Laserfiche WebLink
DOOR JAMB (REFER 1X4 1/2"DRYWALL <br />DOOR JAMB (REFER 1X4 1/2" DRYWALL DOOR JAMB (REFER-,\ i-1 <br />F F <br />X4 F 112"DRYWALL <br />MAX. 8" 41�# UNACCEPTABLE INSTALLTION <br />TO SHT. SDW2-K1 -1-P.T. F <br />TO SHT. SDW2-Kl <br />TO SHT. SDW2-K1 FOR CONN. DETAILS <br />PROPER INSTALLATION <br />NO% DO NOT DO THIS. <br />2'x BOT. PLATE W/ (2) 1 Od @ 6- O.C. <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS X 4 <br />v X 4 <br />#6 REBAR <br />(TYPj <br />3/4"PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />X 4 <br />3-1/4N LONG X 3/16"0 FURRING <br />3/16"0 X 3" LONG FURRING 3/16-0 X 3-1/2" LONG <br />FURRING <br />#5 REBAR <br />AND NAILED W1 8d COMMON @ <br />6' O.C. EDGES AND 12" O.C. FIELD <br />2X BOTTOM PLATE W/ 8d @ 4' <br />O.C., 2 ROWS STAGGERED <br />TAPCON. INTO <br />TAPCONS TAPCONS STAGGER <br />STAGGERED @ 16" <br />(Typ') <br />BLOCK@ SPACING 1" DETAIL <br />1X8 P.T. STAGGERED @ 16' 0 .. <br />O.C. 2-ROWS INTO 2-ROWS INTO <br />4 <br />I <br />PER MANUFACTURE <br />MASONRYTHROUGH MASONRYTHROUGH <br />1-1/211 DETAIL 3" DETAIL <br />STD. 90A 90- HOOK (TYP.) <br />D <br />2xBAN JOIST W/ FACE NAIL 10d <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1X8 P.T. I x8 P.T. & 2x8 P.T. <br />FILL SOLID <br />BOTH CELLS <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />TAPCON @ 16' <br />O.C. & 4" FROM <br />1X4 P.T. -1/2" DOOR JAMB (REFER <br />3/16" x 3 <br />1X4 DRYWALL <br />I IL v <br />4% <br />—1 . 11� <br />METAL SEAT PLATE <br />NOTE: <br />DOOR JAMB (REFER EACH END W/ MIN, <br />DOOR JAMB (REFER TAPCON TO SHT. SDW2-Kl FOR <br />F1/2" <br />. <br />LAP SHEATHING TO <br />TO SHT. SDW2-K1 2"EDGE DIST. <br />TO SHT. SDW2-K1 CONN. DETAIL <br />— <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />FOR CONN. DETAJLS <br />FOR CONN. DETAILS 10d @ 12- O.C. <br />1X4 <br />4% <br />jolt <br />FURRING <br />2X8 P.T. WITH 3/16"01 X 3' <br />LONG TAPCONS <br />±2K <br />—NOT*C%V FIRST COURSE <br />USP HGAM1 0 @ 12' O.C. w14-SDS <br />1/4xl 1/2"SCREWS INTO BAND <br />2X8 P.T. <br />2X8 <br />2x P.T. AS REO'D <br />STAGGERED @ 16' O.C. <br />�_ <br />*41k* <br />JOIST & (4) 3/16'xl-3/4' WEDGE <br />2x DETAIL <br />2 1/4" DETAIL 2-ROWS INTO MASONRY 3-1/4" <br />DETAIL <br />±5A <br />NOTCH WEB AT THE <br />FIRST 2 COURSES <br />BOLTS INTO K.O. BLOCK <br />OVER <br />BUILDOUT SIZE DOOR <br />-WINDOW ROUGH OPENINGSrCC <br />FILLED CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION <br />� �H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. <br />�S <br />SCALE: N.T.S. <br />1\1-1 �S <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO <br />SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />UPLIFT CAPACITY = 945 # FOR 1 STRAP <br />W/ 1/4"x 3 1/4"TAPCON ( 11/4" MIN. <br />A -A <br />= 1890 # FOR 2 STRAPS <br />771 /-FILL 15t4 COURSES <br />EMBEDMENT INTO BLK.) 1/4"MAX <br />7-0" <br />8" <br />I -PLY PRE-ENGINEERED TRUSS <br />SOLID W/GROUT <br />I X 4 FURRING SOLID BLKG. AT TOP BTWN1. <br />1/4" x 3 1/4" TAPCONS <br />USP RT16MW1(8) NA11 NAILS& (6)kx2r <br />BLOCK HEADER ARCH BLKG. & BUCK <br />TAPCONS <br />1/2" DRYWALL <br />.. ........ <br />(IF T RUSS IS 2 PLY INSTALL USP HTWM16 W/ (6) <br />10d NAILS x 1? NAILS AND <br />8d NAILS AT 8" O.C. AT BUCK <br />LEAVE A CUT OUT IN O.S.B. ON THE <br />(4) k X 1 r WEDGE BOLTS 1 (1) STRAP 1225 <br />A <br />2 x 8 45 DIAGONAL (4) 10d NAILS INTO <br />INSIDE TO ALLOW FOR INSULATION <br />(2) ST RAPS 2450#]) <br />BRACE(S) 2 x 8 BRACE/ BLKG. <br />7/16"OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BETWEEN OVER 1 1/T <br />CUT HOLE IN O.S.B. FOR <br />BUILT UP PLWD. BUCK ARCH PANEL POLY -CELL IN THIS AREA <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />IN PLACE BEAM <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHERINSTRU ........ 7 <br />SCRIBE (NOTCH) <br />FACE OF ARCH W/ (3) 10d NAILS <br />.. <br />BACKSIDE TO FIT ARCH I t.1__ L--A (4) 1 Od NAILS INTO 2 x 8 <br />I <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />OVERHANG_L'...�.. <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />\_2 <br />N.T.S. <br />x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB PROVIDE TAPCON WITHIN <br />INSTALL WDW. SCREW ANCHOR-�� ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 <br />RETROFIT WALL OVERHANG DETAIL <br />(NTS) <br />INTO ARCH BLKG. PER 4" MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />FOR OVERHANGS BETWEEN 314"TO 1 1rr <br />1-1/2"THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />DOUBLE 2x4 SCAB FOR 2-6" TO 4'-W O.H. <br />START OF ARC <br />IF TRUSSES USED) W/ (3) #6 X 4%' WOOD <br />NOTE: FOR OVERHANGS LESS THAN 314* - NO REPAIR REqD. <br />4'MAX. RAD. <br />SCREWS @ 16- O.C. MAX. OR IF MASONRY <br />)(Ov (2) 10d NAILS @ 8' O.C. <br />ARCH DETAIL <br />WALL USE (3) 114' X 3 1/2' TAPCONS AT 16" <br />jej TO TRUSS TOP CHORD <br />SCALE: N.T.S. <br />�S <br />O.C. 12 <br />+ <br />+ + rA, PLYWOOD SHEATHING <br />1 1-011 51-011 <br />L L <br />JACK TRUSS PROVIDED BY SE <br />+ + <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24' O.C. <br />+ + <br />+ + <br />NISH FLOQ I <br />2 x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ + BLOCKING AS <br />% <br />WITH 1/4" x 3 1/4" TAPCON (11/4' MIN. <br />B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />C <br />EMBEDMENT INT <br />PER NAILING SCHEDULE LL <br />TO SUPPORT <br />'---#5 <br />/4"MAX <br />2'-0" 8N <br />+ <br />TRUSS SOFFIT <br />BAR <br />BLOCK HEADER SOLID BLKG. AT TOP BTWN. ARCH <br />-12d <br />(5) NAILS <br />+ <br />+ <br />CENTERED W/ <br />BLKG. & BUCK <br />USP RT <br />2X6 TO 2X4 3A <br />2X4 SYP <br />IN TOP <br />1 X 4 FURRING <br />EACH TRUSS <br />---------- Y" <br />KNOCKOUT/ <br />CHAIR BLOCK <br />8d NAILS@ 8-C.C. ATBUCK <br />2 x 8 VERT. W/ (2) 1 Od <br />NAILS AT EA. END <br />PROVIDE 2 8 DIAG. BRACE BTWM., <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ (3) <br />CONNECTOR <br />MONO FOOTING <br />x <br />SIZE AND REINF. PER PLAN <br />VERT. BRACES WHEN HGT. F <br />0 <br />TAPCON AT EA. SIDE <br />12d NAILS <br />SEE LINTEL <br />AND SECTION DETAILS - - <br />BRACE EXCEEDS 240 <br />BUCK - (1) WITHIN 4' <br />JACK TRUSS PROVIDED BY—/ <br />SCHED. <br />* * . <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />%, <br />A <br />2 x 8 VERT. BRACE(S) INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24' O.C. <br />bENTER SOOIT <br />CLEAN FILL <br />DIRT <br />TO BE INSTALLED <br />00, <br />BUILT UP PLWD. BUCK - <br />4'-0" MAX SEE P <br />PRECAST LINTEL <br />.1721* : A.. * & ,-STANDARD <br />1 7/16" OSB ARCH PANEL <br />SCRIBE (NOTCH) BACKSIDE I <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />#5 BARIN 9(T HOOK <br />TO FIT ARCH CONNECT W/ <br />START OF ARC <br />IF TRUSSES USED) W/ (2) #6 X 4%"WOOD <br />FOR OVER HANG <br />FILLED CEL . L L <br />8d NAILS 2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />4'MAX RAD. <br />SCREWS @ 16' O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0') <br />VL <br />BTWN1. OSB ARCH FACES W/ (4) 10d NAILS <br />EQUAL EQUAL <br />WALL USE (2) 1/4' X 3 1/2' TAPCONS AT 16- <br />L.L <br />INSTALL WDW, SCREW­-� THRU OSB INTO 2 x 8 <br />O.C. <br />V-;:ro- v ;:r <br />ANCHOR INTO ARCH BLKG. <br />PER INSTALLATION DETAILS ARCH DETAIL <br />SECTION @ ENTRY rL_"%� <br />SECTION @ ROOF EXTENSION K-M <br />STEMWALL FOOTING SIZE AND <br />REINF. <br />13-13 <br />MONO TO STEMWALL FOOTING <br />PERLAN AND STEMWALL <br />SCALE: N.T.S. <br />�S <br />SCALE: 3/4"= V-0" �S <br />SCALE: 3/4"= l'-O" \11.1 �S <br />SECTION DETAILS <br />SCALE: 3/4"= l'-O" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />EXCEED (3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />FOR ADDITIONAL INSTRUCTION. <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />REINFORCING. PROVIDE LOWER <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8. PLUS OR MINUS <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />DRILL 314"X6" MIN. HOLE <br />TYPE OS" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />HTT16W1(I8)-16d NAILSTO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W , W * M , AT PERIMETER <br />COURSES TO PREVENT THE MORTAR FROM BEING"SQUEEZED"OUT. <br />1/4' EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />STUDS & (1) - 5/8- DIA. ALL <br />_�#5XVEMBEDDED INTO <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL PER ANCHOR) <br />(1) #5 BARS CONT. OCCURS <br />TOP WITH MIN. 3" <br />THREAD ROD EPDXIED W/ <br />SIMPSON "SEr EPDXY MIN. <br />�E EXISTING BOND BEAM <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />COVER 6'-0" <br />5" EMBEDMENT & 3" MIN. <br />0 <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />,-F.F. <br />EDGE DISTANCE <br />FILL CELL FULL HEIGHT W1 <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) EXPANSION STRIP <br />U_ Uj NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />0 0 <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />LU A <br />a. <br />REINFORCING AS FOLLOWS: <br />• PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />• PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W1 <br />XIT EMBEDDED INTO <br />2� <br />EXISTING FOOTING <br />2-#5X61 IN C ONC. <br />• COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />C14 <br />DRILL 3/4"X6"MIN. HOLE <br />FILLED CELL <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />GRADE t> <br />SET BAR IN EPDXY <br />6" MIN. LAP <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />NOTE: <br />REMAIN FREE OF MORTAR. <br />2� <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION <br />NOTES. <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />;4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />\�'�—(2) #5 REBAR. MIN. 3' <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16"MIN. COVER EA. WAY <br />700, <br />K�A <br />SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />_q <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />�� <br />J, SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 3/4"= V-0" <br />SCALE: 314"= 1'-0" <br />FOR WIND SPEEDS UP TO 110 MPH-, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />z M <br />z (0 <br />Z <br />Arli� <br />CL <br />z <br />V) 0 <br />LU <br />U <br />LU <br />Ln <br />cl <br />LU <br />W <br />-M <br />00 <br />C) <br />0 <br />0) CL 0 <br />0f _W <br />< 0 <br />Ln <br />Ci <br />8 D. <br />% <br />0 C%A <br />%-� 0-- <br />3 vkfz <br />ICYS <br />0 <br />z <br />0 <br />LL <br />C11 Ar <br />0 <br />114 <br />To the best of the Engineer's knowledge, information, and <br />belief, the structural plans and specifications contained <br />within these drawings comply with the Florida Building <br />Code Sth Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />C:) <br />z <br />0 <br />1-4 4-j <br />15 <br />(n M CE 1, <br />m Ln <br />Ln <br />(n 0 N <br />(" — Lr, <br />L LL <br />CL <br />>% � M <br />U M -I <br />Cl 00 <br />z <br />z § E <br />z M <br />LU C:) F- <br />_j C:) <br />W ko <br />9z <br />U <br />03 <br />z <br />485, <br />in ge <br />��H <br />L;u <br />Z <br />8 <br />z <br />0 <br />Ln <br />8 <br />0 <br />U <br />U) <br />0 M <br />W <br />IN <br />Z <br />r_ <br />1, u, <br />L'. � <br />Z <br />_j <br />Ln <br />x <br />di <br />120: �j <br />il_ -_ 8 <br />0 <br />rn <br />%0 <br />< <br />z <br />z <br />tu- <br />RIZ <br />0 <br />Z <br />LU <br />z <br />0 <br />V) <br />SCALE AS NOTED <br />DATE 2/24/2014 <br />TECH: ERAND <br />VERSION NO 10 <br />SHEET NO. <br />SS <br />