Laserfiche WebLink
CORNER OF <br />HOME <br />GARAGE SIDE <br />_ 10'-0" <br />TANK -LESS W/H <br />5'-011 <br />STUB -OUT FOR -' <br />GAS METER 0 — <br />O <br />N <br />H C G <br />coo <br />a _ <br />0 o <br />1'-0" o ° ' <br />1 p in <br />� U <br />0 <br />x <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />**ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY** <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7'-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-611 <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2) 16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3)16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15'-411 <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM), <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />W <br />m <br />0 <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />+ + <br />+ + + + + + + + + <br />+ + + + + + + + + + t t t + <br />+ <br />+ <br />+ + + + + + + + o <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ + + + + + + + + to' <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ <br />+ <br />+ <br />+ '-0" (TYP.) <br />+ + <br />4'-0" <br />+ + + <br />+ + <br />4'-0" <br />+ + + <br />+ <br />+ + <br />+ <br />+ + <br />+ + + <br />+ + <br />+ + <br />+ <br />+ <br />+ + <br />h + <br />+ <br />+ + <br />+ + <br />+ + <br />+ + <br />+ <br />+ <br />+ + + + + + + + <br />+ <br />+ + + + + + + + + + <br />+ + <br />+ + <br />+ + + + + + + o <br />+ + <br />+ + + + +++ + + <br />7++++++ <br />+ <br />++ <br />+ t + + + + + <br />+ <br />+ + + + ++ + + + + <br />+ <br />++ <br />+++ <br />+++++++ <br />+ <br />cr' <br />`-RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (1.1103 SECOND GUST EXPOSURE "C" WIND ZONE <br />15/32" CDX I <br />PLYWOOD OR <br />7/16" OSB <br />a_v � v v.v. to VU 1111VuJl 1/11V1\ IVIVILV ` V V.V. LIJI.]LV lX <br />+ + + + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH 2-3/8 INCH NAIL LENGTH <br />NOTE: FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+hacker and Filler Block Dimensions <br />BCI®Joist Backer Block <br />Thickness Filler Block Thickness <br />Series <br />3/4" or 7/8" <br />5000s 1.8/1.7 <br />wood panels <br />Two 3!4" wood panels or 2 x _ <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2x — + 5/8" or 3/4" wood panel <br />902.0 <br />2x — lumber <br />Double 2 x _ lumber <br />DOUBLE JOIST CONS <br />(Not required if both los <br />Filler <br />1/8" gap <br />FILL CELLS STD. 90° HOOK r— BOND BEAM <br />W <br />.... ...... <br />STD. 90° <br />CONT. #5 <br />CONT. #5 HOOK <br />BAR <br />BAR <br />#5 CONT. <br />.. ... .. <br />. ..... <br />FROM <br />F ATION <br />TOUR D HEST <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D COLUMN AND SHEATHING PER PLAN <br />CONNECTION TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br />Solid block all posts from # OF 2nd FLOOR <br />above to bearing below. STUDS <br />@ INT. BRG. WALL SECTION <br />N.T.S. <br />1/8" min. } Small gap 2" min. <br />2" max. � 4" max. <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener 2" min. <br />required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVINGY" GAP @TOP sides by 6". - Hangers with sides not containingtop t. WEB STIFFENER <br />DOUBLE JOIST CONNECTION Birds <br />n uthce of uis. <br />- Birdsmouth cuts. N.T.S. <br />- Under 2nd floor Cnh Imn ae1/ Inane <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for appropriate <br />details in <br />One 10d box <br />areas=20 of high <br />or=20 sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam O <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />Use 3" (10d) nails at 6" o.c. <br />higher than 15001b <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Q'/ Provide adequate bearing <br />for each lapped joist. Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />.10d nails require additional consideration. — <br />SECTION a@ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />Imm -� 0---E] t <br />611 A 1)/2" ROUND HOLE MAY 6" 6"DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1%2' <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1%" <br />SEEMMEME <br />BMW <br />mmmmi <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1%" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALL SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series Depth End Intermediate <br />® <br />BCI5000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />BCI 6000s 0 <br />BC16500s® <br />9-1/2" <br />11 -7/8" <br />' 2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC160s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC190so <br />11 - / " <br />3-16d <br />3-16d <br />14' <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />w/ (22) <br />NAILS i <br />5/8"o <br />THRU <br />SIMPSC <br />w/ (22) <br />NAILS 1 <br />R TRUSS <br />OP PLATE <br />I.0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />Joist <br />1-When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />',,,Install tight to top flange. <br />JC <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4%2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with ' to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange, flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />depth <br />I -JOISTS BUCKETS <br />N.T.S, <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />�'® <br />LOCATION OF <br />�. <br />SECOND H10A <br />SIMPSON H10A <br />° <br />° ° <br />(WHEN <br />w/ (18) 1Od x 1 1/2" <br />° <br />REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE PVC OR SCH40 SLEEVE <br />A/C CHASE 4" PVC PENETRATION <br />SLEEVE THRU STEM z: <br />WALL <br />=1 I, III, 11=1 11=1 a I I I —I 1-1 11=1 I I I I I <br />•'a II I d I 14. d:SA <br />__ i—III— i i': <br />—. I I-1 I-1 I I-1 I I-1 I I III-1 I I FINISH GRADE -III— I I <br />SLEEVE THRU STEM-/ ° <br />SEE PLAN FOR--'°• a . • e . • <br />FOUNDATION INFO a. a' ° <br />STEM FOUNDATION <br />GRADE <br />r-REINF. SEE PLAN <br />(2) #5 REBAR <br />A/C CHASE 4" PVC <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />L-- SEE FND. PLN. <br />SIZE & REINF. <br />If <br />12" BELOW PIPE VERTICAL THRU FND. <br />GRADE <br />TOP (2) #5's x 4' 0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATIONPLUMBING LINE <br />co � �d • a. • .. <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />d c' n c <br />------� . .4--.-- -- a. °/ ca <br />II=1I1=1I1=1I ` ,a I1=111=1II: <br />a <br />, I —III —_I I I- <br />II—I11= \ G <br />a <br />SEE FND. PLN. <br />SIZE & REINF. <br />N <br />0 <br />N <br />3 <br />Z -- 4 <br />a <br />d a <br />-,�<" S Y • i44 <br />00 <br />Sri <br />LJ— <br />d"� <br />0 <br />Q <br />z <br />LU <br />O <br />i^a <br />W <br />0 <br />z <br />Q <br />nN > 0O N o <br />W L .� �O ah c <br />C) MN <br />CO �) <br />an <br />o <br />N V -0 <br />7m:E=_ <br />MpoQU <br />O U <br />0 <br />�M:o <br />•sA� O <br />"R <br />.N u W Q: v <br />V 00 E ^ .2) <br />F0 <br />W <br />LLI W O F- <br />Hcg�2YZLLWQ �Of Z <br />n-2 <br />LlOOR-0 <br />�O?W <br />Q� <br />OpEE Om5H <br />0 <br />Z <br />L <br />(nW Zz <br />(WR' Q� <br />U) <br />_0n <br />WOw0<-Z o�J <br />Q ❑2Q <br />0W Z�Q a <br />0� 0Q¢LQ O LL <br />f <br />N <br />O <br />O <br />OW <br />U0 � N <br />v) C:) O <br />O <br />Q U0 Ln <br />J <br />U_ <br />w Q Ln <br />I:e <br />Q>Qoo <br />Z � I— <br />z <br />W_J <br />� <br />mi <br />/1 <br />co <br />T- <br />ao <br />� <br />CO <br />� <br />O <br />N <br />O <br />N <br />O <br />N <br />04 <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />1 <br />O <br />1 <br />O <br />O <br />Op <br />CD <br />CAI <br />A <br />CD <br />N <br />0 <br />0 <br />CD <br />0 <br />1 <br />L <br />� <br />> <br />O <br />N <br />O <br />M <br />O <br />d' <br />O <br />LO <br />O <br />C0 <br />O <br />I1- <br />0. <br />Z Z <br />LL <br />o <br />oWcn <br />V <br />N <br />o <br />U�o <br />0- <br />LO <br />�_ <br />Z <br />OC- <br />z��l- <br />=Q <br />_ <br />~co0Z <br />- 2 Z <br />ZLU <br />Z � <br />0-ZZ <br />LU <br />0J2Z <br />Q <br />C/) CO <br />z <br />Z Z <br />=QO <br />H <br />■ <br />z <br />Q <br />U <br />U <br />0- <br />0 <br />0 <br />m <br />Q <br />Z <br />z <br />W <br />J <br />LU <br />It <br />�, <br />o <br />N <br />LAST PLOT DATE <br />Feb. 9, 21 <br />STRUCTURAL <br />z <br />.. <br />p <br />I. <br />I <br />DETAILS <br />