My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36690 Garden Wall Way
Zephyrhills
>
Building Department
>
Building Plans
>
36690 Garden Wall Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 8:54:29 AM
Creation date
2/28/2025 11:08:33 AM
Metadata
Fields
Template:
Building Plans
Street #
36690
Location
Garden Wall Way
Contractor
Lennar
Building Plans - Permit #
8463
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A l l - I _l 1 <br />CROSS BRACING DETAIL (TYP.) 1 <br />SCALE:NTS <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />SSES <br />(2) 12D NAILS —t' <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS 8 <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL 4 <br />SCALE:NTS <br />EXTERIOR <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL a ENTRY FRONT WALL <br />SCALE:NTS <br />TRUSS NOTES. TYP. HAND FRAMING ABOVE TRUSS <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONV. FRAMED RIDGE 2X4 STUDS & PLATES AT 2'-0" O.C.MAY BE NAILED EACH DIRECTION TYP. U.N.O. SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 w/ (12) 1Od NAILS SEE PLAN L. <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/MIN. (4) 12d WHEN #2 SPF 48" O.C. W/ 4 CENTERED AT SIMPSON HUC410 w/ (14) FOR CANT. <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO 2x8 BLOCKING NAILED @ 10d TOP &BOTTOM() SPLIT TIE 1INTO BEAM SEE <br />6d HEADER <br />E6) <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS EACH SIDE w/ 3 12d NAILS BEAMS TOGETHER <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES () OR SIMPSON H2.5A w/ ROOF PLAN FOR MORE <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD WHEN REQUIRED w/ (2) (10) 8d NAILS INFO <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & /2HTS20 w/ (24) 10d x <br />1 1" N <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION 1 1/2" NAILS EACH SEE FLOOR PLAN FOR <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED COLUMN SIZE & BASE ' OO FLITCH PLATE <br />RECI <br />SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN 2x4 #2 SYP NAILER. NAIL <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER COLLAR TIE FOR COLUMN SIZE INDICATED ON BM. TO STUDS w/ (3) 16d AT <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. 'k EVERY 3rd & ADDITIONAL INFO. SCHEDULE/PLAN EACH STUD - TOENAIL ROOF AND EXTERIOR <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS RAFTER 7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING REQ'D ONLY WHEN COLUMN SIZE & BASE EACH TRUSS TO NAILER SHEATHING ATTACHED <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" OPTION A SCHEDULE/PLAN DICATEDNBM OPTION B CONNECTION INFO OPTION C. w/ (3) 10d PER NAILING SCHEDULE <br />O.C. MAXIMUM. 2x4 SPF 2 (2) #7 x 3-1/2"SEE 2ND FLOOR WALL SECTION <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d WOOD SCREW EACH FOR ADDITIONAL INFORMATION <br />NAILS AT EACH TRUSS INTERSECTION. CB TRUSS OR SIMPSONCOMMON B M . TO POST ATTACHMENTrA <br />AT 48 <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS w/ (10) $d NAILS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT TB AT " O.C. <br />SEE ROOF PLAN SCALE: 3/4"=1'-0" <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB B FOR BEAM SIZE & IF 2x DOUBLE LEDGER, <br />BM. SPLICE OVER <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS BEVEL CUTS CONNECTION INFO. ATTACH FIRST PLY <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS (OPTIONAL) CENTER OF POST w/ D 16d NAILS H N <br />PRE-ENG. TRUSS A A END OF TRUSS THEN <br />2X4 BLOCKING SEE PLAN FOR ATTACH SECOND PLY <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP TOP OF BEAM <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />DIRECTION TYP. A <br />DIAGONAL 2x8 #2 SPF RIDGE BEAM SIMPSON LUS26 w/ (8) 10d NAILS • <br />MAX8'-0" WOOD 2x6 #2 SYP RAFTERS FOR SPANS 4FT SIMPSON MTS18 w/ (14) OR IF 2 PLY TRUSS SIMPSON <br />MTRUSS "�'� <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS 10d NAILS TYP. U.N.O. SEE PLAN FOR SIMPSON LUS26-2 w/ (8) 16d NAILS TO SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2-0"0.C. MAX. w/ (3) 10d CANTILEVER IF MTS18 w/ (14) LEDGER AND J/S6 FOR MORE INFO. <br />SEE FLOOR PLAN FOR INDICATED <br />COMMON TOENAILS TO TIE BEAM 10d NAILS VERIFY WITH PLAN FOR <br />COLUMN SIZE & TYP. U.N.O. 2X10 #2 SYP CONT. LEDGER w/ (3) LOCATION AND DIRECTION <br />2X4 CONT. AT CONC. MASONRY ADDITIONAL INFO. 1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH (IF PARALLEL SEE 2/D2 FOR <br />FLOOR TRUSS, 24" O.C. MAX. (AT BLOCKING INFO) <br />T& B CHORD BEARING SUPPORT STEEL OR WOOD (WOOD COLUMN SHOWN) MIDDLE <br />EACH SIDE OF G.T. INSTALL (4) LAG MASONRY WALL <br />SCREWS EACH SIDE) (TYPICAL) <br />SEE FOUNDATION SECTION AT LOW ROOF <br />A -A ALTERNATE BLOCKING CORNER 9 <br />DETAIL @ INTERIOR BEARING 3 PLAN FOR MORE INFO SCALE: NTS <br />5" <br />WOOD TRUSS SCALE:NTS COMMON B M . ATTACHMENT �18 <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING SCALE:NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE:NTS <br />VARIES» 1 1 2x STUDS @ 16" O.C. <br />ROOF SHEATHING SEE 1/S5 FOR ( ) <br />ATTACHED PER ADDITIONAL SEE PLAN FOR w/ SIMPSON SP1 w/ 10 10d <br />8d NAILS AT VALLEY TRUSS NAILS AT BASE & SIMPSON <br />N SP2 w/ 12 10d NAILS AT TOP <br />O <br />NAILING SCHEDULE OUTLOOKER ( ) <br />INFO. <br />2x4 #2 SPF BRACING @ � <br />EXTERIOR SHEATHING INFO. 4 O.C. <br />16" O.C. W/ (4) 12d �� —1/t— COMMON TRUSSES. ATTACHED PER 2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP —�-- —>�— SEE TRUSS PLAN 2x4 STUDS w/ SIMPSON r NAILING SCHEDULE TO TRUSS W/ (2) 12d TOENAILS <br />PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION SP1 w/ (10) 10d NAILS EACH END ( BETWEEN TRUSSES <br />STRUCTURAL SHEATHING NAILS TO TRUSS SPF TOP INFORMATION. AT BASE SEE J/S6 FOR GABLE (2) 12d NAILS TO EACH VERTICAL <br />ATTACHED PER NAILING BOTTOM CHORD LOW ROOF/WALL <br />SCHEDULE PLATE MORE INFO. v TRUSS SHEATHING ATTACHED STUD) <br />-- <br />VARIES SEE PLAN PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />lgL VARIES W/ - - FOR WALL LOCATION 2x4 BASE PLATE W/ 1/2" PLYWOOD NAILS @ 16" O.C. ALONG W/ <br />ROOF SLOPE SIMPSON LSTA30 w/ SIMPSON MTS12 w/ (14) 10d x <br />(22) 10d NAILS OR (2) 16d NAILS TO i 1 1/2" NAILS TO BLOCKING <br />SIMPSON MTS12 w/ EACH COMMON BELOW @ 16" O.C. <br />WOOD WALL MIN. 2x4 #2 SPF STUDS @ � (14) 10d x 1 1/2 TRUSS/ FRAMING NAILS -v <br />OR TRUSS. 2X4 CONT. W/ (2) — 16" O.C. W/ EXTERIOR TO FLOOR GIRDER TYP TOP & BOTTOM r <br />SEE PLAN 16d COMMONS <br />NAILS EACH <br />Y SHEATHING ATTACHED BELOW @ 16" O.C. <br />PER NAILING SCHEDULE & • MASONRY WALL BELOW: SIMPSON <br />STUD TYP. T&B % <br />(3) 12d TOENAILS TO a.. HETA16 w/ (9) 10d x 1 1/2" NAILS @ PLYWOOD <br />SEE PLAN FOR PLATE BELOW MASONRY WALL 4'-0" O.C. TO GABLE TRUSS FLOORING <br />TRUSS OR _ _ _ _ <br />ROOF SYSTEM TOP OF WALL OR BEAM <br />• BEAM BELOW: SIMPSON HTS20 w/ <br />a -- - <br />o MIN. 2x4 #2 SYP P.T. PLATE 16" FLOOR SYSTEM FLOOR GIRDER SEE TRUSS PLAN (24) 10d x 1 1/2" NAILS @ 4'-0" O.C.° <br />W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR TO GABLE TRUSS LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE @ 3" FROM EACH END & DIRECTION CONNECTION COMMON TRUSS RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE 16" O.C. MAX. �° SEE ROOF PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER INFO. •p SECTION @FLOOR FOR CONNECTION MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL SECTION ENTRYr_8"N�CONNECTION r22N)i,SECTION AT HIP GABLE 12 SECTION @ BUMP OUT 39 <br />SCALE:NTS SCALE:NTS SCALE: NTS SCALE:NTS SCALE: NTS <br />DETAILS & SECTIONS <br />- Q c <br />0 <br />.p <br />CV W <br />� S <br />CM W <br />•--F_o <br />O ` co <br />4p <br />c� <br />� <br />co <br />y�. <br />N L <br />cam m <br />O r_ <br />o c <br />Ln <br />V <br />� <br />C) m , <br />� o <br />a u <br />� G <br />.••�ty,SF'• o <br />•'•c`v <br />' <br />L� <br /><< 1 <br />w <br />Qj <br />101 <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained <br />within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />rn <br />W vE <br />o <br />Q 8 <br />8c.4 <br />N W <br />rn <br />0 00 (A <br />LL <br />v <br />Oq - N 0 <br />Q LL <br />a a <br />a <br />LL <br />Z c <br />0 <br />o 0 <br />Co <br />m o m <br />O: t 7 '� N t0 <br />` o <br />Co J Q <br />W og�� <br />¢ m <br />W <br />Z Cl) <br />LL <br />�rw <br />0. <br />U =- <br />N <br />z a 0 <br />Z <br />co F <br />000 <br />_ W <br />0 <br />Z N <br />Z n <br />a <br />N <br />V) Z aC1 <br />� <br />o <br />(D4-1 u- <br />U w <br />CD <br />—71 <br />V <br />O�W s <br />�U ! Ly N N <br />U <br />W J <br />EEo <br />L U <br />= <br />c <br />® O = <br />0 <br />• <br />O <br />M <br />LL <br />E <br />Zo <br />oo <br />> n <br />Z� <br />Q <br />a O <br />rO <br />w <br />?® <br />- <br />F Q <br />o E <br />ao <br />xo <br />as <br />oa <br />-O <br />O ° <br />°< <br />Z <br />� ru <br />.� t <br />w o <br />a z <br />a a <br />oY�LL <br />Q p <br />Z�� <br />r9 J <br />hm <br /><w <br />S � <br />Z <br />s° <br />W <br />C/) <br />a <br />W <br />d Z <br />�w <br />oz <br />3 <br />�O <br />¢¢ <br />x <br />�O <br />r� <br />� <br />zl� <br />ar <br />L <br />o <br />LOLO <br />Q <br />c� <br />H <br />CO O <br />T_ <br />: <br />C) <br />J <br />Y <br />r <br />0 <br />r <br />r^ <br />v, m <br />C�fl <br />Ir— <br />< <br />O N <br />00 <br />O <br />N <br />LO <br />T— <br />(0 <br />T <br />E <br />c 00 <br />o <br />Z <br />`° <br />Z <br />E T <br />`m <br />a <br />E <br />U J Q <br />J <br />JOB <br />NO: 22-04746 <br />SCALE : AS NOTED <br />SHEET NO. <br />D 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.