Laserfiche WebLink
C) <br />00 <br />70 <br />-t'l CORNER OF <br />HOME <br />CD <br />GARAGE SIDE <br />CD <br />-0 <br />:2 <br />C) <br />00 <br />101-011 <br />TANK -LESS W/H <br />H C G <br />000 <br />51-01' <br />0 <br />- CD <br />STUB -OUT FOR r b 0 -1 <br />GAS METER 01 e -1 0 Lo <br />C,4 <br />MEASUREMENTS ARE FROM FINISHED FLOOR <br />ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />T-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3) 16d TOENAILS <br />2- X 10" @ 16" O.C. <br />16-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19-4- <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6-1 1' <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2) 16d TOENAILS . <br />2- X 8" @ 24" O.C. <br />111-01, <br />(2) 16d TOENAILS <br />2" X 10" @ 24" 0. C. <br />'IT-011 <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15-4- <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />SOUTHERN YELLOW PINE, 55 PSF LOADING 1 <br />RVA <br />co <br />uJ <br />< <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />. . <br />. . . . . . . . . . <br />. . . . . . . . . . . . . . <br />+ <br />+ <br />+ + + + + + + + = <br />9 <br />+ + + + + + + + + + + + + <br />+ + <br />. . <br />. . . . . . . . . ED . <br />. . . . . . . . . . . . . ... <br />+ <br />.. . . . . . . . . . <br />. . . . . . . . . . . . . . <br />. . <br />+ + <br />+ <br />+ 4 <br />+ + <br />+ 1-01, (TYP.) <br />-0" `TYP') <br />U-13" <br />+/ <br />+ + <br />+ + <br />6-4' <br />7 <br />+ 4 <br />+ <br />+ <br />++ <br />+ + <br />+ + <br />. . <br />. . <br />+ <br />+ <br />+ I <br />+ <br />+ <br />X+ <br />+ + <br />+ + <br />+ + <br />+ 4 <br />+ <br />4 + <br />+ <br />+ <br />+ + <br />+ + <br />+ + <br />+ + <br />+ -f <br />+ + + + + <br />7++ <br />+ <br />+ <br />+ + + + + + + + + + + <br />+ + <br />+ + <br />+ + + 9 <br />7++++, <br />. . <br />. . . . . . . . . . <br />i- + <br />+ <br />+ + + + + + <br />+ <br />+ + + + + + <br />+ + + + + <br />+ + <br />+ + <br />, + <br />+ +R+ <br />+ + + <br />+ + + + + <br />+ + + ' A-- -4- 4- <br />+ I <br />\-RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />15/32"CDX <br />PLYWOOD OR <br />7/16" OSB <br />OU r'%IIMU 0F1MI14rX INMILO kW V V.1— L-UUF—O Ct <br />4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />0.113 INCH NOMINAL SHANK DIAMETER <br />0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />2 INCH NAIL LENGTH 2 INCH NAIL LENGTH <br />FOR 8d RING SHANK NAILS 0.1 13x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />NOTE: <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />Backer and Filler Block Dimensions <br />BCI Joist <br />BackerBlock <br />Series <br />Thickness <br />Filler Block Thickness <br />3/4" or 7/8" <br />5000s 1.8/1.7 <br />wood panels <br />1 <br />Two 3/4" wood panels or 2 x <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x + 5/8" or 3/4" wood panel <br />1-1 /8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602,0 <br />wood panels <br />2 x + 5/8" or 3/4" wood panel <br />.902,0 <br />2 x — lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking--, <br />1/8" gap <br />11 �, <br />—i <br />FILL CELL--\ STD. 90' HOOK BOND BEAM <br />LU <br />< STD. 900 <br />CONT. #5 <br />> <br />CONT. #5 HOOK <br />BAR <br />BAR <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKINGrrJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @ INT. BRIG. WALL <br />N.T.S. <br />1/8" min 2" min. <br />2" ' ) Small gap <br />" <br />ma <br />. <br />4 <br />max. <br />/71 <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 1 Od nails 2x4/PIywood/OSB web stiffener 2" min. <br />2x-: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite required when indicated or 4" max. <br />- Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING Y8" GAP @ TOP sides by 6". - Hangers with sides not containing <br />top flange of joist. WEB STIFFENER <br />DOUBLE JOIST CONNECTION - Birdsmouth cuts. N.T.S. <br />- Under 2nd floor cohimn w/ ln;;d.q <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for a ppropriate <br />details in <br />1--or--20 <br />One 1 Od box <br />areas=20 of high <br />sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVIL or <br />0 <br />Glulam Beam <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />Use 3" (1 Od) nails at 6" o.c. <br />Load bearing walls -7 <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 pif max. along bearing wall <br />Required on interior walls : - for vertical load transfer 10 <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or 2 <br />Web Stiffener Fastener Schedule <br />Joist Bearing ocation <br />Series Depth End Intermediate - <br />F— <br />BCl 5000so-191--7/8"I <br />1/2" <br />1 2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />R <br />BCI 6000s <br />BCI 6500s 8 <br />9-1/2" <br />11-7/81, <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI 60se <br />11 -7/8" <br />2-8d <br />3-8d <br />14!:� <br />—2-8d <br />5-8d <br />16" <br />1 2-8d <br />6-8d <br />BCI 90se <br />11-7/8" <br />1 3-1 6d <br />3-16d <br />14" <br />� 5-16d <br />5-16d <br />6-16d <br />SIMPSC <br />w/ (22) <br />NAILS I <br />5/81 <br />THRU <br />BOLT <br />SIMPSC <br />w/ (22) <br />NAILS I <br />RTRUSS <br />'OP PLATE <br />I.0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />AIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 <br />Plumbing HETAL20 INSTALLATION <br />11=�, <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />13/4" minimum bearing for each. <br />I -Joist can be offset <br />pl� IF <br />" <br />QY,-' Provide adequate bearing Use 10dx3" nails at 6"o.c. for all joist <br />for each lapped joist. <br />blocking panel *Non -stacking walls <br />nails quire additional consideration. <br />-N IN <br />SECTION T. BRG. WALL re <br />(U-) <br />N.T.S. <br />MINIMUM SPACING 2x GREATEST <br />DIMENSION OF LARGEST HOLE <br />D <br />(KNOCKOUT EXEMPTS) <br />(see table below) <br />D <br />(see table below) <br />0— 11 <br />-4 <br />A 1Y2" ROUND 6" 6" -DO NO <br />tit CUT ANYWHERE IN AC - <br />HOI F MAY CUT HOLES <br />CANTILEVER LARGER THAN 1Y2" <br />THE WEB. PROVIDE AT #ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN ly2,, <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />5. THE ENTIRE WEB MAY BE CUT OUT, DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE %" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />up to 3 <br />to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />A <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />Backer block (12" wide min.) <br />Nail with 10- 1 Od nails. <br />Install tight to top flange. <br />SLEEVE THRU STEM <br />- 0 -- A <br />SEE PLAN FOR <br />FOUNDATION INFO 4* <br />STEM FOUNDATION <br />Filler block. <br />Nail with <br />10-1 Od nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />A1/4"-2" gap—�� <br />--1 <br />Backer Block,_---, -:2z, <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be fight <br />to bottom of top flange with to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4%2" gap at bottom of top <br />flange. flange. <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />eb stiffner as <br />height <br />E 11 requirements <br />7 <br />0.6 X Joist <br />T/ D depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />GRADE <br />REINF. SEE PLAN <br />(2) #5 REBAR <br />'LA/C =HASE 4- �PVC <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON HETA20 HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />3 <br />0 (WHEN <br />SIMPSON H10A <br />w/ (18) 1 Od x 1 1/2" REQUIRED) <br />NAILS <br />U PLI FT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />0151 3 <br />I A <br />10 1 /2- <br />X <br />TYPICAL SIMPSON MTS <br />HTS INSTALLATION <br />TOP (2) #5's x 4'4' <br />CENETERED @ PIPE <br />PENETRATION <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />12" BELOW <br />PIPE VERTICAL THRU FND. <br />GRADE <br />TOP (2) #5's x 4' 0" <br />P <br />CENETERED @ Pl- E <br />PENETRATION <br />A <br />PVC OR SCH40 SLEEVE <br />PLUMBING LINE <br />T,— <br />A ..4 <br />A <br />4 <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @ PIPE <br />PENETRATION PLUMBING LINE <br />4- 4 <br />-11E 11--i A 4 <br />SEE FND. PLN. <br />SIZE & REINF. <br />Cn <br />C� <br />CO <br />(D <br />U) 21 <br />1=1 <br />tn 0 <br />U <br />U <br />0 LU <br />a-, <br />V) <br />E <br />20 <br />YZ ro <br />co <br />0 C:) <br />Fn t-- <br />CN <br />LU <br />E <br />0 <br />Cb C) M <br />M <br />co <br />0 Z5 C', <br />= U­ C'O <br />-5 -00 <br />0 <br />cy) <br />0 <br />11 C1. c�, <br />0 7;r� <br />Al I <br />BID. <br />N C B D C <br />A <br />10 <br />CD <br />Lu R �� <br />U) <br />2 �� 0? <br />= < �� - 8 �, <br />LLI - a,� <br />. - <br />LU <br />z 0 N <br />40 U) <br />Z U) mE �M, <br />WL <br />C� <br />< C <br />OWV7 d <br />WWW4�NOMA <br />E 400%. <br />je C14 <br />se, : - <br />< - <br />F <br />0\4- <br />OpEsw <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition, Engineers signature and seal is only for <br />the tructural engineering portions of the drawing pages bearing <br />Engsineees signature and seal, <br />LENIVAM <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />09 <br />�1 <br />04 <br />LU <br />ZZ <br />w < lox- Q� <br />Z <br />U, z <br />w <br />2: <br />Co <br />CE2 <br />u- 0 <br />U <br />@ <br />W <br />LLJ <br />z z <br />> 0 <br />X <br />> <br />0 <br />z <br />z <br />15 <br />2: <br />CL <br />z <br />C <br />7- <br />cu <br />-a <br />2: <br />0 <br />41, <br />ZD <br />< <br />12u: <br />gg <br />U <br />uJ <br />, � 2� <br />0 <br />g <br />9 <br />U 2 W <br />C-4 <br />Cf) <br />< <br />< W- <br />z <br />11 g <br />29 U� 0 <br />T-11 <br />8y 8 <br />U-11 <br />Ln <br />UJ <br />2: <br />L <br />2: <br />< <br />W C', <br />0 Z,0, <br />In �� U <br />� < <br />8 <br />-94- <br />00 <br />< <br />z <br />z <br />Ly t� z <br />W 0 <br />Z� <br />Ln <br />Z <br />t7u <br />C), Ln 0 <br />z <br />0 <br />co <br />0 <br />06 <br />:5 <br />z <br />< Lu <br />r-1 <br />I <br />SCALE AS NOTED <br />DATE 3/7/2018 <br />TECH: JMUROSKI <br />VERSION NO <br />4mO <br />SHEET NO. <br />SN 1 <br />of. <br />LU <br />LU <br />