SIMPSON HGAMV
<br />W/
<br />(4) 1/4"xl 1/2" SDS
<br />SCREWS
<br />TO BLOCKING & (1
<br />1 /4"X2 3/4"
<br />TITEN TO CMU
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND
<br />FASTENERS. (MIN. FIRST 4 BAYS)
<br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/
<br />SCHEDULE FOR SHEATHING DETAIL-7 (2)16d NAILS —�
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />MAX. 9" AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />UNSUPPORTED,
<br />IF >9" SEE 10/S5 BACKNAIL w/ (2)16d NAILS —�
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />MAX 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />IF >9" SEE 10/S5
<br />BACKNAIL w/ (2)16d NAILS
<br />SEE STRUCTURAL NOTES AND NAILING
<br />SCHEDULE FOR SHEATHING DETAIL ��\
<br />' 45°± /
<br />45° ± SEE STRUCTURAL
<br />NOTES AND NAILING
<br />2x4 CRO BRACE SCHEDULE FOR
<br />APPROX. 8" FROM SHEATHING DETAIL 2x4 KICKER 2x8 SYP#2 "L" BRACE TO
<br />RIDGE FASTENED AT @ 8'-0" 0/C. EXTEND AT LEAST 90% OF
<br />"L" BRACE TO EXTEND 2x4 CROSS BRACE WEB LENGTH & NOTCH AT '
<br />EACH JOINT W/ (3) @ AT LEAST 90% OF WEB APPROX. 8" FROM BOTTOM CHORD (SEE TABLE)
<br />& (2)10d TOE NAILS @ . LENGTH (SEE TABLE) RIDGE FASTENED AT
<br />EA. END @ 48" O.C. SIMPSON H2.5A w/ (10) 8d
<br />2x8 P.T. GABLE TRUSS EACH JOINT w/ (3)10d &
<br />SILL (2)1Od TOE NAILS @ EA. FROM LEDGER TO
<br />1/2" CDX PLYWOOD OR END •� BLOCKING
<br />' 7/16" OSB SHEATHING GYPSUM WALL BOARD
<br />ATTACHED W/ 10d GABLE TRUSS
<br />NAILS 6" O.C. EDGES 2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST '
<br />@ 1/2"CDX PLYWOOD OR 7/16"
<br />AND 12" O.C. FIELD (4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM
<br />10dX3" @ 3" 0/C CORD ATTACHED W/ (2)16d TOENAILS OSB SHEATHING ATTACHED
<br />THROUGH CHORD 2"x4" LEDGER (MATCH BOTTOM CHORD w! 10d NAILS @ 6 O.C.
<br />na INTO 2" 6" P T PLATE SLOPE OF ADJACENT SCISSOR TRUSS) EDGES AND 12" O.C. FIELD
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />MAX. 9"
<br />UNSUPPORTED, BACKNAIL w/ (2)16d NAILS
<br />IF >9" SEE 10/S5 SEE STRUCTURAL NOTES AND
<br />DETAIL
<br />SCHEDULE FOR SHEATHING
<br />DOUBLE TOP PLATE 2"x4" CROSS BRACE
<br />2x4 CROSS BRACE APPROX. 8" APPROX. 8" FROM
<br />FROM RIDGE FASTENED AT RIDGE FASTENED AT
<br />EACH JOINT w/ (3)1 Od & (2)1 Od EACH JOINT w/ (3)
<br />TOE NAILS @ EA. END 10d & (2)10d TOE
<br />2x FRAME WALL (SEE WALL NAILS @ EA. END
<br />SECTION FOR SIZE & SPACING) 2x4 PANEL BLOCKING
<br />1/2" CDX PLYWOOD OR 7/16" @ 48" O/C FOR THE
<br />OSB SHEATHING ATTACHED FIRST (4) ROWS OF
<br />W/ 10d NAILS @ 6" O.C. EDGES TRUSSES FROM EA.
<br />AND 12" O.C. FIELD END TYP. TOP &
<br />(2) 16d NAILS BOTTOM ATTACHED
<br />W/ (2)16d TOENAILS
<br />x 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING
<br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE
<br />FASTEN WITH 1 Odx3" @ 4" O/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL
<br />1/2" x 8" "J" BOLT @ 48" 0 C
<br />(2)16d
<br />INSTALLED PER MANUF. WEEP SCREED FROM EA. END TYP. TOP & BOTTOM SIMPSON HGA1OKT w/ (4)1/4"x1 1/2" SIDS SCREWS TO
<br />@ 48" O.C. BLOCKING, FASTEN WITH
<br />SIMPSON META12 w/ (7)10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2)16d TOENAILS TRUSS & (4)1/4"x3" SDS SCREWS TO PLATES AT 24" O.C.
<br />MOISTURE BARRIER 1Odx3" @ 4" O/C
<br />1!2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK -
<br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER ALTERNATE SIMPSON MSTAM24 w/ (7)10d NAILS MOISTURE BARRIER
<br />SIMPSON META12 w/ (7)
<br />NOTE: IF EMBEDDED 10dx1 1/2" NAILS AT EA. & (4)1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH
<br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24,, GABLE WEB SECTION 2
<br />WEB, USE MSTAM36 w/ (7) �O.C.MAX)WMIN,4"
<br />1Od NAILS & (4) 1/4"x2 1/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK
<br />TITEN ON OUTSIDE S5 SCALE: N.T.S. S5
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />-REFER TO DETAIL J N N AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />ON SHEET S5 FOR
<br />X-BRACING, AND TOP r " SEE STRUCTURAL
<br />CHORD BLOCKING - NOTES AND NAILING
<br />INFORMATION `° SCHEDULE FOR
<br />1 1 SHEATHING DETAIL BACKNAIL w/
<br />1/ " (2)16d NAILS
<br />-WOOD TRUSSES co oo 2"x4" CROSS BRACE
<br />-2x4 RAT RUN BRACING APPROX. 8" FROM
<br />AT 24" O.C. ON TOP BRACING
<br />1 1 2" % RIDGE FASTENED AT
<br />EACH JOINT w/ (3)
<br />BOTT. CHORD FOR 4 10d & (2)10d TOE
<br />TRUSS SPANS NAILS @ EA. END
<br />ATTACHED W/ 2 -16d
<br />AT EA. TRUSS JOINT " �� O (3) 2" x 4" LAMINATIONS W/ (1) ROW " " 2x4 PANEL BLOCKING
<br />(2) 2 x 4 LAMINATIONS W/ 1 ROW (3) 2 x 6 LAMINATIONS W/ (2) ROWS OF @ 48" O/C FOR THE (2)16d NAILS
<br />2x4 BLOCKING @ 24" OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS FIRST
<br />2X4 L CKIN (D = 0.148 , L = 3) OR EQUAL (D = 0.207 , L = 41/2') OR EQUAL (D = 0.207", L = 41/2") OR EQUAL (4) ROWS OF
<br />O/CTRUSSES FROM EA.
<br />TOENAILS @ EA. END NOTES: END TYP. TOP &
<br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL BOTTOM ATTACHED
<br />' MASONRY WALL OF THE COLUMN (SPACE AS SHOWN FOR 3-PLY) w/ (2)16d TOENAILS
<br />-ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL
<br />SPACE AS SHOWN FOR 3 PLY
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 1 O/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR
<br />7/16" OSB SHEATHING
<br />ATTACHED w/ 1 Od NAILS
<br />@ 6" O.C. EDGES AND 12"
<br />O.C. FIELD
<br />•2x4 "T" ON TOP OF PANEL
<br />BLOCKING, FASTEN WITH
<br />1Odx3" @ 4" O/C
<br />2x4 BLOCKING 2x4 "T" BLOCKING
<br />@ 48" O.C. 16d NAIL
<br />"L" BRACE
<br />ATTACHED W/
<br />71
<br />10d NAILS @ 4"
<br />O,C. TYPICAL
<br />GABLE TRUSS WEB
<br />DOUBLE "L" BRACING DETAIL 5
<br />SCALE: N.T.S. S5
<br />2x4 "T" BLOCKING
<br />2x4 BLOCKING @
<br />48" O.C. 16d NAIL
<br />L BRACE ATTACHED
<br />W/ 10d NAILS @ 4" 0.C�
<br />TYPICAL
<br />GABLE TRUSS WEB J
<br />SINGLE "L" BRACING DETAIL 6
<br />SCALE: N.T.S. S5
<br />DIAPHRAGM
<br />BLOCKING @
<br />48" 0/C GABLE TRUSS
<br />TRUSS VERTICAL
<br />J
<br />2x4 LEDGER (MATCH BOTTOM CHORD DBL. TOP PLATE SIMPSON SPZ w/ (12) 10d
<br />SLOPE OF ADJACENT TRUSS NAILS AT EACH STUD FASTENED WITH 3
<br />) STUD WALL (SEE TYP. SEC.) ( )
<br />SECTION 16d PER SIDE
<br />3 SECTION 4 SCISSOR GABLE "T" BRACE 7
<br />SCALE: N.T.S. S5 SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 10/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR 7/16"
<br />OSB SHEATHING ATTACHED
<br />W/ 1Od NAILS @ 6" O.C.
<br />E ES AND 12" O.C. FIELD
<br />14CJACK TRUSS
<br />SEE PLAN FOR
<br />CONNECTION
<br />OF THE LAST LAMINATION ( ) 2x4 "T' ON TOP OF PANEL
<br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION BLOCKING, FASTEN WITH L- 2x4 BLOCKING W/
<br />EXT. WALL CONN. COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF 1Odx3 @ 4 O/C (2)12d TOENAILS
<br />NON -LOAD BEARI G LOCATIONrD B.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION
<br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=V-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT—UP COLUMNS 8 9
<br />ADDITIONAL INFORMATION. SCALE: N.T.S. S5 SCALE: N.T.S. S5
<br />CROSS BRACING DETAIL
<br />S5
<br />12
<br />6.9 MAX.
<br />12"
<br />1INIMUM 2x
<br />'ROSS BRACING
<br />SEE PLAN FOR
<br />OCATIONS) TOENAIL
<br />(2)16d NA
<br />(2)16d PER
<br />JOINT
<br />7"YA" RAIN SFF RA/Sri
<br />SCALE: N.T.S.
<br />S5
<br />:E RSH SCHEDULE
<br />IR ATTACHMENT
<br />:4 #2 SYP BLK'G @ 16" O.C.
<br />10d x 0.131"
<br />)ENAILS EA, SIDE
<br />)NT. 2x4 #2 SYP w/ 1 Od
<br />XO.131" @ 8" O.C.
<br />ALTERNATE NON -DROP
<br />GABLE END DETAIL 10
<br />SCALE: N.T.S. S5
<br />GABLE TRUSS
<br />1" BRACE W/ 10d @ 4" O.C.
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />I all a �II fl allm \ lI II Ik 4
<br />CONT. BEARING
<br />GABLE END BRACING DETAIL
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S.
<br />PRE-ENGINEERED
<br />WOOD TRUSSES
<br />OVERLAP TRUSS BRACING
<br />AT LEAST TWO TRUSS SPACES
<br />-MINIMUM (2)16d PER JOINT \-MINIMUM 2X4 TRUSS BRACING
<br />TRUSS BRACING OVERLAP DETAIL
<br />SCALE: N.T.S.
<br />6" OVERLAP
<br />M
<br />S5
<br />"L" BRACE W/ 10d @ 4" O/C
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />8d @ 6"O/C
<br />WOOD TRUSSES
<br />SIMPSON HGAMIOKTAw/ (4)
<br />1/4"x1 1/2" SDS SCREWS TO
<br />BLOCKING & (4)1/4"X2 3/4"
<br />TITEN TO CMU
<br />2 x 4 BLOCKING w/ (2)1 Od
<br />TOE NAILS AT EACH END @
<br />24" O/C (TYP)
<br />BRACING w/ (3)1 Od x 3" AT =
<br />• EACH CONN. @ 24" O/C
<br />MOISTURE BARRIER
<br />BOND BEAM
<br />MASONRY WALL
<br />ARCHITECTURAL FINISH
<br />EXT. WALL CONN. (� NON -LOAD
<br />BEARING LOCATION (UNEVEN CLG.)
<br />SEE TYP. WALL SECTION FOR
<br />ADDITIONAL INFORMATION.
<br />SCALE: N.T.S.
<br />"L" BRACING REQUIREMENTS
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />MAX. 9"
<br />UNSUPPORTED, BACKNAIL w/ (2)16d NAILS
<br />IF >9" SEE 10/S5 SEE STRUCTURAL NOTES AND
<br />DETAIL
<br />SCHEDULE FOR SHEATHING
<br />DOUBLE TOP PLATE 2"x4" CROSS BRACE
<br />2x4 CROSS BRACE APPROX. 8" APPROX. 8" FROM
<br />FROM RIDGE FASTENED AT RIDGE FASTENED AT
<br />EACH JOINT w/ (3)1 Od & (2)1 Od EACH JOINT w/ (3)
<br />TOE NAILS @ EA. END 10d & (2)10d TOE
<br />2x FRAME WALL (SEE WALL NAILS @ EA. END
<br />SECTION FOR SIZE & SPACING) 2x4 PANEL BLOCKING
<br />1/2" CDX PLYWOOD OR 7/16" @ 48" O/C FOR THE
<br />OSB SHEATHING ATTACHED FIRST (4) ROWS OF
<br />W/ 10d NAILS @ 6" O.C. EDGES TRUSSES FROM EA.
<br />AND 12" O.C. FIELD END TYP. TOP &
<br />(2) 16d NAILS BOTTOM ATTACHED
<br />W/ (2)16d TOENAILS
<br />x 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING
<br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE
<br />FASTEN WITH 1 Odx3" @ 4" O/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL
<br />1/2" x 8" "J" BOLT @ 48" 0 C
<br />(2)16d
<br />INSTALLED PER MANUF. WEEP SCREED FROM EA. END TYP. TOP & BOTTOM SIMPSON HGA1OKT w/ (4)1/4"x1 1/2" SIDS SCREWS TO
<br />@ 48" O.C. BLOCKING, FASTEN WITH
<br />SIMPSON META12 w/ (7)10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2)16d TOENAILS TRUSS & (4)1/4"x3" SDS SCREWS TO PLATES AT 24" O.C.
<br />MOISTURE BARRIER 1Odx3" @ 4" O/C
<br />1!2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK -
<br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER ALTERNATE SIMPSON MSTAM24 w/ (7)10d NAILS MOISTURE BARRIER
<br />SIMPSON META12 w/ (7)
<br />NOTE: IF EMBEDDED 10dx1 1/2" NAILS AT EA. & (4)1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH
<br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24,, GABLE WEB SECTION 2
<br />WEB, USE MSTAM36 w/ (7) �O.C.MAX)WMIN,4"
<br />1Od NAILS & (4) 1/4"x2 1/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK
<br />TITEN ON OUTSIDE S5 SCALE: N.T.S. S5
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />-REFER TO DETAIL J N N AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />ON SHEET S5 FOR
<br />X-BRACING, AND TOP r " SEE STRUCTURAL
<br />CHORD BLOCKING - NOTES AND NAILING
<br />INFORMATION `° SCHEDULE FOR
<br />1 1 SHEATHING DETAIL BACKNAIL w/
<br />1/ " (2)16d NAILS
<br />-WOOD TRUSSES co oo 2"x4" CROSS BRACE
<br />-2x4 RAT RUN BRACING APPROX. 8" FROM
<br />AT 24" O.C. ON TOP BRACING
<br />1 1 2" % RIDGE FASTENED AT
<br />EACH JOINT w/ (3)
<br />BOTT. CHORD FOR 4 10d & (2)10d TOE
<br />TRUSS SPANS NAILS @ EA. END
<br />ATTACHED W/ 2 -16d
<br />AT EA. TRUSS JOINT " �� O (3) 2" x 4" LAMINATIONS W/ (1) ROW " " 2x4 PANEL BLOCKING
<br />(2) 2 x 4 LAMINATIONS W/ 1 ROW (3) 2 x 6 LAMINATIONS W/ (2) ROWS OF @ 48" O/C FOR THE (2)16d NAILS
<br />2x4 BLOCKING @ 24" OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS FIRST
<br />2X4 L CKIN (D = 0.148 , L = 3) OR EQUAL (D = 0.207 , L = 41/2') OR EQUAL (D = 0.207", L = 41/2") OR EQUAL (4) ROWS OF
<br />O/CTRUSSES FROM EA.
<br />TOENAILS @ EA. END NOTES: END TYP. TOP &
<br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL BOTTOM ATTACHED
<br />' MASONRY WALL OF THE COLUMN (SPACE AS SHOWN FOR 3-PLY) w/ (2)16d TOENAILS
<br />-ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL
<br />SPACE AS SHOWN FOR 3 PLY
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 1 O/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR
<br />7/16" OSB SHEATHING
<br />ATTACHED w/ 1 Od NAILS
<br />@ 6" O.C. EDGES AND 12"
<br />O.C. FIELD
<br />•2x4 "T" ON TOP OF PANEL
<br />BLOCKING, FASTEN WITH
<br />1Odx3" @ 4" O/C
<br />2x4 BLOCKING 2x4 "T" BLOCKING
<br />@ 48" O.C. 16d NAIL
<br />"L" BRACE
<br />ATTACHED W/
<br />71
<br />10d NAILS @ 4"
<br />O,C. TYPICAL
<br />GABLE TRUSS WEB
<br />DOUBLE "L" BRACING DETAIL 5
<br />SCALE: N.T.S. S5
<br />2x4 "T" BLOCKING
<br />2x4 BLOCKING @
<br />48" O.C. 16d NAIL
<br />L BRACE ATTACHED
<br />W/ 10d NAILS @ 4" 0.C�
<br />TYPICAL
<br />GABLE TRUSS WEB J
<br />SINGLE "L" BRACING DETAIL 6
<br />SCALE: N.T.S. S5
<br />DIAPHRAGM
<br />BLOCKING @
<br />48" 0/C GABLE TRUSS
<br />TRUSS VERTICAL
<br />J
<br />2x4 LEDGER (MATCH BOTTOM CHORD DBL. TOP PLATE SIMPSON SPZ w/ (12) 10d
<br />SLOPE OF ADJACENT TRUSS NAILS AT EACH STUD FASTENED WITH 3
<br />) STUD WALL (SEE TYP. SEC.) ( )
<br />SECTION 16d PER SIDE
<br />3 SECTION 4 SCISSOR GABLE "T" BRACE 7
<br />SCALE: N.T.S. S5 SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 10/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR 7/16"
<br />OSB SHEATHING ATTACHED
<br />W/ 1Od NAILS @ 6" O.C.
<br />E ES AND 12" O.C. FIELD
<br />14CJACK TRUSS
<br />SEE PLAN FOR
<br />CONNECTION
<br />OF THE LAST LAMINATION ( ) 2x4 "T' ON TOP OF PANEL
<br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION BLOCKING, FASTEN WITH L- 2x4 BLOCKING W/
<br />EXT. WALL CONN. COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF 1Odx3 @ 4 O/C (2)12d TOENAILS
<br />NON -LOAD BEARI G LOCATIONrD B.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION
<br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=V-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT—UP COLUMNS 8 9
<br />ADDITIONAL INFORMATION. SCALE: N.T.S. S5 SCALE: N.T.S. S5
<br />CROSS BRACING DETAIL
<br />S5
<br />12
<br />6.9 MAX.
<br />12"
<br />1INIMUM 2x
<br />'ROSS BRACING
<br />SEE PLAN FOR
<br />OCATIONS) TOENAIL
<br />(2)16d NA
<br />(2)16d PER
<br />JOINT
<br />7"YA" RAIN SFF RA/Sri
<br />SCALE: N.T.S.
<br />S5
<br />:E RSH SCHEDULE
<br />IR ATTACHMENT
<br />:4 #2 SYP BLK'G @ 16" O.C.
<br />10d x 0.131"
<br />)ENAILS EA, SIDE
<br />)NT. 2x4 #2 SYP w/ 1 Od
<br />XO.131" @ 8" O.C.
<br />ALTERNATE NON -DROP
<br />GABLE END DETAIL 10
<br />SCALE: N.T.S. S5
<br />GABLE TRUSS
<br />1" BRACE W/ 10d @ 4" O.C.
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />I all a �II fl allm \ lI II Ik 4
<br />CONT. BEARING
<br />GABLE END BRACING DETAIL
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S.
<br />PRE-ENGINEERED
<br />WOOD TRUSSES
<br />OVERLAP TRUSS BRACING
<br />AT LEAST TWO TRUSS SPACES
<br />-MINIMUM (2)16d PER JOINT \-MINIMUM 2X4 TRUSS BRACING
<br />TRUSS BRACING OVERLAP DETAIL
<br />SCALE: N.T.S.
<br />6" OVERLAP
<br />M
<br />S5
<br />"L" BRACE W/ 10d @ 4" O/C
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />8d @ 6"O/C
<br />WOOD TRUSSES
<br />SIMPSON HGAMIOKTAw/ (4)
<br />1/4"x1 1/2" SDS SCREWS TO
<br />BLOCKING & (4)1/4"X2 3/4"
<br />TITEN TO CMU
<br />2 x 4 BLOCKING w/ (2)1 Od
<br />TOE NAILS AT EACH END @
<br />24" O/C (TYP)
<br />BRACING w/ (3)1 Od x 3" AT =
<br />• EACH CONN. @ 24" O/C
<br />MOISTURE BARRIER
<br />BOND BEAM
<br />MASONRY WALL
<br />ARCHITECTURAL FINISH
<br />EXT. WALL CONN. (� NON -LOAD
<br />BEARING LOCATION (UNEVEN CLG.)
<br />SEE TYP. WALL SECTION FOR
<br />ADDITIONAL INFORMATION.
<br />SCALE: N.T.S.
<br />"L" BRACING REQUIREMENTS
<br />x 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING
<br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE
<br />FASTEN WITH 1 Odx3" @ 4" O/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL
<br />1/2" x 8" "J" BOLT @ 48" 0 C
<br />(2)16d
<br />INSTALLED PER MANUF. WEEP SCREED FROM EA. END TYP. TOP & BOTTOM SIMPSON HGA1OKT w/ (4)1/4"x1 1/2" SIDS SCREWS TO
<br />@ 48" O.C. BLOCKING, FASTEN WITH
<br />SIMPSON META12 w/ (7)10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2)16d TOENAILS TRUSS & (4)1/4"x3" SDS SCREWS TO PLATES AT 24" O.C.
<br />MOISTURE BARRIER 1Odx3" @ 4" O/C
<br />1!2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK -
<br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER ALTERNATE SIMPSON MSTAM24 w/ (7)10d NAILS MOISTURE BARRIER
<br />SIMPSON META12 w/ (7)
<br />NOTE: IF EMBEDDED 10dx1 1/2" NAILS AT EA. & (4)1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH
<br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24,, GABLE WEB SECTION 2
<br />WEB, USE MSTAM36 w/ (7) �O.C.MAX)WMIN,4"
<br />1Od NAILS & (4) 1/4"x2 1/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK
<br />TITEN ON OUTSIDE S5 SCALE: N.T.S. S5
<br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END.
<br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING
<br />-REFER TO DETAIL J N N AND FASTENERS. (MIN. FIRST 4 BAYS)
<br />ON SHEET S5 FOR
<br />X-BRACING, AND TOP r " SEE STRUCTURAL
<br />CHORD BLOCKING - NOTES AND NAILING
<br />INFORMATION `° SCHEDULE FOR
<br />1 1 SHEATHING DETAIL BACKNAIL w/
<br />1/ " (2)16d NAILS
<br />-WOOD TRUSSES co oo 2"x4" CROSS BRACE
<br />-2x4 RAT RUN BRACING APPROX. 8" FROM
<br />AT 24" O.C. ON TOP BRACING
<br />1 1 2" % RIDGE FASTENED AT
<br />EACH JOINT w/ (3)
<br />BOTT. CHORD FOR 4 10d & (2)10d TOE
<br />TRUSS SPANS NAILS @ EA. END
<br />ATTACHED W/ 2 -16d
<br />AT EA. TRUSS JOINT " �� O (3) 2" x 4" LAMINATIONS W/ (1) ROW " " 2x4 PANEL BLOCKING
<br />(2) 2 x 4 LAMINATIONS W/ 1 ROW (3) 2 x 6 LAMINATIONS W/ (2) ROWS OF @ 48" O/C FOR THE (2)16d NAILS
<br />2x4 BLOCKING @ 24" OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS FIRST
<br />2X4 L CKIN (D = 0.148 , L = 3) OR EQUAL (D = 0.207 , L = 41/2') OR EQUAL (D = 0.207", L = 41/2") OR EQUAL (4) ROWS OF
<br />O/CTRUSSES FROM EA.
<br />TOENAILS @ EA. END NOTES: END TYP. TOP &
<br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL BOTTOM ATTACHED
<br />' MASONRY WALL OF THE COLUMN (SPACE AS SHOWN FOR 3-PLY) w/ (2)16d TOENAILS
<br />-ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL
<br />SPACE AS SHOWN FOR 3 PLY
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 1 O/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR
<br />7/16" OSB SHEATHING
<br />ATTACHED w/ 1 Od NAILS
<br />@ 6" O.C. EDGES AND 12"
<br />O.C. FIELD
<br />•2x4 "T" ON TOP OF PANEL
<br />BLOCKING, FASTEN WITH
<br />1Odx3" @ 4" O/C
<br />2x4 BLOCKING 2x4 "T" BLOCKING
<br />@ 48" O.C. 16d NAIL
<br />"L" BRACE
<br />ATTACHED W/
<br />71
<br />10d NAILS @ 4"
<br />O,C. TYPICAL
<br />GABLE TRUSS WEB
<br />DOUBLE "L" BRACING DETAIL 5
<br />SCALE: N.T.S. S5
<br />2x4 "T" BLOCKING
<br />2x4 BLOCKING @
<br />48" O.C. 16d NAIL
<br />L BRACE ATTACHED
<br />W/ 10d NAILS @ 4" 0.C�
<br />TYPICAL
<br />GABLE TRUSS WEB J
<br />SINGLE "L" BRACING DETAIL 6
<br />SCALE: N.T.S. S5
<br />DIAPHRAGM
<br />BLOCKING @
<br />48" 0/C GABLE TRUSS
<br />TRUSS VERTICAL
<br />J
<br />2x4 LEDGER (MATCH BOTTOM CHORD DBL. TOP PLATE SIMPSON SPZ w/ (12) 10d
<br />SLOPE OF ADJACENT TRUSS NAILS AT EACH STUD FASTENED WITH 3
<br />) STUD WALL (SEE TYP. SEC.) ( )
<br />SECTION 16d PER SIDE
<br />3 SECTION 4 SCISSOR GABLE "T" BRACE 7
<br />SCALE: N.T.S. S5 SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 10/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR 7/16"
<br />OSB SHEATHING ATTACHED
<br />W/ 1Od NAILS @ 6" O.C.
<br />E ES AND 12" O.C. FIELD
<br />14CJACK TRUSS
<br />SEE PLAN FOR
<br />CONNECTION
<br />OF THE LAST LAMINATION ( ) 2x4 "T' ON TOP OF PANEL
<br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION BLOCKING, FASTEN WITH L- 2x4 BLOCKING W/
<br />EXT. WALL CONN. COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF 1Odx3 @ 4 O/C (2)12d TOENAILS
<br />NON -LOAD BEARI G LOCATIONrD B.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION
<br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=V-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT—UP COLUMNS 8 9
<br />ADDITIONAL INFORMATION. SCALE: N.T.S. S5 SCALE: N.T.S. S5
<br />CROSS BRACING DETAIL
<br />S5
<br />12
<br />6.9 MAX.
<br />12"
<br />1INIMUM 2x
<br />'ROSS BRACING
<br />SEE PLAN FOR
<br />OCATIONS) TOENAIL
<br />(2)16d NA
<br />(2)16d PER
<br />JOINT
<br />7"YA" RAIN SFF RA/Sri
<br />SCALE: N.T.S.
<br />S5
<br />:E RSH SCHEDULE
<br />IR ATTACHMENT
<br />:4 #2 SYP BLK'G @ 16" O.C.
<br />10d x 0.131"
<br />)ENAILS EA, SIDE
<br />)NT. 2x4 #2 SYP w/ 1 Od
<br />XO.131" @ 8" O.C.
<br />ALTERNATE NON -DROP
<br />GABLE END DETAIL 10
<br />SCALE: N.T.S. S5
<br />GABLE TRUSS
<br />1" BRACE W/ 10d @ 4" O.C.
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />I all a �II fl allm \ lI II Ik 4
<br />CONT. BEARING
<br />GABLE END BRACING DETAIL
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S.
<br />PRE-ENGINEERED
<br />WOOD TRUSSES
<br />OVERLAP TRUSS BRACING
<br />AT LEAST TWO TRUSS SPACES
<br />-MINIMUM (2)16d PER JOINT \-MINIMUM 2X4 TRUSS BRACING
<br />TRUSS BRACING OVERLAP DETAIL
<br />SCALE: N.T.S.
<br />6" OVERLAP
<br />M
<br />S5
<br />"L" BRACE W/ 10d @ 4" O/C
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />8d @ 6"O/C
<br />WOOD TRUSSES
<br />SIMPSON HGAMIOKTAw/ (4)
<br />1/4"x1 1/2" SDS SCREWS TO
<br />BLOCKING & (4)1/4"X2 3/4"
<br />TITEN TO CMU
<br />2 x 4 BLOCKING w/ (2)1 Od
<br />TOE NAILS AT EACH END @
<br />24" O/C (TYP)
<br />BRACING w/ (3)1 Od x 3" AT =
<br />• EACH CONN. @ 24" O/C
<br />MOISTURE BARRIER
<br />BOND BEAM
<br />MASONRY WALL
<br />ARCHITECTURAL FINISH
<br />EXT. WALL CONN. (� NON -LOAD
<br />BEARING LOCATION (UNEVEN CLG.)
<br />SEE TYP. WALL SECTION FOR
<br />ADDITIONAL INFORMATION.
<br />SCALE: N.T.S.
<br />"L" BRACING REQUIREMENTS
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 1 O/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR
<br />7/16" OSB SHEATHING
<br />ATTACHED w/ 1 Od NAILS
<br />@ 6" O.C. EDGES AND 12"
<br />O.C. FIELD
<br />•2x4 "T" ON TOP OF PANEL
<br />BLOCKING, FASTEN WITH
<br />1Odx3" @ 4" O/C
<br />2x4 BLOCKING 2x4 "T" BLOCKING
<br />@ 48" O.C. 16d NAIL
<br />"L" BRACE
<br />ATTACHED W/
<br />71
<br />10d NAILS @ 4"
<br />O,C. TYPICAL
<br />GABLE TRUSS WEB
<br />DOUBLE "L" BRACING DETAIL 5
<br />SCALE: N.T.S. S5
<br />2x4 "T" BLOCKING
<br />2x4 BLOCKING @
<br />48" O.C. 16d NAIL
<br />L BRACE ATTACHED
<br />W/ 10d NAILS @ 4" 0.C�
<br />TYPICAL
<br />GABLE TRUSS WEB J
<br />SINGLE "L" BRACING DETAIL 6
<br />SCALE: N.T.S. S5
<br />DIAPHRAGM
<br />BLOCKING @
<br />48" 0/C GABLE TRUSS
<br />TRUSS VERTICAL
<br />J
<br />2x4 LEDGER (MATCH BOTTOM CHORD DBL. TOP PLATE SIMPSON SPZ w/ (12) 10d
<br />SLOPE OF ADJACENT TRUSS NAILS AT EACH STUD FASTENED WITH 3
<br />) STUD WALL (SEE TYP. SEC.) ( )
<br />SECTION 16d PER SIDE
<br />3 SECTION 4 SCISSOR GABLE "T" BRACE 7
<br />SCALE: N.T.S. S5 SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5
<br />MAX. 9"
<br />UNSUPPORTED,
<br />IF >9" SEE 10/S5
<br />"L" BRACE TO EXTEND
<br />AT LEAST 90% OF WEB
<br />LENGTH (SEE TABLE)
<br />-GABLE TRUSS
<br />-1/2" CDX PLYWOOD OR 7/16"
<br />OSB SHEATHING ATTACHED
<br />W/ 1Od NAILS @ 6" O.C.
<br />E ES AND 12" O.C. FIELD
<br />14CJACK TRUSS
<br />SEE PLAN FOR
<br />CONNECTION
<br />OF THE LAST LAMINATION ( ) 2x4 "T' ON TOP OF PANEL
<br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION BLOCKING, FASTEN WITH L- 2x4 BLOCKING W/
<br />EXT. WALL CONN. COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF 1Odx3 @ 4 O/C (2)12d TOENAILS
<br />NON -LOAD BEARI G LOCATIONrD B.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION
<br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=V-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT—UP COLUMNS 8 9
<br />ADDITIONAL INFORMATION. SCALE: N.T.S. S5 SCALE: N.T.S. S5
<br />CROSS BRACING DETAIL
<br />S5
<br />12
<br />6.9 MAX.
<br />12"
<br />1INIMUM 2x
<br />'ROSS BRACING
<br />SEE PLAN FOR
<br />OCATIONS) TOENAIL
<br />(2)16d NA
<br />(2)16d PER
<br />JOINT
<br />7"YA" RAIN SFF RA/Sri
<br />SCALE: N.T.S.
<br />S5
<br />:E RSH SCHEDULE
<br />IR ATTACHMENT
<br />:4 #2 SYP BLK'G @ 16" O.C.
<br />10d x 0.131"
<br />)ENAILS EA, SIDE
<br />)NT. 2x4 #2 SYP w/ 1 Od
<br />XO.131" @ 8" O.C.
<br />ALTERNATE NON -DROP
<br />GABLE END DETAIL 10
<br />SCALE: N.T.S. S5
<br />GABLE TRUSS
<br />1" BRACE W/ 10d @ 4" O.C.
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />I all a �II fl allm \ lI II Ik 4
<br />CONT. BEARING
<br />GABLE END BRACING DETAIL
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S.
<br />PRE-ENGINEERED
<br />WOOD TRUSSES
<br />OVERLAP TRUSS BRACING
<br />AT LEAST TWO TRUSS SPACES
<br />-MINIMUM (2)16d PER JOINT \-MINIMUM 2X4 TRUSS BRACING
<br />TRUSS BRACING OVERLAP DETAIL
<br />SCALE: N.T.S.
<br />6" OVERLAP
<br />M
<br />S5
<br />"L" BRACE W/ 10d @ 4" O/C
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />8d @ 6"O/C
<br />WOOD TRUSSES
<br />SIMPSON HGAMIOKTAw/ (4)
<br />1/4"x1 1/2" SDS SCREWS TO
<br />BLOCKING & (4)1/4"X2 3/4"
<br />TITEN TO CMU
<br />2 x 4 BLOCKING w/ (2)1 Od
<br />TOE NAILS AT EACH END @
<br />24" O/C (TYP)
<br />BRACING w/ (3)1 Od x 3" AT =
<br />• EACH CONN. @ 24" O/C
<br />MOISTURE BARRIER
<br />BOND BEAM
<br />MASONRY WALL
<br />ARCHITECTURAL FINISH
<br />EXT. WALL CONN. (� NON -LOAD
<br />BEARING LOCATION (UNEVEN CLG.)
<br />SEE TYP. WALL SECTION FOR
<br />ADDITIONAL INFORMATION.
<br />SCALE: N.T.S.
<br />"L" BRACING REQUIREMENTS
<br />CROSS BRACING DETAIL
<br />S5
<br />12
<br />6.9 MAX.
<br />12"
<br />1INIMUM 2x
<br />'ROSS BRACING
<br />SEE PLAN FOR
<br />OCATIONS) TOENAIL
<br />(2)16d NA
<br />(2)16d PER
<br />JOINT
<br />7"YA" RAIN SFF RA/Sri
<br />SCALE: N.T.S.
<br />S5
<br />:E RSH SCHEDULE
<br />IR ATTACHMENT
<br />:4 #2 SYP BLK'G @ 16" O.C.
<br />10d x 0.131"
<br />)ENAILS EA, SIDE
<br />)NT. 2x4 #2 SYP w/ 1 Od
<br />XO.131" @ 8" O.C.
<br />ALTERNATE NON -DROP
<br />GABLE END DETAIL 10
<br />SCALE: N.T.S. S5
<br />GABLE TRUSS
<br />1" BRACE W/ 10d @ 4" O.C.
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />I all a �II fl allm \ lI II Ik 4
<br />CONT. BEARING
<br />GABLE END BRACING DETAIL
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S.
<br />PRE-ENGINEERED
<br />WOOD TRUSSES
<br />OVERLAP TRUSS BRACING
<br />AT LEAST TWO TRUSS SPACES
<br />-MINIMUM (2)16d PER JOINT \-MINIMUM 2X4 TRUSS BRACING
<br />TRUSS BRACING OVERLAP DETAIL
<br />SCALE: N.T.S.
<br />6" OVERLAP
<br />M
<br />S5
<br />"L" BRACE W/ 10d @ 4" O/C
<br />(SEE SCHEDULE FOR SIZE
<br />AND LOCATION)
<br />8d @ 6"O/C
<br />WOOD TRUSSES
<br />SIMPSON HGAMIOKTAw/ (4)
<br />1/4"x1 1/2" SDS SCREWS TO
<br />BLOCKING & (4)1/4"X2 3/4"
<br />TITEN TO CMU
<br />2 x 4 BLOCKING w/ (2)1 Od
<br />TOE NAILS AT EACH END @
<br />24" O/C (TYP)
<br />BRACING w/ (3)1 Od x 3" AT =
<br />• EACH CONN. @ 24" O/C
<br />MOISTURE BARRIER
<br />BOND BEAM
<br />MASONRY WALL
<br />ARCHITECTURAL FINISH
<br />EXT. WALL CONN. (� NON -LOAD
<br />BEARING LOCATION (UNEVEN CLG.)
<br />SEE TYP. WALL SECTION FOR
<br />ADDITIONAL INFORMATION.
<br />SCALE: N.T.S.
<br />"L" BRACING REQUIREMENTS
<br />STUD
<br />SPACING
<br />NO
<br />"L" BRACE
<br />(1) 2"x4" (U.N.O.)
<br />"L" BRACE
<br />2"x6" (U.N.O.)
<br />"L" BRACE
<br />24"
<br />0'0" - 3'-0"
<br />T-0" - 6'-O"
<br />6'-0" & GREATER
<br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND
<br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING
<br />NOTE:
<br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES
<br />BRACE TO EXTEND FULL HEIGHT OF GABLE.
<br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 10dx3" NAILS @ 4" 0/C.
<br />3) SEE 6/S5 FOR MORE INFO.
<br />SIMPSON HGA10KT W/ (4) 1/4"x1 1/2" SDS
<br />tiviv i . u.nruva "-
<br />GABLE END BRACING DETAIL SCALE:3/4"=1'-0"
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION
<br />61 WbUN SNZ W/ (12)
<br />10d NAILS AT EACH
<br />STUD
<br />END JACK
<br />1 V-0" MAX.
<br />✓9
<br />o
<br />Cr
<br />CORNERJACK
<br />k
<br />0.
<br />QU
<br />Er
<br />w
<br />z
<br />O
<br />U
<br />HIP FRAMING REFERENCE PLAN
<br />20'-0" MAX 20'-0" MAX
<br />"X" BRACE SEE DET. J/S5 CONTINUOUS BOTTO CHORD BRACING 2X4 MIN.
<br />1111
<br />2�-
<br />NOTE: ZTOP CHORD 2x4 #2 SYP BRACING
<br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING
<br />ZBOTTOM
<br />@ 16" O.C. MAX. FOR FIRST (4)
<br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING
<br />BAYS
<br />THAT MY BE REQUIRED
<br />CHORD GABLE END BRACING
<br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT
<br />@ 4'4" O.C. MAX. FOR FIRST (4) BAYS
<br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB.
<br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN
<br />AS PER BCSI
<br />SCISSOR TRUSS
<br />SCISSOR TRUSS
<br />W/ DROP CEILING BRACING DETAIL
<br />SCALE: N.T.S.
<br />2X4 BRACING @ 48" O.C. CONTINUOUS TO
<br />FIXED LOCATION ATTACHED W/ (2)10d AT
<br />EA. TRUSS (NOTE: BRACING MAY BE
<br />PLACED ON EITHER TOP OR BOTTOM OF
<br />THE BOTTOM CORD)
<br />COSMETIC DROP CEILING FRAMING
<br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS
<br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION
<br />WOOD FRAMED GABLE END BRACING DETAIL
<br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S.
<br />FOR WIND SPEED SPECIFICATION
<br />L
<br />En
<br />I11 hw/t,��¢��
<br />���yy����4iZlI
<br />Cj
<br />U
<br />�O� C:"
<br />•,`
<br />B
<br />C"'i���
<br />0. .
<br />FL5
<br />......
<br />To the best of the Engineer's knowledge, information and belief,
<br />the structural plans and specifications contained within these
<br />drawings comply with the 2020
<br />Florida Building Code -
<br />Residential 7th Edition. Engineers signature and seal is only for
<br />the structural engineering portions of the drawing pages bearing
<br />Engineers signature and seal.
<br />�1
<br />F
<br />E ti
<br />O (rOj tp h �k
<br />C
<br />O N N v J
<br />C J It
<br />M
<br />9n°0� ac"a
<br />LL
<br />�MO� u. a Y
<br />Q
<br />�
<br />JLLu- a 3
<br />o
<br />�0
<br />Z
<br />t
<br />W
<br />8
<br />5Nco M O
<br />°' ¢
<br />LL Z
<br />U rn .1
<br />a
<br />W o
<br />N Mz° CD
<br />06
<br />Z
<br />W
<br />C] ❑ ❑
<br />z N c+r
<br />o$
<br />z to
<br />z
<br />J
<br />N
<br />N
<br />V O
<br />— LL
<br />N
<br />W
<br />—�
<br />O
<br />V)
<br />�U)
<br />�_ s
<br />fz
<br />ago
<br />W �
<br />pEp
<br />L O
<br />I
<br />yl1
<br />O N
<br />Cn
<br />Q -
<br />�0
<br />•
<br />N O
<br />4m
<br />oCAD
<br />w
<br />M
<br />o 0
<br />0
<br />Z
<br />`; o
<br />0®
<br />14
<br />CL o
<br />C 8
<br />I.EiF-
<br />wz
<br />oa
<br />cc (6
<br />U
<br />& 8
<br />O
<br />O�
<br />O
<br />N
<br />¢z
<br />g
<br />WZ
<br />H
<br />� _
<br />_
<br />U
<br />o
<br />zz
<br />z
<br />co N
<br />ym
<br />QW
<br />oa
<br />go
<br />W
<br />U
<br />LL
<br />�o
<br />a
<br />OW
<br />r�
<br />z
<br />o
<br />w�
<br />�~
<br />>°
<br />c0
<br />d
<br />zl¢
<br />a
<br />VO c$
<br />N O
<br />> Lo
<br />a�
<br />nL'
<br />W
<br />m
<br />0
<br />.>
<br />C)
<br />0
<br />T
<br />0
<br />'
<br />0
<br />O
<br />n
<br />r)
<br />O
<br />m
<br />O
<br />E N
<br />.T�
<br />N
<br />00
<br />T-
<br />... V
<br />r
<br />0)
<br />m
<br />F T
<br />M
<br />Z
<br />z
<br />E
<br />E
<br />aCU
<br />'a w
<br />€
<br />d
<br />4.;
<br />U -1
<br />Q p
<br />JOB
<br />NO:
<br />20-8083
<br />SCALE :
<br />AS NOTED
<br />SHEET NO.
<br />S5