Laserfiche WebLink
3 <br />3 <br />Q <br />rn <br />N <br />a <br />v <br />rn <br />0 <br />O <br />Go <br />I <br />0 <br />Q <br />z <br />v <br />x <br />0 <br />J <br />CD <br />00 <br />I <br />N <br />i <br />c <br />3 <br />a <br />N <br />N <br />E <br />x <br />0 <br />c <br />0 <br />U <br />2 <br />0 <br />t� <br />CL <br />N <br />fl <br />0 <br />c <br />0 <br />a <br />N <br />N <br />0 <br />Y <br />S <br />0 <br />to <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />w <br />J <br />In <br />c� <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />Pinr;F I INF <br />+ + <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + o <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ + + + + + + + +r; <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ <br />+rs <br />V-0" <br />+ <br />6'-0�- <br />+ <br />+ + <br />+++ <br />+++ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />++ <br />+ <br />+ + <br />+ <br />+ + + + + + + + <br />+ <br />+ +++++ <br />+ ++ <br />+ <br />+ + + + + + + o <br />+ + <br />+ + + + <br />++ <br />+ + + + + + + + io <br />+ <br />+ + + + + + <br />+ ++ <br />+++ <br />+++ <br />+ <br />UIP-1 <br />15/32" CDX <br />PLYWOOD OR <br />7/16" OSB <br />`RIDGE LINE <br />140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2 INCH NAIL LENGTH 2 INCH NAIL LENGTH <br />NOTE: FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAYBE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING <br />CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />5000s 1.8/1.7 <br />3/4" or 7/el <br />wood panels <br />Two 3/4" wood panels or 2 x _ <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />902.0 <br />2 x _ lumber <br />Double 2 x _ lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocldng ° <br />1/8" gap <br />r <br />i <br />FILL CELL STD. 90° HOOK BOND BEAM <br />kn <br />Lou <br />a STD. 90° CONT. #5 <br />BAR >� HOOK �(�� BAR <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />v BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />1NTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TA <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br />Solid block all posts from # OF 2nd FLOOR <br />above to bearing below. STUDS <br />SECTION <br />@ INT. BRG. WALL <br />N.T.S. <br />1/8" min. Small 2" min. <br />2" ) <br />gap <br />max. � 4 max. <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. 2x4/Plywood/OSB web stiffener 2" min. <br />4) Place joists together and nail from each side with 2 rows of 10d nails required when indicated or 4" max. <br />2x : CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING Y" GAP @ TOP sides by 6", - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouth cuts. N.T.S. <br />- Under 2nd floor column w/ loads <br />N.T.S. higher than 1 ROM <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />* Non stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />_ <br />local building <br />1/16 <br />code for appropriate <br />details in <br />One 10d box <br />areas=20 of high <br />or--20 sinker <br />lateral load. <br />nail each side <br />„ <br />10 -0 <br />at bearing. <br />TANK -LESS W/H <br />H C G <br />000 <br />5'-0" Q <br />c� <br />STUB -OUT FOR 1'-0" o ° <br />GAS METER 0 o <br />c 'Ct U <br />(V = <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7'-5" <br />(2)16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2)16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3)16d TOENAILS <br />2" X 10" 16" O.C. <br />16'-5" <br />1 SIMPSON HTS20 OR (3)16d TOENAILS <br />2' X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4)16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2)16d TOENAILS <br />2" X 6" @ 24" O.C. <br />V-6" <br />(2)16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3)16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15'4" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />Squash block <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES —� <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />Use 3" (10d) nails at 6" o.c. <br />Q'/ Provide adequate bearing <br />for each lapped joist. <br />Odnails SECTION @ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls: - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series Depth End Intermediate <br />® <br />BC15000s <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />BC16000s® <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90sw <br />11-7/ " <br />3-16d <br />3-16d i <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSON MGT <br />w/ (22)10d <br />�GIRDERTRUSS <br />NAILS TYP. <br />2X TOP PLATE <br />5/89 <br />THRU <br />BOLT <br />2 X B.U.0 <br />SIMPSON MGT <br />w/(22)10d <br />NAILS TYP. <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />AIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />Use 10dx3" nails at Vo.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration. <br />to <br />El <br />ROUND HOLE MAY 6,� 6��1. <br />0 NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1Y" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1Y2" <br />8 <br />1'-0" <br />1'-1" <br />1'-2" <br />V-2" <br />1'-3" <br />1'-3" <br />1'-7" <br />1'-11" <br />2'-4" <br />2'-9" <br />3'-2" <br />3'-7" <br />Any 16" joist 12 <br />V-0" <br />1'-1" <br />1'-2" <br />V-2" <br />1'-3" <br />1'-9" <br />2'4" <br />2'-11" <br />3'-7" <br />W-2" <br />4'-9" <br />5'4" <br />— Span (ft) 16 <br />V-0" <br />V-1 " <br />V-2" <br />V-2" <br />V-7" <br />2'-0" <br />3'-2" <br />3'-10" <br />4'-9" <br />5'-7" <br />6'-4" <br />7'-2" <br />20 <br />V-0" <br />1'-1" <br />V-2" <br />V-2" <br />2'-0" <br />3'-0" <br />4'-0" <br />4'-10" <br />5'-11" <br />W-11" <br />7'-11" <br />W-11" <br />24 <br />V-0" <br />1'-1" <br />1'-2" <br />V-3" <br />2'-5" <br />3'-7" <br />4'-9" <br />5'-10" <br />7'-2" <br />8'-4" <br />9'-0" <br />10'-9" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY, <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE %" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />N.T.S. <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />it — <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />SIMPSON H10A • ° ,° (WHEN <br />w/ (18)10d x 1 1/2" ° REQUIRED) <br />NAILS <br />UPLIFT =1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />TOP (2) #5's x 4'-0" v <br />CENETERED @ PIPE <br />PENETRATION <br />d a a. <br />d <br />e d e d: v <br />00 • <br />• FINISffGRADE �r— <br />Backer block (12" wide min.) —I I <br />Nail with 10-10d nails. <br />Install tight to top flange. SLEEVE THRU STEM ' ' <br />Joist hanger SEE PLAN FOR--'< . q • • • <br />EITOL <br />FOUNDATION INFO ' e <br />STEM FOUNDATION <br />GRADE r— REINF. SEE PLAN <br />Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install fight to top flange. <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />II— v } r <br />A/C CHASE 4" PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />�— SEE FND. PLN. <br />SIZE & REINF. <br />12" BELOW PIPE VERTICAL THRU FND. <br />GRADE <br />TOP (2) #5's x 4'-0"—\ <br />CENETERED @ PIPE <br />PENETRATION <br />rPVC OR SCH40 SLEEVE <br />r—PLUMBING LINE <br />d <br />A l—h ai a'e : .e <br />is Z ••a. ,' • .. <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @ PIPE <br />PENETRATION PLUMBING LINE <br />d a ' .e e <br />a <br />I a e a s <br />a <br />SEE FND. PLN. <br />SIZE & REINF. <br />J. <br />r *,�.�,t�ri1llllrrrrri <br />�� <br />N� E•• '• <br />• <br />J N <br />< <br />U <br />,•'• <br />P �•C. <br />F o <br />L <br />0 <br />�nFcSS,o`'r� <br />�\ <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />a <br />o 9 m pip <br />O 4 N i! <br />N Cb 2 N J <br />V <br />(A 0 <br />a;�� <br />�i <br />LL-+a <br />aL <br />y- 1 M � W to <br />Z <br />0�' <br />-9�• �; O <br />ro 12 _o6 <br />m <br />W <br />toNCO m m <br />2rnrn ¢�¢ <br />coa <br />Z <br />ILd <br />Z <br />LO <br />N M¢ Uo3 <br />OU <br />��0 <br />W <br />N <br />Z <br />z <br />z <br />a <br />�4 <br />z <br />LL <br />V <br />N <br />by . <br />� <br />0 <br />g <br />c N <br />�$ <br />o <br />W <br />E <br />a <br />Z <br />Q <br />E 012'. <br />t( <br />XU< <br />oa <br />O <br />g1 <br />Uz� <br />z�L <br />C.•�V <br />badipo <br />�= <br />(� <br />CIO � -J <br />mOWg <br />h <br />Ca <br />u <br /><z <br />i <br />Sao <br />J8 <br />U <br />S <br />° Z <br />_A <br />-' <br />co <br />� <br />ZI< <br />OU 3 <br />�IN <br />J <br />Sn..1 <br />M <br />W <br />0 <br />N <br />� <br />'' <br />� <br />U <br />� <br />T <br />o <br />m <br />0 <br />CO <br />C <br />E <br />� <br />� <br />ka <br />� <br />= <br />T <br />N <br />rn N <br />0 <br />M <br />,Z• <br />3 T <br />M N <br />vi O <br />c <br />Z <br />Z <br />C <br />E 0 <br />o <br />m r- <br />m <br />a <br />U <br />Q p <br />JOB <br />NO: <br />20-8073 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />S N 1 <br />