Laserfiche WebLink
TEMPORARY TAP <br />E <br />'FLAP' TO HOLD FLAP <br />X/ 4ousE <br />4,1 WRAP <br />♦ HA ING <br />O <br />9' <br />ROUGH <br />OPENING <br />HOUSE <br />WRAP <br />SHEATHING <br />TEMPORARY TAPE <br />'FLAP' <br />TO HOLD FLAP <br />4OU5E <br />WRAP <br />♦ ♦ .♦ SHEATHING <br />O <br />ROUGH <br />OPENING <br />4' <br />SILL WRAP <br />,ILL FLASHING <br />HOUSE <br />WRAP INSTALL FLEXIBLE <br />FLASHING <br />SHEATHING CORNERS AT <br />WINDOW SILL <br />TEMPORARY TAPE <br />'FLAP' 70 HOLD FLAP <br />4,1 Hou,E <br />WRAP/ <br />♦ / i <br />SHEATHING <br />CAULK BEHIND <br />WINDOW FLANGE <br />BEFORE <br />INSTALLATION. <br />WINDOW FLANGE <br />SILL FLASHING <br />HOUSE <br />WRAP <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' WINDOW FLASHING METHOD 'A -I' WINDOW FLASHING METHOD 'A -I' <br />A A WINDOW INSTALLER WILL CUT THE BUILDING PAPER AT A 45• ANGLE TO A POINT 9' UP AND 9' OUT 3-5TEP PROCESS: <br />01 FROM THE UPPER CORNER, UT THE ROUGH OPENING. O A INSTALL SILL FLASHING (EXTENDING 4' BEYOND THE ROUGH OPENING ON EACH SIDE) O A APPLY A CONTINUOUS BEAD OF CAULKING ON THE BACK SIDE OF THE WINDOW FLANGE. <br />B. INSTALL CORNER SHIELD FLASHING (FASTEN WITH M015TOP SEALANT OR EQUAL) B. INSTALL THE WINDOW ACCORDING TO THE MANUFACTURERS SPECIFICATIONS. <br />B. THIS WILL MAKE A 'FLAP' THAT WILL BE USED TO COVER THE HEAD FLASHING IN STEP 6, C. INSTALL SILL WRAP (MUST COMPLETELY COVER ROUGH OPENING SILL (INCLUDING COWER SHIELDS) <br />METAL FLASHING <br />DOUBLE LAYER SPLINE APPLIED <br />VERTICALLY (IF USING FELT, SPLIT <br />36' - WIDE SHEET IN HALF) <br />2' TO 4' LAP AT <br />; = <br />HORIZONTAL JOINT <br />i� <br />. ' <br />2' TO 4' LAP AT <br />I I <br />I <br />If <br />HORIZONTAL. JOINT <br />I I I <br />I <br />' <br />SHEATHING <br />j I � <br />``♦\` I 1 I <br />' <br />BUILDING PAPER <br />HOUSEWRAP <br />I I <br />1 I <br />1 I <br />I -CUT <br />� <br />� <br />WINDOW <br />OPENINGS <br />SHEATHING WRAP <br />(BUILDING PAPER <br />OR HOUSEWRAP) <br />J� ♦` <br />, i i <br />CARRIED P TO 2' <br />`\ <br />; <br />BELOW BOTTOM <br />i <br />OF SHEATHING <br />/ <br />4' TO 6' LAP AT <br />VERTICAL JOINT <br />�' <br />9' (6' MIN.) BEYOND <br />CORNER BOARD <br />SHEATHING <br />WRAP DETAIL <br />SCALE: N.T.,. <br />WINDOW FLANGE <br />HOUSE <br />WRAP <br />SHEATHING <br />TEMPORARY TAPE <br />'FLAP' TO HOLD FLAP � <br />LNDUSE <br />WRAP <br />HEAD FLASHING <br />SILL FLASHING <br />JAM FLASHING <br />WINDOW FLASHING METHOD WI' <br />OA INSTALL HEAD FLASHING OVER THE WINDOW FLANGE. <br />B. EXTEND THE HEAD FLASHING 8' BEYOND THE ROUGH OPENING ON EACH SIDE. <br />1JV I I VI 1 v I T♦II 1 RA/ I &it_ I 1 1 1"111 <br />TO ALLOW MOISTURE TO BE DIVERTED TO THE OUT5IDE 5UF�:ACE <br />TEMPORARY TAPE <br />'FLAP' TO HOLD FLAP <br />HOUSE <br />WRAP/ <br />♦ � I <br />�t I <br />SHEATHING <br />JAM FLASHING <br />WINDOW FLANGE <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' <br />0 A INSTALL JAMB FLASHING OVER THE WINDOW FLANGE ON EACH SIDE. <br />B. EXTEND THE JAMB FLASHING 4' ABOVE THE ROUGH OPENING AND 8' BELOW THE ROUGH OPENING. <br />C. INSTALL THE WINDOW ACCORDING TO THE MANUFACTURERS SPECIFICATIONS. <br />HOUSE <br />WRAP <br />/HOUSE <br />'FLAP' WRAP <br />e <br />SILL FLASHING <br />WINDOW FLANGE <br />WINDOW FLASHING METHOD 'A -I' <br />0 A. ALLOW THE BUILDING PAPER 'FLAP' TO DRAPE OVER THE HEAD FLASHING. <br />EAD FLASHING <br />JAM FLASHING <br />/HOUSE <br />'FLAP' WRAP <br />---------------------------- <br />WEATHER RESISTANT <br />CONSTRUCTION TAPE EAD FLASHING <br />JAM FLASHING <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING WINDOW FLANGE <br />WINDOW FLASHING METHOD 'A -I' <br />n A. APPLY WEATHER RESISTANT TAPE OVER THE 45• ANGLE CUT ON THE BUILDING PAPER <br />B. ON INSIDE PERIMETER OF WIDOW APPLY CONTINUOUS BEAD OF SEALANT OR EXPANDABLE FOAM <br />1 � =r <br />s til{ �sz3* 5V � r <br />DANSCO <br />ENGINEERING, LLC <br />P.O. BOX 3400 <br />Apollo Beach, Florida 33572 <br />p. 813.645.0166 <br />f. 813.645.9698 <br />www.donscoengineering.com <br />CA 25948 <br />i <br />o <br />0 <br />N <br />z <br />O�^ <br />00 <br />�(nM� <br />M <br />aW�^ <br />aCa¢Ir' <br />z�tQ00 <br />Z�� <br />W <br />zw <br />w 2 <br />J <br />0 <br />CD <br />nr <br />U <br />w <br />Q <br />� <br />= <br />LJJ <br />Lu IL <br />= o <br />L-0 `- Q <br />IL <br />Q <br />W <br />z <br />p <br />Q <br />O Q <br />~ Q <br />z w <br />Q Z � <br />Z <br />�ti OU L0 <br />IL <br />V) <br />V <br />TO THE BEST OF THE ENGINEER'S <br />KNOWLEDGE AND BELIEF, THE STRUCTURAL <br />PLANS AND SPECIFICATIONS COMPLY WITH <br />6TH EDITION (2017) FLORIDA RESIDENTIAL <br />BUILDING CODE, SECTION R301 FOR <br />140 MPH (Vasd = 108MPH), 3 SEC. GUST, <br />EXPOSURE "C" ENCLOSED (INTERNAL <br />PRESSURE COEFFICIENT=+0.18) WIND ZONE <br />THIS DRAWING AND DESIGN IS VALID FOR 12 MONTHS <br />AFTER THE DATE IT IS SIGNED AND SEALED. <br />SIGNED AND SEALED FOR THE STRUCTURAL PORTION <br />OFTHIS DRAWINGONLY. <br />02018 LENNAR CORP.-THIS PLAN MAY NOT BE <br />REPRODUCED IN ANY MANNER WITHOUT WRITTEN <br />CONSENT FROM LEN NAR CORPORATION. <br />02018 - THESE DRAWINGS AND DESIGNS ARE THE <br />JOINT PROPERTY OF DANSCO ENGINEERING, LLC AND <br />THE CLIENT ON THIS PROJECT. ANY REPRODUCTION <br />OR UNAUTHORIZED USE IS PROHIBITED. <br />REVISION: <br />DATE <br />DESCRIPTION <br />12.19.17 <br />1.00 6TH ED. (2017) FBC <br />UPDATES <br />UPDATED CONNECTION <br />06.08.18 <br />1.01 CROSS-REFERENCE TABLE <br />AND STAIR STRAP <br />VERSION NO. 1.01 / 06.08.18 <br />d <br />y� E0 <br />d3i I.,y i ..j -' <br />Pr <br />Q— <br />LLJ <br />m <br />w t— <br />Lu <br />W CD Z <br />N QLO �N <br />2 ,— <br />Lu wM =0, <br />W :D* �* <br />Z QL i =LIJ <br />W ❑ <br />SHEET TITLE: <br />WINDOW FLASHING <br />DETAILS & NOTES <br />SHEET INFORMATION: <br />JOB NO.: 381319 <br />DATE ISSUED: 10.09.18 <br />DRAWN BY: LF <br />REVIEWED BY: TH <br />WF-1 <br />O <br />O <br />1 <br />00 <br />N <br />