My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2979 Moulden Hollow Dr
Zephyrhills
>
Building Department
>
Building Plans
>
2979 Moulden Hollow Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 1:19:48 PM
Creation date
2/19/2025 10:42:09 AM
Metadata
Fields
Template:
Building Plans
Street #
2979
Location
Moulden Hollow Dr
Contractor
Lennar Homes LLC
Building Plans - Permit #
20516
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T3 <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />00 <br />21 <br />E <br />3� <br />DOI <br />;1; J� I <br />— — — I <br />101-091 <br />TANK -LESS W/H <br />H C G <br />000 <br />51-011 <br />STUB -OUT FOR <br />GAS METER 0 LO <br />1C!1?4 <br />MEASUREMENTS ARE FROM FINISHED FLOOR <br />ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />ROUGH -IN ELECTRIC TO LEF7 (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2- X 4- @ 16' O.C. <br />T-51' <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />101-8-1 <br />(2) 16d TOENAILS <br />2- X 8- @ 16" O.C. <br />131-911 <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19-4- <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4- @ 24" O.C. <br />61-11' <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />V-13" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11 1-0" <br />(2) 16d TOENAILS <br />2- X 10- @ 24" O.C. <br />131-011 <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />164" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />W. <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />PIMP 1 IM: <br />. . <br />. . . . . . . . . <br />I \ . . . . . . . . . . . . . I- +i <br />+ <br />+ 4 <br />. . . . . . . . . <br />. . . . . . . . . . . . . . <br />+ + <br />+ + <br />. . . . . . . . . <br />. . . . . . . . . . . . 4 + <br />+ + <br />+ <br />. . . . . . . ... . <br />. . . . . . . . . . . + + <br />+ + <br />+ <br />4- + <br />1-0.1 (TYP.) <br />6'-0" <br />+/ <br />6-4- <br />+ + <br />+ 4 <br />+ + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ + <br />_1__+ <br />+ <br />4 4 <br />4 + <br />+ + + <br />+ + <br />+ + <br />+ <br />+ 4' <br />+ + + + + + <br />+ + + + + + + + + <br />+ + <br />+ + <br />+ + <br />+ + <br />+ + <br />+ + + + + <br />+ + + + <br />+ <br />I <br />+ <br />+ + + + + + <br />+ <br />+ +++ + + + + + <br />+ + <br />+ + <br />J- 4. 4- + <br />+ +K+ <br />+++ + 4- 4, 4, . <br />+ <br />0-i <br />15/32" CDX <br />PLYWOOD OR <br />7/16" OSB <br />I `—RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE"C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />4- O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2 INCH NAIL LENGTH 2 INCH NAIL LENGTH <br />NOTE: FOR 8d RING SHANK NAILS 0.1 13x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />Backer and Filler Block Dimensions <br />BCIOJoist <br />Backer Block <br />Series <br />Thickness <br />Filler Block Thickness <br />3/4" or 7/8" <br />5000s 1.8/1.7 <br />wood panels <br />Two 3/4" wood panels or 2 x <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1 /8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1 90 .0 <br />2 x — lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking <br />1/8" gap <br />FILL CELL <br />(n <br />Lu <br />STD. 900 <br />CONT. #5 > HOOK <br />BAR � I <br />STD. 90' HOOK <br />BOND BEAM <br />SIMPSON MGT <br />w/ (22) 1 Od GIRDER TRUSS <br />NAILS TYP. <br />CONT. #5 <br />BAR 5/81 L2X TOP PLATE <br />#5 CONT. THRU <br />FROM BOLT <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT BASE PLATE <br />BEARING COLUMN <br />'J�; �r_�_PLYWO'OD <br />SEE PLAN FOR REQ'D <br />FLOOR <br />COLUMN AND <br />CONNECTION <br />SHEATHING PER PLAN <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />01 nr1V1K1r_1 Tr% RAATr'U <br />Solid block all posts from # OF 2nd FLOOR <br />above to bearing below. STUDS <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />1/8" min. small gap 2" min. <br />2" max.. 4" max. Web Stiffener Fastener Schedule <br />Joist B aring Location <br />Series 11 pth I End intermediate <br />9-1/2" 2-8d 2-8d <br />BCI 50OOsP 11-7/8" 2-8d 3-8d <br />14" 2-8d <br />Clinch nails 9-1/2" 2-8d 2-8d <br />when BCI 6000s" 11 -7/87- - 2�8d 3-8d <br />possible BCI 6500se- 14" 2-8d 5-8d <br />1 jz" 1) QA 9z QA <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. <br />77 <br />Tight fit ------------ <br />BCI 60s@ <br />11-7/8" <br />14" . <br />2-8d <br />2-8d <br />3-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 1 Od nails <br />2x4/PIywood/OSB web stiffener 2" min. <br />A'- <br />BC, 90so <br />11-7/8.1- <br />14" <br />� 3-16d <br />5-16d <br />3-16d <br />5-16d <br />2x-: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite required when indicated or ,tax. 16" 6-16d 6-16d <br />- Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVINGY8" GAP @ TOP sides by 6". - Hangers with sides not containing <br />top flange of joist. WEB STIFFENER <br />DOUBLE JOIST CONNECTION - Birdsmouth cuts. N.T.S. <br />- Under 2nd floor Column w/ loads <br />N.T.S. higher than 1500ib. <br />BLOCKING PANEL, INTERIOR <br />SQUASH BLOCKS AT INTERIOR Boise Joist Blocking Vertical load transfer =1 900 plf max. along bearing wall <br />BEARING Use 3" (10d) nails at 6" o.c. Required on interior walls for vertical load transfer Plumbing <br />Vertical load transfer 1900 pff max along load bearing wall. Load bearing walls when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />Load bearing wall must stack beam below Load bearing wall must stack over <br />over squash=20 blocks and <br />*Non -stacking walls blocking and wall or beam below.* <br />wall or beam below.* <br />require additional Joist <br />consideration. Check <br />local building When joists meet over wall, provide <br />I -Joist can be offset <br />code for appropriate 13/4" minimum bearing for each. <br />Ix up to 3" to avoid <br />details in One 1 Od box <br />vertical plumbing <br />areas=20 of high or--20 s <br />inker <br />lateral load. nail each side 3" max <br />at bearing. <br />JOISTS OFFSET <br />N.T.S. <br />Provide a Jequate bearing Use 10dx3" nails at 6"o.c for all joist <br />for each lapped joist. <br />blocking panel *Non -stacking walls <br />Squash block Od nails require additional consideration. <br />(2x4 minimum) SECTION @ INT. BRG. WALL <br />Bearing wall, Versa -Lam LVL or N.T.S. <br />Glulam Beam <br />MINIMUM SPACING = 2x GREATEST <br />CKOUT'S) Z�WED DIMENSION OF LARGEST HOLE <br />IN BEARING ZONES D (KNOCKOUT EXEMPTS) <br />(see table below) D <br />(see table below) <br />DO NOT cut, notch <br />or drill flanges <br />611 A %2" ROUND HOLE MAY 6" 6-1- DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3"OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN %" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE %" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Joist hanger <br />I.0 <br />SIMPS( <br />w/ (22) - <br />NAILS 1 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />=_ AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 <br />HETAL20 INSTALLATION <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />Backer block (12" wide min.) .71J� �11 <br />Nall with 10- 10d nails. <br />>-, nstall tight to top flange. <br />SLEE, E I HRU STEM <br />x_ SEE PLAN FOR-,-' <br />4T <br />I . .? 4 <br />FOUNDATION INFO <br />STEM FOUNDATION <br />Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install fight to top flange, <br />/1/4%2" gap <br />Backer Block <br />"Top Mount' "Face Mount" <br />Backer block shall be fight Backer block shall be fight <br />to bottom of top flange with to top bottom ange with <br />1/4"-2" gap at top of bottom 1/4%2" gap at bottom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />GRADE <br />REINF. SEE PLAN <br />tvi- %,nmor + rvu <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />SIMPSON H10A (WHEN <br />w/ (18) 1 Od x 11/2" REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />TOP 2) #5's x 4'-0" <br />CENETERED @ PIPE <br />PENETRATION <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />r%lr%r- % 1r-r%-"10% A I -T-# lr.%i 1 r-1k 1� <br />TOP (2) #5's x 4'-0"_ PVC OR SCH40 SLEEVE <br />CENETERED @ PIPE PLUMBING LINE <br />PENETRATION <br />4 <br />4 <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @ PIPE <br />PENETRATION PLUMBING LINE <br />.4 <br />4 T. <br />4 <br />A-0 -i:� <br />�d 4 <br />A <br />A <br />A <br />SEE FND. PLN. <br />SIZE & REINF. <br />Cz <br />4--J <br />0 LU <br />Lh Of <br />0 <br />:0. <br />C) <br />0 <br />co <br />UD, <br />r' cl. 0 D c. <br />0 <br />rq <br />cc <br />z <br />1z LL <br />LU <br />LU A6; J <br />z 01-4" <br />U) -11,g <br />z U) <br />0 <br />S L <br />< <br />0 <br />F U <br />0 F E S Z' <br />To the best of the Engineer's knowledge, Information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />LENNAR <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />N Ce <br />z <br />31 <br />�i <br />96, <br />U) <br />LU <br />F- <br />z <br />z <br />CU <br />;or <br />0 <br />CC <br />=5 <br />U <br />F_ <br />C <br />M <br />0 <br />1�6 <br />ej 0 <br />U) <br />< <br />Z <br />Z <br />LU <br />Ln <br />U.1 <br />a U <br />rn <br />< <br />z <br />V <br />ILD <br />Z <br />Z <br />t- <br />U <br />LU <br />u, <br />z <br />0 <br />r_1 <br />06 <br />T__I <br />CL <br />V) <br />LU <br />2 <br />S <br />SCALE AS NOTED <br />DATE 10/2/2018 <br />TECH: MIAMES <br />VERSION No' 4n0 <br />SHEET NO. <br />SN 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.