Laserfiche WebLink
n " <br />04 <br />2 LBS. EPS <br />FOAM <br />1 1/2" <br />1'-011 <br />fV <br />q 2 LBS. EPS o <br />FOAM <br />04 <br />6 B�RAC DETAIL <br />_ -n <br />r� <br />u <br />NJ <br />2 LBS. EPS <br />FOAM <br />0 <br />CN <br />'v <br />Nt <br />4" 4" 4" 4" <br />1 " T-4" <br />CN <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />llglv <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />12 MANUFACTURED <br />15 <br />ROOFTRUSS <br />MTL DRIP EDGE <br />ro 2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />V-0" ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />)FFIT DETAIL <br />2" <br />yC 7"X1" THICK SMOOTH <br />STUCCO BAND <br />ti <br />4"X1"THICK SMOOTH 4° <br />STUCCO BAND <br />10 GARAGE DETAIL <br />3/4 — 11-011 <br />T__r1_1 _T_ <br />-I <br />----12" X 1 1/4" THICK SMOOTH <br />STUCCO BAND <br />M <br />1 8„ <br />3 1/2" SMOOTH STUCCO <br />FINISH <br />PERMA WRAP COLUMN <br />OR EQUAL <br />11 0 1 <br />4" SMOOTH STUCCO <br />FINISH <br />'v <br />6" SMOOTH STUCCO <br />OVER CMU <br />2' 2" <br />°7 5/8" SMOOTH STUCCO <br />OVER CMU <br />ELEV AT O'-O" <br />FIRST FLOOR FF <br />5/8" STUCCO OVER <br />CMU <br />4" STUCCO BAND <br />GARAGE <br />DOOR <br />4" V-0" 2"X2" THICK PAINTED <br />RAISED TRIM BAND <br />N <br />6"X1" THICK PAINTED <br />FD <br />RAISED TRIM BAND <br />_ 5/8" STUCCO OVER <br />C� CMU <br />_ 1 ZIP N <br />12 I _.1 � L_ L. <br />13 _17d" = � ,_V,: <br />ELEV AT 0'-0" <br />FIRST FLOOF <br />ASSUM D <br />fi <br />7"X2" THICK <br />PAINTED RAISED <br />TRIM BAND <br />6"X2" PAINTED <br />RAISED TRIM <br />BAND <br />SHINGLE <br />ROOF 7 <br />6A5: <br />A5 IN. <br />ILI <br />on MEN <br />won MEN <br />• • 0011111 MENI all <br />_ ■■■ <br />1 /411 — 1'-011 <br />SHINGLE <br />ROOF <br />INININININININ <br />Mimi <br />4' OFF RIDGE VENT <br />12 <br />15 <br />Ch <br />F_ <br />■i■Sri■uir��Inr�•um�Ir�ri•mruumru.n�i■�ri•iurnmr�•u.ri�u.. �, � <br />7/8" STUCCO <br />OVER <br />* <br />z I-- <br />� _j = <br />C.J. �, <br />'� <br />ELEV AT 10'-0" <br />_ <br />FRAME <br />C? U) W <br />L <br />2ND FLOOR FF <br />Ss <br />FLASHING <br />_ <br />- <br />- <br />- <br />- - <br />ELEV AT 8'-8" <br />_ <br />"ll fill <br />II flioMID-WALL <br />_ <br />T.O.M. <br />A/C UNIT <br />AND PAD <br />WEEP <br />SCREED <br />TYP. <br />60 <br />r` 1 * 5/8" STUCCO <br />ON CMU <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />REAR ELEVATION A <br />1 /8If = 1'-011 <br />12 <br />15 <br />_ - ELEV AT 18'-0" <br />T.O.P. <br />7/8" <br />STUCCO <br />OVER FRAME <br />5 <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />FLASHING <br />ELEV AT 10'-0" <br />� 2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.O. M. <br />I <br />SHINGLE <br />ROOF <br />I <br />I I <br />I 11 <br />I I A5 <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />4' OFF RIDGE VENT <br />8 <br />SHINGLE �5 A5 16'-4" 6'-0" 9'-8" <br />ROOF <br />w <br />a <br />O <br />_ ELEV AT 18'-0" 0 1'-0" � 77 <br />T.O.P. 0 <br />CASING `.4 <br />BEADS 12 7/8" STUCCO <br />WEEPS C.J. `' C.J. <br />J = C.J. ELEV AT 10'-0" <br />OVER 4 (— OVER ti 0 U) w 2ND FLOOR FF w <br />FLASHING FRAME iv = <br />-- - - - - - - - - - - O55� <br />12 ELEV AT 8'-8" <br />T.O.M. <br />MID -WALL " 2'-0„ C UNIT VENT RIDGE <br />WEEP STUCCO AND PAD <br />T-0" SCREED co ON CMU <br />TYP. zo <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />W W <br />3 RIGHT ELEVATION'A <br />' � U_ <br />-0�1/8= 1F- <br />SOW OW SLR <br />5:12 > 5:12 <br />4' OFF RIDGE VENT 12 <br />8 SHINGLE _Oerm 15 <br />A5 ROOF <br />_ - ELEV AT 18'-0" <br />T.O.P. <br />7/8" STUCCO C.J. C.J. _j = J. ELEV AT 10'-0"' <br />OVER w * - 2ND FLOOR FF w <br />FRAME iv -= 3 0 0- <br />-12 ELEV AT 8 -8 -J 77 <br />77 <br />DRIP "V" T.O.M. <br />MID -WALL WEEP SCREED TYP. SCREED w <br />2'-0" 5/8" 0 N <br />STUCCO -J 77 <br />19 <br />ON CMU-� <br />LOPE SLR <br />_ _ _ _ _ _ _ _ _ _ _ _ ELEV AT 0'-01, 1�2 5:12 <br />1 ST FLOOR FF <br />SLO <br />5:12 <br />CLEFT ELEVATION A PROOF PLAN A <br />1 /8" = 1'-0" <br />1 /8" = 1'-0" <br />W <br />0- <br />0 <br />J <br />co <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4DRAWINGS.. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />MAR 2 <br />V_ <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC SECTION R806 <br />FORMULA = S.F. / 150 (1/150) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1697 SQ FT <br />VENTILATION REQUIRED = 815 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 407 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1218 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET (MEASURE <br />VERTICALL BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE B LANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />* OFF -RIDGE VENTS 138 SQ. IN. OF NET FREE AREA / UNIT <br />* SOFFIT VENTS 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />* LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR,SIDE-HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACE ABILITY TO MANUFACTURER AND PRODUCT <br />N <br />N <br />O <br />N <br />N <br />ft <br />Q <br />o <br />00 <br />i4 <br />LO <br />f( <br />z <br />ILLJ <br />a <br />O <br />W <br />z <br />SIN <br />a) � <br />='0o <br />_W <br />\J' <br />L u <br />� zo- 2 <br />N co <br />2 <br />M <br />U 0QQ -0m u a <br />E r o <br />2 00 2 <br />co, <br />0 U_ a Q <br />a <br />•^�, <br />U O � <br />LU QN <br />W <br />L CD �� <br />°• <br />W <br />w�W_ W U-3 W�w �0_O <br />a <br />¢�m�cXJu)0�10fW00' <br />°Z�2°pzQoZ¢ <br />OnogOZ'OWR000nWimzCL W <br />U <br />�OZU�a(Y <br /><L�WOj Z <br />¢ <br />Q <br />D_'O <br />Q ¢ <br />LL <br />O W P � Y z <br />oQ o 0 0¢ ¢X <br />�W <br />>t <br />0 <br />z W <br />O <br />D5ti <br />F_ M 0 <br />Q W M <br />cn L' <br />r. <br />co <br />z V <br />W <br />W <br />J O <br />A <br />0 <br />t� <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />0 <br />00000 <br />N <br />N <br />N <br />N <br />N <br />f- <br />M <br />M <br />� <br />C)C) <br />0 <br />C) <br />C) <br />O <br />r- <br />N <br />o <br />N <br />o <br />1 <br />I <br />1 <br />' <br />z <br />NW <br />Lo <br />> <br />p <br />C)C)O <br />N <br />M <br />d <br />O <br />e <br />i <br />zr <br />W <br />Qz <br />w <br />CDz <br />Ch <br />-1—i <br />-� <br />W <br />OWO <br />�zj <br />O <br />rLo.0 Oo <br />Z <br />0- <br />�--I <br />Q <br />= <br />m=w <br />Ln <br />(D <br />I-F� <br />(V <br />O <br />znm <br />W <br />i' <br />QF-� <br />■ ■ <br />O <br />2;�2 <br />>_ <br />C)U <br />Q <br />gW& <br />w� <br />z <br />az <br />�z <br />z <br />< <br />=2 <br />U <br />0 <br />0 <br />z <br />z <br />z <br />W <br />W <br />J <br />r` <br />o <br />C) <br />LAST PLOT DATE <br />. . <br />December 14, 2022 <br />4-a <br />O <br />EXTERIOR <br />_■.I <br />ELEVATIONS & ROOF <br />PLAN A <br />