Laserfiche WebLink
SHEATHING WRAP AND FLASHING: <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />SECTION R10313 WATER-RE515TIVE BARRIERS <br />ALL SHEATHING WRAP MUST BE INTEGRATED WITH FLASHING <br />MATERIALS. IT'5 NOT ENOUGH TO WRAP A HOUSE, AND THEN TO <br />SIMPLY X-CUT THE OPENINGS AND FOLD THE FLAPS INSIDE. <br />FOLLOW THE GUIDELINES FROM THE DETAIL SHEETS WHEN <br />INSTALLING ANY SHEATHING WRAP, <br />A5PHALT-5ATURATEE) FELT: <br />COMMONLY AVAILABLE IN TWO WEIGHTS, ASPHALT FELT, OR <br />"BLACK PAPER" 15 MADE FROM CORRUGATED PAPERS MIXED <br />WITH 5AWDU5T AND AN ASPHALT RESIN, <br />WHEN CH005ING NO, 15 FELT, LOOK FOR MATERIAL RATED A5TM <br />D486� OR A5TM D226 STANDARD, WHICH ENSURES A WEIGHT OF <br />AT LEAST 11.5 L56, PER SQUARE. <br />PLASTIC HOUSE WRAP: <br />PLASTIC POU5EWRAP5 TYPICALLY MADE OF POLYOLEFIN <br />FABRIC- EITHER POLYETHYLENE OR POLYPROPYLENE. THE <br />PRIMARY DIFFERENCE IN HOUSEWRAPS 15 WHETHER OR NOT THEY <br />ARE PERFORATED: <br />1.) PERFORATED PRODUCTS ARE MADE FROM A VAPOR -TIGHT <br />PLASTIC, AND THEN NEEDLE -PUNCHED TO ALLOW THE WRAP TO <br />"BREATHE" (ALLOW VAPOR TO PA65 THROUGH). UNFORTUNATELY, <br />THESE HOLES AL50 ALLOW LIQUID WATER TO SEEP THROUGH, <br />PARTICULARLY WHEN THE SIDING 15 PRESSED TIGHT AGAINST IT. <br />THE HOU5EWRAP WILL SLOW THE SEEPAGE BUT WILL NOT BLOCK <br />IT ENTIRELY, <br />2.) NON -PERFORATED HOU5EWRAP6 ARE MADE FROM PLASTIC <br />FIBER THAT ALLOWS VAPOR TO PA55 BETWEEN THE FIBERS. <br />THESE GENERALLY PEI;T-ORM MUCH BETTER THEN PERFORATED <br />PRODUCTS AT RE515TING LIQUID WATER, WHICH SHOULD BE <br />CONSIDERED THEIR PRIMARY TASK <br />LEACHING: <br />HOU5EWRAP5 ARE 5U5CEPTIBLE TO DAMAGE FROM <br />EXTRACTIVES THAT CAN LEACH FROM WOOD 51DIN65 MATERIALS, <br />PARTICULARLY CEDAR AND REDWOOD. TH15 CAN BE <br />PREVENTED IN TWO WAYS: <br />1.) INSTALL 51DING ON BATTENS TO CREATE AN AIR GAP, WHICH <br />REDUCES CONTACT BETWEEN THE SHEATHING WRAP AND 51DING. <br />2.) BACK -PRIME ALL WOOD 51DING MATERIALS, TP15 REDUCES <br />LEACHING AND BLOCKS M015TURE FROM MOVING THROUGH THE <br />SIDING AND BL15TERING THE FINISH, <br />INSTALLING SHEATHING WRAP: <br />THE PRIMARY PURP05E OF HOUSE WRAP 15 TO STOP WATER <br />AIR-5EALIWG AND VAPOR CONTROL ARE SECONDARY. <br />1.) USE SHEATHING WRAP OR FELT PAPER ON ALL HOUSES, NO <br />MATTER WHAT KIND OF SIDING 15 USED. <br />2.) THE WRAP SHOULD BE CONTINUOUS: AVOID A PATCHWORK OF <br />SMALL PIECES, REVIEW FLASHING DETAILS, AS 50ME FLA5HING6 <br />(SUCH AS TH05E AROUND ELECTRICAL FIXTURES, MECHANICAL <br />PENETRATIONS, ETC.) SHOULD BE INSTALLED CONCURRENT WITH <br />SHEATHING WRAP, <br />3.) LAP UNDER COURSES OF HOUSEWRAP OVER LOWER COURSES <br />4 INCH AND LAP VERTICAL SEAMS 12 INCHES. CODE REQUIRES A <br />HORIZONTAL LAP OF 6 INCHES. <br />4.) DO NOT X-CUT SHEATHING WRAP AT OPENINGS. INSTEAD, I -CUT <br />THE SHEATHING WRAP, RUNNING THE KNIFE ALONG THE ROUGH <br />OPENING AT THE HEAD OF THE SILL, AND THEN SLITTING <br />VERTICALLY IN THE CENTER OF THE OPENING. <br />5.) IF THE WALLS ARE LAPPED WHILE THEY ARE LYING ON THE <br />DECK BEFORE STANDING THEM UP, BE SURE TO ADD A COURSE <br />OF SHEATHING WRAP TO COVER THE RIM JOIST. REMEMBER, TH15 <br />COURSE MUST LAP UNDER THE SHEATHING WRAP ABOVE IT. <br />(o.) ALWAYS WRAP GABLE ENDS. TH15 PART OF A HOUSE SEES A <br />LOT OF EXP05URE TO WIND -DRIVEN WATER <br />1.) ADD A SECOND LAYER OF SHEATHING WRAP ALONG INSIDE <br />AND OUT51DE HOUSE CORNERS, LAPPING AT LEAST � IN. (AN <br />EVEN MULTIPLE OF 3(o-IN. WIDE ASPHALT FELT) ON EACH WALL. <br />8,) CONTROL 5PLA5H5ACK BY SLOPING THE GRADE AROUND <br />THE HOUSE AND KEEPING 51DING AT LEAST 8 INCHES ABOVE <br />GRADE. AT DECKS AND STOOPS WHERE 5PLA5HBACK MAY BE <br />A PROBLEM, USE A WIDE PEEL-AND-5TICK FLASHING MEMBRANE <br />MAKE SURE THE MEMBRANE LAP5 UNDER THE SHEATHING WRAP <br />ABOVE IT, <br />9.) ALL FLASHING (FOR WINDOWS, DOORS, DECK LEDGERS, <br />ELECTRICAL FIXTURES, VENT, PIPES, AND CANTILEVERED <br />BEAMS) MUST LAP UNDER THE SHEATHING WRAP ABOVE IT, DO <br />NOT RELY ON TAPE TO SEAL THE FLASHING, <br />TAPING HOUSE WRAP: <br />MANUFACTURES OF PLASTIC HOU5EWRAP RECOMMENDED TAPING <br />ALL 5EAM5 TO BLOCK AIR LEAKAGE THROUGH WALLS. <br />TAPE SHOULD BE TYPE RECOMMENDED BY SINGLE <br />SOURCE" SYSTEM, <br />50ME TAPE 15 USEFUL FOR STOPPING WATER LEAKS BY <br />REPAIRING RIPro (PARTICULARLY TEARS AROUND STAPLES) AND <br />FOR SECURING THE WRAP TO FLASHING BEFORE THE SIDING 15 IN <br />PLACE, <br />DO NOT PATCH OVER HOU5EWRAP AND RELY ON THE <br />5TICKINE56 OF THE TAPE TO SEAL THE PATCH. ALWAYS LAP <br />HOU5EWRAP AND FLA5HING6 UNDER THE PIECE OF SHEATHING <br />WRAP ABOVE. <br />DRAINAGE PLANE: <br />WEEP 5CREED5 AND CONTROL JOINTS CONTINUED: <br />FIN1514-COAT THICKNESS:. <br />ALL STUCCO SYSTEMS APPLIED OVER FRAMED <br />OVER THE INTERSECTION BETWEEN DIFFERENT TYPES OF <br />THE FIN15H COAT 15 ONLY ABOUT 1/8 INCH THICK IT <br />SUBSTRATES SHALL INCORPORATE A DRAINAGE PLANE <br />CONSTRUCTION, SUCH AS THE JOINT BETWEEN WOOD <br />SHOULD BE APPLIED AS EVENLY AS P05515LE TO <br />FRAMING AND A BLOCK WALL. <br />ENSURE UNIFORM DRYING, <br />SHEATHING WRAP FOR STUCCO: <br />ON TALL WALLS AND LONG RUNS, APPLIED VERTICALLY <br />OR HORIZONTALLY TO BREAK UP WALL AREAS INTO <br />ALL STUCCO SYSTEMS REQUIRE SHEATHING WRAP - THE <br />SMALLER SECTIONS (LESS THAN 18 FEET), <br />MIX PROPORTIONS; <br />PREFERRED WAY 15 DOUBLE LAYERS OF HOUSE WRAP <br />SIMILARLY, CA51NG BEAD AND CORNER BEAD HELP TO <br />UNDER 5ELF-FURRED LATH, PAPER BACKED LATH <br />CREATE EXPAN51ON JOINTS AT CRITICAL INTERSECTIONS: <br />INCONSISTENT MIXING WILL RESULT IN OBVIOUS <br />COULD BE USED AS THE SECOND LAYER. <br />OUT51DE CORNERS ARE BEST DETAILED WITH COFNER <br />DIFFERENCES IN COLOR, TEXTURE, AND STRENGTH WHICH <br />PAPER -BACKED LATH SHOULD NOT BE CON51DERED A <br />5EAD, <br />CAN CAUSE THE BATCHES TO FAIL. MAKE EVERY EFFORT <br />SUBSTITUTE FOR WELL -DETAILED SHEATHING WRAP. <br />TO KEEP MIX PROPORTIONS AND TIMES BETWEEN COATS <br />LAP LOWER COURSES OF SHEATHING WRAP UNDER UPPER <br />INSIDE CORNERS SHOULD BE FLASHED WITH TWO LAYERS <br />CONSISTENT, <br />COURSES 50 WATER WILL DRAIN DOWN AND OUT, AND <br />OF SHEATHING WRAP OR FLEXIBLE FLASHING, AND THEN <br />FLASH ALL OPENINGS, FOLLOWING THE FLASHING <br />CA51NG BEAD SHOULD BE APPLIED VERTICALLY TO <br />MIX IN A MECHANICAL MIXER FOR 3-5 MINUTES AFTER THE <br />GUIDELINES PER THE (oth EDITION (2011) FLORIDA <br />CREATE AN EXPAN51ON JOINT. WHILE THE FLASHING <br />ADDITION OF THE LAST INGREDIENTS. <br />BUILDING WDE-RESIDENTIAL. <br />SERVES AS THE M06T IMPORTANT WATER SEALING <br />PROTECTION, THE JOINT BETWEEN THE TWO CA51NG BEADS <br />CURING AND TIME BETWEEN STUCCO COATS: <br />SHOULD HAVE BACKER ROE) AND CAULKED WITH <br />INSTALLATION: <br />HIGH -QUALITY URETHANE SEALANT, AS A FIRST LINE OF <br />PROVIDE SUFFICIENT M015TURE IN THE PLASTER MIX OR <br />WHERE METAL PLASTER BASE WITH BACKING 15 USED, THE <br />DEFENSE. <br />BY M015T OR FOG CURING TO PEF411T CONTINUOUS <br />VERTICAL AND HORIZONTAL LAP JOINTS SHALL BE WR5 TO <br />HYDRATION OF THE GEMENTITIOU5 MATERIALS. THE M05T <br />WR5 AND LATH TO FLANGE. LATH SHALL BE APPLIED WITH <br />APPLY CA5ING BEAD (ALSO CALLED "J" BEAD), AT THE <br />EFFECTIVE PROCEDURE FOR CURING AND TIME BETWEEN <br />THE LONG DIMEN51ON AT RIGHT ANGLES TO THE SUPPORTS, <br />JOINT BETWEEN ANY D1551MILAR MATERIALS - AROUND <br />COATS WILL DEPEND ON CLIMATIC AND JOB CONDITIONS. <br />UNLE55 OTPERW15E SPECIFIED. <br />WINDOW FLANGES, WHERE STUCCO MEETS A BRICK <br />LATH SHALL NOT BE CONTINUOUS THROUGH CONTROL JOINTS <br />CHIMNEY, OR AT THE TOP OF A WALL WHERE STUCCO <br />501CIENT TIME BETWEEN COATS 5WALL BE ALLOWED TO <br />BUT SHALL BE STOPPED AND TIED AT EACH SIDE. LATH <br />MEETS A SOFFIT OR FRIEZE BOARD, USE CONTROL JOINT <br />PERMIT EACH COAT TO CURE OR DEVELOP ENOUGH <br />SHALL BE ATTACHED TO FRAMING MEMBERS WITH <br />OR EXPAN51ON JOINT AT MA50NRY/FRAME WALL <br />RIGIDITY TO RE515T CRACKING OR OTHER PHY51CAL <br />ATTACHMENTS SPACED NOT MORE THAN 1 INCHES ON <br />CONNECTIONS. <br />DAMAGE WHEN THE NEXT COAT 15 APPLIED. <br />CENTERS ALONG SUPPORTS, <br />THE TIMING BETWEEN COATS WILL VARY WITH CLIMATIC <br />FOUNDATION WEEP 5GREED SHALL BE INSTALLED AT THE <br />TEXTURED FIN15H OVER MA50NRY: (STUCCO FINISH) <br />CONDITIONS AND TYPES OF PLASTER BASE. <br />BOTTOM OF ALL FRAMED EXTERIOR WALLS, BELOW THE <br />TEMPERATURE AN[) RELATIVE HUMIDITY EXTEND OR <br />FLOOR LINE. WHERE WALL 15 SUPPORTED BY A FLOOR OR <br />TEXTURED FIN15H 5Y5TEM5 APPLIED IN ACCORDANCE <br />REDUCE THE TIME BETWEEN CONSECUTIVE OPERATIONS. <br />FOUNDATION, GROUND OF WEEP 5GREED SHOULD BE MIN, I" <br />WITH A5TM C S26 AND C 1063. <br />COLD OR LET LEATHER LENGTHENS AND HOT OR DRY <br />OR MAX, 2" BELOW F.F.E.. <br />WEATHER SHORTENS THE TIME PERIOD. MODERATE <br />LATH ATTACHMENT: <br />EXTERIOR PL45TER: <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />CHANGES IN TEMPERATURE AND RELATIVE HUMIDITY CAN <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />SECTION R103.11 PLASTER <br />BE OVERCOME BY PROVIDIWG ADDITIONAL HEATING <br />SECTION R103.1.1 LATH <br />MATERIALS DURING COLD WEATHER AND BY REDUCING <br />RESISTANCE TO RAIN PENETRATION 15 IMPROVED WHERE <br />THE A55ORPTION OF THE BASE BY PRE -WETTING DURING <br />1. 51DE LAPS OF METAL PLASTER BASES SHALL BE WIRE TIED. <br />PLASTER HAS BEEN ADEQUATELY DEN51FIED DURING <br />HOT OR DRY WEATHER <br />THEY SHALL BE ATTACHED BETWEEN SUPPORTS AT INTERVALS <br />APPLICATION AND PROPERLY CURED. PL45TER SHALL <br />NOT MORE THAN 9 INCHES. <br />NOT, HOWEVER, BE CON51DERED TO BE "WATERPROOF". <br />IN ORDER TO PROVIDE MORE INTIMATE CONTACT AND <br />PREFABRICATED CONTROL JOINT MEMBERS SHALL BE <br />BOND BETWEEN COATS AND TO REDUCE RAPID WATER <br />2. EXPANDED METAL LATP SHALL BE LAPPED Y2 INCHES (12,71 mm) <br />INSTALLED PRIOR TO THE APPLICATION OF PLASTER <br />LOSS, THE SECOND COAT SHOULD BE APPLIED AS 50ON <br />MIN, AT THE SIDES. LAP METAL LATH I INCH (25 mm) AT ENDS. <br />THE CREATION OF A GROOVE OR CUT IN PLASTER SHALL <br />AS THE FIRST COAT 15 SUFFICIENTLY RIGID TO RE515T <br />WHERE END LAPS OCCUR BETWEEN THE FRAMING MEMBERS, THE <br />NOT BE CONSIDERED A CONTROL OR EXPAN51ON JOINT. <br />CRACKING, THE PRESSURES OF THE SECOND COAT <br />ENDS OF THE SHEETS OF ALL METAL PILASTER BASES SHALL BE <br />APPLICATION, AND THE LEVELING PROCESS. <br />LACED OR WIRE TIED. <br />STUCCO: (THREE COAT) <br />THE AMOUNT OF WATER AND THE TIMING FOR CURING <br />3. WHERE METAL PLASTER BASE WITH BACKING 15 USED, THE <br />PORTLAND CEMENT PLASTER WILL VARY WITH THE <br />VERTICAL AND HORIZONTAL LAP JOINTS SHALL BE WRB TO WRB <br />TRADITIONAL THREE -COAT STUCCO CON515T5 OF THREE <br />CLIMATIC CONDITIONS, THE TYPE OF BASE, AND USE OR <br />AND LATH TO FLANGE, <br />SEPARATE LAYERS OF CEMENT PLASTER MATERIALS: <br />NON USE OF WATER -RETENTIVE ADMIXTURES. <br />A TROWEL -APPLIED SCRATCH COAT, WHICH 15 APPLIED <br />4. BACKING SHALL BE LAPPED NOT LE55 THAN 2 INCHES (50 mm), <br />OVER LATH AND GROOVED TO PROVIDE A KEY WAY FOR <br />50ME M015TURE MUST BE RETAINED IN OR ADDED BACK <br />ON WALLS, THE BACKING SHALL BE LAPPED 50 WATER WILL <br />THE NEXT COAT: A 5AND-FIN15HED BROWN COAT, WHICH <br />TO FRESHLY APPLIED PORTLAND CEMENT-BA5ED <br />FLOW TO THE EXTERIOR BACKING SHALL NOT BE PLACED <br />KEYS INTO THE SCRATCH COAT: AND A FINISH, OR COLOR <br />PLASTER IF THE RELATIVE HUMIDITY 15 RELATIVELY HIGH <br />BETWEEN PLASTER BASE (LATH) AND FLANGES OF <br />COAT. <br />(ABOVE 15 %), THE FREQUENCY FOR RE -WETTING A <br />ACCESSORIES. METAL LATH TO METAL FLANGE CONTACT SHALL <br />THE FIRST TWO COATS OF A THREE COAT 5Y5TEM ARE <br />SURFACE MAY BE REDUCED. IF IT 15 HOT, DRY, AND <br />BE REQUIRED TO ENSURE THAT FLANGES ARE MECHANICALLY <br />MADE OF A 51TE-MIXED CEMENT PLASTER, EACH BATCH <br />WINDY, THE FREQUENCY OF RE -WETTING MUST BE <br />LOCKED TOGETHER <br />CONTAINS MEASURED AMOUNTS OF STUCCO CEMENT, <br />INCREASED. <br />5.5PAGING OF ATTACHMENTS FOR METAL PLASTER BASES - <br />SAND AND POTABLE WATER. <br />TO HELP REDUCE THE CRACKING THAT 15 <br />CONSIDER THE PHYSICAL CHARACTERISTICS OF THE <br />ATTACHMENTS FOR SECURING METAL PLASTER BASES TO <br />COMMON WITH STUCCO, THE BASE MIX CAN BE MODIFIED <br />STRUCTURE AS WELL AS THE PREVIOUSLY MENTIONED <br />FRAMING MEMBERS SHALL BE SPACED NOT MORE THAN 6 <br />WITH LIQUID POLYMER ADDITIVES, WHICH INCREASE <br />CONDITIONS WHEN SELECTING THE METHOD OF CURING. <br />INCHES O.C. INTO THE FRAMING MEMBERS, FOR DIAMOND MESH <br />STRENGTH AND IMPROVE CURING, AND WITH CHOPPED <br />THE METHOD CAN BE ONE OR A COMBINATION OF THE <br />AND FLAT RIB LATHS AND AT EACH RIB FOR Ya INCH (9.5 mm) <br />FIBERGLA55 FOR REINFORCEMENT. <br />FOLLOWING: <br />R15 LATH, <br />(1) M015T CURING 15 ACCOMPLISHED BY APPLYING A FINE <br />61ATH SHALL BE APPLIED WITH THE LONG DIMEN51ON AT RIGHT <br />SCRATCH COAT: <br />FOG SPRAY OF WATER 45 FREQUENTLY AS REQUIRED, <br />ANGLES TO THE SUPPORTS, UNLE55 OTHERW15E SPECIFIED. <br />GENERALLY TWICE DAILY IN THE MORNING <br />THE SCRATCH COAT 15 APPLIED DIRECTLY TO A CLEAN <br />AND EVENING. CARE MUST BE EXERG15ED TO AVOID <br />1. ENDS OF ADJOINING PLASTER BASES SHALL BE STAGGERED. <br />BLOCK WALL OR, ON WOOD STRUCTURES OVER WRI5 AND <br />ER05ION DAMAGE TO PORTLAND CEMENT-BA5ED <br />GALVANIZED METAL LATH. A METAL 5CARIFING TOOL 15 <br />PLASTER 5URI:ACE5. <br />USED TO CREATE "5CRATCH" LINES IN THE STILL WET <br />WEEP SCREED5 AND CONTROL JOINTS: <br />SURFACE. THE FURROWS CREATE A ROUGH SURF AGE INTO <br />(2) PLASTIC FILM, WEN TAPED OR WEIGHTED DOWN <br />WHICH THE BROWN COAT CAN KEY FOR A GOOD BOND. <br />AROUND THE PERIMETER OF THE PLASTERED AREA, CAN <br />A WEEP 5CREED AT THE BOTTOM OF THE WALL AND <br />SCRATCHING SHOULD ALWAYS BE HORIZONTAL AND <br />PROVIDE A VAPOR BARRIER TO RETAIN THE M015TURE <br />OVER OPENINGS SERVES TWO IMPORTANT PURPOSES - IT <br />SHOULD BE 1/4 INCH DEEP. <br />BETWEEN THE MEMBRANE AND PLA5TER. CARE MUST BE <br />PROVIDES A 5GREED THAT HELPS ENSURE UNIFORM <br />EXERC15ED IN PLACING THE FILM: IF TOO SOON, THE FILM <br />COAT THICKNESS, AND IT PROVIDES A PLACE FOR WATER <br />5CRATCH-COAT THICKNE55: <br />MAY DAMAGE 5UR:ACE TEXTURE: IF TOO LATE, THE <br />THAT LEAKS INTO THE WALL TO ESCAPE. <br />M015TURE MAY HAVE ALREADY ESCAPED. <br />THE SCRATCH COAT SHOULD BE APPROXIMATELY 3/8 <br />FOUNDATION WEEP 5GREED AT FRAME WALL5: <br />INCH TO 1/2 INCH THICK - THICK ENOUGH TO JUST COVER <br />(3) CANVAS, CLOTH, OR SHEET MATERIAL BARRIERS CAN <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />THE WIRE. <br />BE ERECTED TO DEFLECT SUNLIGHT AND WIND, BOTH OF <br />SECTION R103.12.1 WEEP 5CREED5 <br />WHICH WILL REDUCE THE RATE OF EVAPORATION, IF THE <br />BROWN COAT: <br />HUMIDITY 15 VERY LOW, TH15 OPTION ALONE MAY NOT <br />ACCE55ORY USED TO TERMINATE PORTLAND CEMENT BASED <br />PROVIDE ADEQUATE PROTECTION. <br />5TUCCO AT THE 50TTOM OF EXTERIOR WALL5. TH15 ACCE55ORY <br />THE 5RO% COAT (WHICH 15 ACTUALLY GRAY, LIKE <br />SHALL HAVE A SLOPED GROUND OR 5CREED FLANGE TO <br />OTHER CEMENT STUCCO), 15 A SMOOTH COAT, USUALLY <br />PAINTING STUCCO: <br />FACILITATE THE REMOVAL OF M015TURE FROM THE WALL CAVITY <br />"RODDED" WITH STRAIGHT EDGES AND WOODEN FLOATS. <br />AND A VERTICAL ATTACHMENT FLANGE NOT LE55 THAN 3 1/2 <br />IT 15 APPLIED 45 50ON AS THE SCRATCH COAT <br />NEWLY APPLIED STUCCO SHOULD BE ALLOWED ABOUT <br />INCHES LONG, <br />REACHES SUFFICIENT RIGIDITY TO CARRY THE BROWN <br />30 DAYS TO CURE BEFORE PAINTING, DEPENDING ON THE <br />INSTALLATION OF EXTERIOR LATH AND FRAMING SHALL COMPLY <br />COAT. TH1515 USUALLY AT "THUMB PRINT HARD" AND <br />WEATHER CONDITIONS - TESTING THE PH LEVEL 15 THE <br />WITH THE APPLICATION REQUIREMENTS OF A5TM C 1063, <br />CAN BE DONE ON THE SAME DAY. <br />BEST WAY TO DETERMINE PAINT READINESS. PAINT <br />MANUR HAVE A MAX, PH LEVEL (APPROX. 10). <br />STUCCO CONTROL JOINTS: <br />BROWN COAT THICKNE55: <br />EX15TING STUCCO 5URFACE5 SHOULD BE POWER-WA5HED <br />AND ALLOWED TO THOROUGHLY DRY BEFORE PAINTING. <br />CONTROL JOINTS ALLOW FOR THE THERMAL EXFIAN51ON <br />THE BROWN COAT 15 COMP05ED OF SLIGHTLY MORE <br />DO NOT USE A WATER BLASTER, AS THE PRE56URE CAN <br />AND CONTRACTION OF THE PLASTER MEMBRANE, <br />5AND THAN THE SCRATCH COAT MIXTURE, AND <br />DO SEVERE DAMAGE TO THE STUCCO, <br />CONTROL JOINT SHOULD BE APPLIED OYER THE METAL <br />THEREFORE IT 15 MORE MANAGEABLE BUT SLIGHTLY <br />STUCCO SHOULD BE FAINTED ONLY WITH <br />LATH AT EITHER A MAXIMUM D15TANCE OF 18 LINEAR FEET <br />WEAKER. IT SHOULD BE APPLIED 1/4 TO 3/5 INCH THICK. <br />ACRYLIC-BA5ED PAINTS WITH ADEQUATE VAPOR <br />OR A MAXIMUM OF 144 SQUARE FEET OF STUCCO %f;�FACE. <br />APPLY THE BROWN COAT EVENLY AS POSSIBLE AN <br />TRAN51`115510N CHARACTERISTICS, AS THESE PREVENT <br />UNEVEN BROWN COAT CAN LEAD TO AN INCON515TENT <br />NEW M015TURE -RELATED PROBLEMS WITHIN THE HOUSE. <br />THE DEPTH OF THE GROUND OF THE CONTROL JOINT <br />THICKNE55 IN THE FIN15H COAT, CAUSING 50ME AREAS OF <br />CONTROL JOINT 5ACKER ROD: <br />SHOULD BE DE51GNED TO FIN15H FLUSH WITH THAT OF THE <br />THE FIN15H COAT TO DRY BEFORE OTHERS. THE RESULTS <br />WEEP 5CREED5 AND PLA5TER5TOP5. <br />15 A SPLOTCHY OR "MOTTLED" COLOR COAT AND <br />BACKER ROD SHOULD BE USED TO FILL LARGE GAPS <br />EXCESSIVE HAIRLINE CRACKING. <br />AND CONTROL THE DEPTH. M05T BACKER RODS TODAY <br />LATH SHALL BE D15CONTINUED BEHIND THE CONTROL <br />ARE MADE OF FOAM AND COME IN DIAMETERS FROM 1/4 <br />JOINT. <br />FIN15HED COAT: <br />INCH TO 2 INCH AND UP. CHOOSE A BACKER ROE) THAT 15 <br />OVER THE RIM J015T AT THE INTERSECTION BETWEEN <br />JUST A LITTLE LARGER THAN THE JOINT 50 IT WILL STAY <br />FLOORS TO ACCOMMODATE SHRINKAGE IN THE FLOOR <br />AFTER THE CURING PERIOD, A FIN15H COAT CAN BE <br />IN PLACE AND ALLOW YOU TO CONTROL THE DEPTH OF <br />J015T. <br />APPLIED. <br />THE SEALANT. <br />APPLYING SEALANT: <br />FLASHING VENT PIPE PENETRATIONS; <br />APPLY TO CLEAN DRY 5UR:ACE5. APPLICATION <br />VENT PIPES ON WOOD AND ASPHALT ROOFS ARE <br />TEMPERATURE: 40 DEGREES TO 80 DEGREES. PREPARE <br />USUALLY FLASHED U51NG A PRE ASSEMBLED METAL PAN <br />THE SURFACE U51NG THE FOLLOWING 5TRATEGIE5: <br />WITH A RU55ER BOOT. ORDER THE UNIT ACCORDING TO <br />SCRAPE, CHIP, OR BRUSH WITH A 5TIFF-BR15TLE BRUSH, <br />THE OUTSIDE DIAMETER OF THE VENT PIPE. FOR SLATE <br />AND DUST THE IN51DE OF THE JOINT, OR BLOW IT OUT WITH <br />AND TILE ROOFS A MALLEABLE LEAD JACKET WILL LAST <br />COMPRE65ED AIR, <br />LONGER, <br />WIPE THE SURFACE WITH A STRONG SOLVENT, SUCH AS <br />ACETONE OR METHYL ETHYL KETONE, THESE 5OLVENT5 <br />FLEXIBLE FLASHING MATERIALS: <br />EVAPORATE WATER AND D155OLVE GREASY SUBSTANCES <br />THAT CAN RETARD ADHESION. <br />FLEXIBLE FLASHING- 5ELF-ADHERING BITUMINOUS <br />TOOL EVERY CAULK JOINT. THE BEST TOOL 15 A STEEL <br />TAPE-5HOULD BE USED TO FLASH ALL OF THE FOLLOWING: <br />SPATULA THAT 15 SLIGHTLY SMALLER THAN THE WIDTH OF <br />EXTERIOR DOOR SILLS: DECK LEDGERS: IN51DE AND OUT51DE <br />THE JOINT. ACHIEVE A SMOOTH, EVEN APPEARANCE <br />COFNER5 OF WALL SHEATHING: STUCCO 5HELvE5 AND <br />WITHOUT 5QUEEZE-OUT ON THE SIDES. <br />PARAPETS: BELOW GRADE CONCRETE CRACKS: AND WALL <br />CUT THE NOZZLE OF THE TUBE AT AN ANGLE SLIGHTLY <br />AREA SUBJECT TO 5PLA5HBACK. <br />SMALLER THAN THE 51ZE OF THE JOINT, <br />IN COLD WEATHER, KEEP THE CAULK WARM, AL50 IT MAY <br />FLEXIBLE FLA5HING5 COME IN SEVERAL VARIETIES, INCLUDING <br />BE NECE55ARY TO HEAT THE 5URFACE WITH A HEAT GUN. <br />"PEEL -AND STICK" PRODUCTS, AS WELL AS NON-5TICK <br />TAKE CARE TO NOT STRIP THE PAINT OF START A FIRE. <br />PRODUCTS. <br />ROOFING: FLASHING: <br />RUBBERIZED FLA5HING5: <br />LENGTH. <br />5ELF-ADHE51VE, RUBBERIZED ARE MADE FROM THE SAME <br />MATERIALS AS THE EAVES MEMBRANES USED TO PREVENT ICE <br />TO AVOID EXCE551VE EXPAN51ON AND CONTRACTION, <br />DAM LEAKS. TYPICALLY AVAILABLE IN ROLLS FROM 4-12 IN. <br />USE 8 FOOT TO 10 FOOT LENGTHS OF METAL, MAXIMUM, <br />WIDE (BUT 50METIME6 AVAILABLE UP TO 36 IN, WIDE), THESE <br />FOR VALLEY FLASHING. AVOID USING ALUMINUM, WHICH <br />FLEXIBLE FLA5PING5 CAN BE APPLIED DIRECTLY TO THE <br />EXPANDS AT A GREATER RATE THAN OTHER METALS. <br />SHEATHING, AS LONG AS THE 5URFACE 15 WARM AND <br />LAP SECTIONS a INCHES MINIMUM. <br />RELATIVELY CLEAN. <br />VALLEY CENTERLINE: <br />THIME55 VARIES FROM 2�- TO 60-MIL5. THE THINNER THE <br />MATERIAL, THE EA51ER IT CAN BE FOLDED AND TUCKED <br />WHEN A STEEP ROOF INTER5ECT5 A SHALLOW ONE, WATER <br />BENEATH SIDING, BUT AL50 THE EA51ER IT WILL TEAR AND <br />CASCADING DOWN THE STEEP ROOF CAN OVERSHOOT <br />DEGRADE IN THE SUNLIGHT. <br />THE VALLEY AND RUN UP BENEATH THE SHINGLES ON THE <br />SHALLOW ONE. ROOFS LIKE TH16 NEED A VALLEY <br />CLIMATE CAUTIONS: <br />FLASHING WITH A CRIMPED CENTERLINE, THE STEEPER <br />THE ROOF THE MORE CRITICAL THE CRIMP WILL BE. <br />IN WARM TEMPERATURES, WHEN RUBBERIZED ASPHALT 15 THE <br />STICKIEST, IT 15 NEARLY IMP0551BLE TO REP051TION IT ONCE <br />EDGE TREATMENTS: <br />THE FLASHING HAS TOUCHED THE SURFACE MAKE SURE TO <br />DRY -FIT BEFORE PULLING THE RELEASE PAPER IT 15 AL50 <br />LIKE ALL ROOF FLASHING, VALLEY FLASHING SHOULD <br />VERY DIFFICULT TO HANDLE ALONE WHEN IT 15 STICKY. <br />HAVE HEMMED EDGES. NOT ONLY DO THESE SHED WATER <br />MORE EFFECTIVELY, BUT HOLDING THE SWINGLE AWAY <br />IN HOT TEMPERATURES, RJBBERIZED ASPHALT TENDS TO OOZE, <br />FROM THE FLASHING, THEY PREVENT CAPILLARY SUCTION <br />MAKING IT ME55Y TO HANDLE. IN SUNBELT AREAS (OR <br />FROM DRAWING THE WATER UP UNDER THE SHINGLE. <br />WHEREVER SURFACE TEMPERATURES MAY EXCEED IaO*F), AVOID <br />U61NG WITH METAL FLA5HING5: THE FLA5HING5 WILL COOK AND <br />RIDGE TREATMENT: <br />THE A5PHAULT 50ON DRIES OUT, <br />VALLEYS THAT MEET AT A RIDGE SHOULD BE SOLDERED <br />IN COLD WEATHER, 5ELF-ADHEREING FLA5HING5 OFTEN DON'T <br />TO ONE ANOTHER HOWEVER TH15 CONNECTION MAY <br />STICK WELL. CHECK THE MANUFACTURER'S MINIMUM APPLICATION <br />BREAK WHEN THE VALLEY METAL EXPANDS AND <br />TEMPERATURE. 50ME STICK IN TEMPERATURES BELOW 25'F, BUT <br />CONTRACTS. BEST PRACTICE CALLS FOR COVERING THE <br />M05T REQUIRE SURFACE TEMPERATURES OF 40*F OR GREATER <br />CONNECTION AT THE RIDGE WITH A MOLDABLE PIECE OF <br />LEAD FLASHING. <br />COMPATIBILITY: <br />FASTENER: <br />DO NOT USE RUBBERIZED ASPHALT AND BUTYL TAPES <br />TOGETHER ON CONCRETE, MASONRY, OR 05B, RUBBERIZED <br />METAL VALLEY CAN BE FASTENED WITH NAILS OR CLEATS <br />FLA5HING5 MAY NOT STICK WELL UNLE55 A PRIMER 15 APPLIED. <br />AT 2 FEET ON CENTER, CLEATS ARE BETTERt THEY WILL <br />ON THESE 5URFACE5, A BUTYL FLASHING WORKS BETTER, <br />NOT BECOME FATIGUED AND SHEAR WHEN THE METAL <br />EXPANDS AND CONTRACTS, <br />POLY VS. FOIL: RUBBERIZED FLA5PING5 TYPICALLY COME WITH <br />WHEN U51NG NAILS, PLACE THEM AT LEAST 5 INCHES AWAY <br />A POLYETHYLENE OR FOIL COVERING TO PROTECT THEM FROM <br />FROM THE VALLEY CENTER TO PREVENT LEAKS. <br />SUNLIGHT. POLY -COVERED PRODUCTS NEED TO BE COVERED <br />FROM SUNLIGHT WITHIN 30 TO 90 DAY5i FOIL -COVERED TAPES <br />VALLEY TREATMENT: <br />HAVE NO EXACT EXP06URE LIMITATIONS BUT EVENTUALLY WILL <br />DRY OUT AND BECOME BRITTLE, ANY SHIFT IN 5UI;TACE <br />METAL VALLEYS SHOULD BE FABRICATED FROM NO LE55 <br />MOVEMENT WILL PULL AT THE BOND UNTIL EITHER THE BOND <br />THAN NO. 28-GAUGE CORRO51ON SHEET METAL. <br />FAIL5 OR THE MEMBRANE CRACKS. <br />ASPHALT SHINGLES, VALLEY FLASHING MUST EXTEND AT <br />LEAST 8 INCHES ON EITHER 51DE OF THE CENTERLINE. <br />EXP05EID APPLICATIONS: IN PERMANENTLY EXP05ED <br />WOOD SHINGLES, THE WING OF THE VALLEY MUST EXTEND <br />APPLICATIONS, USE AN EPDM FLASHING TAPE INSTEAD OF AN <br />10 INCHES EACH 51DE OF CENTERLINE. <br />INEXFIEN51VE FLEXIBLE FLASHING MATERIAL. THE DRAWBACK <br />SLATE, TILE, AND WOOD SHAKES, A VALLEY MUST EXTEND <br />WITH EPDM TAPE 15 THAT IT'5 EXPENSIVE, AS WELL AS QUITE <br />11 INCHES EACH SIDE OF CENTERLINE. <br />THICK ( ABOUT 10-MIL.), MAKING IT AWKWARD TO FOLD INTO <br />SMALL AREAS. <br />SECTION OF ROOF FLASHING MUST HAVE AN ENE) LAP OF <br />AT LEAST 4 INCHES FOR WOOD SHINGLES AND SHAKES, <br />BUTYL RUBBER FLA5HING5: <br />AND AT LEAST 6 INCHES FOR $LATE AND TILE ROOFS. <br />DO NOT USE 13UTYL FLASHING NEAR ANY A5PHALT-BA5ED <br />PRODUCTS. THE BUTYL AND THE ASPHALT PRODUCTS <br />FRONT WALL FLASHING: <br />WILL BOTH DRY OUT FASTER AND L005E THEIR ADHESION. <br />INSTALL UP THE ROOF UNTIL YOU REACH THE 545E OF <br />NONSTICK FLA5PING5: <br />THE VERTICAL WALL. ADJUST THE EXF105URE OF THE LAST <br />FEW COURSES, IF NECESSARY, 50 THE LAST COURSE 15 AT <br />NOT ALL FLEXIBLE FLA5HING5 ARE 5ELF-ADHERING. 50ME MUST <br />LEAST 8 INCHES WIDE. <br />BE SECURED WITH STAPLES OR ROOFING NAILS. WHILE <br />CUT AND BEND A CONTINUOUS METAL FLASHING STRIP <br />GENERALLY THINNER AND THE QUICKEST WAY TO DETERIORATE <br />THAT EXTENDS AT LEAST 5 INCHES UP THE VERTICAL <br />IN SUNLIGHT, THESE ARE OFTEN THE BEST CHOICE FOR APPLYING <br />WALL AND AT LEAST 4 INCHES OVER THE LAST SHINGLE <br />BENEATH 51DING AND TRIM IN CON515TENTLY COLD <br />COURSE, <br />TEMPERATURES, OR WHEN THE 5UWACE 15 ROUGH AND <br />WHEN INSTALLING THE METAL FLASHING STRIP OVER THE <br />DIRTY-FACTOR5 THAT CAN DIMIN15H THE BOND OF <br />LAST SHINGLES, EMBED IT IN ROOFING CEMENT AND NAIL <br />PEEL-AND-5TICK FLA5HING5. COVER NONSTICK FLASHING AS <br />IT To THE ROOF ONLY, <br />50ON AS P0551BLE TO PROTECT IT FROM SUNLIGHT, <br />DO NOT NAIL THE FLASHING STRIP TO THE WALL. <br />APPLY AN ADDITIONAL ROW OF 5HINGLE5 - TRIMMED TO <br />DRAINAGE PLANE: <br />THE WIDTH OF THE FLASHING - OVER THE FLASHING AND <br />EMBEDDED IN ASPHALT PLASTIC ROOFING CEMENT. <br />AN AIR SPACE BEHIND THE SIDING (1/4-TO 3/8-INCHE5 15 <br />ENOUGH) WILL ALLOW WATER TO DRAIN AND THE BACKSIDE OF <br />51DEWALL FLASHING: <br />SIDING TO DRY. <br />SHINGLE ROOFS (ASPHALT, 5LATE, OR WOOD) THAT BUTT <br />WELL DRAINED WALL SYSTEMS: <br />AGAINST VERTICAL WALLS ARE BEST PROTECTED BY <br />METAL STEP FL45HING PLACED OVER THE END OF EACH <br />DIFFERENT 51DING5 CALL FOR DIFFERENT DRAINAGE DETAILS. <br />SHINGLE COURSE. <br />TYPICAL DETAILS FOR WELL -DRAINING WALLS ARE SHOWN FOR <br />DIFFERENT TYPES OF 51DING: <br />CUT STEP FLASHING PIECES To BE 10 INCHES LONG AND 2 <br />INCHES WIDER THAN THE SHINGLE EXPOSURE EG. 1 <br />BOARD 51DING, SHAKE AND SHINGLE 51DIING AND VINYL SIDING. <br />INCHES FOR ROOF SHINGLES WITH A 5 INCH EXPOSURE, <br />IN EACH CASE, AN AIR SPACE MUST BE CREATED BEHIND THE <br />BEND THE 10 INCH LENGTH TO EXTEND 5 INCHES OVER <br />61DING AND AN EXIT PROVIDED FOR THE WATER TO DRAIN OUT, <br />THE ROOF DECK AND 5 INCHES UP THE WALL 5URFACE, <br />FLASHING DETAILS: <br />1.) NEVER RELY ON THE 5TICKINE55 OF PEEL-AND-5TICK <br />FLA5HING5 FOR SHEATHING: THE BOND 15 UNLIKELY TO LAST <br />OVER THE LIFE-5PAN OF THE HOUSE. <br />2.) ALWAYS LAP FLASHING UNDER THE SHEATHING WRAP ABOVE. <br />FLASHING WINDOWS: <br />DO NOT X-CUT SHEATHING WRAP AT OPENINGS. INSTEAD I -CUT <br />THE SHEATHING WRAP, RUNNING THE KNIFE HORIZONTALLY ALONG <br />THE ROUGH OPENING AT THE HEAD OF THE SILL, THEN SLITTING <br />VERTICALLY IN THE CENTER OF THE OPENING. TH15 WAY, THE <br />WINDOW FLANGE CAN BE SLIPPED UNDER THE SHEATHING WRAP <br />WHEN INSTALLING THE WINDOW. <br />SILL DETAILS: INSTALL A BEVELED CANT STRIP OR NARROW <br />DAM STRIP TO THE ROUGH OPENING SILL, THEN WRAP THE 5ILL <br />WITH SHEATHING WRAP OR A FLEXIBLE FLASHING MEMBRANE. <br />MAKE SURE TH15 MEMBRANE DRAPES OVER THE SHEATHING <br />WRAP BELOW. <br />ALL SHEATHING WRAPS MUST BE INTEGRATED WITH FLASHING <br />MATERIALS. T5 NOT ENOUGH TO WRAP A HOUSE, AND THEN <br />SIMPLY X-CUT THE OPENINGS AND FOLD THE FLAPS INSIDE, <br />FOLLOW THE GUIDELINES FROM THE DETAIL SHEETS WHEN <br />INSTALLING ANY SHEATHING WRAP. <br />WINDOW AND DOOR SPLINES: <br />WINDOWS AND DOORS SHOULD BE FLASHED WITH FELT PAPER <br />OR FLEXIBLE FLASHING SPLINES. THE SPLINES SHOULD BE <br />INSTALLED AFTER THE 5ILL FLASHING, AND THE SHEATHING WRAP <br />SHOULD 60 ON AFTERWARDS OR BE SLIT 50 IT LAPS OVER THE <br />SPLINES. <br />FLANGED WINDOW HEADS DO NOT NEED ADDITIONAL FLASHING. <br />THE NAILING FIN WILL DO A GOOD JOB SEALING THE HEAD IF IT <br />CAN BE TUCKED BENEATH THE SHEATHING WRAP WHEN THE <br />WINDOW 15 INSTALLED. LEAVE A 1/4-IN. GAP BETWEEN THE <br />SIDING AND THE WINDOW ALONG THE HEAD, BUT DO NOT CAULK <br />TH15 GAP: OTHERWISE, WATER THAT RUNS BEHIND THE SIDING <br />ABOVE WON'T HAVE A PLACE TO DRAIN. <br />IF THE FLANGE CANNOT BE TUCKED UNDER THE SHEATHING WRAP <br />WHEN THE WINDOW 15 INSTALLED, SLIT THE WRAP AND ADD HEAD <br />FLASHING, <br />UNFLANGED WINDOWS WILL NEED A ADDITIONAL METAL <br />Z-FLA5WING ABOVE THE HEAD CASING OR BRICK MOLD. MAKE <br />SURE TH15 Z-FLA5HING LAPS UNDERNEATH THE SHEATHING WRAP, <br />MULLED WINDOWS AND WINDOW WALL5 MUST HAVE A CONTINUOUS <br />HEAD FLASHING: THE MANUFACTURER'5 MULLION COVER WILL <br />NOT PREVENT WATER FROM RUNNING BETWEEN THE WINDOW UNITS <br />FROM ABOVE. <br />ROUND -TOP WINDOWS SHOULD BE FLASHED WITH <br />PEEL-AND-5TICK FLEXIBLE FLASHING. SLIT THE SHEATHING <br />WRAP AND SLIP IT UNDEFNEATH, LETTING IT DRAPE OVER THE <br />WINDOW TOP. THEN CUT THE FLASHING TO CONFORM TO THE <br />NAILING FIN. RELY ON PROPER LAPPING OF THE FLASHING, NOT <br />ON CAULK. <br />FLASHING DOORS: <br />OVER WOOD FLOORS, DOOR THRESHOLDS SHOULD BE FLASHED <br />WITH A METAL PAN OR Z-FLA5HING. 5LA55 SHOULD BE FORMED <br />WITH A "51EAT" TO HOLD THE THRESHOLD. <br />FLASHING LEDGERS AND BEAMS: <br />LEDGER FLASHING NEEDS TO BE MORE THAN A Z-FLA5HING <br />RUNNING ALONG THE TOP EDGE OF THE LEDGER BOARD. USE <br />METAL COIL STOCK SLIPS UNDER THE SHEATHING WRAP ABOVE <br />THE LEDGER, AND DRAPES OVER THE SHEATHING WRAP BELOW <br />THE LEDGER <br />ALTERNATIVELY, BUILD A DECK COMPLETELY FREE-5TANDING <br />FROM THE WALL, OR INSERT 5PACER5 BETWEEN THE LEDGER <br />BOARD AND THE WALL, 50 IT STANDS OUT AND ALLOWS WATER <br />TO DRAIN FREELY. <br />CANTILEVERED DECK OR BALCONY JOISTS THAT PROTECT <br />THROUGH THE WALL FRAMING ARE TROUBLE SPOTS. FLASH WITH <br />TWO-PIECE FLASHING MEMBRANE. <br />FL45HING WALL PENETRATIONS: <br />ELECTRICAL FIXTURES: INSTALL ELECTRICAL BOXES AND <br />LIGHTING FIXTURES ON HEMMED METAL FLA5HING5 PLATE. DO <br />NOT TAPE THE PLATE OVER THE SHEATHING WRAPi SLIT THE <br />SHEATHING WRAP AND TUCK IT BENEATH. <br />MECHANICAL PENETRATIONS: GAS LINE, CONDUIT, WATER <br />SPIGOTS, AND SMALL PENETRATIONS SHOULD BE FLASHED WITH <br />TWO-PIECE METAL FLASHING PLATE. SEAL THE TWO PLATES WITH <br />"LOW MODULES" URETHANE CAULK <br />51DEWALL FLASHING: <br />BECAUSE OF THE VOLUME OF WATER THAT CAN FOUR DOWN A <br />SLOPED ROOF, ONE OF THE M05T CRITICAL FLASHING DETAILS <br />OCCURS WHERE A ROOF INTER5ECT5A 51DEWALL. THE ROOF <br />SHOULD BE FLASHED WITH A STEP FLASHING. WHERE THE ROOF <br />TEWINATE5, INSTALL A KICK -OUT TO DEFLECT WATER AWAY <br />FROM THE SIDING. THOUGH NOT ALWAYS P05515LE IN THE <br />SCHEDULE, IT'5 BE5T TO INSTALL A FULL 36-IN. PIECE OF <br />RU55ERIZED ASPHALT FLASHING ON THE WALL BEFORE THE <br />5UBFA5GlA AND TRIM BOARDS ARE NAILED IN PLACE, AND THEN <br />COME BACK TO INSTALL THE KICKOUT. <br />DAVIS BEWS <br />DESIGN GROVP <br />L50 STATE STRMT EAST <br />OUDSM& RX)ROA 34677 <br />813. 925.1300 TEL <br />813. 925. 1800 FAX <br />VVWW.DAWqNE%V&C0M <br />TAMPA 9 IDET*4� <br />EST. 1994 <br />0 <br />C) <br />0 <br />Ae 0 <br />=3 t-0 , <br />�Z. V) m <br />cy) <br />M Lf) <br />z U) <br />(1) _�:e Ln <br />LL --s <br />, (y) <br />cr- u 21 <br />z '<',r §" E <br />z <br />w z <br />Lu C) <br />�z <br />=0 <br />z <br />g <br />< z <br />ce <br />u <br />1= 4 <br />V) 0 a <br />z z< <br />z <br />0 LLI <br />o <br />u <br />01- <br />Z Z <br />0 <br />u <br />z <br />z z <br />z <br />0 <br />0 <br />u <br />b <br />F- <br />D z <br />0 UJ <br />u_ <br />Lu <br />z c:) <br />r4 Lu <br />0 <br />z <br />z U z z 0 <br />Lu <br />0 u <br />uj z F- <br />0 z <br />z Lu <br />z <br />0 D <br />rn a- uj %D m <br />SCALE AS NOTED <br />DATE 10-19-2018 <br />VERSION NO. <br />imo <br />SHEET NO. <br />DT6 <br />