i I I I - - __ - __ - - - - A I I I F I - I I I I - - __ - p- I I I - - I I I I I I - I - - - - 11 . I I I' I I I A I I -
<br />C_
<br />MIAMV 11LAW-D"ECOUNTY
<br />FGT Industries. Inc.
<br />PGT Industries. Inc.
<br />CD a)
<br />0 > 0
<br />0
<br />PRODUCTCONTROL SECTION
<br />CL
<br />PGT Industries. Inc.
<br />(D 0- 0 2
<br />1190S SW26Sueet RaomZOO
<br />NOTICE OF ACCEPT-A-NCT: EVIDENCE SUB-AMTED
<br />NOTICE OF ACCEPT AY CE: EVIDENCESUBMITTED
<br />CU -0
<br />DEPART&WNTOF REGIMATORYAAMECONOWC RESOURCES WR) Miamt Flomb 33175-14'4
<br />T1(7Sd)31_,;-25P0 Ff-,W)313-2599
<br />.NOTICE OF AC CEPTAINCE: EVIDENCE SUB-MITTED
<br />-p- (2)
<br />BO-k"A.ND CODE ADMMSTRATIONWMION
<br />1. Evidence submitted under preiious _N0,A
<br />D. QUALITY ASS MAYCE
<br />0 - C/)
<br />CU
<br />=3 -Cia Cn
<br />NOTICE OF ACCEPTAN-CE (NOA) W"manklade."vecanonv
<br />A. DRAWINGS
<br />B. TESTS (continued)
<br />1. Miami Dade Department of Regulatory and Economic Resources (R.ER)_
<br />CD -0 0
<br />PGTIndctstrirs,1nc.
<br />1070 Technology Drive,
<br />1. Manufacturer's die drawings and sections.
<br />5. Test report on 1) Air Infiltration Test. per FBC. TAS _202-94
<br />0 -9
<br />o, 0
<br />-North Venice. FL 342"75,
<br />(-Snbndaed under 170.4 No. 11-0107 04)
<br />2) Uniform Static Air Pressure Test. per FBC. TAS 202-94
<br />E 1L-ITERLAL CERTIRCATIONS 00
<br />0 LL
<br />SCOPE:
<br />2. Dmving No- _MD-5-57 0.0. titled -Vinyl 'Sliding Glass Dom NOA (LAIY', sheets; 1.
<br />3) Water Resistance Test. per FBC, TAS 202-94.
<br />1. Notice of Acceptance No. 1-5-0528.14 issued to Vision Extrusion Limited for their
<br />Co 0 = ,-
<br />CU
<br />This NOA is being issued under the applicable rules and regulations governing the use of c ons1ruction materials. The
<br />through 21 of 22 1. prepared by manufacturer, dated 10:05.15. with revision A dated
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />-111tite Rigid PVC Exterior Extmsions for Windows and Doors". dated 0311345
<br />Cn C) >
<br />E 2
<br />documentation submitted has been reviewed and accepted by Miami -Bade County RER -Product Control Section to
<br />0+`051117, signed and sealed by A. Lynn Miller- P.E.
<br />5) Cychc Find Pressme Load ing per FBC. TAS 203-94
<br />expiring on 09!301119.
<br />to W
<br />be used in.Nfia= Dade Clo=v and other areas where allowed bv the Authority; liavwg luri!,Icuou (AHTI.
<br />6) Forced Bin, Test. per FBC_ TAS 2 0 2- 94
<br />-trusion Limited for their
<br />2. Notice of Acceptance No. 16 _x
<br />-0920.08 issued to Vision F
<br />Cl) 0
<br />M C)
<br />This NOA shall not be valid after the expiration date stated below The Nfiami-Dade Couwy Product Control Sec6on
<br />B. TESTS
<br />along %
<br />vith marred rip drawings a�d installation diagram of vinyl sliding glass door, prepared
<br />1000 Tan 202 and lighter Shades (Ni on-Allite) Rigid PA -C Exterior Extrusions for _J
<br />C. <
<br />W
<br />(InNha-Dade County) andor the ALIT (in areasother than.Nfianu Dade C-cunry) reserve the right to have this
<br />I - Test report on 1) Unifonn Static Air Pressure Test. per FBC, TAS 202-94
<br />by Fenestfation Testing Lab- Inc.- Test Report No. FTL 8549. dated 11,061:5). signed and
<br />'"Indows and Doors'*. dated 12,1416. expiring on 12,29;2 1
<br />product or material tested for quality a-savranceputposm. If this product or material fails to performin the a ccepted
<br />wanner. the man nfacturer will incur the expense of such testing and the AlUmay immediatelyiev ok-e- modify, or
<br />2) Large Missile Impact Test per FBC_ TAS 201-94
<br />3) Cyclic Wind Preswe Load ingy per FBC, TAS 203-94
<br />sealed by Idalmis Ortega- P. E. (Test report reAwd on 12,04A5 and 0.11146)
<br />6. Testreporton 1) Air Infiltration Test, per FBC. TAS 1-02-94
<br />3. Notice of Acceptance No. V"52& 15 issued to Vision Extrusion Ltniited for their
<br />"Brown C, (rated (Painted or Laminated) White Rigid PVC Exteiior Extrusions for
<br />C-2
<br />Cc
<br />suspend the use of such product or material within their jurisdiction. RER reserves the right to revokethis
<br />N%mdows Doors". dated 08,13.15. 09,30,19-
<br />C7.1
<br />Q�
<br />act fence. it is determined byANhami-Dade County Product Control Section that this product or material fails to
<br />along with marked up drawings and mstallation diagram of vmyl sliding glass door, prepared
<br />by Fenestration Testing Lab- Inc. -Test Report No.FTL8717, dated 12,1071;15_ signed and
<br />2) Uniform Static Air Pressure Test- per FBC. TAS 202-94
<br />3) Water Resistance Test. per FBC. TAS 202-94.
<br />and expiring on
<br />4- Notice of Acceptance No- 1"'712.02 issued to ENERGI Fenestration Solutions USA -
<br />C�4
<br />meet the requirements of the applicable build* castle_sealed
<br />This product is approved as described hezein and has been denigned to comply with the norub Building Code,
<br />including the M gh Velocity Hurricane Zone
<br />by Idalniis Ortega, P. E. (Test report revised on 02,11,5,� 16 and 0_2 `24A 6)
<br />2 - Test report on 1) Air Infiltration Test. per FBC. TAS 292-94
<br />4) Lame Missile Impact Test per FBC. TAS 20 1 -94
<br />5) Cyclic W ind Pres=e Loading per FBC_ TAS 203-94
<br />Inc. for their "TAN3040 and Lighter Shades (.N-- on-NNIdtf) Rigid PVC Exterior
<br />on 02
<br />Extrusions for Windows and Doors" dated 09 15 116, expiring 04-21.
<br />"557a"770"N -inyl
<br />2) Uniform Static Air Pr sure Test_ per FBC. TAS 202-94
<br />along marked -up drawings and installation diagram of vinyl sliding glass door, prepared
<br />55 Notice of Acceptance No- 1"7121.04 issued toENTERGIFenestration Solutions USA.
<br />r ers- NLI
<br />DESCRIPTION: Series Sliding Glass Door (Reinforced) w,*o 9V & 1350 con L_
<br />-onze
<br />"Bronze -C'Exterior
<br />DOCUAWNT: Drawing No. Rev B. titled V inyl Sliding Glass Door NOA (M". shem
<br />-1) Water Resistance Test- per FBC. TAS 202-94�
<br />by Fenestration Testing Lab- Inc., Test Report No. FTL 9552- dated 12 '04145- signed and
<br />Inc- for their and Lighter Shades of Cap Coated Rigid PA
<br />Or_ -S-
<br />-APPROVAL -AM-5570.0
<br />4) Large Missile Impact Test per FBC. TAS 201-94
<br />sealed by Idilmis Ortega. P. E. (Yest report revised on 021,115.,'2016)
<br />Extrusions for Windows and Doors" dated 0915116- expiritig on 04.16`10.
<br />I through -11 of 2 1. preparedbymatuffacunw. dated 10 .`05;l 5 and last revised on 01"Oli-21 1. signed and scaled by
<br />5) Cyclic Wind Pan-mm Loading per FBC_ TAS 203-0-4
<br />7- Test report on 1) Uniform Static Air Pressure Test- per FBC. TAS 202-94
<br />6.. Notice of Acceptance No. 16-0712.03 issued to ENERGI Fenestration Solutions USA.
<br />.5 CD
<br />0-
<br />A. LmNwfiller. P.E.. bearing the Miami -Dade CountyPiroduct Control Reiisionstamp with the Notice of
<br />6) Forced Entry Test, per FBC, TAS 12021-94
<br />2) Large Missile Impact Test per FBC. TAS 201-94
<br />Inc. for their Wbite Rigid PVC Exterior Extrusions for Windows and Doors* dated
<br />Acceptance number and expitgion date by the _X11ami-Da & Cow Pro duc t Control Se c "n.
<br />along with marked -up drawings and installation diagram of vinyl sliding glass door- prepared
<br />3) lic Wind PressLoading per FBC. TAS 203-94
<br />Cyc =
<br />0&10 ' 17, expirine on 02.28,18.
<br />MISSILE L%IPACT RATrG- Large and Small Afissile Impact Resistant
<br />by Fenestration Testin g Lab- Inc.- Test Report No. FTL 8546- dated 11,`06 15- signed and
<br />along with marked -up drawings and installation diagram of vinyl sliding glass door, prepared
<br />7. Test reports No(s). 10-002-792(,.k), 10-O&M052T 535753-09- per ASTNE-84-
<br />Limitations-
<br />I See table I (sheet.Z) and table 2 (5heet D for applicable SGD unit smes- design pressures. reiffmements ty pes.
<br />sealed by IcLahais Ortega. P_ E- (lest repoTt mised. on 01 e0446 and 02111 1*2016)
<br />by Fenestration Testing Lab. Inc.. Test Report No. ft-L 6638 (samples A-4 thru A-2 2). dated
<br />ASTMD 1929 and AST MD-63 5. issued by EXOV A to Vision Extrusion for cellulosic
<br />.
<br />glass types. Sill riser (see tables B-1 & B-2. sheets 7-9) and anchor layout sheets retlizirernents in 11 tine 16.
<br />3. Test report on 1) Air Infiltration Test per FBC. TAS 1-02-94
<br />11,19.-40. signed and sealed try Jorge A. Causo. P. E. �Snbutfttvd under.LVOAX& 11-
<br />composite material.
<br />lRj gid White n7C, Tan (Nion-Tarbite) Rigid PV C andBromm coated (Painted ot- laminated) nAdie Rigid P%-'C to be
<br />1 Uriffom Static Air Pressure Test-
<br />� per FBC. TAS 202-94
<br />010' 04)
<br />(Submitted under.Y0A.,V6. 11-910 104)
<br />Z
<br />labeled per referenced NOA' s requirements_
<br />3) Water Resistance Test. per FBC. TAS 202-94
<br />8 Test report on 1) Air Infiltration Test. per FBC_ TAS 202-94
<br />8- Notice of Acceptance No. 14-0916. 11 issued to Kuraray America., Inc. for their
<br />3. Egress operable- doors must comply vtritli min clear width or height per FBC requirement as applicable.
<br />4) Large Missile Impact Test per FBC_ TAS 201-94
<br />2) Uniform Static Alt Pressure Test. per FBC. TAS 202-014
<br />-Seiin-yGlast (Clear and White) InterlayeC. eViring on OT04/1 8.
<br />4, Pocket walls undet- separate approval, to be reviewed by Building official
<br />5) Cyclic Wind Pressure Loading per FBC. TAS 203-94
<br />-
<br />3) Water Resistance Test, per FBC- TAS 202-94-
<br />9. Notice ofAcceptance No.16-1 117.01 issued y to Kurai-aAmerica, Inc. for their
<br />LABELING: Each umt -.hall bear a permanent label with the mannfficturer`s name or logo. city- state and series and
<br />6) Forced Entry Test, per FBC. TAS 202-94
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />--TrosifolAl, 11traclear. Clear and Color PVB Interlavers. expiring on 07408:19-
<br />follmarmystatenwnt: "Nfiam-Dade County Product Control .kpproved"_ noted herein
<br />along with marked -up drawings and installation diagram of-%inyl sliding glass door. prepared
<br />1
<br />5) Cyclic Vind Pressure Loadnigper FBC, TAS 203 -94
<br />W
<br />RENEWAL of this-NOA shall be consideredafterarenmal application data been filed and there has beenno
<br />by Fenestration Testing Lab. Inc.- Test Report No. F TL 8-547. dated 1 _10+1 5, signed and
<br />6) Forced Entry Test. per FBC. TAS 2021-94
<br />F. STATIENLIEENTS
<br />change in the applicable building code negatively affecting the performance ofthis product-
<br />ised an 0214516)
<br />sealed by I dahnis Ortega� P.E. Jest report rev
<br />along with marked -up drawings and installation diagram of mnyl sliding glass door, prepared
<br />I - Statement letter of conformance with FBC-51hEdit1on (2014) and FBC
<br />TERMV;ATION ofthis NOA will, oc cur after the expiration date or if theta has been a revision or change in the
<br />4. Test report on 1).4ar Infiltration Tes;t. per FBC_ TAS 202-94
<br />by Fenestration Testing Lab, Inc_ Test Report No- IFIL 6337 (san4Aes A- I thru A-5). dated
<br />(2017). issued by manufacturer- dated 08,14.47, signed & sealed by Lynn Miller. P.E.
<br />Materiah. use, and or manufacture ofthe product or process. Nbsuse of this NOA as an endorsement of any product.
<br />2) Uniform Static Air Pressure Test, per FBC_ TAS 210-1-94
<br />12:06 '10. signed and sealed by Jorge A. Causo. P. E. (Subirfined under.N70_4 Xo. 11-
<br />2. Statement letter of no financial interest. dated U, 11 & 17. issued by manufacturer. signed
<br />for sales, adve Ttising or any other purposes shall automatic ally terminate this NOA. Failure to complywith airy
<br />3) Water Resistance Test, per FBC. TAS 202-94
<br />010f. 09)
<br />sealed by Lynn Miller- P_E_
<br />section of this NOA shall be cause for termination and renwx-'al ofNOA.
<br />4) Large .Nfissire Impatt Tel per FBC_ TAS 201-94
<br />1 Letter -of lab compliance, part of the above test reports.
<br />ADVERTISEAU-N-T: The NOA number preceded by the words. %liami-Dade County. Florida. and followed by the
<br />5) Cyclic W, ind Pressure Loading per FBC. TAS 203-94
<br />C. CALCULATIONS
<br />4. RER Test Proposal No. 17-0387. dated 0-5:105.17. smed by Ishaq Chanda- P.E.
<br />expiration date may be displayed in adiwtisingliterature- If anyportionof the NOAisi display ed. then it shall be
<br />6) Forced Entry- Test, per FBC..TAS 202-94
<br />1- Anchor verification calculations and structural analysis, compl�* with FBC--2014,
<br />done in its entirety.
<br />I
<br />along with marked -up drawings and in-stallation diagram of iinyl sliding glass door, prepared
<br />prepared by PGT. dated 1 - 1 5and last revised on- 01- 15,' 6- signed and sealed by
<br />.
<br />GOTHER
<br />LN.-SPECTIO'-N. A copy of this entireNOA -.hall beproiidedto the user bythe manufacturer or distributors and
<br />by Fenestration Testing Lab. Inc. - Test Report No. FTL 8548. dated 1-1.04.45, signed and
<br />AnthornyL. Miller.. PE. (Snbiniped urider.YO-4 Yo. 15-1210.01).
<br />I . Notice of Acceptance No. 1-5-1210.01. issued to PGT Industries. for their Series
<br />shall be available for inspection at the job site at the request of the Building Official.
<br />sealed by Idalmi-Ortega- P_ E. (Test repart revised on 0I,04 .16 and 014 11 6)_
<br />2. Gluing complies with ASTNEE-1300-09-
<br />70-- Vinyl Shdinv Glass Door, (.Reinforced) - L.111._ '_expiring on 041+221
<br />This NOA revises & renews NOA *2 0-04 29.05 and consists of this page I and evidewe pages E- 1. E-2. E-3. E-4.
<br />E-5 & E-6 as well as approval document mentioned above _
<br />hA3 q L Chanda. P.E.
<br />I haq I. Chanda. P.E.
<br />Ishaq L Chasda, PX,
<br />The.submitted doe niation was reviewed by Ishaq L Clhanda, P.E.
<br />Product Control Unit Supervisor
<br />Product Control'unit Supervisor
<br />Product Control Unit Supervisor
<br />.VG -Al INO. 21_021U.03
<br />INOA No. 21-0205,03
<br />TNOA No. 21-0206.03
<br />NX0A No. 21-0204.03
<br />MANfs COUNTY Expir2tionDatoi April l.4,1026
<br />ExpirationDaw _April l4,2016
<br />Expiration Date. April l.4, 2016
<br />Expiration 1)2te.t April 14, 2026
<br />Approvall)2tte.-March 5,2021
<br />Approval Date: March 2.9. 20211
<br />Approval Date: March -2.4, 2021
<br />Approva I Dato. '-\latch ZS, 2011
<br />Page I
<br />E-1
<br />E
<br />E -3
<br />PGT Industries. Inc.
<br />C GI N%`mdows and Doors, Inc.
<br />PGT Industries. Inc.
<br />NOTICE Of ACCEPTAN4'E: EVIDENCESU, B-\UTTED
<br />NOTICE OF ACCEPTANCE: EVIDENCE SL7B'-\IITTED
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />2. Evidence Submitted under preilous submittal
<br />E. '_\LXTERL-kL CERTIFICATIONS (continue)
<br />3. New Evidence Submitted
<br />5. Quanex Part Sutter Snacer Standard complying with ASTM C 518 Them al Conductivity
<br />A. DRAWINGS
<br />0.881 B-fU-in.,1hr_-ft2_0F. ASTM F 1 *249 )X7%-`rR-Pass, AS -I NLI D3985 Oxygen -Pass, ASTNI E
<br />A. DRAWINGS
<br />1. Drawing No. AID-557 0.0 Rev-B_ titled' -Vinyl Sliding Glass Door NOA (LW-. sheets
<br />2I90 I.G . Durability -N, o Fog -Pass. (Subm ifted underpro ion s A70-4 A'& 15-0409 05A
<br />I Drawing No- ]NED-5570.0 Rev B_ titled inyl Slid ing Glass Door NOA (I.Mf'. sheets 1
<br />uih 21 of 21, prepared by manufacturer. dated 10,105,i 15 and last revised on
<br />I through
<br />through 21 o f 211 - prepared by mmufac turer , _dated 10,`0 5:15 and last revised on 0 2) "D L2 1
<br />,
<br />04:`221,2)0, signed and sealed by A- Lynn Miller. P.E.
<br />AS -2
<br />6. Quanex Part Duraseal cortiplying with. - T,%1 C 518 Thermal Conductiirir�, 2 � I BTU -in
<br />signed and sealed by A- Lynn Miller, P.E.
<br />Cn
<br />hr_-ft-'_'F, ASTNI F 1249 WN-1IR-Pass- ASTM D 1434 Argon Perrucance-Pass. ASTNI E
<br />Note: This mision consists replacement of same existing installation screw with flat head.
<br />B. TESTS
<br />1189 I.G. Durability -No Fog, ASIM E 546 Dew Point Developrimat -101F in 48 hey_
<br />1. Test reports on: 1) Ali Infiltration Test, per FBC. TAS 202-94
<br />(&tbm Ned underAb_4 Vo. 15-0409.05).
<br />(D
<br />2) Uniform Static Air Pressure Test, Loading, per FBC. TAS 202-94
<br />Vision Extrusions- Ltd- Parts complying with PITC-AAMA 303-13. VohmiarvSpecification
<br />B. TESTS
<br />3) Water Resistance Test- per FBC. TAS 20194
<br />for Rigid Poly- .Anyl CUonde (PVC) Exterior Profiles for Vision Extiriisions. bd.-xT_X-1 by
<br />1. None.
<br />4) Large Missile Impact Test per FBC_ TAS 201-94
<br />A.ANIA Fenestration Exterior Profile Certification Program (5ubiviued nuder.N'0_4 Vo. L)-
<br />5) Cyclic Wind Pressure Loading, per FBC. TAS 103-94
<br />0409,05)
<br />C. CALCITLATIGINS
<br />along with marked -up dmvings and inst.-alation diagram of all PGT Industries. Inc.
<br />8- Vision Extrusions- Ltd- Parts comp lying with P`VTC-.kA_MA. 303-13.
<br />L None -
<br />representative unds listed below and tested to qualify Dowsfl 791 and Dowsil 98.1 silicones,
<br />(Subiv itted under X0_4 No. 15-0409. 0 5�
<br />(D
<br />(D
<br />prepared by Fenestration Testing Laboratory. Inc-. Test Reports No-
<br />9- PVC-A-Alvi A 303-13. Voluntary Specification for Rigid Poly-,, inyl CUoride TVQ F--denor
<br />D. QU, AL ITY A S SURAN. E
<br />"INfiarni-Dade
<br />FTL-7897�, PGT PW5520 PVC FixedWindow (unit 6 in proposal), dated 09.;03 ' 14
<br />Profiles for Vision Extrusions. Ltd_-VEX-1 by AAMA Fenestration Exterior Profile
<br />1. Department of Regulatory and Economic Resources (RER).
<br />FTL-20-2107.1. PGT SGD780 Alantimmu Sliding Glass Door (unit 7 in proposal) FTL-20-
<br />Certification Program
<br />2107.2. PGTCA740 Alum. Outswing Casement Window (unit 8 inproposal) FTL-20-
<br />10- Notice of Acceptance No. 18-12171.14 issued to Energi Fenestration Solution, USA. Inc. for
<br />E. ALA.TERIAL CERTIFICATIONS
<br />CU
<br />2107.3, PGT PW 7620.4, Ahminum Fixed Window (unit 9 in proposal) and FTL-2 0-2107-4.
<br />their -Tan 3040 & fight shade (non -white) NN-hite Rigid PVC Exterior Extrusions for
<br />L Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc. for their
<br />>
<br />PGT PW7620AAhmiiu=Fixed Window (unit 10 in proposal} dated 07111?20_ all signed
<br />Windows and Doom", expiring on 021,104,22 1.
<br />"Trosidott Ultractear, Clear. and Color PA'B Glass Interlavers-'. expiring on 07,08,1214-
<br />0
<br />and sealed by Idalmis Ortega. P.E_
<br />11- Notice of Acceptance No- 1"122.02 issued to Energi Fenestration Solution, USA. Inc- for
<br />2- Notice of Acceptance No. 17-080&02 issued to Kuraray America. Inc. for their
<br />their senies --M-hite Rigid PVC Exteiior Extrusions for X%7 Endows and Doors"_ expui-mig on
<br />"Senti-rGlast, (Clear and "Ifte) Glass lnteflavers�'_ MPT171119 on 07/0C213_
<br />-of
<br />>
<br />CL
<br />CL
<br />C CALCULATIONS
<br />02,28.23-
<br />3. Notice Acceptance No. 18-1106. 10 issued to V ision Extrusions Limited for their -Brown
<br />O
<br />1. Anchor verification calculations and structural analysis- complymg with FBC'
<br />-t n Solution,
<br />1,22. Notice of Acceptance No, 2"203.03 issued to Energi Fenes ratio So t USA. Inc. for
<br />Coated (Painted or Laminated) White Rigid PVC Exterior Extrusions foi- Windows
<br />Edition (2020). dated 04,!,21'20, prepared by manufacturer- signed and sealed by
<br />INUef.
<br />their -Bronze & light shade cap coated White Rigid PVC Exterior Extrusions for
<br />and Doors"- expiring on 09,30:214.
<br />Anthony LNmn . RE
<br />Windows and Doors-, expiring on 04r46`25.
<br />4. Notice of Acceptance No- 18-1106.11 issued to'k."ision Extrusions Limited for their series
<br />2 Glazing complies with AST_MEI3{io _04.49. -12 and -16.
<br />"VE 1000 Tan 202 and fighter shades (Non -White) Rigid Cellular PVC Exterior
<br />D. QUALITY ASSURANCE
<br />F, STATE-NIFINTS
<br />Extru-Aons foi- Windows and Doors'-- expiring on 1129,2 1.
<br />N-fiami-Dade Department of Regulatory .and Economic Resources (RER).
<br />L Statement letter of conformance to FBC' 71k Edition (2020), dated 04L22-1,210- issued by
<br />manufacturer. signed and sealed by Anthony Lynn Miller_ P.E.
<br />F. S TAT E -1 1E N T S
<br />E. 3LALTERLA.1, CERTIFICATIONS
<br />L Statement letter of no financial interest and of independent- issued by manufacturer, dated
<br />I
<br />I- Statement letter of conformance to FBC '71b Edition 12020), dated 021-01-:21. issued by
<br />1. Notice of Acceptance No- 19-0305.02 issued to Kai-aray America. Inc. for their
<br />04.18:20, signed and sealed by Anthony L=Nfiller. RE.
<br />nianufactumr. signed and scaled by Anthony Lynn Nidler, RE.
<br />C/)
<br />"Trol.fott Ultraclear. Clear. and Color PA-B Glass Interlavers-'. expiring on
<br />31 ate Labeling Agreement doctmient between PGT_ dated 0330.15 and signed by all
<br />PM_
<br />2- Private Labeling Agreement dated 03!0&2 1 between PGT Industries. Inc. and CGI
<br />co
<br />07/08;124_
<br />involved parties.
<br />Windows and Doors Inc.. signed by Dean NL Ruark, P.E.. V.P. Engineering. on behalf of
<br />U
<br />M
<br />2. Notice of Acceptance No, 17-0808.02 issued to Kuraray America. Inc. for their
<br />".Sentt;4
<br />both companies.
<br />Glasf (C le.ir imd%Nbre) Glim Iuterhiym-s expumg on OT04123.
<br />G. OTHERS
<br />3. Notice of Acceptance No- 18-1106.10 issued to Vision Extrusions Limited for their
<br />*'Brown
<br />L This NOA revises 'NOA# 17-0420.06(P1v7TwiCGI) and updates to FBC20210 ('!Edition)-
<br />G. OTHERS
<br />-0
<br />Coated (Painted or' Laminated) White Rigid PVC Exterior Extrusions
<br />expiring 04?2 1?-'2 1 -
<br />L This NOA revises & renews N`0.k# 20-0429.0-55 (PLA wCGI), expiring 04,14,216.
<br />for 11-mdows and Do ors". expiring on 09,30.214.
<br />21 RER Test proposals #19-1155 dated 0 1 .10.230 approved by Ishaq I - Chanda. PE_ expiriu
<br />2. The current associated PLA CGI file #21-0205,01- expiring 04+114!.2716.
<br />CU
<br />4. Notice of Acceptance No. 18-1106.11 issued to Vision Extrusions Limited for their
<br />series -17E 1000 Tan 202 and lighter shades (No"lC ite) Rigid ellulai- PVC
<br />LU CU
<br />Exterior Extrusions for'" endows and Doors". expiring on 124,29'21.
<br /><
<br />Ishaq L Chanda, P.E.
<br />Ishaq 1, Chanda, P.E.
<br />Z
<br />Ishaq I. Chanda. P.E.
<br />Product Control Unit Supeniter
<br />Product Control Unit Supervisor
<br />Z
<br />Product Control Unit Supervisor
<br />NOA No. 21-D20-5,03
<br />NOA No. 21-020.9.03
<br /><
<br />NOA -No. 21-020:5.03
<br />Expiration Date: April 14.20N
<br />Expiration D,.%;t*-. April 14,!026
<br />Expiration Date, April 14, 2026
<br />Approval Da te- March 26.. 2021
<br />Approval D2ie. March 2-1, 2021
<br />Approval Datt- March 2;, 1021
<br />E -_4
<br />E -6
<br />E -4
<br />SHEET
<br />NO.
<br />March 6, 2023
<br />PA 1.4
<br />
|