Laserfiche WebLink
THIS DETAIL ONLY REFERS TO THE DIAMOND -MESH <br />EXPANDED METAL LATH ATTACHMENT. <br />METAL LATH - •.,. - WALL SHEATHING <br />16GAx1-1°':_'1 LONG (3/4%1" CROWN) <br />STAPLES Gas 6" O.C. VERT BETWEEN I MAX1 i I I 16GAx1-1,' ' LONG (341-1" <br />STUDS (NOTED THUS:—) - OFFSET I I k I CROWN) STAPLES (a) 6" <br />STAPLES BETWEEN STUDS AS SHOWN O.G. VERT INTO STUDS <br />(NOTED THUS:—) <br />METAL LATH ATTACHMENT DETAIL <br />REV. 09.24.21 SCALE: 314" = V-0" <br />*DETAIL EXCEEDS THE REQUIREMENTS FOR FBCR 703.7.1 LATH - <br />*ONLY APPLIES TO LENNAR TPAIJAX— <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS. <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4%1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESIVE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C 1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />5'-0" <br />STUB -OUT FOR -' <br />GAS METER O <br />0 <br />CV <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />T-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'4" <br />(3)16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4)16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'4" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />115'-4" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />V,•, <br />} } + t + t t t t t + C- <br />p <br />+ + <br />+ + <br />+ + + + t <br />t <br />+ <br />+ <br />+ <br />+ <br />} <br />+ <br />+ <br />+ <br />+ <br />Backer and Filler Block Dimensions <br />BCI®Joist Backer Block <br />Series <br />Thickness Filler Block Thickness <br />3/4" or 7/8"5000s 1.8/1.7 wood panels <br />Two 3/4" wood panels or 2 x <br />6000s 1.8/1.7 wood panels 2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 wood panels 2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 wood panels 2 x _ + 5/8" or 3/4" wood panel <br />902.0 2 x _ lumber Double 2 x _ lumber <br />DOUBLE JOIST CONS <br />(Not required if both loa <br />Filler <br />1/8" gap <br />FILL CELLS STD. 900 HOOK <br />BOND BEAM <br />........ ........... ...... <br />V7 <br />W <br />¢ STD. 90° CONT. #5 <br />CONT. #5 HOOK BAR <br />BAR <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />6OND BEAM <br />BOND BEAM STEP <br />DOUBLE JOIST CONS <br />(Not required if both loa <br />Filler <br />1/8" gap <br />FILL CELLS STD. 900 HOOK <br />BOND BEAM <br />........ ........... ...... <br />V7 <br />W <br />¢ STD. 90° CONT. #5 <br />CONT. #5 HOOK BAR <br />BAR <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />6OND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br />Solid block all posts from <br /># OF 2nd FLOOR <br />above to bearing below. <br />STUDS <br />SECTION <br />@ INT. BRG. WALL <br />N.T.S. <br />1/8" min.) Small 2' min. <br />2" <br />gap <br />max. � 4 max. <br />Clinch nails <br />when <br />possibleA 1 <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 118" gap between top of filler blocking and bottom of top flange. 2x4/Plywood/OSB web stiffener 2" min. <br />4) Place joists together and nail from each side with 2 rows of 10d nails required when indicated or 4" max. <br />2x—: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVINGYs" GAP @TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouthcuts. N.T.S. <br />- Under 2nd floor column w/ loads <br />N.T.S. higher than l rnnlh <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for appropriate <br />1/16" <br />details in <br />One 10d box <br />areas=20 of high <br />or-20 sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />Ilea 3" (indl nails nt R" n c <br />�'/ Provide adequate bearing <br />for each lapped joist. <br />Odnails SECTION @ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />BLOCKING PANEL, INTERIOR <br />Web Stiffener Fastener Schedule <br />Joist Bearing Location <br />Series I Depth I End Intermediate <br />9-1/2111 <br />2-8d <br />2-8d <br />14" <br />1 2-8d <br />BCI6000s <br />BCI6500s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC160s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90s® <br />" <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* -7 <br />Use 1063" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration. — <br />imam <br />ioJ, is <br />6„ A 1Yz" ROUND HOLE MAY 6„ 6„ DO NOT CUT HOLES <br />THE WEB. PROVIDE AT <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1Y" <br />ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1Yz" <br />Round Hole Diameter (in) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />8.875 <br />10 <br />11 <br />12 <br />13 <br />Rectangular Hole Side (in) <br />2 <br />3 <br />5 <br />6 <br />8 <br />9 <br />10 <br />Any 16" joist <br />Span (ft) <br />8 <br />V-0" <br />V-1" <br />1'-2" <br />V-2" <br />V-3" <br />V-3" <br />1'-7" <br />1'-11" <br />2'-4" <br />2'-9" <br />3'-2" <br />X-7" <br />12 <br />V-0" <br />V-1" <br />V-2" <br />V-2" <br />V-3" <br />V-9" <br />2'-4" <br />2'-11" <br />3'-7" <br />4'-2" <br />4'-9" <br />5'4" <br />16 <br />1'-0" <br />1'-i " <br />V-2" <br />1' 2" <br />V-7 <br />2" 5" <br />3 2„ <br />3'-10" <br />W-9" <br />5'-7" <br />6`-4" <br />7'-2" <br />20 <br />V-0" <br />V-1" <br />V-2" <br />1'-2" <br />2'-0, <br />3'-0" <br />4'-D'" <br />4'-10" <br />5'-11" <br />6'-11" <br />7'-11" <br />8"-11" <br />24 <br />1'-O" <br />V-1- <br />V-2" <br />V-3" <br />2'-5"1 <br />3'-7" <br />4'-9" <br />5'-10" <br />1 7=2" <br />1 8'-4" <br />9'-6'" <br />10'-9," <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1y" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1Yz" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />SIMPS( <br />w/ (22) <br />NAILS 1 <br />5/8"0 <br />THRU <br />BOLT <br />SIMPS( <br />w/ (22) <br />NAILS 1 <br />R TRUSS <br />OP PLATE <br />I,C <br />TYPICAL SIMPSON MGT TO <br />BUILT—UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />AIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />111L <br />Joist <br />F—When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3 to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Joist hanger <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />Backer block (12" wide min.) -I 1 ICI I ICI J I� 1 =� <br />Nail with 10-1 Od nails. <br />Install tight to top flange. SLEEVE THRU STEM-/ " <br />SEE PLAN FOR '0 <br />FOUNDATION INFO <br />STEM FOUNDATION <br />GRADE REINF. SEE PLAN <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top a _a * •� <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. ` ,_I,„,I 1 II, F I I, 1 <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be fight Backer block shall be tight <br />to bottom of top flangq,with to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange, <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />o depth <br />A/C CHASE �PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />I -JOISTS BUCKETS <br />N.T.S. <br />MAR 0 9 M3 <br />Virtual Review Assist. Inc. <br />Plans Review completed and appro <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />SIMPSON H10A (WHEN <br />w/ (18)10d x 1 1/2" ° REQUIRED) <br />NAILS <br />UPLIFT =1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE <br />PENETRATION <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />BELOW <br />GRADE PIPE VERTICAL THRU FND. <br />G <br />TOP (2) #5's x 4' _0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />a <br />a'a : Q <br />--------------------- <br />� Q <br />A Y <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />a <br />-----4 4.A,. °/ as G <br />I JJ 1=1 `� a /Q 1=L�1 I I; <br />-T,�I a <br />P <br />'tea -a ---_4 . rr <br />a <br />SEE FND. PLN. <br />SIZE & REINF. <br />N <br />N <br />O <br />N <br />O <br />co <br />�: • <br />O <br />LO <br />w <br />�s- --- <br />elf <br />I <br />.. <br />LU <br />tr <br />0 <br />z <br />Q <br />V) <br />N Lr: <br />L <br />W <br />_ <br />`J1 <br />L O- U <br />� <br />N n N <br />(N <br />CO + <br />V s0 -0 - 0 %) <br />� <br />E -� L p <br />A) M <br />�/ u g <br />Ell-p ti 8 o Q <br />V aN <br />N <br />L. oE� m <br />°L 0 <br />W <br />LiiW <br />OW uj WOE <br />W H Q w m_i X 9¢ Y z lx z <br />W0j �<0�[C�LLUO020 0 <br />Q Q V <br />Zoo zLLu_512M011 ¢ <br />��Oz02oomzz <br />0 0 <br />U) Z <br />cnwa�i-nnww�_zLLo:¢p � <br />¢�wa. Og�55-2uJ2 �¢ <br />OQ a 0 0Qz ¢ <br />�¢LL <br />O <br />O <br />N <br />Z W <br />Urn <br />,>_, O <br />0 `M O <br />aV J Lt7 <br />� ((All <br />Q W Q <br />� a � I <br />a�a00 <br />Z�� <br />Z <br />W <br />J O <br />l0 <br />J <br />V_ <br />N <br />N <br />O <br />CV <br />O <br />N <br />O <br />O <br />00 <br />CoV`� <br />O <br />T11 <br />ao <br />T­ <br />00 <br />O <br />N <br />O <br />N <br />O <br />N <br />N <br />O <br />O <br />N <br />O <br />N <br />O <br />CV <br />O <br />N <br />O <br />N <br />O <br />N <br />C)N <br />CA <br />N <br />CA <br />O <br />O <br />O <br />CO <br />O <br />CV <br />e— <br />A <br />O <br />CIO <br />4 <br />O <br />O <br />O <br />O <br />T— <br />cV <br />O <br />O <br />p <br />' <br />E <br />N <br />U.) <br />0 <br />N <br />0 <br />C6 <br />0 <br />0 <br />6 <br />C <br />CO <br />0 <br />tL <br />4t <br />Cr <br />M <br />(� <br />Z Z <br />o <br />vV <br />� <br />Wwin <br />10_�cl <br />MCL <br />Q <br />0 Q <br />0 <br />T_ W <br />UVW) <br />-0 <br />Z <br />ZLUP <br />=m=Z <br />�- <br />9z <br />J� <br />a <br />z0 <br />�ZZ <br />uAz <br />�` <br />O< <br />�WM <br />T_1 <br />o_ <br />Z <br />■ • <br />z <br />U <br />a <br />OV <br />MM0 <br />W <br />� <br />Z <br />SN 1 <br />Q <br />Z <br />z <br />w <br />W00 <br />It <br />� <br />LAST PLOT DATE <br />> <br />Nov. 30, 22 <br />Z <br />Q <br />STRUCTURAL <br />J <br />DETAILS <br />