Laserfiche WebLink
SEE ROOF PROVIDE 2X4 MIN. BLOCKING AT <br />PLAN SHE Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />2X4 BLOCKING TYP. <br />BETWEEN TRUSSES TRUSS <br />SECT. A -A <br />I`1 <br />G.T. - s <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING ACK <br />MAX 24" SPAN (EITHER USSES HIP <br />SIDE OR BOTH IF REQ'D) G.T <br />N;�7 <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 44 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />(2) 12D NAILS <br />AT 12" O.C. MAX <br />.. 1V4` ",,, , ,,,���..�� BEAM a@ RAISED ENTRY <br />CROSS BRACING DETAIL JYP.)r_,"'�HIP/RIDGE BLOCKING DETAIL 2 MASONRY WALL 4 KNEEWALL fiD, ENTRY FRONT WALL 6 <br />SCALE:NTS SCALE: NTS SCALE:NTS SCALE: NTS <br />EXTERIOR <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />TRUSS NOTES: <br />CONY. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 <br />MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER <br />w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE <br />IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST <br />PRE-ENG. TRUSS-7 <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />01 <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />BETWEEN EA. TRUSS <br />MAX &EACH END ALTERNATE <br />z DIRECTION TYP. , <br />a <br />00 <br />/—WOOD TRUSS --J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />gL VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />SCALE:NTS <br />DIAGONAL <br />AT 8'-0" <br />MAX <br />LOW <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />V Frf 'x M W <br />TB <br />PRE-ENG. TRUSS <br />CONT. ROOF SHEATHING AT TRUSS TOP —h <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />WOOD <br />TRUSS <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 w/ (12) 10d NAILS SIMPSON HUC410 w/ (14) SEE PLANL. <br />FOR CANT. <br />#2 SPF 48" Q.C. W/ (4) CENTERED AT 16d INTO HEADER & (6) <br />10d TOP & BOTTOM SPLIT TO TIE 10d INTO BEAM - SEE <br />OR SIMPSON H2.5A w/ BEAMS TOGETHER ROOF PLAN FOR MORE <br />(10) 8d NAILS INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />* * 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT—/ CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL a@ INTERIOR BEARING <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />OIL VARIES <br />2x4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d <br />TOENAILS TO TOP — <br />PLATE & (2) 12d END MIN. (2) 2x4 <br />NAILS TO TRUSS SPF TOP <br />BOTTOM CHORD FPLATE <br />C <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />COMMON TRUSSES. <br />SEE TRUSS PLAN <br />FOR CONNECTION <br />INFORMATION. <br />J,VARIES SEE PLAN <br />FOR WALL LOCATION <br />MIN. 2x4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />o <br />MIN. 2X4 #2 SYP P.T. PLATE <br />°. <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />p <br />16" O.C. MAX. <br />INFO. <br />° <br />SECTIO_N__@ <br />ENTRY <br />K8 <br />SCALE:NTS <br />7 SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />SEE FLOOR PLAN CONNECTION INFO REl ONLY WHEN <br />FOR COLUMN SIZE L INDICATED ON BM. <br />& ADDITIONAL INFO. — ]__� I SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REl ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SC EDULDE/PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT rA <br />SEE ROOF PLAN <br />FOR BEAM SIZE & SCALE: 3/4"=1'-0" <br />CONNECTION INFO. BM. TER O OVER <br />CENTER OF POST <br />A A SP <br />� SEE PLAN FOR <br />SIMPSON MTS18 w/ (14) —' <br />10d NAILS TYP. U.N.O. SEE PLAN FOR <br />CANTILEVER IF <br />SEE FLOOR PLAN FOR INDICATED <br />COLUMN SIZE & <br />ADDITIONAL INFO.—�\TF <br />(WOOD COLUMN SHOWN) <br />CORNER d SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />XX <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM — FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE:NTS <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />TRUSS <br />1/2" PLYWOOI <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />11H - A <br />8d NAILS AT <br />4" O.C. <br />SEE PLAN FOR <br />VALLEY TRUSS <br />INFO. <br />`—• MASONRY WALL BELOW: SIMPSON <br />a HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM . BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN a<_ (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />COMMON TRUSS <br />44. SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE �� <br />SCALE: NTS <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />w/ (3) 10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SIMPSON LUS26 w/ (8) 10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />Z <br />LUS26-2 w/ (8) 16d NAILS TO7 <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />(IF PARALLEL SEE 2/D2 FOR <br />BLOCKING INFO) <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE:NTS <br />LOW ROOF/WALL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 w/ (10) 10d <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 10d NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/—/ <br />L (2) 2x6 BLOCKING UNDER— FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP OUT 39 <br />SCALE:NTS <br />DETAILS & SECTIONS <br />0 UD <br />co <br />C) <br />0 <br />—o <br />zQ0 <br />z <br />Q <br />0 <br />t� z <br />V) 0 <br />� w <br />M o <br />�V — <br />0 w <br />) <br />t/) <br />E <br />rU U <br />o co <br />CO N <br />W E <br />— 8 r <br />CM co <br />..M <br />g :]zaj <br />O p N <br />�LL80 <br />U <br />�o <br />Sao <br />MQo <br />A I <br />B D®/r- <br />N C B"D C <br />'if <br />N <br />•-+ N <br />O (D � <br />tw O M ONO <br />O <br />O p N <br />Lu <br />U) Z_ W �N�Z � z <br />W <br />W t <br />im <br />0 = � <br />�¢ o <br />C N m <br />N <br />Z \ 1 1 11 Art a <br />LL <br />? <br />04i <br />z <br />E �0 ; <br />�o <br />A'�' O F E S 5\O \ <br />lilt, r!/litl!!11\1�%%\,\ <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />LENNAR <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />oz <br />0 <br />�o <br />z Qg <br />W C x <br />Uzoo <br />FU <br />Qz <br />T uz^z <br />'_o <br />OW �u, <br />U N <br />U) <br />-i0 <br />z <br />O <br />zz <br />0 <br />> <br />Q <br />�3 <br />Cw <br />1z <br />0 <br />O <br />-0 <br />- <br />� <br />J <br />T <br />J_ <br />9 <br />1oy.� OZ <br />h-Yr— <br />E <br />o�° <br />Q <br />a <br />W <br />u2p <br />� <br />N <br />0 <br />z�Za <br />o <br />Z <br />g� 2 <br />Z <br />LV <br />WS2�z <br />=aZ5 <br />LU <br />y<YO <br />00 <br />M <br />2: <br />Q <br />Z <br />lwz <br />z <br />a <br />CYZS <br />ao <br />z <br />2 <br />aLu <br />SCALE: AS NOTED <br />DATE : 3/16/2018 <br />TECH: MJAMES <br />VERSION N0. 4sO <br />SHEET NO. <br />D1 <br />