My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36582 Smithfield Ln
Zephyrhills
>
Building Department
>
Building Plans
>
36582 Smithfield Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:58:14 AM
Creation date
2/19/2025 10:21:04 AM
Metadata
Fields
Template:
Building Plans
Street #
36582
Location
Smithfield Ln
Contractor
Lennar
Building Plans - Permit #
5569
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) LAYER TYPE 1 (#15) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE 11 (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" URRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROO <br />HIN LE ROOF <br />INSULATION — <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />->sn C:� <br />LUMINUM DRIP EDGE <br />Q-) Q-) Q-) <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH <br />CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 13/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WEI <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />_j <br />_j <br />NAILED PER NAILING SCHEDULE SEE DETAIL CIS6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />W <br />j_U <br />16" O.C. 2X S.P.F. STUDS <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />0 (n <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />---:: <br />APPLY 3 LAYERS W1 TOTAL THICKNESS 7/8" OVER <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />_j Uj <br />Z) Uj <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />U_ M <br />Uj <br />INSULATION PER <br />1/2" GYP. WEI OR 3/8" PLYWOOD/ TYPE 2-M-W OSB — <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 5 1000 <br />B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEA�� <br />S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />OR FELT <br />0 0 <br />PAPER FOR <br />MOISTURE <br />BAPRIER <br />A <br />VIP <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" — <br />GYP. TYPE "X" @ GARAGE ONLY) W1 1318" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8'01C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" O.C; <br />BASEBOARD <br />MIN. 2500 PSI CONC_ SLAB <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />= E <br />t - .* - <br />5q.' 1 1=1 <br />FE111— ElINIM11 <br />F;;-:;l I IEE1 I FE1 I I = I . _. 4 <br />� N1111�11' <br />6x6 W1.4xW1.4 <br />WWF OR FIBERME <br />STD. 90 NOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />ARCHITECTURAL <br />"�FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />co <br />L <br />W <br />C) <br />4"x4" INSPECTION PORT AT <br />EACH FILL CELL TYPICAL <br />W <br />Cn <br />AT GARAGE CONTRACTOR <br />C) <br />co <br />/ <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />410 6" BELOW GRADE <br />]NISH GRADE 00 <br />\-STD. 90'HOOK <br />T M, <br />I TT! <br />(3) # 5 REBAR ON 3" CHAIR-/ (SEE DETAIL) <br />4" 1'-8" <br />W/3" MIN. CLEARANCE <br />TYP 2-STORY WALL SECTION <br />SCALE: 3/4"=V-0" <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL----- <br />*SIMPSON LTP4 W/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL — <br />I N, <br />Lll� <br />SIMPSON LSTA24 STRAP W/ (8) 10 x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />SCALE: N.T.S. <br />@ WOOD 1ST FLR. SCALE: N.T.S. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />�TE W1 <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />00 <br />SEE FRAMING WEEP SCREED <br />9 K <br />0 <br />PLAN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 W/ (8) 1 Odxl 1/2" <br />O/C FOR THE 1 ST 2'-0" CF NAILS @ 24 O.C. INTO TRUSS <br />END WALL W/ (2)1 Odx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" <br />� S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS@ 1 <br />2"x BOT. PLAT[ <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSc <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 1 0dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE JIS6 SCALE: 3/4'*= 1 1-01, <br />FOR ADDITIONAL INFORMATION. <br />HIM <br />RIBBONS <br />M <br />DETAIL (FLOOR TRUSS) 0� <br />SCALE: 1 112"=1'-0" <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT.!5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 W/ (10) 10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />A<U�> - <br />4. A <br />4 <br />MI I F <br />AI11 <br />I= .11 <br />VE1 I F_ <br />1 (3) #5 CONT. ON 3" <br />CHAIR W/ 3" MIN. <br />8" 1 -81, 8" <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rs <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 314"=1'-0" <br />ADDITIONAL SLAB INFORMATION. <br />w <br />Uj <br />U) <br />0 <br />0 <br />co <br />15/32" OSB <br />EXPOSURE I <br />1�1 <br />SHEATHING <br />F <br />x <br />x <br />PROVIDE <br />F <br />BLOCKING AS <br />REQUIRED PEITR <br />n SECTION X-X IF <br />LU NOT FULL <br />HEIGHT SHEET - <br />Z <br />'A <br />y <br />FLOOR <br />SYST <br />M <br />r <br />" <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15132" OSB <br />EXPOSURE1 <br />F <br />SHEATHING Uj <br />Uj <br />)LID 2x <br />BLOCKING @ ALL <br />C <br />C <br />SHEATHING 0 <br />EDGES (SEE <br />OPENING <br />SECTION X-X) <br />Uj <br />F <br />_x I <br />Fr L�j <br />0', <br />--OE <br />W <br />_2x STUDS Lu'j) <br />BEYOND. <br />SEE PLAN 0 <br />. 0 <br />A <br />I <br />III <br />I I <br />L <br />L_ <br />L___y <br />'\-2x4 P.T. BASE <br />\—&JHORIZONTAL PLATE BEYOND <br />2x RIBBON OR -- <br />VERTICAL <br />SEE PLAN <br />BLOCKING <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IAIAI I rl r'%1A-r1fNk1 MIA/�MARA <br />318" "S" = NAIL 318" <br />SPACING <br />1/2" <br />3/4" 112", S <br />112" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/7/16" <br />FLITCH PLATE TO wl (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL wl (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />YER]ICa 110CEINQ <br />SECTION X-X <br />0 <br />�k <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ — <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />W <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN <br />q) <br />NAIL AT BASE 2 ROWS @ 4" O_C_ w/ 8d COMMON NAIL <br />NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. wl 8d COMMON NAIL. <br />6 <br />yj <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />CO <br />STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O,C. <br />2 <br />w/ 8d COMMON NAIL <br />0 Uj <br />0 <br />L�'j U�_ FX< <br />PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />FF__ Ca)� <br />CF W/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />< F_ 0 <br />0 LL <br />U) zi <br />G (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />LL <br />Z U) LU 0 0 <br />LU <br />MEMBER IF GABLE END <br />:E <br />NOTE: <br />8d NAILS FOR WALL SHEATHING MUSTBE MIN.131"X2 1/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />WALL SHEATHING INSTALL. <br />rc <br />& NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED@ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />�4 <br />INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />9 OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />,,/--2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS <br />BEAM <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL M <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W1 <br />2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 Wlf.4xWl.4 <br />WWF OR FIBERMESH <br />A <br />'i4 <br />Cl) <br />4 <br />4 <br />(3) # 5 REBAR ON 3" CHAIR 4" l'-8" <br />WIT' MIN. CLEARANCE <br />ALTERNATE FOOTING <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EAEND <br />EAEND <br />V-4- <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />(2) <br />(3) <br />(2)LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W1 TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 W/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />@ WOOD 1 ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-0" <br />ADDITIONAL INFORMATION. <br />00 <br />FINISH GRADE <br />00 <br />OCT 2 8 2OZZ <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />Wi compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />C14 <br />C14 <br />U) <br />�'P <br />I,- <br />N 1 <br />LO <br />C) <br />00 <br />LO <br />C� <br />< <br />3 <br />11 <br />z <br />W <br />g, <br />zx <br />LU <br />i <br />z <br />(A <br />4) a) L0 <br />0 <br />'0 C') 8 <br />0 CY) 4- <br />(y) 04 <br />V) -4 <br />D () 'L 'D co <br />U -0 7C) <br />E -E -7 coy) <br />0 U 0 <br />0 0 < <br />tn <br />6 <br />U LU C)_:;� <br />0 <br />L. co E <br />C) <br />7C) <br />C) r" C) Z a) <br />F (X -0 <br />I., W <br />LU W <br />Ld <br />W_ W U) uj�00 <br />_j 1,_ <br />W I-- �< (r 2 _j W 9 �e z 0� z <br />0�02_j< < < <br />::) 0 , 0 0 0 _j 0 <br />3: <br />< <br />- (1) OU) OOLL <br />< (3 X _j it <br />Z) z - Z2-, �-i� <br />- 0 0 O� 0 0 0 Z <br />Z) F- F- <br />0 0 <br />OLL <br />CY co <br />U) W W_ Z 2) - -0 <br />Z5 W W 0� < 0 i2 _j <br />(5 CL > Z W 0 1,- Z LL <br />a_ Y <br />0 Z <br />LL <br />-, z 0 W <br />_1 0 LU 5_5 - W z <br />< �W62EO <br />M_ <br />oui < <br />0 W Es Z) z g <br />< < LL <br />U_ 0 <br />2 <br />0 <br />C:) <br />C:) <br />LU <br />0 <br />4 <br />> C) C:) <br />n M CD <br />Lr) <br />I <br />Ul) LL_ II- <br />znj <br />Uj Ln <br />CL <br />00 <br />< <br />U <br />LLJ <br />W <br />�_j C:) <br />C:) <br />CNI <br />C:) <br />C14 <br />I <br />C:) <br />C� <br />C) <br />C) <br />o6 <br />CD <br />Q0 <br />Ir- <br />00 <br />V_ <br />00 <br />V_ <br />CD <br />C\1 <br />CD <br />" <br />C) <br />C14 <br />C14 <br />lr� <br />C) <br />04 <br />C) <br />04 <br />C�l <br />N <br />CD <br />04 <br />C) <br />C\I <br />C) <br />04 <br />C) <br />04 <br />& <br />04 <br />& <br />C:) <br />6 <br />6 <br />Ob <br />9 <br />C'14 <br />M, <br />C:) <br />C) <br />CD <br />C�l <br />CD <br />6 <br />C� <br />CD <br />CD <br />C <br />I <br />0 <br />W <br />L0 <br />CqN <br />Cqf) <br />C:) <br />-'T' <br />0 <br />L6 <br />C:) <br />(6 <br />CD <br />t,� <br />LO <br />1 <br />0- <br />CO <br />U) <br />Z Z <br />z LD <br />W <br />0 W U) <br />U, 5; <br />CF) <br />< <br />0 <br />-0 <br />0 <br />Of W <br />LO <br />Z <br />W i- <br />W <br />ca 0 z <br />90� <br />z <br />ED <br />_'? ?: _j <br />>- '3f 2 <br />< W 0 <br />2 Z W <br />0- <br />Z Z LL <br />Lij <br />0 <br />< < �- <br />_j 2 Z <br />2 00 <br />< <br />00->-w <br />U) Z U) <br />z T-71 <br />z <br />< 0 <br />z <br />C) <br />0 <br />0 <br />0 <br />z <br />z <br />z <br />W <br />Uj <br />0 <br />o <br />LAST PLOT DATE <br />> <br />Jul. 15, 22 <br />I <br />. . <br />'0 <br />— <br />Z <br />STRUCTURAL <br />_J <br />DETAILS —MONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.