3
<br />i�
<br />a>
<br />v
<br />v
<br />S
<br />L0
<br />C"
<br />0
<br />0
<br />I
<br />s
<br />m
<br />v
<br />v
<br />x
<br />L0
<br />0,
<br />0
<br />0
<br />ao
<br />-o
<br />i
<br />3
<br />a
<br />02
<br />N
<br />0
<br />o.
<br />Q
<br />0
<br />x
<br />0
<br />J
<br />N
<br />r7
<br />0
<br />U
<br />v
<br />O
<br />UI
<br />U
<br />O
<br />a
<br />00
<br />N
<br />00
<br />1X4 1/2" DRYWALL
<br />i
<br />\
<br />1/2" DRYWALL DOOR JAMB REFER
<br />DOOR JAMB (REFER 1 X 4 r (
<br />1 X 4 1/2" DRYWALL
<br />, UNACCEPTABLE INSTALLTION
<br />,
<br />DOOR JAMB REFER
<br />( P.T.
<br />TO SHT. SDW2-K1
<br />TO SHT. SDW2-K1 L TO SHT. SDW2-K1
<br />PROPER INSTALLATION MAX.
<br />8
<br />DO NOT DO THIS
<br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C.
<br />FOR CONN. DETAILS
<br />FOR CONN. DETAILS FOR CONN. DETAILS
<br />1 X 4
<br />1 X 4
<br />` '
<br />#5 REBAR (TYP,)
<br />3/4" PLYWOOD DECKING GLUED
<br />ATTACHED WALL SHEATHING TO
<br />2X BOTTOM PLATE W/ Sd 4"
<br />1 X 4
<br />3-1/4" LONG X 3/16"0 FURRING
<br />„ „
<br />3/16 X 3 LONG FURRING 3/16"0 X 3-1/2" LONG
<br />FURRING
<br />#5 REBAR `
<br />'
<br />AND NAILED W/ 8d COMMON @
<br />6 O.C. EDGES AND 12" O.C. FIELD
<br />@
<br />O.C., 2 ROWS STAGGERED
<br />TAPCON. INTO
<br />TAPCONS TAPCONS STAGGERED
<br />STAGGERED @ 16"
<br />2X8
<br />(TYP,)
<br />BLOCK@ SPACING "
<br />1 DETAIL
<br />1X8 P.T. STAGGERED @ 16" O.C.
<br />O.C. 2-ROWS INTO 2-ROWS INTO
<br />1X8
<br />JOIST
<br />2x BAND JOIST W/ FACE NAIL 10d
<br />PER MANUFACTURE
<br />MASONRY THROUGH 1-1/2" DETAIL MASONRY THROUGH
<br />3
<br />��
<br />DETAIL
<br />STD.
<br />STD. 90^ ` /�
<br />90° HOOK (TYP.)
<br />@TOP & TTM CHORD, AND (1
<br />1x4 P.T. & 1x8 P.T. 1x8 P.T. & 2x8 P.T.
<br />FILL SOLID
<br />BOTH CELLS
<br />HOOK (TYP.)
<br />FACE NAILS 10d @ TRUSS VERT.
<br />WEB
<br />3/16" x 3 -1/2"
<br />METAL SEAT PLATE
<br />TAPCON @ 16"
<br />O.C. & 4' FROM
<br />1X4 P.T.
<br />3/16 x 3 -1/2 DOOR JAMB (REFER
<br />1 X 4 1/2 DRYWALL
<br />NOTE:
<br />LAP SHEATHING TO
<br />DOOR JAMB (REFER EACH END W/ MIN
<br />DOOR JAMB (REFER TAPCON TO SHT. SDW2-K1 FOR
<br />BAND
<br />BOTTOM D
<br />TO SHT. SDW2-K1 2" EDGE DIST.
<br />TO SHT. SDW2-K1 CONN. DETAIL
<br />PI
<br />JOIST TYPICAL
<br />FOR CONN. DETAILS
<br />FOR CONN. DETAILS
<br />10d @ 12" O.C.
<br />1 X 4
<br />J
<br />FURRING
<br />— �
<br />2X8 P.T. WITH 3/16"0 X 3"
<br />' +2�
<br />NOTC @ FIRST COURSE
<br />SIMPSON HGAM1OKTA @ 12" O.C.
<br />EWS
<br />LONG S
<br />2x P.T. AS REQ'D
<br />2X8 P.T.
<br />STAGGERED @ 16" O.C.
<br />EKED
<br />2X8
<br />INTO BAND JOIST & (4)1R/4"x2 3/4"
<br />TITEN INTO K.O. BLOCK
<br />2x DETAIL
<br />2 1/4" DETAIL 2-ROWS INTO MASONRY 3-1/4" DETAIL
<br />±5^
<br />NOTCH WEB AT THE
<br />FIRST 2 COURSES
<br />`
<br />BUILDOUT OVER SIZE DOOR
<br />-WINDOW ROUGH OPENINGS CC
<br />FILLED CELL
<br />FOUNDATIONPER PLAN
<br />FILLED CELL INSTALLATION
<br />H
<br />RETROFIT FOR MISSING
<br />EMBEDDED STRAP
<br />SCALE: N.T.S.
<br />SS
<br />SEE TYP. 2-STORY WALL SECTION FOR ADDL.
<br />INFO SCALE: N.T.S.
<br />SCALE: N.T.S.
<br />SS
<br />2x8 P.T. BUCK -CONNECT TO BLOCK
<br />SECTION
<br />UPLIFT CAPACITY = 805 # FOR 1 STRAP
<br />W/ 1/4" x 31/4" TAPCON ( 1 1/4" MIN.
<br />A -A
<br />= 1610 # FOR 2 STRAPS
<br />FILL 1st4 COURSES
<br />EMBEDMENT INTO BLK.) 1/4" MAX
<br />SOLID W/GROUT
<br />8"
<br />1 PLY PRE-ENGINEERED TRUSS
<br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN.
<br />1/4" x 31/4" TAPCONS
<br />BLOCK HEADER ARCH BLKG. & BUCK
<br />SIMPSON HM9KTw/ (4)1/4"xl 1/2" SDS
<br />1/2" DRYWALL *
<br />SCREWS & (5) 1/4" x 21/4"TITEN (IF TRUSS
<br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d
<br />8d NAILS AT 8" O.C. AT BUCK
<br />SINKERS AND (7)1/4"X21/4" TITEN = 2150 #)
<br />2 x 8 45^ DIAGONAL (4)10d NAILS INTO
<br />LEAVE A CUT OUT IN O.S.B. ON THE
<br />BRACE(S) 2 x 8 BRACE/ BLKG.
<br />INSIDE TO ALLOW FOR INSULATION
<br />°
<br />7/16" OSB
<br />TO BE INSTALLED
<br />BOND BEAM OR CAST IN PLACE BEAM
<br />FOR OVERHANGS BETWEEN OVER 1 1/2"
<br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR
<br />POLY -CELL IN THIS AREA
<br />2 x 8 45 DrAGONAL BRACE AT EA.
<br />CONTACT ENGINEER OF RECORD FOR
<br />FURTHER wsTRucTIONs. ;
<br />SCRIBE (NOTCH)
<br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8
<br />FACE OF ARCH W/ (3) 10d NAILS
<br />AT EA. END
<br />RETROFIT TRUSS DETAIL
<br />OVERRAN . �.
<br />°
<br />CONNECT W/ 8d NAILS BRACE/ BLKG.
<br />N.T.S.
<br />INSTALL WDW. SCREW ANCHOR-2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB
<br />ARCH FACES W (4 PROVIDE TAPCON WITHIN
<br />INTO ARCH BLKG. PER ) 10d NAILS THRU OSB INTO 2 x 8
<br />RETROFIT WALL OVERHANG DETAIL NTS
<br />4" MIN. OF BRACE
<br />INSTALLATION DETAILS A
<br />2 X 4 #2 SYP SCAB TO SIDE OF
<br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2"
<br />-A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR
<br />THRU
<br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH
<br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6"
<br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF
<br />ARCH
<br />START OF ARC
<br />IF TRUSSES USED W/ 3 #6 X 4'%" WOOD
<br />) () /
<br />SCREWS 16" O.C. MAX. OR IF MASONRY WALL
<br />* DOUBLE 2X4 SCAB FOR 2'-6" TO 4'-0" O.H.
<br />/
<br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D.
<br />@ /
<br />(2)1Od NAILS @ 8" O.C.
<br />ARCH DETAIL
<br />4' MAX. RAD.
<br />USE (1) SIMPSON 1/2 HD TITEN (CENTERED) w/ /
<br />XOV
<br />FR/y TO TRUSS TOP CHORD
<br />MIN. 4" EMBEDMENT AT 16" O.C.
<br />+
<br />�
<br />(F G7•
<br />1,-fir, 5,_Orr
<br />SCALE: N.T.S.
<br />SS
<br />12
<br />+ + y PLYWOOD SHEATHING
<br />JACK TRUSS PROVIDED BY SEE
<br />+ +
<br />TRUSS COMPANY OR PLAN
<br />2x6 #2 SYP @ 24" O.C.
<br />+ +
<br />+
<br />INISH FLO
<br />QR
<br />2
<br />x 8 BUCK - CONNECT TO BLOCK
<br />SECTION
<br />+ + BLOCKING AS
<br />•
<br />°
<br />`�
<br />WITH
<br />1/4" x 31/4" TAPCON (1 1/4" MIN.
<br />B-B
<br />ROOF SHEATHING ATTACHED
<br />+ REQUIRED
<br />„ EMBEDMENT INTO K.)
<br />/4 MAX
<br />PER NAILING SCHEDULE ALL
<br />TO SUPPORT
<br />+
<br />e.. ° D: #5 BAR
<br />--:CENTERED
<br />Z-0" 8"
<br />TRUSS SOFFIT
<br />+ +
<br />b . D• I. o
<br />D ° W/
<br />BLOCK HEADER
<br />SOLID BLKG. AT TOP BTWN. ARCH
<br />(5)12d NAILS SIMPSON
<br />+
<br />p• e
<br />9 H IN TOP
<br />1 X 4 FURRING
<br />BLKG. &BUCK
<br />2X6 TO 2X4 H2.5A W/ (10)
<br />8d NAILS
<br />2X4 SYP . ®s
<br />EACH TRUSS
<br />. D e o
<br />D .' ' KNOCKOUT / N
<br />° CHAIR BLOCK
<br />8d NAILS @ 8" O.C. AT BUCK
<br />PROVIDE 2 8 DIAG. BRACE BT
<br />2 x 8 VERT. W/ (2) 1 Od
<br />NAILS AT EA. END
<br />PROVIDE (2) MIN.
<br />PROVIDE 2x
<br />CONT. W/
<br />CONNECTOR '®
<br />_ I
<br />MONO FOOTING ' ,a e. • • D e
<br />x
<br />(3)
<br />SIZE AND REINF. PER PN
<br />LA
<br />VERT. BRACES WHEN HGT. OF
<br />TAPCON AT EA. SIDE
<br />12d NAILS
<br />SEE LINTEL
<br />AND SECTION DETAILS -I
<br />BRACE EXCEEDS 24"
<br />BUCK - (1) WITHIN 4"
<br />JACK TRUSS PROVIDED BY
<br />SCHED.
<br />•
<br />LEAVE A CUT OUT IN O.S.B. ON T
<br />MIN. OF START OF
<br />TRUSS COMPANY OR 2X4
<br />CLEAN FILL D ° • e D
<br />2 x 8 VERT. BRACE(S)
<br />INSIDE TO ALLOW FOR INSULATION
<br />ARCH
<br />#2 SYP @ 24" O.C.
<br />bENTER SO IT
<br />DIRT 6 z
<br />TO BE INSTALLED
<br />011
<br />BUILT UP PLWD. BUCK -
<br />4'-0" MAX SEE PLAN
<br />PRECAST LINTEL
<br />e ° STANDARD o
<br />SCRIBE (NOTCH) BACKSIDE
<br />7/16" OSB ARCH PANEL
<br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH
<br />SEE ELEVATION
<br />> 90' HOOK N
<br />#5 BAR IN
<br />TO FIT ARCH CONNECT W/
<br />IF TRUSSES USED) W/ (2) #6 X 4'/2" WOOD
<br />FOR OVER HANG
<br />FILLED CELL e , ' e� . ' s� . . ' •
<br />8d NAILS
<br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS)
<br />START OF ARC
<br />SCREWS @ 16" O.C. MAX. OR IF MASONRY
<br />(MAX. 4'-0")
<br />. . L ., . .,
<br />INSTALL WDW, SCREW
<br />BTWN. OSB ARCH FACES W/ (4)1 Od NAILS
<br />EQUAL EQUAL
<br />4' MAX. RAD.
<br />WALL USE (2)1/4" X 3112" TAPCONS AT 16"
<br />_,
<br />•°
<br />s• , , ,' s• , , ,' s• , •,
<br />IN,• ,Sk
<br />', s•
<br />ANCHOR INTO ARCH BLKG.
<br />THRU OSB INTO 2 x 8
<br />O.C.
<br />PER INSTALLATION DETAILS
<br />B-BMONO
<br />ARCH DETAIL rK
<br />SECTION a@ ENTRY L
<br />SECTION@ ROOF EXTENSION M
<br />STEMWALL FOOTING SIZE AND
<br />REINF. PERLAN AND STEMWALL
<br />TO STEMWALL FOOTING
<br />SCALE: N.T.S. SS
<br />SCALE: 3/4" = 1'-0" SS
<br />SCALE: 3/4" =1'-0" SS
<br />SECTION DETAILS
<br />SCALE: 3/4" = V-0"
<br />GLASS BLOCK INSTALLATION NOTES
<br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT,
<br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY
<br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION.
<br />AT LEAST 2 HOURS BEFORE PLACING MORTAR.
<br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP
<br />EXTENDS TO SILL.
<br />EXISTING BOND BEAM.
<br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL.
<br />MASONRY WALL. SEE PLAN FOR
<br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS
<br />REINFORCING. PROVIDE LOWER
<br />HOOKED DOWEL
<br />DRILL 3/4"x5" MIN. HOLE SET BAR IN
<br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE
<br />SEE SHEET D2 AND
<br />EPDXY CAP TO PREVENT LEAKAGE
<br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE
<br />EXPANSION STRIP
<br />FLOOR PLAN FOR
<br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT
<br />20 ga. PANEL
<br />MORE INFO
<br />TOP SPACE BETWEEN EXISTING GROUT &NEW GROUT
<br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT, FOR SOLID GLASS
<br />ANCHOR
<br />x 1
<br />SIMPSON2"
<br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2" )
<br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER
<br />"SQUEEZED"
<br />W.W.M. AT PERIMETER
<br />1/2" NAILS STUDS & -
<br />NILHTT4 U S & (1)
<br />COURSES TO PREVENT THE MORTAR FROM BEING OUT.
<br />1/4" EXPANSION BOLT (2
<br />WHERE THIS CONDITION
<br />(1) #5 BARS CONT.
<br />L
<br />5/8" DIA. ALL THREAD ROD
<br />O
<br />#5x6' EMBEDDED INTO EXISTING BOND BEAM
<br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS
<br />9 ga. PANEL PER ANCHOR)
<br />TOP WITH MIN. 3" OCCURS
<br />EPDXIED w/ SIMPSON "SET"
<br />z
<br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING
<br />REINFORCING
<br />COVER 6'-0"
<br />EPDXY MIN. 6" EMBEDMENT &
<br />0
<br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL
<br />( EVERY OTHER
<br />F•F•
<br />3 MIN. EDGE DISTANCE
<br />FILL CELL FULL HEIGHT W/
<br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS.
<br />COURSE) EXPANSION STRIP
<br />LL v
<br />NON SHRINK GROUT.
<br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE
<br />e
<br />O
<br />A
<br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL
<br />; v D
<br />w a
<br />REINFORCING AS FOLLOWS:
<br />I —I I I If I i
<br />1
<br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW.
<br />SEALANT
<br />—��—
<br />o e I II�II�
<br />g
<br />#5x6' EMBEDDED INTO
<br />* PRESS PANEL REINFORCING INTO PLACE.
<br />6" MIN. LAP SPLICE
<br />D .D (
<br />z
<br />EXISTING FOOTING (2) #5x6' IN CONC.
<br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL
<br />REINFORCING PANEL
<br />_
<br />.:
<br />N
<br />FILLED CELL
<br />SMOOTH. DO NO FURROW.
<br />D °
<br />r
<br />`
<br />DRILL 3/4 x5 MIN. HOLE
<br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT
<br />GRADE D, D -
<br />SET BAR IN EPDXY
<br />FURROW. MAINTAIN UNIFORM JOINT WIDTH,
<br />6 MIN. LAP
<br />p
<br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST
<br />SPLICE
<br />REMAIN FREE OF MORTAR.
<br />NOTE:
<br />"' z
<br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS
<br />SEE GLASS BLOCK INSTALLATION
<br />NOTES.
<br />�2 o
<br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE
<br />SEALANT
<br />e °
<br />'0
<br />4" SAW CUT
<br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY.
<br />GLASS BLOCK DETAIL
<br />\ D (2) #5 REBAR. MIN. 3"
<br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE
<br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160
<br />.
<br />16"MIN. COVER EAWAY
<br />SECTION
<br />BLOCK SHALL BE INSTALLED PER
<br />A
<br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN
<br />EXISTING FOOTING
<br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING.
<br />1 SCALE: N.T.S.
<br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE
<br />SECTION AT DEEP MONO FOUNDATION
<br />RETROFIT FOR MISSING MSTAM STRAP
<br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS.
<br />RETROFIT
<br />FILLED CELL DETAIL
<br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING.
<br />SCALE: 3/4 - -1-0
<br />_ , „
<br />SCALE: 3/4' - 1-0
<br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR
<br />SCALE: N.T.S.
<br />INSTALLATION OF GLASS BLOCK.
<br />(D
<br />:2!:
<br />CD
<br />Z mEj
<br />z
<br />V) C9
<br />�,u
<br />w
<br />•p
<br />W
<br />o
<br />U
<br />o0
<br />m
<br />W
<br />O
<br />N M
<br />0,C,)
<br />_ Qj
<br />O O N
<br />t" o
<br />U
<br />o
<br />no
<br />Q rn
<br />N
<br />Ln oo v
<br />rn Q d
<br />All
<br />B D®
<br />I °
<br />B,D C 1W
<br />N `D
<br />YI 00 O M W
<br />�"6z
<br />Z W w z
<br />~
<br />U_ w
<br />W -N*!.� a w
<br />._ o
<br />W t,i ¢Ej ckzo-S-0,4!;
<br />1 r w
<br />e OW
<br />''
<br />i"`'��' E `.Q
<br />l�r�a�flFESS�p
<br />1!k%N
<br />To the best of the Engineer's knowledge, information and belief,
<br />the structural plans and specifications contained within these
<br />drawings comply with the 2017 Florida Building Code -
<br />Residential 6th Edition. Engineer's signature and seal is only for
<br />the structural engineering portions of the drawing pages bearing
<br />Engineer's signature and seal.
<br />L NAR
<br />4600 W. Cypress St, Suite 200 I Tampa, FL 33607
<br />www.Lennaffampaxom
<br />0z
<br />0
<br />Lo
<br />LU
<br />za
<br />zg0
<br />z U z Q
<br />Z
<br />0 u�
<br />0
<br />�ap�
<br />W
<br />/"\
<br />0 L0
<br />z
<br />L
<br />^
<br />L.L.
<br />z
<br />�o
<br />2:
<br />>
<br />z
<br />CZL
<br />V) 3:
<br />rl
<br />z
<br />O
<br />"a
<br />JW
<br />U
<br />T
<br />V,
<br />J
<br />o o
<br />R 0
<br />�-
<br />nc
<br />I—
<br />U,
<br />LLJ
<br />0_
<br />z
<br />N
<br />Z
<br />Zarb
<br />o 0
<br />w
<br />J
<br />r-i
<br />CW
<br />G
<br />Q
<br />Z o
<br />wwO
<br />Ln
<br />rN.
<br />Q
<br />Z
<br />Z
<br />Paz
<br />m
<br />ZJ
<br />yz
<br />V)
<br />O
<br />oo
<br />g
<br />=
<br />rn
<br />,-i
<br />CL
<br />cn
<br />in
<br />SCALE : AS NOTED
<br />DATE : 11 /28/2018
<br />TECH: MJAMES
<br />VERSION N0. 4sO
<br />SHEET NO.
<br />SS
<br />
|