Laserfiche WebLink
P 101r' <br />GENERAL CONSTRUCTIONNOTES <br />1. SEE SURVEY, SITE PLAN, UTILITY PLAN, AND GRADING PLAN FOR SITE SPECIFIC BENCHMARK AND ELEVATION <br />DATUM. <br />2. LOCATIONS, DIMENSIONS AND ELEVATIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE <br />SHOWN ACCORDING TO SURVEY INFORMATION PREPARED AND PROVIDED BY SIMMONS, BEALL AND TREBOUR, <br />LLC. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR INACCURACY. PRIOR TO CONSTRUCTION, THE <br />CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DIMENSIONS, AND ELEVATION OF ALL EXISTING UTILITIES, <br />STRUCTURES AND OTHER FEATURES AFFECTING THE WORK AND MAKE ARRANGEMENTS FOR REQUIRED <br />RELOCATIONS WITH THE AFFECTED UTILITY. THE CONTRACTOR SHALL COOPERATE WITH THE UTILITY DURING <br />RELOCATION OPERATIONS. <br />3. CHAPTER 556, UNDERGROUND FACILITY DAMAGE PREVENTION SAFETY ACT OF THE FLORIDA STATUTES <br />REQUIRES THE CONTRACTOR TO NOTIFY 'SUNSHINE 811 "NOT LESS THAN 2 FULL BUSINESS DAYS BEFORE <br />BEGINNING ANY EXCAVATION OR DEMOLITION THAT IS NOT BENEATH THE WATERS OF THE STATE, AND NOT <br />LESS THAN 10 FULL BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION OR DEMOLITION THAT IS <br />BENEATH THE WATERS OF THE STATE. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITIES <br />NOT INCLUDED IN THE "SUNSHINE 811" PROGRAM NOT LESS THAN 2 FULL BUSINESS DAYS BEFORE <br />BEGINNING ANY EXCAVATION OR DEMOLITION. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION, INCLUDING <br />CONSTRUCTION SITE SAFETY, STRICTLY ADHERING TO OSHA STANDARDS, STATE OF FLORIDA, AND LOCAL <br />REQUIREMENTS. <br />5. THE CONTRACTOR SHALL REVIEW THE PLANS FOR CONFLICTS OR OTHER DISCREPANCIES PRIOR TO <br />CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER OF ANY CONFLICTS OR <br />DISCREPANCIES BEFORE PERFORMING ANY WORK. <br />PROPOSED UNDERGROUND UTILITIES MUST I PLACE, TESTED AND INSPECTED PRIOR TO PAVEMENT 6. ALL RO OSED UNDE OUND U L ES S BE N <br />SURFACE COURSE CONSTRUCTION. <br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE CONDITIONS AND INSPECTION <br />REQUIREMENTS OF ALL PERMITS ISSUED FOR THE PROJECT. THE CONTRACTOR SHALL OBTAIN ALL <br />NECESSARY PERMITS PRIOR TO CONSTRUCTION AND SHALL SCHEDULE ALL INSPECTIONS IN ACCORDANCE <br />WITH AGENCY REQUIREMENTS. <br />8. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS AND/OR LATEST <br />EDITION. <br />9. THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL APPLICABLE STATUTES, RULES, <br />REGULATIONS AND PERMIT CONDITIONS. <br />10. AT LEAST THREE (3) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE <br />ENGINEER, OWNER, AND APPROPRIATE PERMITTING AGENCIES OF THE CONTRACTOR'S NAME, STARTING DATE, <br />PROJECTED SCHEDULE, AND OTHER INFORMATION AS REQUIRED. <br />11. SITE WORK CONCRETE SHALL BE IN ACCORDANCE TO FDOT SPECIFICATIONS UNLESS OTHERWISE NOTED. <br />12. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION <br />EQUAL TO OR BETTER THAN EXISTING CONDITIONS UNLESS SPECIFICALLY EXEMPTED BY THE PLANS. <br />13. ALL DISTURBED AREAS THAT ARE NOT TO BE SODDED, ARE TO BE SEEDED AND MULCHED IN ACCORDANCE <br />WITH FDOT STANDARDS. THE CONTRACTOR SHALL MAINTAIN ALL GRASSED AREAS UNTIL A NOTICE OF <br />T NOTICES R N THE PROJECT TERMINATION NOT HAS BEEN SUBMITTED TO THE NPDES STORMWATER NO CES CENTS AND E <br />HAS BEEN ACCEPTED BY THE OWNER. FINAL STABILIZATION IS DEFINED AS "ALL SOIL DISTURBING ACTIVITIES <br />AT THE SITE HAVE BEEN COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF <br />AT LEAST 70% FOR ALL UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS <br />BEEN ESTABLISHED OR EQUIVALENT PERMANENT STABILIZATION MEASURES HAVE BEEN EMPLOYED." <br />14. THE CONTRACTOR SHALL LOCATE AND FLAG ALL PROPERTY CORNERS PRIOR TO FINAL ENGINEERING <br />INSPECTION AND CERTIFICATION. THE CONTRACTOR SHALL BEAR ALL COSTS INCURRED AS A CONSEQUENCE <br />OF LOST OR DISTURBED PROPERTY CORNERS. LOST OR DISTURBED PROPERTY CORNERS SHALL BE <br />REESTABLISHED BY A PROFESSIONAL LAND SURVEYOR. <br />15. THE GEOTECHNICAL ENGINEER SHALL SUPPLY THE ENGINEER AND OWNER WITH A PHOTOCOPY OF ALL <br />COMPACTION TESTS AND OTHER REQUIRED MATERIALS TESTS UNDER THIS CONTRACT. THE GEOTECHNICAL <br />ENGINEER SHALL CERTIFY IN WRITING, TO THE ENGINEER AND OWNER, THAT ALL TESTING REQUIREMENTS HAVE BEEN SATISFIED. <br />16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL REQUIRED TESTING WITH THE <br />GEOTECHNICAL ENGINEER. TESTING IS REQUIRED AS DICTATED BY THE CONTRACT DOCUMENTS, <br />CONSTRUCTION PLANS, SPECIFICATIONS, AND AGENCY REQUIREMENTS. UPON COMPLETION OF THE WORK, <br />THE GEOTECHNICAL ENGINEER SHALL SUBMIT CERTIFICATIONS TO THE ENGINEER AND OWNER THAT STATE <br />THAT ALL REQUIREMENTS HAVE BEEN MET. <br />17. THE CONTRACTOR SHALL REVIEW ALL PROJECT GEOTECHNICAL REPORTS PRIOR TO BIDDING AND THE START <br />OF CONSTRUCTION. <br />18. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND ALL PERMITS <br />AT THE CONSTRUCTION SITE. <br />19. RIM ELEVATIONS OF PROPOSED DRAINAGE AND SANITARY SEWER MANHOLES AND ASSOCIATED STRUCTURES <br />ARE APPROXIMATE. FINAL ELEVATIONS ARE TO BE SET FLUSH AND CONSISTENT WITH THE GRADING PLANS. <br />ADJUST ALL OTHER RIM ELEVATIONS OF MANHOLES, WATER VALVES, GAS VALVES, AND OTHER UTILITIES TO <br />FINISHED GRADE WITHIN LIMITS OF WORK. <br />CLEARING AND EROSION CONTROL NOTES <br />1. ALL TREES TO REMAIN SHALL BE PROTECTED IN ACCORDANCE WITH LOCAL REGULATIONS PRIOR TO THE <br />START OF ANY CONSTRUCTION ACTIVITIES. <br />2. THE CONTRACTOR SHALL PREPARE THE SITE AS DIRECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO <br />STARTING ACTUAL CONSTRUCTION. COPIES OF THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND <br />REPORT ARE AVAILABLE THROUGH THE OWNER OR THE GEOTECHNICAL ENGINEER. QUESTIONS REGARDING <br />SITE PREPARATION REQUIREMENTS SHALL BE DIRECTED TO THE GEOTECHNICAL ENGINEER AND OWNER. <br />3. THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THE NOTES & SPECIFICATIONS, <br />GRADING PLAN, NPDES NOTES AND NPDES DETAILS. <br />4. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL OPERATE AND MAINTAIN EROSION AND SEDIMENT CONTROL <br />DEVICES AND STRUCTURES IN ACCORDANCE WITH THE REGULATIONS SET FORTH IN THE SWPPP. <br />5. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE NECESSARY FOR <br />MAINTAINED IN ACCORDANCE T THE STORMWATER <br />CONSTRUCTION. ALL DISTURBED OPEN AREAS SHALL BE MAIN ED 0 <br />POLLUTION PREVENTION PLAN (SWPPP). <br />6. THE TOP SOIL REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED <br />BY THE OWNER AND SHALL BE USED FOR LANDSCAPING PURPOSES UNLESS OTHERWISE DIRECTED BY THE <br />OWNER. <br />7. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN <br />ACCORDANCE WITH ALL APPLICABLE REGULATIONS. <br />8. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR REMOVAL OF EXISTING STRUCTURES. <br />9. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES TO DISCONNECT OR REMOVE THEIR FACILITIES PRIOR TO <br />REMOVAL OR DEMOLITION OF EXISTING STRUCTURES. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND SHALL BE <br />RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES <br />THAT WILL NOT BE INCORPORATED WITH THE NEW FACILITIES. SHOULD ANY DISCREPANCY EXIST, THE <br />CONTRACTOR SHALL CONTACT THE OWNER FOR CLARIFICATION PRIOR TO DEMOLITION. <br />11. PRIOR TO THE COMPLETION OF CONSTRUCTION, THE RETENTION/DETENTION AREA SHALL BE CLEARED OF <br />SILT, MUD, AND DEBRIS RESULTING FROM THE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS <br />DEVELOPMENT. DISTURBED AREAS SHALL BE GRASSED IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS. <br />GRADING & DRAINAGE NOTES <br />1. ALL DELETERIOUS SUBSTANCES (I.E. MUCK, PEAT, BURIED DEBRIS) SHALL BE EXCAVATED IN ACCORDANCE <br />WITH THE PLANS AND SPECIFICATIONS, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER OR OWNER. <br />DELETERIOUS MATERIAL IS TO BE STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. <br />EXCAVATED AREAS SHALL BE BACKFILLED WITH APPROVED MATERIALS AND COMPACTED AS SPECIFIED BY <br />THE GEOTECHNICAL ENGINEER OR OWNER. <br />2. IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF <br />TREES TO BE SAVED. THE CONTRACTOR SHALL COORDINATE WITH OWNER'S ENGINEER PRIOR TO ANY GRADE <br />CHANGE. <br />3. THE CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. <br />4. ALL PAVEMENT MARKINGS IN PUBLIC RIGHTS OF WAY SHALL COMPLY WITH THE LATEST FDOT STANDARD <br />PLANS AND SPECIFICATIONS. THE MARKINGS SHALL BE PAINTED UNLESS SHOWN ON THE PLANS AND/OR <br />PERMITS TO BE THERMOPLASTIC. PARKING STALL STRIPING SHALL BE 4" WIDE PAINTED WHITE STRIPES <br />UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />5. THE CONTRACTOR SHALL INSTALL EXTRA BASE MATERIAL WHEN THE DISTANCE BETWEEN THE PAVEMENT <br />ELEVATION AND THE TOP OF THE PIPE EXCEEDS THE MINIMUM DIMENSIONS SHOWN IN FDOT DRAINAGE <br />MANUAL APPENDIX C (COVER HEIGHT TABLES). <br />6. INSTALLATION OF PLASTIC PIPES SHALL BE IN ACCORDANCE TO THE MANUFACTURER'S RECOMMENDATION <br />BASED ON COVER, LOADING AND SOIL MATERIAL. <br />7. STANDARD INDICES REFER TO THE LATEST EDITION OF FDOT "STANDARD PLANS FOR ROAD AND BRIDGE <br />CONSTRUCTION". <br />8. PIPE LENGTHS SHOWN ARE APPROXIMATE AND MEASURED FROM CENTER -TO -CENTER OF THEIR CONNECTING <br />STRUCTURES. <br />9. ALL DRAINAGE STRUCTURE FRAMES, GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED <br />FOR H-20 LOADINGS. <br />10. MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE CONSTRUCTION SHALL BE IN <br />ACCORDANCE WITH LOCAL REGULATIONS AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD <br />SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST REVISION THEREOF AND SUPPLEMENTAL <br />SPECIFICATIONS THERETO. <br />11. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL <br />LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES, INVERTS, AND LOCATIONS OF ALL <br />STORMWATER FACILITIES INCLUDING THE DRAINAGE STRUCTURES, BERMS & SWALES. THE CONTRACTOR <br />SHALL PROVIDE COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER FOR THE PURPOSE OF <br />CERTIFYING THE STORMWATER MANAGEMENT SYSTEM. <br />12. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CLEANOUT OF ALL NEW STORM DRAINAGE PIPES AND <br />STRUCTURES, AS WELL AS ANY EXISTING STORM SEWER SYSTEMS EFFECTED BY THE SITEWORK, AT THE END <br />OF CONSTRUCTION WHEN DISTURBED AREAS HAVE BEEN STABILIZED. <br />13. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF ALL <br />VESTIBULES, SLOPED PAVING, EXIST PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, AND <br />EXACT UTILITY ENTRANCE LOCATIONS. <br />14. CONTRACTOR TO COORDINATE ALL BUILDING FOUNDATION OR RETAINING WALL DRAINS TO ENSURE PROPER <br />COORDINATION TO EITHER A STRUCTURE OR DAYLIGHT. <br />GRADING & DRAINAGE TESTING & INSPECTION REQUIREMENTS <br />1. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE OF THE <br />PROJECT BY THE OWNER. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE REQUIRED TESTING WITH THE <br />GEOTECHNICAL ENGINEER. TESTING IS REQUIRED IN ACCORDANCE WITH THE LOCAL JURISDICTION AND/OR <br />FDOT STANDARDS. UPON COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT <br />CERTIFICATIONS TO THE ENGINEER AND OWNER STATING THAT ALL REQUIREMENTS HAVE BEEN MET. <br />SANITARY SEWER NOTES <br />1. ALL SANITARY SEWER MAINS, FORCE MAINS AND LATERALS SHALL HAVE A MINIMUM OF 36 INCHES OF <br />COVER, UNLESS OTHERWISE NOTED ON THE PLANS. <br />2. ALL SANITARY SEWER WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. <br />WHEN THE LOCAL UTILITY REQUIREMENTS ARE IN CONFLICT WITH THESE NOTES, THE LOCAL UTILITY <br />REQUIREMENTS WILL GOVERN. <br />3. PRIOR TO BIDDING AND COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES OR <br />APPURTENANCES, THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF EXISTING CONNECTION <br />POINTS AND NOTIFY THE ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. <br />4. PVC GRAVITY SEWER WER PIPES SHALL MEET THE FOLLOWING MINIMUM CRITERIA; ASTM D3034 SDR35 S E <br />AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURES CRITERIA FOR DEPTH, SOIL MATERIAL <br />AND LOADING CONDITIONS. <br />3' - 12' DEPTH SDR-26 <br />12' - 18' DEPTH SDR-26 <br />> 18' DEPTH DIP <br />5. ALL SANITARY SEWER PIPELINES SHALL BE SOLID GREEN IN COLOR. <br />6. PVC FORCE MAINS 4"DIAMETER AND GREATER SHALL BE PRESSURE C900 CLASS 150200, SDR 1821, COLOR <br />GREEN. FORCE MAINS LESS THAN 4"DIAMETER SHALL BE PRESSURE CLASS 200, SDR 21, COLOR GREEN. A <br />GREEN MAGNETIC TAPE A MINIMUM OF 2" WIDE SHALL BE PLACED 1 FOOT BELOW THE PROPOSED GRADE. <br />THE PRINTING ON THE MAGNETIC TAPE SHALL READ "FORCE MAIN" <br />7. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51-91 (AWWA <br />C151) AND THE PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.511 <br />(AWWA C151). <br />8. ALL SANITARY SEWER GRAVITY MAINS OR SANITARY SEWER FORCE MAINS THAT REQUIRE DIP ARE TO BE <br />POLYLINED OR EPDXY LINED. <br />9. ALL SANITARY SEWER RIMS AND COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING. <br />10. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A <br />PROFESSIONAL LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES AND LOCATIONS ON <br />ALL SANITARY SEWER MAINS, STRUCTURES AND SERVICES. ALL RESTRAINED JOINTS SHALL BE SHOWN ON <br />THE RECORD DRAWINGS. THE CONTRACTOR SHALL PROVIDE TEN (10) COPIES OF THE CERTIFIED RECORD <br />DRAWINGS TO THE ENGINEER. <br />SAN/TAR Y SEWER TESTING & INSPECT/ON REQUIREMENTS <br />1. ALL GRAVITY SEWER PIPING SHALL BE VIDEOTAPED AND RESULTS FURNISHED TO THE LOCAL UTILITY AND <br />THE ENGINEER. <br />2. THE GRAVITY SANITARY SEWER AND ALL SERVICE LATERALS SHALL BE SUBJECT TO ADDITIONAL TESTING AS <br />REQUIRED BY LOCAL REGULATIONS. TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SHALL <br />BE SUBMITTED TO THE LOCAL AUTHORITIES FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL <br />PARTIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. <br />3. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH LOCAL <br />REGULATIONS. TESTS SHALL BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE LOCAL <br />AUTHORITIES FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY. <br />WATER SYSTEM NOTES <br />1. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />2. ALL WATER SYSTEM WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. WHEN <br />THE LOCAL UTILITY REQUIREMENTS ARE IN CONFLICT WITH THESE NOTES, THE LOCAL UTILITY REQUIREMENTS <br />WILL GOVERN. <br />3. CONFLICTS BETWEEN WATER AND STORM OR SANITARY SEWER SHALL BE RESOLVED BY ADJUSTING THE <br />WATER LINES AS REQUIRED. <br />4. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51 AWWA C151) AND THE PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA <br />C151) AND SHALL BE CEMENT MORTAR LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 <br />(AWWA C104). <br />5. ALL FITTINGS 3" OR LARGER SHALL BE MECHANICAL JOINT, DUCTILE IRON PRESSURE CLASS 350. FITTINGS <br />SHALL CONFORM TO THE LATEST REVISION OF EITHER ANSI AWWA C110 A21.10 OR ANSI/AWWA <br />C153/A21.53.. FITTINGS AND ACCESSORIES SHALL BE FURNISHED WITH MECHANICAL TYPE JOINTS IN <br />ACCORDANCE WITH ANSI/AWWA C111 /A21.11. <br />6 THE CONTRACTOR SHALL INSTALL TEMPORARY BLOW -OFFS AT THE END OF WATER SERVICE LATERALS TO <br />ASSURE ADEQUATE FLUSHING AND DISINFECTION. <br />7. ALL PVC WATER MAINS 3" THROUGH 12" SHALL BE IN ACCORDANCE WITH AWWA C900. POTABLE WATER <br />PIPE SHALL BE CLASS 150 AND MEET THE REQUIREMENTS OF SDR 18 IN ACCORDANCE WITH ASTM D-2241. <br />FIRE LINE PIPE SHALL BE CLASS 200 AND MEET THE REQUIREMENTS OF SDR 14. <br />8. WATER MAIN PIPING LARGER THAN 2" AND SMALLER THAN 4" SHALL BE PRESSURE CLASS 200 AND MEET <br />THE REQUIREMENTS OF SDR 21 IN ACCORDANCE WITH ASTM D2241 UNLESS SPECIFIED OTHERWISE. <br />9. SERVICE PIPES AND FITTINGS 2.5„ AND SMALLER SHALL BE POLYETHYLENE TUBING IN ACCORDANCE WITH <br />AWWA C901, PE4710 (PC200) CTS SDR9, PC200) WITH COMPRESSION FITTINGS. <br />10. ALL GATE VALVES 2" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE <br />REQUIREMENTS OF AWWA C509. <br />11. ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE <br />LOCAL UTILITY AND FIRE MARSHAL. <br />12. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEMS SHALL BE IN ACCORDANCE <br />WITH ALL LOCAL REGULATIONS, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION <br />THEREOF, AND SUPPLEMENTAL SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE <br />WATER SERVICE MAIN EXTENSIONS AND CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL <br />REGULATORY AGENCY. <br />13. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A <br />PROFESSIONAL LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW THE LOCATIONS, DIMENSIONS AND <br />ELEVATIONS OF ALL WATER MAINS, SERVICES, MANHOLES, GRAVITY SEWER MAINS, SERVICE LATERALS, PUMP <br />STATIONS AND FORCE MAINS. ALL RESTRAINED JOINTS SHALL BE SHOWN ON THE RECORD DRAWINGS. THE <br />CONTRACTOR SHALL PROVIDE COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER. <br />F. D. E. P. NOTES <br />1. ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND <br />METERS INSTALLED UNDER THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS <br />ASSOCIATION (AWWA) STANDARDS. <br />2. ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER <br />THIS PROJECT AND THAT WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF <br />INTERNATIONAL STANDARD 61. <br />3. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, <br />AND ANY SOLDER OR FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD. <br />4. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN <br />ACCORDANCE WITH SUBPARAGRAPH 62-555.320(21)(B)3, F.A.C., USING BLUE AS A PREDOMINANT COLOR. <br />(UNDERGROUND PLASTIC PIPE WILL BE SOLID -WALL BLUE PIPE, WILL HAVE A CO -EXTRUDED BLUE <br />EXTERNAL SKIN, OR WILL BE WHITE OR BLACK PIPE WITH BLUE STRIPES INCORPORATED INTO, OR APPLIED <br />TO, THE PIPE WALL; AND UNDERGROUND METAL OR CONCRETE PIPE WILL HAVE BLUE STRIPES APPLIED TO <br />THE PIPE WALL. PIPE STRIPED DURING MANUFACTURING OF THE PIPE WILL HAVE CONTINUOUS STRIPES THAT <br />RUN PARALLEL TO THE AXIS OF THE PIPE, THAT ARE LOCATED AT NO GREATER THAN 90-DEGREE <br />INTERVALS AROUND THE PIPE, AND THAT WILL REMAIN INTACT DURING AND AFTER INSTALLATION OF THE <br />PIPE. IF TAPE OR PAINT IS USED TO STRIPE PIPE DURING INSTALLATION OF THE PIPE, THE TAPE OR PAINT <br />WILL BE APPLIED IN A CONTINUOUS LINE THAT RUNS PARALLEL TO THE AXIS OF THE PIPE AND THAT IS <br />LOCATED ALONG THE TOP OF THE PIPE; FOR PIPE WITH AN INTERNAL DIAMETER OF 24-INCHES OR <br />GREATER, TAPE OR PAINT WILL BE APPLIED IN CONTINUOUS LINES ALONG EACH SIDE OF THE PIPE AS WELL <br />AS ALONG THE TOP OF THE PIPE. ABOVEGROUND PIPE WILL BE PAINTED BLUE OR WILL BE COLOR CODED <br />OR MARKED LIKE UNDERGROUND PIPE.) <br />5. THE OPEN END OF THE AIR RELIEF PIPE FROM ALL AUTOMATIC AIR RELIEF VALVES INSTALLED UNDER THIS <br />PROJECT WILL BE EXTENDED TO AT LEAST 1-FOOT ABOVE GRADE AND WILL BE PROVIDED WITH A <br />SCREENED, DOWNWARD -FACING ELBOW. <br />6. NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL BE INSTALLED IN ACCORDANCE WITH <br />APPLICABLE AWWA STANDARDS OR IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDED PROCEDURES. <br />7. A CONTINUOUS AND UNIFORM BEDDING WILL BE PROVIDED IN TRENCHES FOR UNDERGROUND PIPE INSTALLED <br />UNDER THIS PROJECT; BACKFILL MATERIAL WILL BE TAMPED IN LAYERS AROUND UNDERGROUND PIPE <br />INSTALLED UNDER THIS PROJECT AND TO A SUFFICIENT HEIGHT ABOVE THE PIPE TO ADEQUATELY SUPPORT <br />AND PROTECT THE PIPE; AND UNSUITABLY SIZED STONES (AS DESCRIBED IN APPLICABLE AWWA STANDARDS <br />OR MANUFACTURERS' RECOMMENDED INSTALLATION PROCEDURES) FOUND IN TRENCHES WILL BE REMOVED <br />FOR A DEPTH OF AT LEAST 6-INCHES BELOW THE BOTTOM OF UNDERGROUND PIPE INSTALLED UNDER THIS <br />PROJECT. <br />8. ALL WATER MAIN TEES, BENDS, PLUGS, AND HYDRANTS INSTALLED UNDER THIS PROJECT WILL BE PROVIDED <br />WITH THRUST BLOCKS OR RESTRAINED JOINTS TO PREVENT MOVEMENT. <br />9. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL BE CONSTRUCTED <br />OF ASBESTOS -CEMENT OR POLYVINYL CHLORIDE PIPE WILL BE PRESSURE AND LEAKAGE TESTED IN <br />ACCORDANCE WITH AWWA STANDARD C603 OR C605, RESPECTIVELY, AND ALL OTHER NEW OR ALTERED <br />WATER MAINS INCLUDED IN THIS PROJECT WILL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH <br />AWWA STANDARD C600. <br />10. NEW OR ALTERED WATER MAINS, INCLUDING FIRE HYDRANT LEADS AND INCLUDING SERVICE LINES THAT WILL <br />BE UNDER THE CONTROL OF A PUBLIC WATER SYSTEM AND THAT HAVE AN INSIDE DIAMETER OF 3-INCHES <br />OR GREATER, WILL BE DISINFECTED AND BACTERIOLOGICALLY EVALUATED IN ACCORDANCE WITH RULE <br />62-555.340, F.A.C. <br />11. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS UNDER <br />SURFACE WATER WILL HAVE A MINIMUM COVER OF 2-FEET. <br />WATER SYSTEM TESTING & INSPECTION REQUIREMENTS <br />1. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES <br />SHALL REMAIN UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY LOCAL AUTHORITIES <br />HAVING JURISDICTION. PRESSURE TESTS SHALL BE IN ACCORDANCE WITH LOCAL WATER DEPARTMENT, FIRE <br />DEPARTMENT & FDEP SPECIFICATIONS. CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT INSPECTORS <br />48-HOURS IN ADVANCE OF PERFORMING TESTS. <br />2. CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED CHLORINATION/DISINFECTION AND BACTERIOLOGICAL <br />SAMPLING IN ACCORDANCE TO ITEM #10 OF THE "F.D.E.P. NOTES" SECTION OF THIS SHEET. CONTRACTOR <br />SHALL OBTAIN CLEARANCE OF THE DOMESTIC WATER SYSTEM. COPIES OF ALL BACTERIOLOGICAL TESTS <br />(WHICH SHALL ALSO INDICATE THE CHLORINE RESIDUAL) SHALL BE PROVIDED TO THE ENGINEER AND <br />OWNER. <br />WATER CLEARANCE REQUIREMENTS <br />1. NEW OR RELOCATED, UNDERGROUND WATER MAINS INCLUDED IN THIS PROJECT WILL BE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE OF AT LEAST 3-FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE <br />OUTSIDE OF ANY EXISTING OR PROPOSED VACUUM -TYPE SANITARY SEWER, STORM SEWER, STORMWATER <br />FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, <br />F.A.C.; A HORIZONTAL DISTANCE OF AT LEAST 6-FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND <br />THE OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER (OR A HORIZONTAL <br />DISTANCE OF AT LEAST 3-FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY <br />T T TER IN WILL BE LAID <br />EXISTING OR PROPOSED GRAVITY TYPE SANITARY SEWER IF THE BOTTOM OF HE WA MA L <br />AT LEAST SIX INCHES ABOVE THE TOP OF THE SEWER); A HORIZONTAL DISTANCE OF AT LEAST 6-FEET <br />BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED <br />PRESSURE -TYPE SANITARY SEWER, WASTEWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER <br />NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.; AND A HORIZONTAL DISTANCE OF AT LEAST <br />10-FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND ALL PARTS OF ANY EXISTING OR PROPOSED <br />"ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEM". <br />2. NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL <br />CROSS ANY EXISTING OR PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER OR STORM SEWER WILL <br />BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 6-INCHES ABOVE THE OTHER PIPELINE OR AT <br />LEAST 12 INCHES BELOW THE OTHER PIPELINE; AND NEW OR RELOCATED, UNDERGROUND WATER MAINS <br />THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY EXISTING OR PROPOSED <br />PRESSURE -TYPE SANITARY SEWER, WASTEWATER OR STORMWATER FORCE MAIN, OR PIPELINE CONVEYING <br />RECLAIMED WATER WILL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12-INCHES ABOVE OR <br />BELOW THE OTHER PIPELINE. <br />3. AT UTILITY CROSSINGS, ONE FULL LENGTH OF WATER MAIN PIPE WILL BE CENTERED ABOVE OR BELOW THE <br />OTHER PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER PIPELINE OR <br />THE PIPES WILL BE ARRANGED SO THAT ALL WATER MAIN JOINTS ARE AT LEAST 3-FEET FROM ALL JOINTS <br />IN VACUUM -TYPE SANITARY SEWERS, STORM SEWERS, STORMWATER FORCE MAINS, OR PIPELINES <br />CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, AND AT LEAST 6-FEET <br />FROM ALL JOINTS IN GRAVITY- OR PRESSURE -TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR <br />PIPELINES CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C. <br />DEMOLITION NOTES: <br />1. CONTRACTOR SHALL CONSTRUCT ALL TEMPORARY EROSION CONTROL SYSTEMS AS SPECIFIED IN THE <br />S.W.P.P.P. AND AS DIRECTED BY THE ENGINEER OR CITY OF ZEPHYRHILLS INSPECTOR TO PROTECT ADJACENT <br />PROPERTIES AND WATER RESOURCES FROM EROSION AND SEDIMENTATION. MEASURES SHALL BE INSTALLED <br />PRIOR TO DEMOLITION ACTIVITY. <br />2. VARIATIONS TO CONDITIONS OR DISCREPANCY INACTUAL CONDITIONS AS THEY APPLY TO THE DEMOLITION <br />R IDEVELOPMENT W RK AR T E RO HT TO THE ATTENTION OF THE OWNER OR OWNER'S <br />O SITE 0 E 0 6 BROUGHT <br />REPRESENTATIVE AND ENGINEER PRIOR TO THE COMMENCEMENT OF ANY SITE WORK. <br />3. CONTRACTOR SHALL LOCATE AND IDENTIFY ALL EXISTING UTILITIES THAT ARE TO REMAIN AND PROTECT THEM <br />FROM DAMAGE. <br />4. CONTRACTOR TO CONDUCT ALL DEMOLITION OPERATIONS WITH MINIMUM INTERFERENCE TO PUBLIC OR <br />PRIVATE ACCESSES AND FACILITIES. <br />5. PROTECT BENCH MARKS, PROPERTY CORNERS AND ALL OTHER SURVEY MONUMENTS FROM DAMAGE OR <br />DISPLACEMENT. IF A MARKER NEEDS TO BE REMOVED, IT SHALL BE REFERENCED BY A LICENSED LAND <br />SURVEYOR AND REPLACED. <br />6. PROVIDE TRAFFIC CONTROL AS REQUIRED, IN ACCORDANCE WITH THE U.S. DEPT. OF TRANSPORTATION <br />"MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES" AND GOVERNING JURISDICTIONAL REQUIREMENTS. <br />7. CONTRACTOR SHALL COORDINATE EXACT DEMOLITION LIMITS AND UTILITY REMOVAL/RELOCATION <br />REQUIREMENTS WITH THE ENGINEER AND OWNER. <br />8. DEPRESSIONS AND VOID AREAS CAUSED BY DEMOLITION WORK ARE TO BE COMPACTED PER GEOTECH <br />RECOMMENDATIONS AND FILLED TO SUBGRADE ELEVATION TO AVOID WATER PONDING. <br />9. ALL CONSTRUCTION/DEMOLITION DEBRIS, NOT REUSED AS STRUCTURAL FILL, SHALL BE DISPOSED OF OFFSITE <br />IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. <br />10. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS OF EXISTING UTILITIES PRIOR TO COMMENCEMENT OF <br />DEMOLITION AND CONSTRUCTION ACTIVITIES. <br />11. CONTRACTOR IS ADVISED TO VISIT THE SITE AND MAKE THEMSELVES FAMILIAR WITH THE EXISTING SITE <br />CONDITIONS PRIOR TO BEGINNING CONSTRUCTION. <br />12. IF PRESENT, ALL POWER POLES ALONG RIGHT OF WAYS ARE TO REMAIN. RELOCATION OF POWER POLES MAY <br />BE NECESSARY WITH NEW SITE ISSUES. THESE ARE TO BE COORDINATED WITH POWER COMPANY. <br />13. DEMOLITION OF TELECOMMUNICATIONS LINES TO BE COORDINATED WITH LOCAL UTILITY PROVIDER. <br />CONTRACTOR TO VERIFY ROUTING BEFORE DEMO TO PREVENT TERMINATION OF ANY SUCH SERVICE OFFSITE. <br />14. DEMOLITION OF WATER LINES TO BE COORDINATED WITH LOCAL UTILITY PROVIDER. CONTRACTOR TO VERIFY <br />ROUTING BEFORE DEMO TO PREVENT TERMINATION OF ANY WATER SERVICE OFFSITE. <br />15. DEMOLITION OF SEWER LINES TO BE COORDINATED WITH LOCAL UTILITY PROVIDER. CONTRACTOR TO VERIFY <br />ROUTING BEFORE DEMO TO PREVENT TERMINATION OF ANY SEWER SERVICE OFFSITE. <br />16. NO UTILITIES SHALL REMAIN WITHIN ANY ON -GRADE BUILDING PAD AREAS. <br />17. PROTECT EXISTING TREES/PLANT GROWTH AND FEATURES DESIGNATED TO REMAIN AS FINAL LANDSCAPE <br />MATERIAL. <br />18. IF PRESENT, ALL SEPTIC TANKS, DRAIN FIELDS, WELLS AND RELATED INFRASTRUCTURE TO BE ABANDONED <br />AND/OR REMOVED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. <br />19. CONTRACTOR TO INSTALL ALL PERIMETER EROSION CONTROL MEASURES PRIOR TO FULL IMPLEMENTATION OF <br />DEMOLITION PLANS AND/OR COMMENCEMENT OF LAND DISTURBING ACTIVITIES. ONLY THOSE ITEMS <br />NECESSARY FOR INSTALLATION OF PERIMETER EROSION CONTROL MEASURES SHALL BE REMOVED PRIOR TO <br />THIS TIME. <br />20. SEWER SERVICE CONNECTION MUST BE PLUGGED AT CLEAN -OUT PRIOR TO DEMOLITION. THIS WORK SHALL BE <br />COMPLETED IN ADHERENCE TO JURISDICTIONAL REQUIREMENTS. <br />PROPERTY LEGAL DESCRIPTION <br />A PORTION OF TRACTS 25, 26, 39, 40, 41, 42,55 AND 56, ZEPHYRHILLS COLONY COMPANY LANDS SUBDIVISION AS RECORDED IN <br />PLAT BOOK 1, PAGE 55 OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA AND A PORTION OF TRACT "U AND TRACT "H" OF <br />THE PLAT ENTITLED ZEPHYR COMMONS PHASE 1, AS RECORDED IN PLAT BOOK 65, PAGES 132 THROUGH 142 OF THE PUBLIC <br />RECORDS OF PASCO COUNTY, FLORIDA, ALL LYING IN SECTION 35, TOWNSHIP 25 SOUTH, RANGE 21 EAST, PASCO COUNTY, <br />FLORIDA, CITY OF ZEPHYRHILLS; ALL BEING FURTHER DESCRIBED AS FOLLOWS: <br />FOR A POINT OF REFERENCE COMMENCE AT THE NORTHWEST CORNER OF SECTION 35, TOWNSHIP 25 SOUTH, RANGE 21 EAST, <br />PASCO COUNTY, FLORIDA; THENCE ALONG THE NORTH BOUNDARY OF SAID SECTION 35, SOUTH 89°59'50" EAST, 1015.17 FEET <br />TO THE INTERSECT OF THE EASTERN LINE OF THE PLAT ENTITLED ZEPHYR COMMONS PHASE 1, AS RECORDED IN PLAT BOOK <br />65, PAGES 132 THROUGH 142 OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA; THENCE DEPARTING SAID SECTION LINE, <br />SOUTH 00°09'45" WEST, ALONG SAID EASTER LINE, 2598.61 FEET TO A POINT ON THE NORTHERN LINE OF TRACT "F" (ADDITIONAL <br />ROAD RIGHT-OF-WAY) OF SAID PLAT: THENCE NORTH 89°53'13" WEST, ALONG SAID NORTHERN LINE, 55.00 FEET; THENCE <br />NORTH 00°09'45" EAST, 733.28 FEET, FOR A POINT OF BEGINNING; THENCE CONTINUE NORTH 00°09'45" EAST, 458.05 FEET; <br />THENCE NORTH 20°46'40" WEST, 31.14 FEET; THENCE NORTH 89°50'15" WEST, 201.86 FEET; THENCE NORTH 00°00'10" EAST, <br />250.44 FEET; THENCE SOUTH 89°38'24" WEST, 495.78 FEET; THENCE SOUTH 00°00'10" WEST, 656.01 FEET; THENCE SOUTH <br />89°59'50" EAST, 36.67 FEET; THENCE SOUTH 00°00'10" WEST, 53.00 FEET; THENCE NORTH 89°59'50" WEST, 36.67 FEET; THENCE <br />SOUTH 00°00'10" WEST, 148.08 FEET; THENCE SOUTH 89°59'50" EAST, 248.34 FEET; THENCE SOUTH 00°00'10" WEST, 35.78 FEET; <br />THENCE SOUTH 89°59'50" EAST, 240.99 FEET; THENCE NORTH, 158.65 FEET; THENCE SOUTH 89°59'50" EAST, 218.07 FEET, TO THE <br />POINT OF BEGINNING. <br />SAID LAND CONTAINING 12.29 ACRES MORE OR LESS <br />NOTE: THIS LEGAL DESCRIPTION IS PER THE SURVEY INCLUDED IN THIS PLAN SET PREPARED AND PROVIDED BY SIMMONS, <br />BEALL AND TREBOUR, LLC, CERTIFIED TO ZEPHYR COMMONS OUTPARCELS LP, DATED 04/14/2022. <br />ORDINANCE NO. 1411-21 <br />AN ORDINANCE OF THE CITY OF ZEPHYRHILLS, <br />FLORIDA, APPROVING FOR A REZONING OF REAL <br />PROPERTY WITHIN THE BOUNDARIES OF THE CITY OF <br />ZEPHYRHILLS; CHANGING THE ZONING DESIGNATION <br />FROM CITY C2 (COMMUNITY COMMERCIAL) TO CITY R4 <br />(MULTI -FAMILY RESIDENTIAL) FOR A PORTION OF <br />PARCEL NO.: 35-25-21-0010-00700-0000, PROVIDING FOR <br />CODIFICATION, SEVERABILITY, AND AN EFFECTIVE <br />DATE. <br />WHEREAS, the City Council has been given authority by the State of Florida pursuant to <br />Chapter 163 and 166, Florida Statutes, to rezone property within the City limits upon receipt of <br />written consent of the landowner, together with the approval of the City Council of said rezoning <br />duly expressed by Ordinance; and <br />WHEREA <br />S, the City Council gave due public notice of hearings on the proposed rezoning <br />as required by the Zephyrhills Land Development Code, as amended and Chapters 163 and 166, <br />Florida Statutes; and <br />WHEREAS, the Planning Commission, sitting as the Local Planning Agency, did hold a <br />public hearing on the 20' day of October, 2020, to consider the proposed rezoning and has <br />recommended approval; and <br />WHEREAS, the City Council has determined that the R4 zoning category is consistent <br />with the assigned Future Land Use classification of MU (Mixed Use) as established in the adopted <br />Comprehensive Plan and would promote the general welfare of the public and would encourage <br />proper development within the City.; and <br />WHEREAS, the zoning amendment is consistent with the goals, objectives and policies <br />of the Comprehensive Plan; and <br />NOW, THEREFORE, BE IT ENACTED AND ORDAINED BY THE CITY COUNCIL OF <br />ZEPHYRHILLS, FLORIDA, AS FOLLOWS: <br />SECTION 1: The above Whereas clauses are hereby adopted and incorporated herein; <br />SECTION 2: The following described lands, lying and being situated in Pasco County, to wit: <br />Parcel ID No.: 35-25-21-0010-00700-0000 <br />Physical Address: No Physical Address Assigned <br />Legal Description: See Exhibit "A" <br />Assessed in Section 35, Township 25 South, Range 21 East of Pasco County, Florida. <br />12.51 ac <br />res M. O.L <br />the zoning category is hereby changed from C2 to R4 and is included within the boundaries of the <br />City of Zephyrhills, Florida. <br />SECTION 3: All ordinances or parts of ordinances in conflict herewith are hereby repealed to the <br />extent of such conflict. <br />SECTION 4: That if any section, sentence, clause, or phrase of this ordinance is held to be invalid <br />or unconstitutional by a court of competent jurisdiction, then said holding shall in no way affect <br />the validity of the remaining portions of this ordinance. <br />SECTION 5: This Ordinance shall become effective upon passage on the second reading and <br />signing by the Mayor. <br />S 2.EP r <br />. ek . V90ing..!Y stance No. 1411-21 was read and passed on the first reading in an open and <br />regular meeting *ot 0�1,City Council of the City of Zephyrhills, Florida, on this 14's day of <br />� 6cemher, 2020. : e <br />;t �* -,- -5 <br />.. <br />S . <br />- � /7 <br />D ttest: aL,�V- <br />rO yLon L. Htf , CityClerk Charles E. Proctor, uncil President <br />The foregoing Ordinance'No. 1411-21 was read and passed on the second reading, following a <br />pub4wh4"&01_an open and regular meeting of the City Council of the City of Zephyrhills, <br />Frhin'[ia; on°fifis;l day of January, 2021. <br />d . ` Lori L..:Hillrtlan,:City Clerk Charles E. Proctor, Council President <br />Lr, '► . ,q <br />f' z C <br />D r' <br />Thi°&t�rW?T'' yk6i luSance No. 1411-21 was approved by me this I I' day of January, 2021. <br />. '04�.,,,�.?t�� <br />G e Whitfield M r <br />Approved as to legal form and content to <br />Matthew E. Maggard, eit� Attorney <br />U) <br />W <br />I- <br />a) <br />U °' <br />O .0 <br />r` <br />N M <br />Q cc <br />06 " <br />Z U <br />N <br />IL U) <br />LIMA <br />W <br />> <br />Z U <br />Q <br />SEAL <br />GL A Y Fly '�% <br />F <br />* ' No. 52896 * <br />= <br />_! <br />( : = <br />-O I.S T OF t�� ZZ <br />G <br />/''''�,SS/ONAL. E�,.\`,�• <br />///,/tillli►►►t►►\ <br />44 <br />21 <br />U <br />. <br />1.4 <br />0 <br />V-4 <br />0 <br />rM=M1 <br />W <br />UUQ', <br />M <br />M <br />P4 <br />W <br />W(D <br />p; <br />5A <br />hd ;� <br />zww <br />C <br />Z <br />Ea+ <br />x <br />VW <0.0tnd <br />rA <br />adE�I <br />E <br />� <br />9L. <br />U <br />a <br />z <br />c W � <br />W <br />N <br />0 <br />d� <br />ca <br />h a <br />W 0 <br />'i <br />as <br />ao <br />� <br />W <br />w <br />a <br />1174 <br />O,� <br />N <br />z <br />9 <br />a_ <br />= <br />U <br />W <br />W <br />A <br />E <br />d <br />A <br />-4 <br />h <br />0 o a <br />a CDa <br />1 ON <br />r- <br />PC! CD <br />0. c <br />.:d o <br />I o w <br />N N <br />WA Lo 0 <br />A 0 <br />U <br />0�a <br />rar. q <br />o :D <br />a 0 <br />Ey W U <br />o <br />Q <br />Ey Q A. 2 <br />a <br />z <br />I; I U <br />U 1 r/3 <br />'�, Ni <br />i I i <br />a <br />z ,= I � <br />N o N. <br />04 U Cn A <br />4; W �' ��„ <br />G.0 ikl <br />- o I <br />W y a <br />A a <br />F m i ., \ <br />a _ � _= - <br />0 0 0 ,0 <br />�y ��sz,,, I !y <br />A E-Ea-+ E- I E--E E--E <br />z co <br />DRAWN BY FCHECKED BY <br />TLF RCL <br />DATE <br />06/29/2020 <br />SHEET TITLE <br />GENERAL NOTES & <br />SPECIFICATIONS <br />SHEET NUMBER <br />C-0.1 <br />ha ,"I? ft. "M-M <br />