SITE DESCRIPTION: <br />PROJECT NAME: ZEPHYR COMMONS APARTMENTS <br />PROPERTY OWNER: SF ZEPHYR COMMONS OUTPARCELS LP <br />400 CLEMANTIS STREET; SUITE 201 <br />WEST PALM BEACH, FL 33401 <br />TOTAL AREA OF THE SITE 12.83 ACRES <br />TOTAL AREA OF THE SITE TO BE DISTURBED: 13.3 ACRES <br />NAME OF RECEIVING WATER: ZEPHYR COMMONS MASTER POND <br />NATURE OF THE CONSTRUCTION ACTIVITY: <br />SOIL DISTURBING ACTIVITIES WILL INCLUDE MINIMAL CLEARING AND GRUBBING, AS THE SUBJECT SITE HAS <br />BEEN PREVIOUSLY MASS -GRADED AND CURRENTLY CONSISTS OF GRASSY VEGETATION THROUGHOUT; <br />INSTALLATION OF A STABILIZED CONSTRUCTION ENTRANCE, PERIMETER SILT FENCE SEDIMENT BARRIER(S) <br />ALONG THOSE PORTIONS OF THE SITE WHERE SITE RUNOFF IS ANTICIPATED THE SHEET -FLOW ACROSS THE <br />CONSTRUCTION LIMITS AND OTHER & EROSION SEDIMENT CONTROLS THROUGHOUT THE SITE; GRADING <br />ACTIVITIES FOR THE PURPOSE OF INSTALLING STORM SEWER UTILITIES BUILDING FOUNDATIONS AND <br />ACHIEVING THE SPECIFIED DRIVEWAY/PARKING LOT SUB -GRADE ELEVATIONS; CONSTRUCTION OF CURBING, <br />DRIVEWAYS, PARKING LOTS, AND AMENITY AREAS; FINAL GRADING IN PREPARATION FOR FINAL PLANTING <br />AND SEEDING MEASURES. <br />INTENDED SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES: <br />1. INSTALL STAKED SILT FENCE AS INDICATED ON THE CONSTRUCTION PLANS. <br />2. EXCAVATE SKIMMER BASINS FOR SEDIMENT TRAPS FOR SITE RUNOFFS. <br />3. INSTALL NEW SECTION OF 54"RCP STORM LINE TO ROUTE OFFSITE STORMWATER FLOWS THROUGH THE <br />SITE. <br />4. BEGIN MASS GRADING ACTIVITIES AND IN -FILL OF EXISTING STORMWATER DITCHES. <br />5. INSTALL MAIN STORM SEWER AND UTILITY LINES AS MASS GRADING ACTIVITIES PROGRESS PERMITS. <br />6. ONCE GRADING PROGRESS PERMITS, COMMENCE WITH BUILDING CONSTRUCTION. <br />7. INSTALL STORM SEWER SYSTEM AND ITS APPROPRIATE SEDIMENT PROTECTIONS, AS WELL AS SITE <br />UTILITIES. <br />8. STABILIZE PARKING LOT SUB -GRADE. <br />9. INSTALL CONCRETE CURB & GUTTER, PAVING BASE, AND ASPHALT. <br />10. COMPLETE FINAL SITE GRADING ACTIVITIES. <br />11. INSTALL PERMANENT STABILIZATION MEASURES IN ACCORDANCE WITH THE APPROVED LANDSCAPE <br />PLAN(S). REPAIR ANY/ALL WASHOUT AREAS PRIOR TO AND DURING INSTALLATION OF FINAL <br />STABILIZATION MEASURES (I.E. THE LANDSCAPE PLAN). <br />12. ONCE FINAL STABILIZATION OF THE SITE IS ACHIEVED AND CONSTRUCTION ACTIVITIES HAVE CEASED, ALL <br />TEMPORARY EROSION CONTROL DEVICES SHALL BE REMOVED AND DISTURBED AREA(S) RESULTING FROM <br />REMOVAL OF THESE DEVICES SHALL BE SMOOTHED, COMPACTED, AND PERMANENTLY STABILIZED WITH <br />SOD AS NECESSARY. <br />CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS <br />THIS STORM WATER POLLUTION PREVENTI N PLAN REFLECTS THE BEST MANAGEMENT PRACTICES BMP'S TE0 E ( ) <br />DESIGN CRITERIA THAT ARE PRESUMED TO MEET THE PERFORMANCE STANDARDS SET FORTH IN THE WATER <br />RESOURCE IMPLEMENTATION RULE CHAPTER 6 -40 F.A.C. . <br />TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE WITH THE STATE OF FLORIDA EROSION <br />AND SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL, LATEST UPDATE JULY 2013. <br />POLLUTION REDUCTION CONTROLS <br />EROSION AND SEDIMENT CONTROLS <br />STABILIZATION PRACTICES <br />WIND EROSION STABILIZATION - THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO <br />BE GRADED OR ALTERED WITHIN A REASONABLE TIME FRAME. ALL PERVIOUS AREAS OF THE SITE INCLUDED <br />IN GRADING THAT ARE DISTURBED DURING CONSTRUCTION SHALL BE GRADED AND PREPARED WITH A <br />COMBINATION OF SOD AND/OR SEEDING AND MULCHING. PAD AREAS WITHIN FUTURE UNITS WHERE <br />EARTHWORK IS COMPLETED SHALL BE COMPLETELY SEEDED AND MULCHED. AREAS WHERE CONSTRUCTION <br />OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY APPLYING A WATER SPRAY TO <br />SATURATE THE SURFACE SOILS ON A DAILY BASIS (OR AS NEEDED) TO MAINTAIN MINIMAL DUST <br />TRANSPORT. FUGITIVE DUST SHALL BE MONITORED CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO <br />BE TAKEN TO CONTROL OFF SITE TRANSPORT OF UNACCEPTABLE LEVELS OF DUST, <br />TEMPORARY STABILIZATION - TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE <br />CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR AT LEAST 21 DAYS SHALL BE STABILIZED WITH <br />TEMPORARY GRASS AND MULCH OR OTHER APPROVED MEANS, NO LATER THAN 14 DAYS FROM THE LAST <br />CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF BERMUDA AND 80 PARTS OF <br />PENSACOLA BAHIA. THE SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED IMMEDIATELY <br />BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE MULCH MATERIAL USED SHALL <br />NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY CONSISTING OF OAT, RYE OR WHEAT <br />STRAW, OR OF PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED <br />MULCH WHICH CAN BE READILY CUT INTO THE SOIL SHALL BE USED. AREAS OF THE SITE WHICH ARE TO BE <br />PAVED WILL BE TEMPORARILY STABILIZED BY APPLYING STABILIZATION AND BASE. <br />PERMANENT STABILIZATION - DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY <br />PERMANENTLY CEASES SHALL BE STABILIZED WITH SOD NO LATER THAN 14 DAYS AFTER LAST <br />CONSTRUCTION ACTIVITY. <br />STRUCTURAL PRACTICES <br />EROSION PROTECTION - DURING THE CONSTRUCTION PHASES, APPROPRIATE PRACTICES INCLUDING, BUT NOT <br />LIMITED TO SILT FENCE BARRIERS, HAY BALES AND WATERING OR OTHER METHODS NECESSARY WILL BE <br />IMPLEMENTED TO CONTROL FUGITIVE DUST. SEDIMENT BASINS - THE STORM WATER MANAGEMENT AREAS <br />(RETENTION AREAS) WILL SERVE AS SEDIMENT BASINS DURING THE CONSTRUCTION PERIOD. AT THE <br />CONTRACTOR' DISCRETION, THE SEDIMENT BASINS WILL BE CONSTRUCTED TO THE DESIGN CROSS-SECTION <br />OR A MINIMUM OF 2-FEET BELOW EXISTING GROUND TO ALLOW THE SILT TO BE COLLECTED AND REMOVED <br />PRIOR TO COMPLETION OF THE GRADING. <br />STORMWATER MANAGEMENT <br />STORM WATER DRAINAGE WILL BE PROVIDED BY A CURB, STORM WATER AND CATCH BASIN SYSTEM FOR <br />THE DEVELOPED AREAS. GRADED AREAS NOT RECEIVING PERMANENT COVERAGE, SUCH AS ASPHALT, <br />CONCRETE, OR A BUILDING/BUILDING PAD, SHALL BE GRADED AS SPECIFIED ON THE PLANS AND HAVE <br />PERMANENT SEEDING, SODDING, OR LANDSCAPE PLANTING. WHEN CONSTRUCTION IS COMPLETE THE SITE WILL <br />DRAIN TO STORM SEWER INLETS LOCATED THROUGHOUT THE SITE AND BE CONVEYED TO THE EAST/ <br />NORTHEAST, DISCHARGING INTO THE EXISTING STORMWATER POND LOCATED ADJACENT TO THE NORTHEAST <br />PROPERTY LINE. <br />OTHER SPECIFIED CONTROLS: <br />ORDERLY CONSTRUCTION SITE: <br />AN ORDERLY CONSTRUCTION SITE IS ONE OF THE FIRST STEPS TOWARDS PREVENTING STORM WATER <br />CONTAMINATION. A CLEAN AND ORDERLY CONSTRUCTION SITE REDUCES THE POSSIBILITY OF ACCIDENTAL <br />SPILLS, IMPROVES RESPONSE TIME IF THERE IS A SPILL AND REDUCES SAFETY HAZARDS AS WELL. THE <br />FOLLOWING BASIC CONCEPTS SHALL BE IMPLEMENTED: <br />(1) NEAT AND ORDERLY STORAGE OF ANY CHEMICALS, PESTICIDES, FERTILIZERS, FUELS, ETC., THAT <br />ARE BEING STORED AT THE SITE <br />(2) REGULAR GARBAGE, CONSTRUCTION WASTE AND SANITARY WASTE DISPOSAL OFF SITE IN <br />CONFORMANCE WITH ALL APPLICABLE STATE AND LOCAL LAWS. <br />(3) PROMPT CLEANUP OF ANY SPILLS THAT HAVE OCCURRED OF LIQUID OR DRY MATERIALS <br />(4) PROMPT CLEANUP OF ANY SEDIMENTATION THAT HAS OCCURRED ONTO NEARBY ROADWAYS WASTE <br />DISPOSAL: <br />PROPER MANAGEMENT AND DISPOSAL OF BUILDING MATERIALS AND OTHER CONSTRUCTION SITE WASTES <br />SHALL INCLUDE: <br />(1) SELECT A DESIGNATED WASTE COLLECTION AREA ONSITE <br />(2) PROVIDE AN ADEQUATE NUMBER OF CONTAINERS WITH LIDS OR COVERS THAT CAN BE PLACED <br />OVER THE CONTAINER PRIOR TO A RAINFALL EVENT <br />(3) WHEN POSSIBLE, LOCATE CONTAINERS IN A COVERED AREA <br />(4) WASTE COLLECTION AND DISPOSAL SHOULD OCCUR BEFORE THE CONTAINERS OVERFLOW <br />(5) ENSURE THAT CONSTRUCTION WASTE IS COLLECTED, REMOVED AND DISPOSED OF ONLY AT <br />AUTHORIZED DISPOSAL AREAS <br />(6) PROVIDE IMMEDIATE CLEANUP OF CONTAINERS THAT OVERFLOW OR IF A SPILL OCCURS <br />(7) PROVIDE DAILY INSPECTIONS OF WASTE COLLECTION AREAS. <br />HAZARDOUS PRODUCTS: <br />MATERIALS WHICH SHOULD BE CONSIDERED HAZARDOUS MAY INCLUDE BUT ARE NOT LIMITED TO: (PAINTS, <br />ACIDS FOR CLEANING MASONRY SURFACES, CLEANING SOLVENTS, CHEMICAL ADDITIVES FOR SOIL <br />STABILIZATION, CONCRETE CURING COMPOUNDS AND PETROLEUM PRODUCTS). PROPER MANAGEMENT AND <br />DISPOSAL PRACTICES OF HAZARDOUS MATERIALS SHALL INCLUDE: <br />(1) CHECK WITH LOCAL WASTE MANAGEMENT AUTHORITIES TO DETERMINE WHAT THE REQUIREMENTS <br />ARE FOR DISPOSING OF HAZARDOUS MATERIALS <br />(2) USE ALL OF THE PRODUCT BEFORE DISPOSING OF THE CONTAINER <br />(3) DO NOT REMOVE THE ORIGINAL PRODUCT LABEL FROM THE CONTAINER <br />(4) DO NOT MIX PRODUCTS TOGETHER UNLESS SPECIFICALLY RECOMMENDED BY THE MANUFACTURER <br />(5) THE CORRECT METHOD OF DISPOSAL OF THESE PRODUCTS VARIES WITH THE PRODUCT USED. <br />FOLLOW THE MANUFACTURER'S RECOMMENDED METHOD(S). <br />CONTAMINATED SOILS: <br />CONTAMINATED SOILS ARE SOILS WHICH HAVE BEEN EXPOSED TO AND STILL CONTAIN HAZARDOUS <br />SUBSTANCES. THOUGH NOT ANTICIPATED BASED ON INFORMATION PROVIDED BY THE OWNER, SHOULD <br />CONTAMINATED SOILS BE ENCOUNTERED ONSITE DURING EARTH MOVING ACTIVITIES OR DURING THE CLEANUP <br />OF A SPILL OR LEAK OF A HAZARDOUS PRODUCT. CONTACT THE STATE AND LOCAL SOLID WASTE <br />REGULATORY AGENCY CONCERNING INFORMATION AND PROCEDURES NECESSARY TO TREAT OR DISPOSE OF <br />CONTAMINATED SOILS. <br />CONCRETE TRUCKS: <br />EMPTYING OR WASH OUT OF EXCESS CONCRETE MAY BE ALLOWED ONSITE. EXCESS CONCRETE AND WASH <br />WATER SHOULD BE DISPOSED OF IN A MANNER THAT PREVENTS CONTACT BETWEEN THESE MATERIALS AND <br />STORM WATER WHICH WILL BE DISCHARGED FROM THE SITE. PROPER MANAGEMENT AND DISPOSAL <br />PRACTICES OF CONCRETE TRUCK WASH OUT SHALL INCLUDE: <br />(1) DIKES SHALL BE CONSTRUCTED AROUND THE AREA TO CONTAIN THESE MATERIALS UNTIL THEY <br />HARDEN, AT WHICH TIME THEY MAY BE PROPERLY DISPOSED OF. <br />SANITARY / SEPTIC DISPOSAL <br />- <br />ALL SANITARY WASTE SHALL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE <br />MANAGEMENT CONTRACTOR AS REQUIRED BY STATE AND LOCAL CODES AND REGULATIONS. <br />OFFSITE-VEHICLE TRACKING: <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE OFF SITE VEHICLE TRACKING <br />OF SEDIMENTS. THE PAVED STREETS SHALL BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT <br />OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE SITE SHALL BE COVERED <br />WITH A TARPAULIN AT ALL TIMES. <br />TIMING OF CONTROL MEASURES: <br />AS INDICATED IN THE "ESTIMATED CONSTRUCTION SCHEDULE", TREE SAVE FENCING, SILT FENCE SEDIMENT <br />BARRIERS, STABILIZED CONSTRUCTION ENTRANCES AND SEDIMENT BASINS SHALL BE CONSTRUCTED PRIOR TO <br />CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS WHERE CONSTRUCTION ACTIVITY <br />TEMPORARILY CEASES FOR MORE THAN 21 DAYS SHALL BE STABILIZED WITH A TEMPORARY GRASS AND <br />MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY <br />THAT AREA SHALL BE STABILIZED WITH PERMANENT SOD. AFTER THE ENTIRE SITE IS STABILIZED, THE <br />ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE TRAPS AND THE SILT FENCE SEDIMENT BARRIERS <br />SHALL BE REMOVED. <br />MAINTENANCE & INSPECTION PROCEDURES: <br />THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN EROSION <br />AND SEDIMENT CONTROL: <br />1. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM <br />EVENT OF 0.5-INCHES OR GREATER BY A CONTRACTORS REPRESENTATIVE. <br />2. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT SHALL <br />BE INITIATED WITHIN 24 HOURS OF REPORT. <br />3. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE <br />HEIGHT OF THE SILT FENCE. <br />4. SILT FENCE SHALL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT AND TEARS TO SEE IF THE <br />FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS AND TO SEE THAT THE FENCE POSTS ARE <br />FIRMLY IN THE GROUND. <br />5. THE SEDIMENT BASINS SHALL BE INSPECTED DEPTH OF SEDIMENT AND BUILD UP OF SEDIMENT SHALL <br />BE REMOVED WHEN IT REACHES 10% OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. <br />6. TEMPORARY AND PERMANENT GRASSING, MULCHING, AND/OR SODDING SHALL BE INSPECTED FOR BARE <br />SPOTS, WASHOUTS AND HEALTHY GROWTH. <br />A MAINTENANCE INSPECTION REPORT SHALL BE MAD AFTER EACH INSPECTION BY THE CONTRACTOR <br />7 E E L E0 <br />AND SHALL BE KEPT IN AN ACTIVE LOG READILY AVAILABLE AT THE JOB SITE. <br />8. EITHER THE SITE SUPERINTENDENT OR HIS DESIGNEES SHALL BE RESPONSIBLE FOR INSPECTIONS, <br />MAINTENANCE, REPAIR ACTIVITIES AND COMPLETING THE INSPECTION AND MAINTENANCE REPORT. <br />9. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL RECEIVE TRAINING <br />FROM THE SITE SUPERINTENDENT. THEY SHALL BE TRAINED IN ALL THE INSPECTION AND MAINTENANCE <br />PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ON SITE IN GOOD <br />WORKING ORDER. <br />NON-STORMWATER DISCHARGE(S): <br />IT IS EXPECTED THAT THE FOLLOWING NON-STORMWATER DISCHARGES WILL OCCUR FROM THE SITE DURING <br />THE CONSTRUCTION PERIOD: <br />1. WATER FROM WATER LINE FLUSHING. <br />2. PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE <br />OCCURRED). <br />3. IF NECESSARY, UNCONTAMINATED GROUNDWATER (FROM DE -WATERING EXCAVATION). <br />4. ALL NON-STORMWATER DISCHARGES SHALL BE DIRECTED TO THE SEDIMENT BASIN(S) PRIOR TO <br />DISCHARGE. <br />THE FOLLOWING NON-STORMWATER DISCHARGES ARE NOT EXPECTED TO OCCUR AND SHALL NOT OCCUR <br />FROM THE SITE DURING THE CONSTRUCTION PERIOD: <br />CONCRETE FERTILIZERS <br />DETERGENTS PETROLEUM BASED PRODUCTS & FUELS <br />PAINTS (ENAMEL & LATEX) CLEANING SOLVENTS <br />METAL STUDS WOOD <br />GLASS MASONRY BLOCK <br />TAR ROOFING SHINGLES <br />SAND STONE <br />SPILL PREVENTION: <br />MATERIAL MANAGEMENT PRACTICES <br />THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE USED TO REDUCE THE RISK OF <br />SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF. <br />GOOD HOUSEKEEPING: <br />THE FOLLOWING GOOD HOUSE KEEPING PRACTICES WILL BE FOLLOWED ONSITE DURING THE CONSTRUCTION <br />PROJECT. <br />• AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE JOB. <br />• ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE <br />CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE. <br />• PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MANUFACTURER'S LABEL. <br />• SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER. <br />• WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISPOSING OF THE CONTAINER. <br />• MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL BE FOLLOWED. <br />• THE JOB SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF <br />MATERIALS ONSITE. <br />HAZARDOUS PRODUCTS: <br />THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS. <br />• PRODUCTS WILL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT RE -SEALABLE. <br />• ORIGINAL LABELS AND MATERIAL SAFETY DATA WILL BE RETAINED; THEY CONTAIN IMPORTANT PRODUCT <br />INFORMATION. <br />• IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURERS' OR LOCAL AND STATE RECOMMENDED <br />METHODS FOR PROPER DISPOSAL WOULD BE FOLLOWED. <br />PRODUCT SPECIFIC PRACTICES: <br />THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED ONSITE: <br />PATROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS, AND TARS <br />WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ONSITE VEHICLES AND MACHINERY DAILY <br />INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT MAINTENANCE <br />AREAS WILL BE LOCATED AWAY FROM STATE WATERS, NATURAL DRAINS, AND STORMWATER DRAINAGE <br />INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO <br />PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS, AND LUBRICANTS IS PROHIBITED. <br />PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND DISPOSAL AS <br />REQUIRED BY LOCAL AND STATE REGULATIONS. <br />PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL CONTAINERS <br />WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORMWATER COLLECTION SYSTEM. <br />EXVESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS, AND PRODUCT CONTAINERS WILL BE DISPOSED <br />OF ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS. <br />FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED THE <br />MANUFACTURER'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE CROP ESTABLISHMENT OR <br />IN THE FLORIDA MANUAL FOR EROSION AND SEDIMENT CONTROL. ANY STORAGE OF THESE MATERIALS WILL <br />BE UNDER ROOF IN SEALED CONTAINERS. <br />BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIES OR DISPOSED OF <br />ONSITE. ALL SUCH MATERIAL(S) SHALL BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURES. <br />CONCRETE TRUCKS - NO CONCRETE TRUCKS WILL BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS <br />CONCRETE OR DRUM WASH WATER ONSITE. <br />SPILL CONTROL PRACTICES: <br />IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE <br />PREVIOUS SECTIONS OF THIS PLAN, THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION <br />AND CLEANUP; <br />- MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE AVAILABLE ON THE JOB SITE <br />AND PERSONNEL WILL BE MADE AWARE OF THE PROCEDURES, LOCATION OF INFORMATION, AND CLEANUP <br />SUPPLIES. <br />- MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE STORAGE TRAILER OF <br />THE SUPERINTENDENT. THE MATERIALS AND EQUIPMENT WILL INCLUDE BUT NOT BE LIMITED TO BROOMS, <br />DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, FLOOR ABSORBENT, SAND, SAWDUST, AND PLASTIC OR <br />METAL TRASH CONTAINERS SPECIFICALLY FOR THIS PURPOSE. <br />- ALL SPILLS WILL BE CLEANED UP IMMEDIATELY <br />- THE SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE <br />CLOTHING TO PREVENT INJURY FOR CONTACT WITH HAZARDOUS SUBSTANCE. <br />- SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE APPROPRIATE STATE AND LOCAL <br />GOVERNMENT AGENCY, REGARDLESS OF THE SIZE. <br />- THE SPILL PREVENTION PLAN WILL BE ADJUSTED BY THE CONTRACTOR TO INCLUDE MEASURES TO <br />PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS <br />ANOTHER ONE. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT, AND THE CLEANUP MEASURES WILL <br />ALSO BE INCLUDED. <br />- THE JOB SITE SUPERINTENDENT RESPONSIBLE FOR DAY-TO-DAY SITE OPERATIONS, WILL BE THE SPILL <br />PREVENTION AND CLEANUP COORDINATOR. HE WILL HAVE OTHER CONTRACTORS ON -SITE WHO WILL HELP <br />WITH THE PREVENTION AND CLEANUP. THE PERSONNEL NAMES WILL BE POSTED IN THE OFFICE JOB <br />TRAILER ONSITE. <br />NOTES: <br />1. NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL BE DISCHARGED TO WATER OF THE STATE. <br />2. OFF -SITE VEHICLE TRACKING OF DIRT, SOILS AND SEDIMENTS AND THE GENERATION OF DUST SHALL BE <br />MINIMIZED OR ELIMINATED TO THE MAXIMUM EXTENT PRACTICAL. <br />- LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY <br />POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE PERSONNEL. <br />- MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIALS STORAGE <br />AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO: BROOMS, MOPS, RAGS, <br />GLOVES, GOGGLES, CLAY CAT LITTER, SAND, SAWDUST AND PROPERLY LABELED PLASTIC AND METAL <br />WASTE CONTAINERS. <br />- SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND ADJUSTED AS <br />NECESSARY TO PREVENT FUTURE SPILLS. <br />- ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED AS <br />REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS. <br />- FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER), THE NATIONAL <br />RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT 1-800-426-2675. <br />- FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL CENTER (NRC) WILL BE CONTACTED WITHIN 24 <br />HOURS AT 1-800-426-2675. <br />- FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE FLORIDA DEP SHALL <br />BE CONTACTED WITHIN 24 HOURS. <br />- FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE SPILL WILL BE CLEANED <br />UP AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED. <br />SANITARY WASTES: <br />1. A MINIMUM OF ONE PORTABLE SANITARY UNIT WILL BE PROVIDED FOR EVERY TEN (10) WORKERS ON THE <br />SITE. ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONE TIME A <br />WEEK BY A LICENSED PORTABLE FACILITY PROVIDER IN COMPLETE COMPLIANCE WITH LOCAL AND STATE <br />REGULATIONS. <br />2 ALL SANITARY WASTE UNITS WILL BE LOCATED IN AN AREA WHERE THE LIKELIHOOD OF THE UNIT <br />CONTRIBUTING TO STORM WATER DISCHARGE IS NEGLIGIBLE. ADDITIONAL CONTAINMENT BMP'S MUST BE <br />IMPLEMENTED, SUCH AS GRAVEL BAGS OR SPECIALLY DESIGNED PLASTIC SKID CONTAINERS AROUND THE <br />BASE, TO PREVENT WASTES FROM CONTRIBUTING TO STORM WATER DISCHARGES. THE LOCATION OF <br />SANITARY WASTE UNITS MUST BE IDENTIFIED ON THE EROSION AND SEDIMENT CONTROL PLAN, <br />INTERMEDIATE PHASE, SHEET BY THE CONTRACTOR ONCE THE LOCATIONS HAVE BEEN DETERMINED. <br />3. PRIMARY PERMITTEE (OPERATOR/CONTRACTOR) SHALL ENSURE AND DEMONSTRATE THAT THEIR ESPCP IS <br />IN COMPLIANCE WITH APPLICABLE STATE AND LOCAL WASTE DISPOSAL, SANITARY SEWER OR SEPTIC <br />SYSTEM REGULATIONS. <br />WASTE MATERIALS: <br />1. ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A SECURELY LIDDED METAL DUMPSTER. THE <br />DUMPSTER SHALL MEET ALL SOLID WASTE MANAGEMENT REGULATIONS. ALL TRASH AND CONSTRUCTION <br />DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTER. THE DUMPSTER WILL BE EMPTIED A <br />MINIMUM OF ONCE PER WEEK OR MORE OFTEN IF NECESSARY AND TRASH WILL BE HAULED AS REQUIRED <br />BY LOCAL REGULATIONS. NO CONSTRUCTION WASTE WILL BE BURIED ONSITE. <br />2. ALL PERSONNEL WILL BE INSTRUCTED ON PROPER PROCEDURES FOR WASTE DISPOSAL. A NOTICE <br />STATING THESE PRACTICES WILL BE POSTED AT THE JOBSITE AND THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED. <br />3. NO WASTE WILL BE DISPOSED OF INTO STORM WATER INLETS OR WATERS OF THE STATE. <br />HAZARDOUS MATERIALS: <br />1. ALL HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL, <br />STATE, AND/OR FEDERAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. THE JOB SITE <br />SUPERINTENDENT, WHO WILL ALSO BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED, <br />SHALL INSTRUCT SITE PERSONNEL IN THESE PRACTICES MATERIAL SAFETY DATA SHEETS (MSDS'S) FOR <br />EACH SUBSTANCE WITH HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE WILL BE OBTAINED <br />AND USED FOR THE PROPER MANAGEMENT OF POTENTIAL WASTES THAT MAY RESULT FROM THESE <br />PRODUCTS. AN MSDS WILL BE POSTED IN THE IMMEDIATE AREA WHERE SUCH PRODUCT IS STORED <br />AND/OR USED AND ANOTHER COPY OF EACH MSDS WILL BE MAINTAINED IN THE SWPPP FILE AT THE <br />JOB SITE CONSTRUCTION TRAILER OFFICE. EACH EMPLOYEE WHO MUST HANDLE A SUBSTANCE WITH <br />HAZARDOUS PROPERTIES WILL BE INSTRUCTED ON THE USE OF THE MSDS SHEETS AND THE SPECIFIC <br />INFORMATION IN THE APPLICABLE MSDS FOR THE PRODUCT HE/SHE IS USING, PARTICULARLY REGARDING <br />SPILL CONTROL TECHNIQUES. <br />2. THE CONTRACTOR WILL IMPLEMENT THE SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) <br />PLAN FOUND WITHIN THE SWPPP AND WILL TRAIN ALL PERSONNEL IN THE PROPER CLEANUP AND <br />HANDLING OF SPILLED MATERIALS. NO SPILLED HAZARDOUS MATERIALS OR HAZARDOUS WASTES WILL BE <br />ALLOWED TO COME IN CONTACT WITH STORMWATER DISCHARGES. IF SUCH CONTACT OCCURS, THE <br />STORMWATER DISCHARGE WILL BE CONTAINED ON -SITE UNTIL APPROPRIATE MEASURES IN COMPLIANCE <br />WITH STATE AND FEDERAL REGULATIONS ARE TAKEN TO DISPOSE OF SUCH CONTAMINATED STORMWATER. <br />IT SHALL BE THE RESPONSIBILITY OF THE JOB SITE SUPERINTENDENT TO PROPERLY TRAIN ALL <br />PERSONNEL IN THE USE OF THE SPCC PLAN. <br />NOTICE OF TERMINATION: <br />A NOTICE OF TERMINATION SHALL BE SUBMITTED TO THE FDEP AFTER THE CONSTRUCTION HAS BEEN <br />COMPLETED AND THE SITE HAS UNDERGONE FINAL STABILIZATION. <br />POLLUTION PREVENTION PLAN CERTIFICATION: <br />TO THE BEST OF MY KNOWLEDGE, I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL <br />ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM <br />DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION <br />SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS MANAGE THE SYSTEM, OR THOSE <br />PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION SUBMITTED IS, TO THE BEST OF MY <br />KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT <br />PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINES AND IMPRISONMENT <br />FOR KNOWING VIOLATIONS. <br />NAME: TITLE: <br />OPERATOR AND/OR RESPONSIBLE AUTHORITY <br />SIGNATURE: DATE: <br />CONTRACTOR CERTIFICATION: <br />"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND <br />CONDITIONS OF THE STATE OF FLORIDA GENERIC PERMIT FOR STORM WATER DISCHARGE FROM LARGE AND <br />SMALL CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED <br />THEREUNDER." <br />SIGNATURE COMPANY, NAME, AND ADDRESS RESPONSIBLE FOR <br />SIGNATURE: COMPANY: <br />NAME: <br />TITLE: <br />ADDRESS: <br />DATE: PHONE: <br />SIGNATURE: COMPANY: <br />NAME: <br />ADDRESS: <br />TITLE: <br />DATE: <br />PHONE: <br />SIGNATURE: <br />COMPANY: <br />NAME: <br />ADDRESS: <br />TITLE <br />DATE: PHONE: <br />GENERAL CONTRACTOR <br />TEMPORARY & PERMANENT <br />STABILIZATION <br />STABILIZED CONSTRUCTION ENTRANCE, <br />EARTH DIKES, SEDIMENT BASIN <br />EST. CONSTRUCTION SCHEDULE <br />2M 2023 <br />FM I MARCH 1 APRE, 1 MAY 1 JUNI 1 JMY AUG 1 SIP. 1 OCT. WN. 1 DEC. JAH. 1 FEB. 1 MARCH 1 APRIL I MAY 1 DUNE I MY <br />INSTALL TREE SAVE FENCING <br />INSTALL CONSTRUCTION EAT dt SILT FENCE SEDIMENT BARRIERS <br />CLEARING/GRUBBING OF EASTING VEGETATION 2= AS NECESSARY INSTALL TEMP. SIOMMER BASINS, <br />INLET PR07ECTION BMP* SILT FENCE SEDIMENT BARRIERS (E.G. INITIAL PERIMETER OONTROLS) <br />CLEARING/GRUBBING OF FASTING VEGETATION <br />INSTALLA71ON OF F.D.O.T. STORM UNE/DRAINAGE STRUCTURES DM SITE <br />MASS GRADING OF THE OVERALL SITE <br />TEMPORARY VEGETATION <br />INSTALLATION OF STORM, SERWERAGE, AND U71UYIES <br />BUILDING PAD PREP & FOOTING/FOUNDATIONS <br />INSTALL CURB/GUTTER do PAVEMENT BASE <br />VERTICAL BUILDING CONSTRUCTION <br />FINAL GRADING & PAVING <br />PERMANENT VEGETATION/LANDSCAPING <br />INSTALL AND MAINTAIN EROSION <br />CONTROL DEVICES AS NEEDED <br />AFTER SITE STABILIZATION, REMOVE EROSION CONTROL DEVICES <br />SEAL <br />i <br />i <br />G E A <br />Y , L � <br />* ' No. 52896 ' <br />-O '• S T OF <br />�G <br />/// TONAL � ����. <br />"//IIIlII m\\\ <br />O <br />O <br />C', <br />W <br />M <br />M <br />A <br />Wa <br />cn <br />zrWw <br />x <br />o0 <br />U <br />0 <br />1-A <br />E- <br />w <br />L <br />F- <br />a <br />W <br />L) <br />LLj <br />ci <br />In <br />Er OCLC <br />W <br />d <br />z <br />9 <br />a <br />a <br />W <br />A <br />w <br />d <br />A <br />O <br />z <br />ra <br />�IJv <br />cv <br />CQ <br />cc <br />ao <br />-. <br />c•� <br />� <br />-, <br />t` <br />z` <br />o <br />cq <br />cq <br />co <br />E <br />E- <br />O z <br />4CL <br />DRAWN BY TLF <br />DATE <br />06/29/2020 <br />SHEET TITLE <br />S. W.P.P. PLAN <br />NOTES <br />SHEET NUMBER <br />C-4.2 <br />