My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2964 Moulden Hollow Dr
Zephyrhills
>
Building Department
>
Building Plans
>
2964 Moulden Hollow Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 9:44:08 AM
Creation date
2/19/2025 10:28:36 AM
Metadata
Fields
Template:
Building Plans
Street #
2964
Location
Moulden Hollow Dr
Contractor
Lennar Homes LLC
Building Plans - Permit #
20687
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />YY/ L- I vu `w "/l l 1 I I AV j Y Y "U <br />CROSS BRACING DETAIL (TYP.) <br />SCALE:NTS <br />SEE ROOF <br />PLAN SHE <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />PA TRUSS <br />SSES <br />(2) 12D NAILS <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE: NTS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL r4 <br />SCALE: NTS <br />EXTERIOR <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @" ENTRY FRONT WALL <br />SCALE: NTS <br />TRUSS NOTES. <br />TYP. HAND FRAMING ABOVE TRUSS <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 <br />CONY. FRAMED RIDGE 2X4 STUDS & PLATES AT 2'-0" O.C. <br />MAY BE NAILED EACH DIRECTION TYP. U.N.O. <br />SIMPSON LSTA18 <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER <br />w/MIN. (4) 12d WHEN VERTICAL SCAB 2 x 6 <br />w/ (12) 10d NAILS SIMPSON HEADER w/ <br />L.SEE PLAN L. <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE <br />IT LANDS NEXT TO #2 SPF 48 O.C. W! (4) <br />CENTERED AT <br />16d INTO HEADER & (6) <br />6) <br />FOR CANT. <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST <br />2x8 BLOCKING NAILED @ 10d TOP & BOTTOM <br />PRE-ENG. TRUSS <br />SPLIT TO TIE 10d INTO BEAM - SEE <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />EACH SIDE w/ (3) 12d NAILS OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER ROOF PLAN FOR MORE <br />JN <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />WHEN REQUIRED w/ (2) (10) 8d NAILS <br />A <br />INFO <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SIMPSON HTS20 w/ (24) 10d x <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />1 1/2" NAILS EACH <br />SEE FLOOR PLAN FOR <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />COLUMN SIZE & BASE <br />7/16" OSB FLITCH PLATE <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />SEE FLOOR PLAN CONNECTION INFO <br />REQ'D ONLY WHEN <br />2x4 #2 SYP NAILER. NAIL <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />COLLAR TIE <br />FOR COLUMN SIZE <br />INDICATED ON BM. <br />TO STUDS w/ (3) 16d AT <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />EVERY 3rd <br />&ADDITIONAL INFO. <br />7/16" OSB FLITCH PLATE <br />SCHEDULE/PLAN <br />SEE FLOOR PLAN FOR <br />EACH STUD - TOENAIL <br />ROOF AND EXTERIOR <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />RAFTER <br />REQ'D ONLY WHEN <br />COLUMN SIZE & BASE <br />EACH TRUSS TO NAILER <br />SHEATHING ATTACHED <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" •}C <br />OPTION A INDICATED ON BM. <br />OPTION B CONNECTION INFO <br />OPTION C <br />w/ (3) 10d <br />PER NAILING SCHEDULE <br />O.C. MAXIMUM. <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />SCHEDULE/PLAN <br />SEE 2ND FLOOR WALL SECTION <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d EACH EA <br />WOOD SCREW EWEASIMPSON <br />FOR ADDITIONAL INFORMATION <br />NAILS EACH TRUSS INTERSECTfON. <br />TRUSS OR <br />CB <br />COMMON B M TO POST ATTACHMENT <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />H2.5A w/ (10) 8d NAILS <br />. <br />A <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />Tg AT 48" O.C. <br />SEE ROOF PLAN <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. <br />Dg B <br />FOR BEAM SIZE & <br />SCALE: 3/4"=1'-0" <br />IF 2x DOUBLE LEDGER, <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />BEVEL CUTS <br />CONNECTION INFO. <br />BM. SPLICE OVER <br />ATTACH FIRST PLY <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />(OPTIONAL) <br />CENTER OF POST <br />w/(4)16 d NAILS TO EA. <br />2X4 BLOCKING <br />PRE-ENG. TRUSS <br />A A <br />SEE PLAN FOR <br />END OF TRUSS THEN <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS <br />CONT. ROOF SHEATHING AT TRUSS TOP <br />TOP OF <br />EAM <br />ATTACH SECOND PLY <br />MAX &EACH END ALTERNATE <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />w/ (3) ROWS OF 16d <br />DIRECTION TYP. A <br />NAILS AT 24" O.C. <br />v <br />-v <br />• <br />DIAGONAL 2x8 #2 SPF RIDGE BEAM <br />o <br />AT 8 -0 WOOD <br />SIMPSON LUS26 w/ (8) 10d NAILS <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />MAX TRUSS <br />SIMPSON MTS18 w/ (14) <br />OR IF 2 PLY TRUSS SIMPSON <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />10d NAILS TYP. U.N.O. <br />SEE PLAN FOR SIMPSON <br />LUS26-2 w/ {8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />CANTILEVER IF MTS18 w/ (14) <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />COMMON TOENAILS TO TIE BEAM <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />INDICATED 10d NAILS <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />VERIFY WITH PLAN FOR <br />co <br />TYP. U.N.O. <br />LOCATION AND DIRECTION <br />2X4 CONT. AT CONC. MASONRY <br />ADDITIONAL INFO. <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />T & B CHORD STEEL OR WOOD <br />(WOOD COLUMN SHOWN) <br />IN2TO ND OF EACH <br />FLOOR <br />BLOCKING INFO) <br />BEARING SUPPORT <br />MIDDLE <br />TRUSS, C AT <br />.. <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />Q <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />A —A ALTERNATE BLOCKING <br />CORNER <br />SECTION AT <br />LOW ROOF 9 <br />SEE <br />FOUNDATION <br />= <br />DETAIL @ INTERIOR BEARING <br />PLAN FOR MORE INFO <br />SCALE: NTS <br />3 <br />,+�I' <br />SCALE: NTS <br />COMMON B M ATTACHMENTrl 8 <br />WOOD TRUSS <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING <br />. <br />SCALE: NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />4 <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE: NTS <br />OlL VARIES <br />2x STUDS @ 16" O.C. <br />a <br />ROOF SHEATHING <br />SEE 1/S5 FOR <br />SEE PLAN <br />w/ SIMPSON SP1 w/ (10) 10d <br />ATTACHED PER <br />ADDITIONAL <br />8d NAILS AT VALLEY TRUOSS <br />NAILS AT BASE & SIMPSON <br />2x4 #2 SPF BRACING @ NAILING SCHEDULE <br />OUTLOOKER <br />4" O.C. INFO. <br />SP2 w/ (12) 10d NAILS AT TOP <br />o <br />16" O.C. W/ (4) 12d COMMON TRUSSES. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />INFO. <br />2x BLOCKING BETWEEN STUDS <br />3 <br />TOENAILS TO TOP SEE TRUSS PLAN <br />2x4 STUDS w/ SIMPSON NAILING SCHEDULE <br />TO TRUSS W/ (2) 12d TOENAILS <br />o <br />STRUCTURAL SHEATHING <br />PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION <br />SP1 w/ (10) 10d NAILS <br />EACH END ( BETWEEN TRUSSES <br />o <br />PER NAILING <br />NAILS TO TRUSS SPF TOP INFORMATION. <br />AT BASE SEE J/S6 FOR <br />GABIL <br />LOW ROOFMlALL <br />(2) 12d NAILS TO EACH VERTICAL <br />SCHEDULE <br />BOTTOM CHORD PLATE <br />MORE INFO. <br />TRUSS <br />TRUSS <br />STUD) <br />SHEATHING ATTACHED <br />'— <br />VARIES SEE PLAN <br />PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />E <br />VARIES W/ <br />FOR WALL LOCATION <br />2x4 BASE PLATE W/ <br />1/2" PLYWOOD <br />NAILS @ 16" O.C. ALONG W/ <br />ROOF SLOPE <br />SIMPSON LSTA30 w/ <br />SIMPSON MTS12 w/ (14) 10d x <br />= <br />o <br />(22) 10d NAILS OR <br />(2) 16d NAILS TO <br />NAILSTO OCKING <br />= <br />WOOD WALL <br />SIMPSON MTS12 w/ <br />EACH COMMON <br />BELOW @ 6" O.C. <br />y <br />OR TRUSS. 2X4 CONT. W/ (2) <br />MIN. 2x4 #2 SPF STUDS @ <br />(14) 10d x 1 1/2" NAILS <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />LZ <br />SEE PLAN 16d COMMONS <br />16" O.C. W/ EXTERIOR <br />TO FLOOR GIRDER <br />NAILS EACH <br />SHEATHING ATTACHED <br />BELOW @ 16" O.C. <br />o <br />STUD TYP. T&B <br />PER NAILING SCHEDULE & <br />12d TOENAILS TO <br />• MASONRY WALL BELOW: SIMPSON <br />a<. <br />PLYWOOD <br />(3) <br />HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />FLOORING <br />UI <br />TRUSS OR <br />SEE PLAN FOR PLATE BELOW <br />MASONRY WALL , <br />4'-0" O.C. TO GABLE TRUSS <br />co <br />ROOF SYSTEM <br />TOP OF WALL <br />OR BEAM <br />. BEAM BELOW: SIMPSON HTS20 w/ <br />L-11SEE <br />MIN. 2x4 #2 SYP P.T. PLATE <br />16" FLOOR SYSTEM FLOOR GIRDER <br />TRUSS PLAN <br />a<. (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />. W/ 1/2"X8" EPDXY ANCHOR <br />SEE PLAN FOR SEE PLAN FOR <br />TO GABLE TRUSS <br />LOW ROOF TRUSS W/ <br />(2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE @ 3" FROM EACH END & <br />DIRECTION CONNECTION <br />COMMON TRUSS <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE 16" O.C. MAX. <br />Q <br />"' SEE ROOF PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER <br />INFO. �� <br />SECTION @ FLOOR <br />FOR CONNECTION <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />M <br />EXTERIOR. WALL <br />SECTION ENTRY <br />CONNECTION r22��SECTION <br />AT <br />HIP GABLE <br />SECTION @ <br />BUMP OUT <br />� <br />g <br />12 <br />39 <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />W <br />31 <br />DETAILS & SECTIONS <br />(9 �p <br />z M <br />_ o <br />CDto <br />z <br />Q <br />a <br />z <br />V) (9 <br />)m <br />+_j LU <br />M <br />•V — <br />0 W <br />C6 U <br />�g c:, <br />m <br />W <br />- <br />N M <br />C f6 M <br />® U <br />f` C3 M <br />O o 0 <br />00 <br />C� <br /><o <br />¢t3) <br />U)ao <br />"tgv <br />MQo <br />A I <br />B D. <br />N C H D C <br />N � <br />N <br />o N <br />ZLU o a o <br />F ���z �, z <br />LU <br />W > E o � a <br />y � <br />z 0 - sg:� <br />N <br />Wum <br />O a) V OO <br />WWW. G.COM 1 Li <br />`1� Y ✓dC�..� <br />v • vY" v <br />FLO �•�, z <br />// AROFE331oN1\�'���`\ <br />'///'r/{rl JJitl I111i't <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />Z <br />w ¢ Y X <br />0000 <br />ozzz <br />CL2� <br />m <br />a W 2 if <br />�U <br />'�` <br />W tj O <br />i <br />rL <br />z <br />p <br />zz <br />'8 <br />oC <br />I— <br />v <br />s � <br />LU <br />-p <br />rl <br />W <br />z <br />OU <br />= <br />0LU <br />J <br />;¢c <br />C�Oo <br />0 <br />Ion <br />Lu <br />w <br />-aO Q <br />rj <br />z�za Lu y,� <br />Q <br />Li <br />Q <br />W <br />¢ <br />g -W � <br />Z <br />�o�o <br />w <br />Lr) <br />W <br />; rL <br />W <br />Z <br />Z <br />Y U <br />o <br />Ct' <br />L <br />LO 2 <br />ca <br />' <br />^ <br />z <br />Uj <br />i <br />J (n <br />a <br />rn <br />SCALE : AS NOTED <br />DATE : 7/31 /2018 <br />TECH: MJAMES <br />VERSION NO. 4n0 <br />SHEETNO. <br />D1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.