Laserfiche WebLink
i I I I - - __ - __ - - - - A I I I F I - I I I I - - __ - p- I I I - - I I I I I I - I - - - - 11 . I I I' I I I A I I - <br />C_ <br />MIAMV 11LAW-D"ECOUNTY <br />FGT Industries. Inc. <br />PGT Industries. Inc. <br />CD a) <br />­0 > 0 <br />0 <br />PRODUCTCONTROL SECTION <br />CL <br />PGT Industries. Inc. <br />(D 0- 0 2 <br />1190S SW26Sueet RaomZOO <br />NOTICE OF ACCEPT-A-NCT: EVIDENCE SUB-AMTED <br />NOTICE OF ACCEPT AY CE: EVIDENCESUBMITTED <br />CU -0 <br />DEPART&WNTOF REGIMATORYAAMECONOWC RESOURCES WR) Miamt Flomb 33175-14'4 <br />T1(7Sd)31_,;-25P0 Ff-,W)313-2599 <br />.NOTICE OF AC CEPTAINCE: EVIDENCE SUB-MITTED <br />-p- (2) <br />BO-k"A.ND CODE ADMMSTRATIONWMION <br />1. Evidence submitted under preiious _N0,A <br />D. QUALITY ASS MAYCE <br />0 - C/) <br />CU <br />=3 -Cia Cn <br />NOTICE OF ACCEPTAN-CE (NOA) W"manklade."vecanonv <br />A. DRAWINGS <br />B. TESTS (continued) <br />1. Miami Dade Department of Regulatory and Economic Resources (R.ER)_ <br />CD -0 0 <br />PGTIndctstrirs,1nc. <br />1070 Technology Drive, <br />1. Manufacturer's die drawings and sections. <br />5. Test report on 1) Air Infiltration Test. per FBC. TAS _202-94 <br />0 -9 <br />o, 0 <br />-North Venice. FL 342"75, <br />(-Snbndaed under 170.4 No. 11-0107 04) <br />2) Uniform Static Air Pressure Test. per FBC. TAS 202-94 <br />E 1L-ITERLAL CERTIRCATIONS 00 <br />0 LL <br />SCOPE: <br />2. Dmving No- _MD-5-57 0.0. titled -Vinyl 'Sliding Glass Dom NOA (LAIY', sheets; 1. <br />3) Water Resistance Test. per FBC, TAS 202-94. <br />1. Notice of Acceptance No. 1-5-0528.14 issued to Vision Extrusion Limited for their <br />Co 0 = ,- <br />CU <br />This NOA is being issued under the applicable rules and regulations governing the use of c ons1ruction materials. The <br />through 21 of 22 1. prepared by manufacturer, dated 10:05.15. with revision A dated <br />4) Large Missile Impact Test per FBC, TAS 201-94 <br />-111tite Rigid PVC Exterior Extmsions for Windows and Doors". dated 0311345 <br />Cn C) > <br />E 2 <br />documentation submitted has been reviewed and accepted by Miami -Bade County RER -Product Control Section to <br />0+`051117, signed and sealed by A. Lynn Miller- P.E. <br />5) Cychc Find Pressme Load ing per FBC. TAS 203-94 <br />expiring on 09!301119. <br />to W <br />be used in.Nfia= Dade Clo=v and other areas where allowed bv the Authority; liavwg luri!,Icuou (AHTI. <br />6) Forced Bin, Test. per FBC_ TAS 2 0 2- 94 <br />-trusion Limited for their <br />2. Notice of Acceptance No. 16 _x <br />-0920.08 issued to Vision F <br />Cl) 0 <br />M C) <br />This NOA shall not be valid after the expiration date stated below The Nfiami-Dade Couwy Product Control Sec6on <br />B. TESTS <br />along % <br />vith marred rip drawings a�d installation diagram of vinyl sliding glass door, prepared <br />1000 Tan 202 and lighter Shades (Ni on-Allite) Rigid PA -C Exterior Extrusions for _J <br />C. < <br />W <br />(InNha-Dade County) andor the ALIT (in areasother than.Nfianu Dade C-cunry) reserve the right to have this <br />I - Test report on 1) Unifonn Static Air Pressure Test. per FBC, TAS 202-94 <br />by Fenestfation Testing Lab- Inc.- Test Report No. FTL 8549. dated 11,061:5). signed and <br />'"Indows and Doors'*. dated 12,1416. expiring on 12,29;2 1 <br />product or material tested for quality a-savranceputposm. If this product or material fails to performin the a ccepted <br />wanner. the man nfacturer will incur the expense of such testing and the AlUmay immediatelyiev ok-e- modify, or <br />2) Large Missile Impact Test per FBC_ TAS 201-94 <br />3) Cyclic Wind Preswe Load ingy per FBC, TAS 203-94 <br />sealed by Idalmis Ortega- P. E. (Test report reAwd on 12,04A5 and 0.11146) <br />6. Testreporton 1) Air Infiltration Test, per FBC. TAS 1-02-94 <br />3. Notice of Acceptance No. V"52& 15 issued to Vision Extrusion Ltniited for their <br />"Brown C, (rated (Painted or Laminated) White Rigid PVC Exteiior Extrusions for <br />C-2 <br />Cc <br />suspend the use of such product or material within their jurisdiction. RER reserves the right to revokethis <br />N%­mdows Doors". dated 08,13.15. 09,30,19- <br />C7.1 <br />Q� <br />act fence. it is determined byANhami-Dade County Product Control Section that this product or material fails to <br />along with marked up drawings and mstallation diagram of vmyl sliding glass door, prepared <br />by Fenestration Testing Lab- Inc. -Test Report No.FTL8717, dated 12,1071;15_ signed and <br />2) Uniform Static Air Pressure Test- per FBC. TAS 202-94 <br />3) Water Resistance Test. per FBC. TAS 202-94. <br />and expiring on <br />4- Notice of Acceptance No- 1"'712.02 issued to ENERGI Fenestration Solutions USA - <br />C�4 <br />meet the requirements of the applicable build* castle_sealed <br />This product is approved as described hezein and has been denigned to comply with the norub Building Code, <br />including the M gh Velocity Hurricane Zone <br />by Idalniis Ortega, P. E. (Test report revised on 02,11,5,� 16 and 0_2 `24A 6) <br />2 - Test report on 1) Air Infiltration Test. per FBC. TAS 292-94 <br />4) Lame Missile Impact Test per FBC. TAS 20 1 -94 <br />5) Cyclic W ind Pres=e Loading per FBC_ TAS 203-94 <br />Inc. for their "TAN3040 and Lighter Shades (.N-- on-NNIdtf) Rigid PVC Exterior <br />on 02 <br />Extrusions for Windows and Doors" dated 09 15 116, expiring 04-21. <br />"557a"770"N -inyl <br />2) Uniform Static Air Pr sure Test_ per FBC. TAS 202-94 <br />along marked -up drawings and installation diagram of vinyl sliding glass door, prepared <br />55 Notice of Acceptance No- 1"7121.04 issued toENTERGIFenestration Solutions USA. <br />r ers- NLI <br />DESCRIPTION: Series Sliding Glass Door (Reinforced) w,*o 9V & 1350 con L_ <br />-onze <br />"Bronze -C'Exterior <br />DOCUAWNT: Drawing No. Rev B. titled ­V inyl Sliding Glass Door NOA (M". shem <br />-1) Water Resistance Test- per FBC. TAS 202-94� <br />by Fenestration Testing Lab- Inc., Test Report No. FTL 9552- dated 12 '04145- signed and <br />Inc- for their and Lighter Shades of Cap Coated Rigid PA <br />Or_ -S- <br />-APPROVAL -AM-5570.0 <br />4) Large Missile Impact Test per FBC. TAS 201-94 <br />sealed by Idilmis Ortega. P. E. (Yest report revised on 021,115.,'2016) <br />Extrusions for Windows and Doors" dated 0915116- expiritig on 04.16`10. <br />I through -11 of 2 1. preparedbymatuffacunw. dated 10 .`05;l 5 and last revised on 01"Oli-21 1. signed and scaled by <br />5) Cyclic Wind Pan-mm Loading per FBC_ TAS 203-0-4 <br />7- Test report on 1) Uniform Static Air Pressure Test- per FBC. TAS 202-94 <br />6.. Notice of Acceptance No. 16-0712.03 issued to ENERGI Fenestration Solutions USA. <br />.5 CD <br />0- <br />A. LmNwfiller. P.E.. bearing the Miami -Dade CountyPiroduct Control Reiisionstamp with the Notice of <br />6) Forced Entry Test, per FBC, TAS 12021-94 <br />2) Large Missile Impact Test per FBC. TAS 201-94 <br />Inc. for their ­Wbite Rigid PVC Exterior Extrusions for Windows and Doors* dated <br />Acceptance number and expitgion date by the _X11ami-Da & Cow Pro duc t Control Se c "n. <br />along with marked -up drawings and installation diagram of vinyl sliding glass door- prepared <br />3) lic Wind PressLoading per FBC. TAS 203-94 <br />Cyc = <br />0&10 ' 17, expirine on 02.28,18. <br />MISSILE L%IPACT RATrG- Large and Small Afissile Impact Resistant <br />by Fenestration Testin g Lab- Inc.- Test Report No. FTL 8546- dated 11,`06 15- signed and <br />along with marked -up drawings and installation diagram of vinyl sliding glass door, prepared <br />7. Test reports No(s). 10-002-792(,.k), 10-O&M052T 535753-09- per ASTNE-84- <br />Limitations- <br />I See table I (sheet.Z) and table 2 (5heet D for applicable SGD unit smes- design pressures. reiffmements ty pes. <br />sealed by IcLahais Ortega. P_ E- (lest repoTt mised. on 01 e0446 and 02111 1*2016) <br />by Fenestration Testing Lab. Inc.. Test Report No. ft-L 6638 (samples A-4 thru A-2 2). dated <br />ASTMD 1929 and AST MD-63 5. issued by EXOV A to Vision Extrusion for cellulosic <br />. <br />glass types. Sill riser (see tables B-1 & B-2. sheets 7-9) and anchor layout sheets retlizirernents in 11 tine 16. <br />3. Test report on 1) Air Infiltration Test per FBC. TAS 1-02-94 <br />11,19.-40. signed and sealed try Jorge A. Causo. P. E. �Snbutfttvd under.LVOAX& 11- <br />composite material. <br />lRj gid White n7C, Tan (Nion-Tarbite) Rigid PV C andBromm coated (Painted ot- laminated) nAdie Rigid P%-'C to be <br />1 Uriffom Static Air Pressure Test- <br />� per FBC. TAS 202-94 <br />010' 04) <br />(Submitted under.Y0A.,V6. 11-910 104) <br />Z <br />labeled per referenced NOA' s requirements_ <br />3) Water Resistance Test. per FBC. TAS 202-94 <br />8 Test report on 1) Air Infiltration Test. per FBC_ TAS 202-94 <br />8- Notice of Acceptance No. 14-0916. 11 issued to Kuraray America., Inc. for their <br />3. Egress operable- doors must comply vtritli min clear width or height per FBC requirement as applicable. <br />4) Large Missile Impact Test per FBC_ TAS 201-94 <br />2) Uniform Static Alt Pressure Test. per FBC. TAS 202-014 <br />-Seiin-yGlast (Clear and White) InterlayeC. eViring on OT04/1 8. <br />4, Pocket walls undet- separate approval, to be reviewed by Building official <br />5) Cyclic Wind Pressure Loading per FBC. TAS 203-94 <br />- <br />3) Water Resistance Test, per FBC- TAS 202-94- <br />9. Notice ofAcceptance No.16-1 117.01 issued y to Kurai-aAmerica, Inc. for their <br />LABELING: Each umt -.hall bear a permanent label with the mannfficturer`s name or logo. city- state and series and <br />6) Forced Entry Test, per FBC. TAS 202-94 <br />4) Large Missile Impact Test per FBC, TAS 201-94 <br />--TrosifolAl, 11traclear. Clear and Color PVB Interlavers­. expiring on 07408:19- <br />follmarmystatenwnt: "Nfiam-Dade County Product Control .kpproved"_ noted herein <br />along with marked -up drawings and installation diagram of-%inyl sliding glass door. prepared <br />1 <br />5) Cyclic Vind Pressure Loadnigper FBC, TAS 203 -94 <br />W <br />RENEWAL of this-NOA shall be consideredafterarenmal application data been filed and there has beenno <br />by Fenestration Testing Lab. Inc.- Test Report No. F TL 8-547. dated 1 _10+1 5, signed and <br />6) Forced Entry Test. per FBC. TAS 2021-94 <br />F. STATIENLIEENTS <br />change in the applicable building code negatively affecting the performance ofthis product- <br />ised an 0214516) <br />sealed by I dahnis Ortega� P.E. Jest report rev <br />along with marked -up drawings and installation diagram of mnyl sliding glass door, prepared <br />I - Statement letter of conformance with FBC-51hEdit1on (2014) and FBC <br />TERMV;ATION ofthis NOA will, oc cur after the expiration date or if theta has been a revision or change in the <br />4. Test report on 1).4ar Infiltration Tes;t. per FBC_ TAS 202-94 <br />by Fenestration Testing Lab, Inc_ Test Report No- IFIL 6337 (san4Aes A- I thru A-5). dated <br />(2017). issued by manufacturer- dated 08,14.47, signed & sealed by Lynn Miller. P.E. <br />Materiah. use, and or manufacture ofthe product or process. Nbsuse of this NOA as an endorsement of any product. <br />2) Uniform Static Air Pressure Test, per FBC_ TAS 210-1-94 <br />12:06 '10. signed and sealed by Jorge A. Causo. P. E. (Subirfined under.N70_4 Xo. 11- <br />2. Statement letter of no financial interest. dated U, 11 & 17. issued by manufacturer. signed <br />for sales, adve Ttising or any other purposes shall automatic ally terminate this NOA. Failure to complywith airy <br />3) Water Resistance Test, per FBC. TAS 202-94 <br />010f. 09) <br />sealed by Lynn Miller- P_E_ <br />section of this NOA shall be cause for termination and renwx-'al ofNOA. <br />4) Large .Nfissire Impatt Tel per FBC_ TAS 201-94 <br />1 Letter -of lab compliance, part of the above test reports. <br />ADVERTISEAU-N-T: The NOA number preceded by the words. %liami-Dade County. Florida. and followed by the <br />5) Cyclic W, ind Pressure Loading per FBC. TAS 203-94 <br />C. CALCULATIONS <br />4. RER Test Proposal No. 17-0387. dated 0-5:105.17. smed by Ishaq Chanda- P.E. <br />expiration date may be displayed in adiwtisingliterature- If anyportionof the NOAisi display ed. then it shall be <br />6) Forced Entry- Test, per FBC..TAS 202-94 <br />1- Anchor verification calculations and structural analysis, compl�* with FBC--2014, <br />done in its entirety. <br />I <br />along with marked -up drawings and in-stallation diagram of iinyl sliding glass door, prepared <br />prepared by PGT. dated 1 - 1 5and last revised on- 01- 15,' 6- signed and sealed by <br />. <br />GOTHER <br />LN.-SPECTIO'-N. A copy of this entireNOA -.hall beproiidedto the user bythe manufacturer or distributors and <br />by Fenestration Testing Lab. Inc. - Test Report No. FTL 8548. dated 1-1.04.45, signed and <br />AnthornyL. Miller.. PE. (Snbiniped urider.YO-4 Yo. 15-1210.01). <br />I . Notice of Acceptance No. 1-5-1210.01. issued to PGT Industries. for their Series <br />shall be available for inspection at the job site at the request of the Building Official. <br />sealed by Idalmi-Ortega- P_ E. (Test repart revised on 0I,04 .16 and 014 11 6)_ <br />2. Gluing complies with ASTNEE-1300-09- <br />70-- Vinyl Shdinv Glass Door, (.Reinforced) - L.111.­_ '_expiring on 041+221 <br />This NOA revises & renews NOA *2 0-04 29.05 and consists of this page I and evidewe pages E- 1. E-2. E-3. E-4. <br />E-5 & E-6 as well as approval document mentioned above _ <br />hA3 q L Chanda. P.E. <br />I haq I. Chanda. P.E. <br />Ishaq L Chasda, PX, <br />The.submitted doe niation was reviewed by Ishaq L Clhanda, P.E. <br />Product Control Unit Supervisor <br />Product Control'unit Supervisor <br />Product Control Unit Supervisor <br />.VG -Al INO. 21_021U.03 <br />INOA No. 21-0205,03 <br />TNOA No. 21-0206.03 <br />NX0A No. 21-0204.03 <br />MANfs COUNTY Expir2tionDatoi April l.4,1026 <br />ExpirationDaw _April l4,2016 <br />Expiration Date. April l.4, 2016 <br />Expiration 1)2te.t April 14, 2026 <br />Approvall)2tte.-March 5,2021 <br />Approval Date: March 2.9. 20211 <br />Approval Date: March -2.4, 2021 <br />Approva I Dato. '-\latch ZS, 2011 <br />Page I <br />E-1 <br />E <br />E -3 <br />PGT Industries. Inc. <br />C GI N%`mdows and Doors, Inc. <br />PGT Industries. Inc. <br />NOTICE Of ACCEPTAN4'E: EVIDENCESU, B-\UTTED <br />NOTICE OF ACCEPTANCE: EVIDENCE SL7B'-\IITTED <br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br />2. Evidence Submitted under preilous submittal <br />E. '_\LXTERL-kL CERTIFICATIONS (continue) <br />3. New Evidence Submitted <br />5. Quanex Part Sutter Snacer Standard complying with ASTM C 518 Them al Conductivity <br />A. DRAWINGS <br />0.881 B-fU-in.,1hr_-ft2_0F. ASTM F 1 *249 )X7%-`rR-Pass, AS -I NLI D3985 Oxygen -Pass, ASTNI E <br />A. DRAWINGS <br />1. Drawing No. AID-557 0.0 Rev-B_ titled' -Vinyl Sliding Glass Door NOA (LW-. sheets <br />2I90 I.G . Durability -N, o Fog -Pass. (Subm ifted underpro ion s A70-4 A'& 15-0409 05A <br />I Drawing No- ]NED-5570.0 Rev B_ titled inyl Slid ing Glass Door NOA (I.Mf'. sheets 1 <br />uih 21 of 21, prepared by manufacturer. dated 10,105,i 15 and last revised on <br />I through <br />through 21 o f 211 - prepared by mmufac turer , _dated 10,`0 5:15 and last revised on 0 2) "D L2 1 <br />, <br />04:`221,2)0, signed and sealed by A- Lynn Miller. P.E. <br />AS -2 <br />6. Quanex Part Duraseal cortiplying with. - T,%1 C 518 Thermal Conductiirir�, 2 � I BTU -in <br />signed and sealed by A- Lynn Miller, P.E. <br />Cn <br />hr_-ft-'_'F, ASTNI F 1249 WN-1IR-Pass- ASTM D 1434 Argon Perrucance-Pass. ASTNI E <br />Note: This mision consists replacement of same existing installation screw with flat head. <br />B. TESTS <br />1189 I.G. Durability -No Fog, ASIM E 546 Dew Point Developrimat -101F in 48 hey_ <br />1. Test reports on: 1) Ali Infiltration Test, per FBC. TAS 202-94 <br />(&tbm Ned underAb_4 Vo. 15-0409.05). <br />(D <br />2) Uniform Static Air Pressure Test, Loading, per FBC. TAS 202-94 <br />Vision Extrusions- Ltd- Parts complying with PITC-AAMA 303-13. VohmiarvSpecification <br />B. TESTS <br />3) Water Resistance Test- per FBC. TAS 20194 <br />for Rigid Poly- .Anyl CUonde (PVC) Exterior Profiles for Vision Extiriisions. bd.-xT_X-1 by <br />1. None. <br />4) Large Missile Impact Test per FBC_ TAS 201-94 <br />A.ANIA Fenestration Exterior Profile Certification Program (5ubiviued nuder.N'0_4 Vo. L)- <br />5) Cyclic Wind Pressure Loading, per FBC. TAS 103-94 <br />0409,05) <br />C. CALCITLATIGINS <br />along with marked -up dmvings and inst.-alation diagram of all PGT Industries. Inc. <br />8- Vision Extrusions- Ltd- Parts comp lying with P`VTC-.kA_MA. 303-13. <br />L None - <br />representative unds listed below and tested to qualify Dowsfl 791 and Dowsil 98.1 silicones, <br />(Subiv itted under X0_4 No. 15-0409. 0 5� <br />(D <br />(D <br />prepared by Fenestration Testing Laboratory. Inc-. Test Reports No- <br />9- PVC-A-Alvi A 303-13. Voluntary Specification for Rigid Poly-,, inyl CUoride TVQ F--denor <br />D. QU, AL ITY A S SURAN. E <br />"INfiarni-Dade <br />FTL-7897�, PGT PW5520 PVC FixedWindow (unit 6 in proposal), dated 09.;03 ' 14 <br />Profiles for Vision Extrusions. Ltd_-VEX-1 by AAMA Fenestration Exterior Profile <br />1. Department of Regulatory and Economic Resources (RER). <br />FTL-20-2107.1. PGT SGD780 Alantimmu Sliding Glass Door (unit 7 in proposal) FTL-20- <br />Certification Program <br />2107.2. PGTCA740 Alum. Outswing Casement Window (unit 8 inproposal) FTL-20- <br />10- Notice of Acceptance No. 18-12171.14 issued to Energi Fenestration Solution, USA. Inc. for <br />E. ALA.TERIAL CERTIFICATIONS <br />CU <br />2107.3, PGT PW 7620.4, Ahminum Fixed Window (unit 9 in proposal) and FTL-2 0-2107-4. <br />their -Tan 3040 & fight shade (non -white) NN-hite Rigid PVC Exterior Extrusions for <br />L Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc. for their <br />> <br />PGT PW7620AAhmiiu=Fixed Window (unit 10 in proposal} dated 07111?20_ all signed <br />Windows and Doom", expiring on 021,104,22 1. <br />"Trosidott Ultractear, Clear. and Color PA'B Glass Interlavers-'. expiring on 07,08,1214- <br />0 <br />and sealed by Idalmis Ortega. P.E_ <br />11- Notice of Acceptance No- 1"122.02 issued to Energi Fenestration Solution, USA. Inc- for <br />2- Notice of Acceptance No. 17-080&02 issued to Kuraray America. Inc. for their <br />their senies --M-hite Rigid PVC Exteiior Extrusions for X%7 Endows and Doors"_ expui-mig on <br />"Senti-rGlast, (Clear and "Ifte) Glass lnteflavers�'_ MPT171119 on 07/0C213_ <br />-of <br />> <br />CL <br />CL <br />C CALCULATIONS <br />02,28.23- <br />3. Notice Acceptance No. 18-1106. 10 issued to V ision Extrusions Limited for their -Brown <br />O <br />1. Anchor verification calculations and structural analysis- complymg with FBC' <br />-t n Solution, <br />1,22. Notice of Acceptance No, 2"203.03 issued to Energi Fenes ratio So t USA. Inc. for <br />Coated (Painted or Laminated) White Rigid PVC Exterior Extrusions foi- Windows <br />Edition (2020). dated 04,!,21'20, prepared by manufacturer- signed and sealed by <br />INUef. <br />their -Bronze & light shade cap coated White Rigid PVC Exterior Extrusions for <br />and Doors"- expiring on 09,30:214. <br />Anthony LNmn . RE <br />Windows and Doors-, expiring on 04r46`25. <br />4. Notice of Acceptance No- 18-1106.11 issued to'k."ision Extrusions Limited for their series <br />2 Glazing complies with AST_MEI3{io _04.49. -12 and -16. <br />"VE 1000 Tan 202 and fighter shades (Non -White) Rigid Cellular PVC Exterior <br />D. QUALITY ASSURANCE <br />F, STATE-NIFINTS <br />Extru-Aons foi- Windows and Doors'-- expiring on 1129,2 1. <br />N-fiami-Dade Department of Regulatory .and Economic Resources (RER). <br />L Statement letter of conformance to FBC' 71k Edition (2020), dated 04L22-1,210- issued by <br />manufacturer. signed and sealed by Anthony Lynn Miller_ P.E. <br />F. S TAT E -1 1E N T S <br />E. 3LALTERLA.1, CERTIFICATIONS <br />L Statement letter of no financial interest and of independent- issued by manufacturer, dated <br />I <br />I- Statement letter of conformance to FBC '71b Edition 12020), dated 021-01-:21. issued by <br />1. Notice of Acceptance No- 19-0305.02 issued to Kai-aray America. Inc. for their <br />04.18:20, signed and sealed by Anthony L=Nfiller. RE. <br />nianufactumr. signed and scaled by Anthony Lynn Nidler, RE. <br />C/) <br />"Trol.fott Ultraclear. Clear. and Color PA-B Glass Interlavers-'. expiring on <br />31 ate Labeling Agreement doctmient between PGT_ dated 0330.15 and signed by all <br />PM_ <br />2- Private Labeling Agreement dated 03!0&2 1 between PGT Industries. Inc. and CGI <br />co <br />07/08;124_ <br />involved parties. <br />Windows and Doors Inc.. signed by Dean NL Ruark, P.E.. V.P. Engineering. on behalf of <br />U <br />M <br />2. Notice of Acceptance No, 17-0808.02 issued to Kuraray America. Inc. for their <br />".Sentt;4 <br />both companies. <br />Glasf (C le.ir imd%Nbre) Glim Iuterhiym-s expumg on OT04123. <br />G. OTHERS <br />3. Notice of Acceptance No- 18-1106.10 issued to Vision Extrusions Limited for their <br />*'Brown <br />L This NOA revises 'NOA# 17-0420.06(P1v7TwiCGI) and updates to FBC20210 ('!Edition)- <br />G. OTHERS <br />-0 <br />Coated (Painted or' Laminated) White Rigid PVC Exterior Extrusions <br />expiring 04?2 1?-'2 1 - <br />L This NOA revises & renews N`0.k# 20-0429.0-55 (PLA wCGI), expiring 04,14,216. <br />for 11-mdows and Do ors". expiring on 09,30.214. <br />21 RER Test proposals #19-1155 dated 0 1 .10.230 approved by Ishaq I - Chanda. PE_ expiriu <br />2. The current associated PLA CGI file #21-0205,01- expiring 04+114!.2716. <br />CU <br />4. Notice of Acceptance No. 18-1106.11 issued to Vision Extrusions Limited for their <br />series -17E 1000 Tan 202 and lighter shades (No"lC ite) Rigid ellulai- PVC <br />LU CU <br />Exterior Extrusions for'" endows and Doors". expiring on 124,29'21. <br />< <br />Ishaq L Chanda, P.E. <br />Ishaq 1, Chanda, P.E. <br />Z <br />Ishaq I. Chanda. P.E. <br />Product Control Unit Supeniter <br />Product Control Unit Supervisor <br />Z <br />Product Control Unit Supervisor <br />NOA No. 21-D20-5,03 <br />NOA No. 21-020.9.03 <br />< <br />NOA -No. 21-020:5.03 <br />Expiration Date: April 14.20N <br />Expiration D,.%;t*-. April 14,!026 <br />Expiration Date, April 14, 2026 <br />Approval Da te- March 26.. 2021 <br />Approval D2ie. March 2-1, 2021 <br />Approval Datt- March 2;, 1021 <br />E -_4 <br />E -6 <br />E -4 <br />SHEET <br />NO. <br />March 6, 2023 <br />PA 1.4 <br />