall Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2025 3:09:21 PM
Creation date
2/28/2025 11:06:34 AM
Metadata
Fields
Template:
Building Plans
Street #
3278
Location
Lytton Hall Dr
Contractor
Lennar Home
Building Plans - Permit #
21905
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B <br />(1) LAYER TYPE II (430) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />12 PRE ENGINEERED <br />�7 <br />WOOD TRUSS @ 24"HURRICANE <br />ANCHOR @EACH TRUSS <br />O.C. MAX.Z, <br />SHINGLE ROOF <br />SHINGLE ROOF <br />FOR UNDERLAYMENT REQUIREMENTS SEE R905. <br />INSULATIO <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" 0/C WALLS <br />I <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />ix2 NAILER <br />J PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />n NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />LU <br />0 LU <br />16" O.C. 2X S.P.F. STUDS <br />o = <br />W/ (4)16d TOENAILS TO TOP PLATE <br />O cf) 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2)10d @ 6" O.C. <br />A- METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />� w LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />x INSULATION PER <br />1/2" GYP. WB OR 3/S" PLYWOOD/ TYPE 2-M-W OSI3 <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />g R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPWG SHALL DIVIDE THE CONCEALS <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />E PLAN <br />0 <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />a:.Al. <br />. <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB <br />8"x8"X16" CONC. KNOCKOUT <br />INSTALLATION PER <br />BLK, W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN <br />SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT, IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />it. <br />Cl) <br />L <br />v 4"x4" INSPECTION PORT AT <br />a- EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. <br />w <br />o- <br />AT GARAGE CONTRACTOR <br />BASEBOARD <br />N <br />TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB <br />CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER <br />NOTE: EXTEND DECO FINISH <br />MUNICIPALITY <br />r <br />410 6" BELOW GRADE <br />c <br />a a•' <br />N <br />.r r. •"a' Q " .' <br />'r <br />Ad <br />FINISH GRADE 00 <br />CM <br />6x6W1.4xW1.4 I <br />I <br />r <br />'•r •ri <br />d ° <br />I(j ~ CD <br />WWF OR FIBERMESHI <br />"—STD. 90 *HOOK <br />(3) # 5 REBAR ON 3" CHAIR I (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2-STORY WALL SECTION <br />SCALE:3/4"=V-0" G <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2 _NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8)1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL- <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SCALE: N.T.S. <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. SCALE: N.T.S. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />)F BEAM OR GIRDER <br />,TE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT, PLATE W/ <br />(2)1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL'IT" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN • INSTALLED PER MANUF. <br />c <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8)10dx1 1/2" <br />O/C FOR THE 1 ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION, <br />R <br />S6 <br />2x STUDS @ 1— <br />2"x BOT. PLATE <br />(2)1 Od @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS11 <br />FLOOR CONNECTION <br />@ MASONRY 1ST FLR. SEE J/S6 <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />(6)1/4" x 21/4" TITEN <br />SCREWS TO MANOONRY i\ <br />WALL PER STRAP \ <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8)1 Odx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />B <br />SCALE:3/4"=V-0" S6 <br />B.U.C. <br />(8)10d NAILS TO <br />STUD PER STRAP <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE. 1 1/2 -1-0 S6 <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT.:5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10)10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x6 W1.4 x WIA WWF OR FIBERMESH <br />•fie <br />r .r e• n .a <br />d. <br />11=,I 1—I I —I 1 I—J I I —III— 1- ' (3) #5 CONT. ON 3" <br />8 I I I 1 8 TiT 8, CHAIR W/ 3" MIN, <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rs <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />15132" OSB <br />EXPOSURE <br />SHEATHING <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />SECTION X-X IF <br />NOT FULL <br />HEIGHT SHEET - <br />(2)- 2x TOP PLATE <br />r d BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING ul <br />w <br />x <br />SOLID2x V) <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING O <br />co <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />a. v <br />C <br />x <br />g <br />x <br />E <br />W <br />2x STUDS <br />BEYOND. <br />SEE PLAN O <br />0 <br />V) <br />FLOOR SYST M <br />2x4 P.T. BASE <br />2x RIBBON OR 'VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IA/AI r rl rl/A T"1/1AI MIA ^r'%A AA <br />4 FT. <br />4 FT. <br />® (D °o <br />2 <br />5 FT. 4 FT. O O O <br />5 FT. 4 FT. Q2 <br />O3 1O 1 0� 1 ED © 2 <br />4 FT. <br />4 FT. Q o O 4 FT. <br />ROOF NAILING ZONE DIAGRAM <br />ROOF NAILING SCHEDULE <br />NAILING ZONES (SHINGLE AND TILE) <br />o <br />w <br />J <br />ZONE 1: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />ZONE 2: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />Z_ <br />ZONE 3 8d RING SHANK NAILS @ 4" O.C. ON EDGE AND 4" O.0 IN FIELD <br />z <br />(NOTE: IF 5/8" PLYWOOD IS USED, CONTRACTOR MUST USE 10d RING <br />LLO ¢ <br />SHANK NAILS) <br />= <br />NOTE: <br />ROOF SHEATHING: (APA RATED EXPOSURE 1)112" PLYWOOD <br />0 ? w g <br />(TILE) OR 7/16" OSB MIN. (SHINGLES) SPAN RATED 24/16 <br />w LLHO� <br />} ¢ r O in <br />SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, ATTACH <br />H O <br />PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE ATTACHED TO <br />z N LULL <br />STUD AND OR BLOCKING AT ALL EDGES. <br />N w 0 0 <br />LL LL <br />A MINIMUM 1/8" SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES <br />AND END JOINTS TO ALLOW FOR EXPANSIONS FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN 1/8" <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />cJ' 3/4" S 1/2" <br />'I 'I 1/2„ <br />_�t <br />Tt\ <br />) � S 1/2" <br />Q NAIL AT BASE 2 ROWS @ 4" O.C. W/8d COMMON NAIL <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. W/8d COMMON NAIL <br />© NAIL OPENING PERIMETER @ 3" O.C. W/8d COMMON NAIL <br />0 NAIL INT. AT 3" O.C. W/8d COMMON NAIL <br />Q STAGGER ALL VERT. JOINTS & NAIL @ 4" O.C. <br />W/8d COMMON NAIL <br />QF SHEATHING SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />W/ 8d COMMON NAILS @ 4" O.C. <br />OG (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />MEMBER IF GABLE END <br />NOTE: <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 21/2' <br />• DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />O <br />AT ALL PANEL BLOCKING <br />LOCATIONS MIN 2 X 4 #2 SPF <br />TURNED VERTICAL W/ 7/16" <br />OSB FLITCH PLATE TO W/ (2) <br />12d TOENAILS EA. END. NAIL <br />FLITCH PLATE TO VERTICAL <br />W/ (4) 8d NAILS <br />2 Sd NAILS 3" 0 <br />STAGGERED C <br />rc WALL SHEATHING INSTALL. VFRT AI RI Ce KINC <br />S6 &NAILING SCHED. SECTIONX-X <br />sF pJN��lti <br />GqN <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2x CRIPPLES �° <br />2"x10" OR GREATER HEADER <br />16" O.C. W/ (2)12d <br />TOENAILS T/B <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />`S4 <br />• INTERIOR HEADER: <br />10d NAILS @ <br />8" 0/C TYP. <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />DOUBLE 2x <br />• EXTERIOR HEADERS: <br />CRIPPLE STUD <br />(1) 2x SILL PLATE W/ (2) <br />TYPICAL (U.N. O.) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6)10d x 1 1/2" EACH SIDE <br />O,o N��R�OR <br />N� <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />,BEAM <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16"PLATE WASHER (MIN. <br />SHEAR 3500#, MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />`t WWF OR FIBERMESH <br />d. r. <br />a, <br />M -III-I I L�ILI^I IA <br />A" • . <br />-I I I`I I MI I I 1 r r <br />IIIIIIIIIIIIIIIII 4 - <br />'I1(,111A�°_� <br />� III-111 <br />(3) # 5 REBAR ON T CHAIR 4" V-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />© <br />LE <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />V 4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'4 <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />97-16' <br />(3) <br />1 (3 <br />(2) <br />(3) <br />1 (2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 W/(10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />-i — 60 <br />— I � <br />111,; <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-0" <br />ADDITIONAL INFORMATION. <br />0 <br />00 <br />2 <br />CO <br />zC> <br />z <br />Q <br />2 <br />z <br />w <br />•V — <br />CJ ty <br />-� 0,_ <br />= <br />o <br />U <br />o <br />m <br />N <br />w <br />_ <br />N M (• <br />CM <br />fL6 o M <br />® = g? <br />j2 <br />O ON <br />LL m <br />t 00 <br />Co <br />o <br />Q ai <br />-14 <br />o- o <br />" R : <br />rn <C 6 <br />8 D. <br />Nf <br />N �D <br />- ry <br />to <br />a <br />W N <br />2 <br />a? �,� 0?z w ,t,b <br />— c <br />U) Z I` O <br />LL <br />LU a W <br />cicm a: <br />LU¢F- <br />w CA 1 c N <br />v(A g If v <br />z ca <br />LU a,6,��Sf118 <br />a <br />FDS .0 <br />rya z\A <br />6sQ. <br />v d • • ��✓ o <br />.: < ' <br />o <br />r,.V��.svll 0 ESSj0ta <br />�\ <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />LENNA <br />4600 W. Cypress St, Suite 2001 Tampa, FL 33607 <br />www.LennarTampa.com <br />€O Z <br />3� <br />Uj <br />za <br />w¢�x <br />oo�0 <br />Z U Z < <br />0�< <br />a. w <br />A` <br />0 <br />V w LL N <br />'� <br />.o <br />o <br />L.. <br />cu <br />^ <br />//� <br />z O <br />r <br />2:Z <br />li <br />V J <br />:5Z <br />ce <br />k / <br />'Q <br />N <br />z <br />V i <br />Q <br />'0 <br />00 <br />/ R <br />J <br />Q aW <br />U <br />i T <br />/�/� <br />W <br />N <br />z <br />2 <br />O Z <br />,- <br />C—CYr <br />G <br />Q <br />�o� <br />i7 m a <br />N <br />vO0ga <br />a O ¢ <br />z�Z� <br /><¢W <br />0 <br />z <br />dl <br />r-1 <br />o <br />`� a g FZ <br />w <br />—� <br />L0 <br />i—I <br />LU <br />¢ <br />LU <br />Z <br />�;I� <br />0 <br />rn jpp <br />O ~ O <br />w Z <br />M <br />M <br />Z Z <br />U <br />boo <br />Ck <br />:5 <br />= <br />j0 <br />¢x <br />rn <br />7 <br />a <br />cn <br />o <br />SCALE : AS NOTED <br />DATE : 7/29/2019 <br />TECH: SCASEY <br />VERSION NO. 1 0 <br />SHEET NO. <br />S6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.