Laserfiche WebLink
s <br />1x4 1/2" DRYWALL <br />DOOR JAMB (REFER 1x4 1/2" DRYWALL DOOR JAMB (REFER <br />1x4 1/2" DRYWALL <br />„ INSTALLTION <br />DOOR JAMB (REFER <br />TO PRODUCT P.T. <br />_�NACCEPTABLE <br />TO PRODUCT TO PRODUCT <br />APPROVAL FOR CONN. <br />PROPER INSTALLATION MAX.MAx <br />$ DO NOT DO THIS <br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C.. <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. 1x4 1 X 4 <br />` #5 REBAR <br />(TYP,) ' <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />1x4 P.T. <br />3-1/4" LONG X 3/16"� FURRING <br />3/16" 0 X 3" LONG FURRING (2) ROWS 3/16" x 3-1/2" <br />FURRING <br />#5 REBAR <br />AND NAILED W/ 8d COMMON @ <br />6" O.C. EDGES AND 12" O.C. FIELD <br />2X BOTTOM PLATE W/ 8d @ 4" <br />O.C., 2 ROWS STAGGERED <br />TAPCON. INTO <br />TAPCONS TAPCON @ 16" O.C. & 4" <br />STAGGERED 16 <br />2X8 <br />(�,P ) <br />` <br />'III <br />BLOCK@ SPACING " <br />1 DETAIL <br />@ 1x8 P.T. FROM EACH END w/ MIN. <br />O.C. 2-ROWS INTO 2" EDGE DIST. ATTACH <br />1X8 <br />PER MANUFACTURE <br />MASONRY THROUGH �� ix8 w/ 2 ROWS <br />1-1 /2 DETAIL () WS 8d NALS 3" <br />DETAIL <br />FILL SOLID <br />STD. 90" ` /� <br />TD. 90° HOOK (TYP,) <br />2x BAND JOIST W/ FACE NAIL 10d <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & ix8 P.T. STAGGERED @ 12" O.C. <br />BOTH CELLS <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />wEB <br />3/16" x 3 -1/2" DOOR <br />1x4 P.T. JAMB REFER <br />TAPCON @ 16" TO PRODUCT <br />METAL SEAT PLATE <br />O.C. & 4" FROM <br />DOOR JAMB (REFER <br />APPROVAL FOR CONN. <br />1x4 1/2" DRYWALL <br />-]OIL <br />NOTE: <br />DOOR JAMB (REFER EACH END W/ MIN <br />TO PRODUCT 2" EDGE DIST. <br />TO PRODUCT <br />APPROVAL FOR CONN. 2x8 P.T. w/ (2) ROWS 3/16" <br />� <br />LAP SHEATHING TO <br />BOTTOM OF BAND <br />x 3-1/2" TAPCON @ 16" <br />JOIST TYPICAL <br />APPROVAL FOR CONN, <br />(2) ROWS 3/16" x 3-1/2" O.C. & 4" FROM EACH <br />1x4 <br />' <br />— -_- -) <br />TAPCON @ 16" O.C. & END w/ MIN. 2" EDGE DIST. <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />FURRING <br />' +2„ <br />NOTC @ FIRST COURSE <br />SIMPSON HGAMIOKTA @ 12" O.C. <br />SIMPSON <br />(PSON1 GA SDS SCREWS <br />2x P.T. AS REQ'D <br />MIN. 2" EDGE DIST. (2) ROWS 10dx3" <br />2x8 <br />` <br />INTO BAND JOIST & (4)1/4"x2 314" <br />2x DETAIL <br />2 1 /4" DETAIL STAGGERED @ 12" O.C. 3-1 /4" DETAIL <br />+5., <br />NOTCH WEB AT THE <br />FIRST 2 COURSES <br />` <br />TITEN INTO K.O. BLOCK <br />BUILDOUT OVER SIZE DOOR <br />-WINDOW ROUGH OPENINGS �CC <br />FILLED CELL PER <br />PLAN <br />FOUNDATION <br />FILLED CELL INSTALLATION <br />H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />UPLIFT CAPACITY <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />A -A <br />_ 16100 #FOR 2 STRAPS <br />' FILL 1St4 COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />SOLID W/GROUT <br />2 0 <br />8 <br />1 PLY PRE-ENGINEERED TRUSS <br />" <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. <br />1/4" x 31/4" TAPCONS <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT wl (4)1/4"xl 1/2" SDS <br />1/2" DRYWALL * <br />SCREWS & (5)1/4" x 21/4" TITEN (IF TRUSS <br />I <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7)1/4"X21/4" TITEN = 2150 #) <br />2 x 8 45' DIAGONAL (4)10d NAILS INTO <br />LEAVE A CUT OUT IN O.S.B. ON THE <br />BRACE(S) 2 x 8 BRACE/ BLKG. <br />INSIDE TO ALLOW FOR INSULATION <br />•.:. <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />FOR OVERHANGS BETWEEN OVER 1 112" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />CONTACT ENGINEER FURTHER INSTRUCTIONS. 4, <br />SCRIBE <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 <br />FACE OF ARCH W/ (3)10d NAILS <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />...• ; . <br />OVERHANG: .;!.' ;'I • <br />:�...:� <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. ON.T.S.INSTALL WDW. SCREW ANCHOR\_2•� <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />�•' <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />INTO ARCH BLKG. PER 4 MIN, OF BRACE <br />DETAILS A <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR <br />THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />TRUSS AS SHOWN FOR O.H. UP TO Z-6" <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />-'— 1-1/2" THK, OR MORE BUCK WITHIN 6" MIN. OF START OF <br />ARCH <br />START OF ARC <br />IF TRUSSES USED W/ 3 #6 X 4%" WOOD <br />) () <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />10d <br />k0�FR (TO <br />ARCH DETAIL <br />4' MAX. RAD. <br />J <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ <br />TRUSS2) <br />yqN TOP CHORD <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />+ lF <br />+ N C'TN <br />�� <br />1-0rr 5 r-0 <br />SCALE: N.T.S. <br />SS <br />12 <br />+ PLYWOOD SHEATHING <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />+ + <br />+ + <br />+ <br />INISH FLO <br />2 <br />x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ + BLOCKING AS <br />° <br />WITH <br />�� �� �� <br />1/4 x 31/4 TAPCON (1 1/4 MIN. <br />B_B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />D <br />EMBEDMENT INTO K.) <br />PER NAILING SCHEDULE ALL <br />TO SUPPORTP. <br />/4" MAX <br />2,-0„ 8„ <br />TRUSS + SOFFIT <br />P . P „ ° ° #5 BAR <br />p <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5)12d NAILS SIMPSON <br />+ <br />p 10 ° <br />9 H D ° ° CENTERED W/ <br />1 X 4 FURRING <br />BLKG. & BUCK <br />2X6 TO 2X4 H2.5A w/ (10) <br />8d NAILS <br />2X4 SYP . , s <br />EACH TRUSS <br />o ° °� IN TOP o <br />KNOCKOUT / cat <br />_ <br />o CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />PROVIDE 2 8 DIAG. BRACE B <br />2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ <br />i <br />CONNECTOR e <br />- p <br />MONO FOOTING _ .> 0 p ° <br />x <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />TAPCON AT EA. SIDE <br />BUCK - (1) WITHIN 4" <br />(3) <br />12d NAILS <br />SEE LINTEL <br />SIZE AND REINF. PER PLAN ° . <br />AND SECTION DETAILS <br />JACK TRUSS PROVIDED BY <br />SCHED. <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />-I ° <br />2 x 8 VERT. BRACES <br />(} <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />ARCH <br />#2 SYP @ 24" O.C. <br />'- "MAX <br />ENTER SO IT <br />CLEAN FILL > <br />DIRT D Z <br />BUILT UP PLWD. BUCK - <br />SEE PLAN <br />PRECAST LINTEL <br />° STANDARD c, <br />SCRIBE NOTCH BACKSIDE <br />(NOTCH) <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />o 90' HOOK N <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4W' WOOD <br />FOR OVER HANG <br />FILLED CELL <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />` = <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL <br />4'MAX. RAD. <br />WALL USE (2)1/4" X 31/2" TAPCONS AT 16" <br />o ° <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />O.C. <br />ANCHOR INTO ARCH BLKG. <br />STEMWALL FOOTING SIZE AND <br />PER INSTALLATION DETAILS <br />B_B <br />ARCH DETAIL K <br />SECTION @ ENTRY L <br />SECTION @ ROOF EXTENSION M <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" =1'-0" SS <br />SCALE: 3/4" =1'-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" = V-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL, <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL, SEE PLAN FOR <br />D)SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />SIMPSON HTT4 w/ (18) 10d x 1 <br />MUST BE PACKED WITH NON -SHRINK GROUT USUALLY t 2" <br />( ) <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />1/2" NAILS STUDS & - <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />PER ANCHOR <br />9 ga. PANEL j <br />1 #5 BARS CONT. <br />O OCCURS <br />L O <br />5/8" DIA. ALL THREAD ROD <br />"SET" <br />� <br />Z <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. HE SAME SPACING <br />R <br />REINFORCING <br />TOP WITH MIN. 3" <br />EPDXIED w/ SIMPSON 1 <br />0 <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />COVER 6'_0" F F <br />EPDXY MIN. 6" EMBEDMENT & <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE ) EXPANSION STRIP <br />3" MIN. EDGE DISTANCE <br />v <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />°. <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />w n <br />A <br />REINFORCING AS FOLLOWS:xe <br />E LOWER HALF OF MORTAR I BED T. D W. <br />PLAC 0 0 N JOIN 0 NOT FURROW. <br />SEALANT <br />:. D Q . <br />- - <br />I I II�II iI <br />L <br /><a <br />I- <br />1 <br />PRESS PANEL REINFORCING INTO PLACE. <br />LAP SPLICE / <br />6 MIN S IC W <br />TT <br />� - - <br />— - <br />�I I — I. <br />l J. <br />U Z <br />_ <br />#5x6 EMBEDDED INTO <br />EXISTING FOOTING (2) #5x6 IN CONC. <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWELREINFORCING=I <br />. <br />• � ` � PANEL <br />...:::.,,.,...: ;° <br />•: I � <br />cn � <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />FULL MORTAR - <br />F PLACE UL O BED FOR JOINTS T REQUIRING N REINFORCING IN 0 01 S NO QUI I G PANEL REI 0 C G DO NOT <br />} <br />• P � LI.= <br />-- <br />I ILT <br />�-rrL <br />� <br />N <br />DRILL 3/4"x5" MIN. HOLE <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6" MIN. LAP <br />GRADE P, p . P <br />° <br />SET BAR IN EPDXY z <br />sit <br />O <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />Z.I <br />n <br />REMAIN FREE OF MORTAR. <br />NOTE:z_ <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION <br />NOTES. <br />r D <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />° <br />� <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />\ P (2) #5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. COVER EA. WAY <br />A SECTION <br />I) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 3/4" =1'-0" <br />SCALE: 3l4" =1'-0" <br />FOR WIND SPEEDS UP TO 110 MPH', PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />ziifl <br />7 <br />z M <br />zC) <br />zWall <br />Q <br />Q w <br />O"r <br />IM <br />o <br />U <br />or- <br />m <br />W <br />E <br />— 8 <br />N M <br />Zr M <br />@ C N <br />_a; <br />C3 <br />o0 <br />" 00 <br />C o <br /><C <br />5 <br />0 T CL 0 <br />rn <br />a v <br />Q d <br />AlN.C.BYDeC <br />B D• <br />v11� <br />,N- N <br />o <br />Z W M�a � a a <br />Nz w z <br />N a w <br />W �C a <br />V a -C 17 <br />Z � @ cg6 <br />t7 �� I <br />Lz v. <br />• J <br />z, s %i <br />_ <br />0�• <br />•a \z <br />�tE/EiltiiitEtFs���\ <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential eth Edition. Engineers signature and seal Is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />LENNAR <br />4600 W. Cypress St, Suite 2001 Tampa, FL 33607 <br />www.Lennaffampaxom <br />oz <br />�Q <br />Q. <br />LU <br />ZOO <br />z��� <br />�_$ <br />yrr p�z <br />y 4 £ J <br />O° u� o <br />u <br />O <br />L <br />8 L <br />Z Z° <br />z <br />4� <br />-0 <br />00 <br />= <br />00 <br />fV <br />C/) <br />J <br />¢� <br />°R0 <br />o <br />J <br />W Q22 <br />N <br />L1J <br />02 g� <br />Z Z <br />Q <br />Q¢�CC <br />~ �o <br />Z <br />¢ <br />z <br />� <br />QtLU <br />g¢� <br />Lu <br />cl i <br />Z <br />t <br />g, Z S <br />0m <br />am' <br />`M <br />Z <br />`S <br />w <br />(11 <br />¢ z <br />r <br />T -i <br />a <br />cn <br />s <br />SCALE : AS NOTED <br />DATE : 7/29/2019 <br />TECH: SCASEY <br />VERSION NO. 10 <br />0 <br />SHEET NO. <br />SS <br />