Laserfiche WebLink
Ul) <br />E�j <br />ra <br />cc <br />LO <br />LO <br />C'4 <br />I <br />�4 <br />6 <br />41 <br />R <br />C14 <br />E <br />�2_ <br />0 <br />ET_ <br />CS <br />5�1 <br />6� <br />9 <br />'9 <br />q <br />�45 <br />ROOF <br />SEE SHEATHING <br />PLAN <br />4 <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT, A- <br />,E <br />N <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />TRUSS <br />3;;'A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING ACK <br />IL <br />MAX 24" SPAN (EITHER US <br />USSES HIP <br />01 C <br />SIDE OR BOTH IF REQ'D) G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />(2) 2x8 #2 SYP w) <br />O.S.B. FLITCH P1 <br />TOP @TRUSSB <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 1 Od <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1 Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 1 Od <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />VVI I vu "��l I I I A� v V"� BEAM RAISED ENTRY <br />CROSS BRACING DETAIL (TYP.)K" HIP/RIDGE BLOCKING DETAIL MASONRY WALL KNEEWALL @ ENTRY FRONT WALL(�6 <br />SCALE: NTS SCALE:NTS SCALE: NTS <br />SCALE:NTS <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONV. FRAMED RIDGE <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MAY BE NAILED <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE w/ MIN. (4) 12d WHEN <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST IT LANDS NEXT TO <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES PRE-ENG. TRUSS <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED W/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB­-,' <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT <br />SEE TYP <br />TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />-EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 W/ (24) 10d x <br />1 1/2" NAILS EACH <br />17 ITI 14 <br />. <br />. <br />PRE-ENG. TRUSS <br />2X4 BLOCKING <br />2X4 DIAGONAL AT 8'-0" O.C. CONT. ROOF SHEATHING AT TRUSS TOP <br />BETWEEN EA. TRUSS <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />-----/--WOOD TRUSS <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL r7 <br />SCALE:NTS <br />DIAGONAL <br />AT 8-41 <br />MAX <br />WOOD <br />TRUSS <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 w/ (12) 1 Od NAILS iSEE PLAN I, <br />SIMPSON HUC410 w/ (14) 1 FOR CANT.T <br />#2 SPF 48" O.C. W/ (4) CENTERED AT 16d INTO HEADER & (6) — <br />10d TOP & BOTTOM SPLIT TO TIE 10d INTO BEAM - SEE <br />OR SIMPSON H2.5A w/ BEAMS TOGETHER ROOF PLAN FOR MORE <br />(10) 8d NAILS INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A W/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />* * 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-O"O.C. MAX. W/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT--/ CONC.MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />OIL VARIES <br />IT <br />2X4 #2 SPF BRACIN( <br />16" O.C. W/ (4) 12d <br />TOENAILS TO TOP <br />PLATE & (2) 12d ENE <br />NAILS TO TRUSS <br />BOTTOM CHORD <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />COMMON TRUSSES. <br />SEE TRUSS PLAN <br />FOR CONNECTION <br />INFORMATION. <br />OILVARIES SEE PLAN <br />FOR WALL LOCATION <br />t A MIN. 2X4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />SEE PLAN FOR PLATE BELOW <br />_WA L _L <br />TOP OF <br />III <br />-'--MIN. 2X4 #2 SYP P.T. PLATE <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE @ T FROM EACH END & <br />PLAN FOR MORE 16" O.C. MAX. <br />INFO. <br />SECTION @ ENTRY r8N� <br />SCALE:NTS <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE& BASE 7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />0 Rj <br />REQ'D ONLY WHEN COLUMN SIZE& BASE <br />INDICATED ON BM. <br />CONNECTION INFO 1171"r 1 n K I f-% <br />OPTION A SCHEDULE/PLAN <br />OPTION B <br />COMMON <br />BM. <br />TO <br />POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS1 8 W/ (14) <br />1 Od NAILS TYP. U.N. 0. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A <br />A F <br />SEE PLAN FOR <br />SCALE: 3/4"=1'-0" <br />BM' SPLICE OVER <br />CENTER OF POST <br />- $t�f <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />2X4 STUDS W/ SIMPSON <br />SP1 W/ (10) 1 Od NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2x4 BASE PLATE W/ <br />SIMPSON LSTA30 W/ <br />(22) 1 Od NAILS OR <br />SIMPSON MTS12 W/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE:NTS <br />SEE VS5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />MIDDLE <br />8d NAILS AT <br />4" O.C. <br />SEE PLAN FOR <br />VALLEY TRUSS <br />INFO. <br />0 \_* MASONRY WALL BELOW: SIMPSON <br />HETA16w/(9) 10dx 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />BEAM BELOW: SIMPSON HTS20 w/ <br />OR BEAM '44 * <br />SEE TRUSS PLAN (24) 1 Od x 1 1/2" NAILS @ 4'-0" 0. C. <br />A TO GABLE TRUSS <br />COMMON TRUSS <br />SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE <br />SCALE:NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS W/ (3) 16d AT <br />ROOF AND EXTERIOR <br />EACH STUD - TOENAIL <br />SHEATHING ATTACHED <br />EACH TRUSS TO NA LE <br />PER NAILING SCHEDULE <br />W/ (3) 1 Od <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SIMPSON LUS26 W/ (8) 10d NAILS <br />ZSEE <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 W/ (8) 16d NAILS TO <br />LEDGER <br />FLOOR FRAMING PLAN <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER W/ (3) <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />(IF PARALLEL SEE 2/D2 FOR <br />BLOCKING INFO) <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />SCREWS EACH SIDE) <br />MASONRY WALL <br />9YPICAL) <br />SECTION AT LOW ROOF <br />SCALE:NTS <br />LOW ROOF/WALL�� <br />SHEATHING ATTA HEDN <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 W1 (10) 1 Old <br />NAILS AT BASE & SIMPSON <br />SP2 W/ (12) 1 Od NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END (BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS 12 W/ (14) 1 Od x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />-------- <br />7 <br />PLYWOOD <br />FLOORING <br />Z(2) 2x6 BLOCKING UNDER FLOOR G.T. <br />LOW ROOF TRUSS W/--// <br />RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 W/ (16) <br />MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />@ BUMP OUT( 39 <br />SECTION- 0 <br />SCALE: NTS <br />DETAILS & SECTIONS <br />Ln <br />9= <br />W <br />:X. 6AJ <br />0 =' =' <br />I% <br />C4 <br />2 0- � <br />5 -:5 <br />04 e <br />3; <br />s 's <br />C= <br />rz <br />4:' <br />r')IMAIA. <br />I\N­ )C) <br />SE <br />F L 0 <br />Ovk <br />111 ol'W <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal Is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal, <br />W <br />S E <br />8 <br />R <br />6 C14 C> LL <br />r_ 7� u, <br />_-, <br />M u. u- 0. <br />I <br />S2 <br />z 2.4 <br />i P <br />t 1, 0 <br />W 0. <br />W <br />z co C'4 z <br />LO Cl) <br />C14 <br />< <br />z <br />W Do <br />91 <br />Z <br />.2 <br />4—J u- <br />U <br />0 LU <br />V) <br />LU <br />E <br />ME: <br />C14 <br />C-1. <br />.:j <br />,I <br />IV <br />z <br />E <br />zn <br />.6 <br />g <br />�9 <br />Z <br />< <br />0 <br />L? <br />�0 <br />CL <br />8 E <br />Cc) <br />05 <br />z <br />.5 t <br />M0 <br />x <br />2, <br />z <br />z <br />8 <br />W <br />A <br />�� <br />Z3 <br />�w <br />M. <br />'0 <br />LO <br />LO <br />Fa <br />< <br />a- <br />a) <br />L_ <br />LO <br />co <br />=3 L0 <br />0 <br />LO <br />U) <br />ca <br />L0 <br />v <br />0 '6 <br />0) <br />e'0 <br />64 <br />.0 c) <br />C) <br />0) <br />CN <br />.0 <br />00 <br />< <br />E <br />-91 CV) <br />r_ L0 <br />0 <br />z <br />z <br />W <br />E 4=1I (0) <br />2 <br />M <br />C <br />IM <br />FL <br />E t 'a -0 <br />0 'a Ira <br />0 _j < <br />JOB <br />NO: 23 -00525 <br />SCALE: AS NOTED <br />SHEE7 NO. <br />D1 <br />