Laserfiche WebLink
SHEATHING WRAP AND FLASHING: <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />SECTION R103.13 WATER -RESISTIVE BARRIERS <br />ALL SHEATHING WRAP MUST BE INTEGRATED WITH FLASHING <br />MATERIALS. IT'5 NOT ENOUGH TO WRAP A HOUSE, AND THEN TO <br />SIMPLY X-CUT THE OPENINGS AND FOLD THE FLAPS INSIDE. <br />FOLLOW THE GUIDELINES FROM THE DETAIL SHEETS WHEN <br />INSTALLING ANY SHEATHING WRAP, <br />ASPHALT -SATURATED FELT: <br />COMMONLY AVAILABLE IN TWO WEIGHTS, ASPHALT FELT, OR <br />"BLACK PAPER," 15 MADE FROM CORRUGATED PAPERS MIXED <br />WITH SAWDUST AND AN ASPHALT RESIN. <br />WHEN CPOOSING NO, 15 FELT, LOOK FOR MATERIAL RATED A5TM <br />D4869 OR A5TM D226 STANDARD, WHICH ENSURES A WEIGHT OF <br />AT LEAST 11.5 LBS. PER SQUARE. <br />PLASTIC HOUSE WRAP: <br />PLASTIC HOU5EWRAP5 TYPICALLY MADE OF POLYOLEFIN <br />FABRIC- EITHER POLYETHYLENE OR POLYPROPYLENE. THE <br />PRIMARY DIFFERENCE IN HOU5EWRAP515 WHETHER OR NOT THEY <br />ARE PERFORATED: <br />I.) PERFORATED PRODUCTS ARE MADE FROM A VAPOR -TIGHT <br />PLASTIC, AND THEN NEEDLE -PUNCHED TO ALLOW THE WRAP TO <br />"BREATHE" (ALLOW VAPOR TO PA55 THROUGH). UNFORTUNATELY, <br />THESE POLES ALSO ALLOW LIQUID WATER TO SEEP THROUGH, <br />PARTICULARLY WHEN THE SIDING 15 PRE55ED TIGHT AGAINST IT. <br />THE HOU5EWRAP WILL SLOW THE SEEPAGE BUT WILL NOT BLOCK <br />IT ENTIRELY, <br />2.) NON -PERFORATED POU5EWRAP6 ARE MADE FROM PLASTIC <br />FIBER THAT ALLOWS VAPOR TO PA55 BETWEEN THE FIBERS. <br />THESE GENERALLY PERFORM MUCH BETTER THEN PERFORATED <br />PRODUCTS AT RE515TING LIQUID WATER, WHICH SHOULD BE <br />CONSIDERED THEIR PRIMARY TASK <br />LEACHING: <br />HOUSEWRAPS ARE SUSCEPTIBLE TO DAMAGE FROM <br />EXTRACTIVES THAT CAN LEACH FROM WOOD SIDING MATERIALS, <br />PARTICULARLY CEDAR AND REDWOOD. THIS CAN BE <br />PREVENTED IN TWO WAYS: <br />IJ INSTALL SIDING ON BATTENS TO CREATE AN AIR GAP, WHICH <br />REDUCES CONTACT BETWEEN THE SHEATHING WRAP AND SIDING. <br />2.) BACK -PRIME ALL WOOD 51DING MATERIALS, THIS REDUCES <br />LEACHING AND BLOCKS MOISTURE FROM MOVING THROUGH THE <br />SIDING AND BLISTERING THE FINISH. <br />INSTALLING SHEATHING WRAP <br />THE PRIMARY PURPOSE OF HOUSE WRAP IS TO STOP WATER <br />AIR -SEALING AND VAPOR CONTROL ARE SECONDARY, <br />1.) USE SHEATHING WRAP OR FELT PAPER ON ALL HOUSES, NO <br />MATTER WHAT KIND OF SIDING 15 USED. <br />2J THE WRAP SHOULD BE CONTINUOUS: AVOID A PATCHWORK Of <br />SMALL PIECES. REVIEW FLASHING DETAILS, AS SOME FLA5HING5 <br />(SUCH AS THOSE AROUND ELECTRICAL FIXTURES, MECHANICAL <br />PENETRATIONS, ETC.) SHOULD BE INSTALLED CONCURRENT WITH <br />SHEATHING WRAP. <br />3.) LAP UNDER COURSES OF HOU5EWRAP OVER LOWER COURSES <br />4 INCH AND LAP VERTICAL SEAMS 12 INCHES. CODE REQUIRES A <br />HORIZONTAL LAP OF b INCHES. <br />4J DO NOT X-CUT SHEATHING WRAP AT OPENINGS, INSTEAD, I -CUT <br />THE KNIFE ALONG THE ROUGH <br />THE SHEATHING WRAP RUNNING E E L D E E <br />OPENING AT THE HEAD OF THE SILL, AND THEN SLITTING <br />VERTICALLY IN THE CENTER OF THE OPENING. <br />5.) IF THE WALLS ARE LAPPED WHILE THEY ARE LYING ON THE <br />DECK BEFORE STANDING THEM UP, BE SURE TO ADD A COURSE <br />OF SHEATHING WRAP TO COVER THE RIM JOIST. REMEMBER, TH15 <br />COURSE MUST LAP UNDER THE SHEATHING WRAP ABOVE IT. <br />6.) ALWAYS WRAP GABLE ENDS. TH15 PART OF A HOUSE SEES A <br />LOT OF EXP05URE TO WIND -DRIVEN WATER <br />1.) ADD A SECOND LAYER OF SHEATHING WRAP ALONG INSIDE <br />AND OUTSIDE HOUSE CORNERS, LAPPING AT LEAST 9 IN. (AN <br />EVEN MULTIPLE OF 3(6-IN. WIDE ASPHALT FELT) ON EACH WALL. <br />8.) CONTROL 5PLA5HBACK BY SLOPING THE GRADE AROUND <br />THE HOUSE AND KEEPING SIDING AT LEAST 8 INCHES ABOVE <br />GRADE. AT DECKS AND STOOPS WHERE 5PLA5HBACK MAY BE <br />A PROBLEM, USE A WIDE PEEL -AND -STICK FLASHING MEMBRANE <br />MAKE SURE THE MEMBRANE LAPS UNDER THE SHEATHING WRAP <br />ABOVE IT. <br />9.) ALL FLASHING (FOR WINDOWS, DOORS, DECK LEDGERS, <br />ELECTRICAL FIXTURES, VENT, PIPES, AND CANTILEVERED <br />BEAMS) MUST LAP UNDER THE SHEATHING WRAP ABOVE IT, DO <br />NOT RELY ON TAPE TO SEAL THE FLASHING, <br />TAPING HOUSE WRAP: <br />MANUFACTURES OF PLASTIC HOU5EWRAP RECOMMENDED TAPING <br />ALL SEAMS TO BLOCK AIR LEAKAGE THROUGH WALLS. <br />TAPE SHOULD BE TYPE RECOMMENDED BY "SINGLE <br />SOURCE" SYSTEM, <br />50ME TAPE IS USEFUL FOR STOPPING WATER LEAKS BY <br />REPAIRING RIPS (PARTICULARLY TEARS AROUND STAPLES) AND <br />FOR SECURING THE WRAP TO FLASHING BEFORE THE SIDING 15 IN <br />PLACE, <br />DO NOT PATCH OVER HOU5EWRAP AND RELY ON THE <br />5TICKINE55 OF THE TAPE TO SEAL THE PATCH. ALWAYS LAP <br />HOU5EWRAP AND FLA5HING5 UNDER THE PIECE OF SHEATHING <br />WRAP ABOVE. <br />DRAINAGE PLANE: <br />WEEP 5CREED5 AND CONTROL JOINTS CONTINUED: <br />FINISH -COAT THICKNESS: <br />ALL STUCCO SYSTEMS APPLIED OVER FRAMED <br />OVER THE INTERSECTION BETWEEN DIFFERENT TYPES OF <br />THE FINISH COAT 15 ONLY ABOUT 1/6 INCH THICK IT <br />SUBSTRATES SHALL INCORPORATE A DRAINAGE PLANE <br />CONSTRUCTION, SUCH AS THE JOINT BETWEEN WOOD <br />SHOULD BE APPLIED AS EVENLY AS P0551BLE TO <br />FRAMING AND A BLOCK WALL. <br />ENSURE UNIFORM DRYING, <br />SHEATHING WRAP FOR STUCCO: <br />ON TALL WALLS AND LONG RUNS, APPLIED VERTICALLY <br />OR HORIZONTALLY TO BREAK UP WALL AREAS INTO <br />ALL STUCCO SYSTEMS REQUIRE SHEATHING WRAP - THE <br />SMALLER SECTIONS (LESS THAN IS FEET). <br />MIX PROPORTIONS: <br />PREFERRED WAY 15 DOUBLE LAYERS OF HOUSE WRAP <br />SIMILARLY, CASING BEAD AND CORNER BEAD HELP TO <br />UNDER SELF -FURRED LATH. PAPER BACKED LATH <br />CREATE EXPANSION JOINTS AT CRITICAL INTERSECTIONS: <br />INCON515TENT MIXING WILL RESULT IN OBVIOUS <br />COULD BE USED AS THE SECOND LAYER <br />OUTSIDE CORNERS ARE BEST DETAILED WITH CORNER <br />DIFFERENCES IN COLOR, TEXTURE, AND STRENGTH WHICH <br />PAPER -BACKED LATH SHOULD NOT BE CONSIDERED A <br />BEAD, <br />CAN CAUSE THE BATCHES TO FAIL. MAKE EVERY EFFORT <br />SUBSTITUTE FOR WELL -DETAILED SHEATHING WRAP. <br />TO KEEP MIX PROPORTIONS AND TIMES BETWEEN GOATS <br />LAP LOWER COURSES OF SHEATHING WRAP UNDER UPPER <br />INSIDE CORNERS SHOULD BE FLASHED WITH TWO LAYERS <br />CONSISTENT, <br />COUR5E5 50 WATER WILL DRAIN DOWN AND OUT, AND <br />OF SHEATHING WRAP OR FLEXIBLE FLASHING, AND THEN <br />FLASH ALL OPENINGS, FOLLOWING THE FLASHING <br />CASING BEAD SHOULD BE APPLIED VERTICALLY TO <br />MIX IN A MECHANICAL MIXER FOR 3-5 MINUTES AFTER THE <br />GUIDELINES PER THE bth EDITION (2011) FLORIDA <br />CREATE AN EXPANSION JOINT. WHILE THE FLASHING <br />ADDITION OF THE LAST INGREDIENTS. <br />BUILDING CODE -RESIDENTIAL. <br />SERVES AS THE M05T IMPORTANT WATER SEALING <br />PROTECTION, THE JOINT BETWEEN THE TWO CA51NG BEADS <br />CURING AND TIME BETWEEN STUCCO COATS: <br />SHOULD HAVE BACKER ROD AND CAULKED WITH <br />INSTALLATION: <br />HIGH -QUALITY URETHANE SEALANT, AS A FIRST LINE OF <br />PROVIDE SUFFICIENT M015TURE IN THE PLASTER MIX OR <br />WHERE METAL PLASTER BASE WITH BACKING 15 USED, THE <br />DEFENSE. <br />BY MOIST OR FOG CURING TO PERMIT CONTINUOUS <br />VERTICAL AND HORIZONTAL LAP JOINTS SHALL BE WRB TO <br />HYDRATION OF THE CEMENTITIOU5 MATERIALS. THE MOST <br />WRB AND LATH TO FLANGE. LATH SHALL BE APPLIED WITH <br />APPLY CASING BEAD (ALSO CALLED "J" BEAD), AT THE <br />EFFECTIVE PROCEDURE FOR CURING AND TIME BETWEEN <br />THE LONG DIMENSION AT RIGHT ANGLES TO THE SUPPORTS, <br />JOINT BETWEEN ANY DISSIMILAR MATERIALS - AROUND <br />COATS WILL DEPEND ON CLIMATIC AND JOB CONDITIONS. <br />UNLE55 OTHERWISE SPECIFIED. <br />WINDOW FLANGES, WHERE STUCCO MEETS A BRICK <br />LATH SHALL NOT BE CONTINUOUS THROUGH CONTROL JOINTS <br />CHIMNEY, OR AT THE TOP OF A WALL WHERE STUCCO <br />SUFFICIENT TIME BETWEEN COATS SHALL BE ALLOWED TO <br />BUT SHALL BE STOPPED AND TIED AT EACH SIDE, LATH <br />MEETS A SOFFIT OR FRIEZE BOARD. USE CONTROL JOINT <br />PERMIT EACH COAT TO CURE OR DEVELOP ENOUGH <br />SHALL BE ATTACHED TO FRAMING MEMBERS WITH <br />OR EXPANSION JOINT AT MA5ONRY/FRAME WALL <br />RIGIDITY TO RE515T CRACKING OR OTHER PHYSICAL <br />ATTACHMENTS SPACED NOT MORE THAN 1 INCHES ON <br />CONNECTIONS. <br />DAMAGE WHEN THE NEXT COAT IS APPLIED, <br />CENTERS ALONG SUPPORTS. <br />THE TIMING BETWEEN COATS WILL VARY WITH CLIMATIC <br />FOUNDATION WEEP SCREED SHALL BE INSTALLED AT THE <br />TEXTURED FIN15H OVER MA50NRY: (STUCCO FINISH) <br />CONDITIONS AND TYPES OF PLASTER BASE. <br />BOTTOM OF ALL FRAMED EXTERIOR WALLS, BELOW THE <br />TEMPERATURE AND RELATIVE HUMIDITY EXTEND OR <br />FLOOR LINE. WHERE WALL 15 SUPPORTED BY A FLOOR OR <br />TEXTURED FIN15H SYSTEMS APPLIED IN ACCORDANCE <br />REDUCE THE TIME BETWEEN CONSECUTIVE OPERATIONS. <br />FOUNDATION. GROUND OF WEEP SCREED SHOULD BE MIN. I" <br />WITH A5TM C 926 AND C 1063, <br />COLD OR WET WEATHER LENGTHENS AND HOT OR DRY <br />OR MAX. 2" BELOW F.F.E. <br />WEATHER SHORTENS THE TIME PERIOD. MODERATE <br />LATH ATTACHMENT: <br />EXTERIOR PLASTER: <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />CHANGES IN TEMPERATURE AND RELATIVE HUMIDITY CAN <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />SECTION R103.12 PLASTER <br />BE OVERCOME BY PROVIDING ADDITIONAL HEATING <br />SECTION R103.1.1 LATH <br />MATERIALS DURING COLD WEATHER AND BY REDUCING <br />RESISTANCE TO RAIN PENETRATION 15 IMPROVED WHERE <br />THE ABSORPTION OF THE BASE BY PRE -WETTING DURING <br />I. 51DE LAPS OF METAL PLASTER BASES SHALL BE WIRE TIED. <br />PLASTER HAS BEEN ADEQUATELY DEN51FIED DURING <br />HOT OR DRY WEATHER <br />THEY SHALL BE ATTACHED BETWEEN SUPPORTS AT INTERVALS <br />APPLICATION AND PROPERLY CURED, PLASTER SHALL <br />NOT MORE THAN 9 INCHES. <br />NOT, HOWEVER, BE CONSIDERED TO BE "WATERPROOF". <br />IN ORDER TO PROVIDE MORE INTIMATE CONTACT AND <br />PREFABRICATED CONTROL JOINT MEMBERS SHALL BE <br />BOND BETWEEN COATS AND TO REDUCE RAPID WATER <br />2, EXPANDED METAL LATH SHALL BE LAPPED % INCHES (12.1 mm) <br />INSTALLED PRIOR TO THE APPLICATION OF PLASTER <br />LOSS, THE SECOND COAT SHOULD BE APPLIED AS SOON <br />MIN, AT THE SIDES. LAP METAL LATH I INCH (25 mm) AT ENDS. <br />THE CREATION OF A GROOVE OR CUT IN PLASTER SHALL <br />AS THE FIRST COAT 15 SUFFICIENTLY RIGID TO RESIST <br />WHERE END LAPS OCCUR BETWEEN THE FRAMING MEMBERS, THE <br />NOT BE CONSIDERED A CONTROL OR EXPANSION JOINT. <br />CRACKING, THE PRESSURES OF THE SECOND COAT <br />ENDS OF THE SHEETS OF ALL METAL PLASTER BASES SHALL BE <br />APPLICATION, AND THE LEVELING PROCESS, <br />LACED OR WIRE TIED. <br />STUCCO: (THREE COAT) <br />THE AMOUNT OF WATER AND THE TIMING FOR CURING <br />3. WHERE METAL PLASTER BASE WITH BACKING IS USED, THE <br />PORTLAND CEMENT PLASTER WILL VARY WITH THE <br />VERTICAL AND HORIZONTAL LAP JOINTS SHALL BE WRB TO WRB <br />TRADITIONAL THREE -COAT STUCCO CON515T5 OF THREE <br />CLIMATIC CONDITIONS, THE TYPE OF BASE, AND USE OR <br />AND LATH TO FLANGE. <br />SEPARATE LAYERS OF CEMENT PLASTER MATERIALS: <br />NON USE OF WATER -RETENTIVE ADMIXTURES. <br />A TROWEL -APPLIED SCRATCH COAT, WHICH 15 APPLIED <br />4.BACKING SHALL BE LAPPED NOT LE55 THAN 2 INCHES (50 mm), <br />OVER LATH AND GROOVED TO PROVIDE A KEY WAY FOR <br />50ME M015TURE MUST BE RETAINED IN OR ADDED BACK <br />ON WALLS, THE BACKING SHALL BE LAPPED SO WATER WILL <br />THE NEXT COAT: A SAND -FINISHED BROWN COAT, WHICH <br />TO FRESHLY APPLIED PORTLAND CEMENT -BASED <br />FLOW TO THE EXTERIOR BACKING SHALL NOT BE PLACED <br />KEYS INTO THE SCRATCH COAT: AND A FINISH, OR COLOR <br />PLASTER IF THE RELATIVE HUMIDITY 15 RELATIVELY HIGH <br />BETWEEN PLASTER BASE (LATH) AND FLANGES OF <br />COAT. <br />(ABOVE 15 %), THE FREQUENCY FOR RE -WETTING A <br />ACCESSORIES. METAL LATH TO METAL FLANGE CONTACT SHALL <br />THE FIRST TWO COATS OF A THREE COAT SYSTEM ARE <br />5URF4CE MAY BE REDUCED. IF IT 15 HOT, DRY, AND <br />BE REQUIRED TO ENSURE THAT FLANGES ARE MECHANICALLY <br />MADE OF A 51TE-MIXED CEMENT PLASTER EACH BATCH <br />WINDY, THE FREQUENCY OF RE -WETTING MUST BE <br />LOCKED TOGETHER <br />CONTAINS MEASURED AMOUNTS OF STUCCO CEMENT, <br />INCREASED. <br />5. SPACING OF ATTACHMENTS FOR METAL PLASTER 5A5E5 - <br />SAND AND POTABLE WATER <br />TO HELP REDUCE THE CRACKING THAT ISCOMMON <br />CONSIDER THE PHYSICAL CHARACTERI5TIC5 OF THE <br />ATTACHMENTS FOR SECURING METAL PLASTER BASES TO <br />WITH STUCCO, THE BASE MIX CAN BE MODIFIED <br />STRUCTURE AS WELL AS THE PREVIOUSLY MENTIONED <br />FRAMING MEMBERS SHALL BE SPACED NOT MORE TPAN 6 <br />WITH LIQUID POLYMER ADDITIVES, WHICH INCREASE <br />CONDITIONS WHEN SELECTING THE METHOD OF CURING. <br />INCHES O.C. INTO THE FRAMING MEMBERS, FOR DIAMOND MESH <br />STRENGTH AND IMPROVE CURING, AND WITH CHOPPED <br />THE METHOD CAN BE ONE OR A COMBINATION OF THE <br />AND FLAT RIB LATHS AND AT EACH RIB FOR % INCH (9.5 mm) <br />FIBERGLASS FOR REINFORCEMENT, <br />FOLLOWING: <br />RIB LATH. <br />(U M015T CURING 15 ACCOMPLISHED BY APPLYING A FINE <br />6.LATH SHALL BE APPLIED WITH THE LONG DIMENSION AT RIGHT <br />SCRATCH GOAT: <br />FOG SPRAY OF WATER AS FREQUENTLY AS REQUIRED, <br />ANGLES TO THE SUPPORTS, UNLE55 OTHERWISE SPECIFIED. <br />GENERALLY TWICE DAILY IN THE MORNING <br />THE SCRATCH COAT 15 APPLIED DIRECTLY TO A CLEAN <br />AND EVENING. CARE MUST BE EXERCISED TO AVOID <br />1. ENDS OF ADJOINING PLASTER BASES SHALL BE STAGGERED. <br />BLOCK WALL OR, ON WOOD STRUCTURES OVER WRB AND <br />EROSION DAMAGE TO PORTLAND CEMENT -BASED <br />GALVANIZED METAL LATH. A METAL 5CARIFING TOOL 15 <br />PLASTER SURFACES. <br />USED TO CREATE "SCRATCH" LINES IN THE STILL WET <br />WEEP 5GREED5 AND CONTROL JOINTS: <br />SURFACE. THE FURROWS CREATE A ROUGH SURFACE INTO <br />(2) PLASTIC FILM, WHEN TAPED OR WEIGHTED DOWN <br />WHICH THE BROWN COAT CAN KEY FOR A GOOD BOND. <br />AROUND THE PERIMETER OF THE PLASTERED AREA, CAN <br />A WEEP SCREED AT THE BOTTOM OF THE WALL AND <br />SCRATCHING SHOULD ALWAYS BE HORIZONTAL AND <br />PROVIDE A VAPOR BARRIER TO RETAIN THE M015TURE <br />OVER OPENINGS SERVES TWO IMPORTANT PURPOSES - IT <br />SHOULD BE 114 INCH DEEP. <br />BETWEEN THE MEMBRANE AND PLASTER. CARE MUST BE <br />PROVIDES A SCREED THAT HELPS ENSURE UNIFORM <br />EXERCISED IN PLACING THE FILM: IF TOO SOON, THE FILM <br />COAT THICKNESS, AND IT PROVIDES A PLACE FOR WATER <br />SCRATCH -COAT THICKNE55: <br />MAY DAMAGE SURFACE TEXTURE: IF TOO LATE, THE <br />THAT LEAKS INTO THE WALL TO ESCAPE. <br />MOISTURE MAY HAVE ALREADY ESCAPED. <br />THE SCRATCH COAT SHOULD BE APPROXIMATELY 3/8 <br />FOUNDATION WEEP 5GREED AT FRAME WALLS: <br />INCH TO 1/2 INCH THICK - THICK ENOUGH TO JUST COVER <br />(3) CANVAS, CLOTH, OR SHEET MATERIAL BARRIERS CAN <br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF: <br />THE WIRE, <br />BE ERECTED TO DEFLECT SUNLIGHT AND WIND, BOTH OF <br />SECTION R103.12.1 WEEP 5CREED5 <br />WHICH WILL REDUCE THE RATE OF EVAPORATION, IF THE <br />BROWN COAT: <br />HUMIDITY 15 VERY LOW, TH15 OPTION ALONE MAY NOT <br />ACCE55ORY USED TO TERMINATE PORTLAND CEMENT BASED <br />PROVIDE ADEQUATE PROTECTION. <br />STUCCO AT THE BOTTOM OF EXTERIOR WALLS. THIS ACCE55ORY <br />THE BROWN COAT (WHICH 15 ACTUALLY GRAY, LIKE <br />SHALL HAVE A SLOPED GROUND OR SCREED FLANGE TO <br />OTHER CEMENT STUCCO), 15 A SMOOTH COAT, USUALLY <br />PAINTING STUCCO: <br />FACILITATE THE REMOVAL OF M015TURE FROM THE WALL CAVITY <br />"RODDED" WITH STRAIGHT EDGES AND WOODEN FLOATS. <br />AND A VERTICAL ATTACHMENT FLANGE NOT LE55 THAN 3 112 <br />IT 15 APPLIED AS SOON AS THE SCRATCH GOAT <br />NEWLY APPLIED STUCCO SHOULD BE ALLOWED ABOUT <br />INCHES LONG. <br />REACHES SUFFICIENT RIGIDITY TO CARRY THE BROWN <br />30 DAYS TO CURE BEFORE PAINTING, DEPENDING ON THE <br />INSTALLATION OF EXTERIOR LATH AND FRAMING SHALL COMPLY <br />COAT. TH15 15 USUALLY AT "THUMB PRINT HARD" AND <br />WEATHER CONDITIONS - TESTING THE PH LEVEL 15 THE <br />WITH THE APPLICATION REQUIREMENTS OF A5TM G 1063, <br />CAN BE DONE ON THE SAME DAY. <br />BEST WAY TO DETERMINE PAINT READINESS. PAINT <br />MANUF. HAVE A MAX. PH LEVEL (APPROX.10). <br />STUCCO CONTROL JOINTS: <br />BROWN COAT THICKNESS: <br />EXISTING STUCCO 5tIRFACE5 SHOULD BE POWER-WA5HED <br />AND ALLOWED TO THOROUGHLY DRY BEFORE PAINTING. <br />CONTROL JOINTS ALLOW FOR THE THERMAL EXPANSION <br />THE BROWN COAT 15 COMP05ED OF SLIGHTLY MORE <br />DO NOT USE A WATER BLASTER, AS THE PRE55URE CAN <br />AND CONTRACTION OF THE PLASTER MEMBRANE. <br />SAND THAN THE SCRATCH COAT MIXTURE, AND <br />DO SEVERE DAMAGE TO THE STUCCO. <br />CONTROL JOINT SHOULD BE APPLIED OVER THE METAL <br />THEREFORE IT 15 MORE MANAGEABLE BUT SLIGHTLY <br />STUCCO SHOULD BE PAINTED ONLY WITH <br />LATH AT EITHER A MAXIMUM DISTANCE OF IS LINEAR FEET <br />WEAKER, IT SHOULD BE APPLIED 1/4 TO 3/5 INCH THICK. <br />ACRYLIC -BASED PAINTS WITH ADEQUATE VAPOR <br />OR A MAXIMUM OF 144 SQUARE FEET OF STUCCO SURFACE. <br />APPLY THE BROWN COAT EVENLY AS POSSIBLE. AN <br />TRANSMISSION CHARACTERISTICS, AS THESE PREVENT <br />UNEVEN BROWN COAT CAN LEAD TO AN INCON515TENT <br />NEW M015TURE-RELATED PROBLEMS WITHIN THE HOUSE. <br />THE DEPTH OF THE GROUND OF THE CONTROL JOINT <br />TPICKNE55 IN THE FIN15H COAT, CAUSING 50ME AREAS OF <br />CONTROL JOINT BACKER ROD: <br />SHOULD BE DE51GNED TO FINISH FLUSH WITH THAT OF THE <br />THE FIN15H COAT TO DRY BEFORE OTHERS. THE RESULTS <br />WEEP 5CREED5 AND PLA5TER5TOP5. <br />15 A SPLOTCHY OR "MOTTLED" COLOR COAT AND <br />BACKER ROD SHOULD BE USED TO FILL LARGE GAPS <br />EXCESSIVE HAIRLINE CRACKING. <br />AND CONTROL THE DEPTH. M05T BACKER RODS TODAY <br />LATH SHALL BE DISCONTINUED BEHIND THE CONTROL <br />ARE MADE OF FOAM AND COME IN DIAMETERS FROM 1/4 <br />JOINT. <br />FINISHED COAT: <br />INCH TO 2 INCH AND UP. CHOOSE A BACKER ROD THAT 15 <br />JUST A LITTLE LARGER THAN THE JOINT 50 IT WILL STAY <br />OVER THE RIM J015T AT THE INTERSECTION BETWEEN <br />AFTER THE CURING PERIOD, A FINISH COAT CAN BE <br />IN PLACE AND ALLOW YOU TO CONTROL THE DEPTH OF <br />FLOORS TO ACCOMMODATE SHRINKAGE IN THE FLOOR <br />APPLIED. <br />THE SEALANT. <br />JOIST. <br />APPLYING SEALANT: <br />FLASHING VENT PIPE PENETRATIONS: <br />APPLY TO CLEAN DRY 5URFACE5. APPLICATION <br />VENT PIPES ON WOOD AND ASPHALT ROOFS ARE <br />TEMPERATURE: 40 DEGREES TO 80 DEGREES. PREPARE <br />USUALLY FLASHED U51NG A PRE ASSEMBLED METAL PAN <br />THE SURFACE USING THE FOLLOWING STRATEGIES: <br />WITH A RUBBER BOOT. ORDER THE UNIT ACCORDING TO <br />SCRAPE, CHIP, OR BRUSH WITH A 5TIFF-BRI5TLE BRUSH, <br />THE OUTSIDE DIAMETER OF THE VENT PIPE. FOR SLATE <br />AND DUST THE INSIDE OF THE JOINT, OR BLOW IT OUT WITH <br />AND TILE ROOFS A MALLEABLE LEAD JACKET WILL LAST <br />COMPRE55ED AIR <br />LONGER <br />WIPE THE SURFACE WITH A STRONG SOLVENT, SUCH AS <br />ACETONE OR METHYL ETHYL KETONE. THESE SOLVENTS <br />FLEXIBLE FLASHING MATERIALS: <br />EVAPORATE WATER AND DISSOLVE GREASY SUBSTANCES <br />THAT CAN RETARD ADHESION. <br />FLEXIBLE FLASHING- SELF -ADHERING BITUMINOUS <br />TOOL EVERY CAULK JOINT. THE BEST TOOL 15 A STEEL <br />TAPE -SHOULD BE USED TO FLASH ALL OF THE FOLLOWING: <br />SPATULA THAT 15 SLIGHTLY SMALLER THAN THE WIDTH OF <br />EXTERIOR DOOR SILLS: DECK LEDGERS: INSIDE AND OUTSIDE <br />THE JOINT. ACHIEVE A SMOOTH, EVEN APPEARANCE <br />CORNERS OF WALL SHEATHING: STUCCO SHELVES AND <br />WITHOUT SQUEEZE -OUT ON THE SIDES. <br />PARAPETS: BELOW GRADE CONCRETE CRACKS: AND WALL <br />CUT THE NOZZLE OF THE TUBE AT AN ANGLE SLIGHTLY <br />AREA SUBJECT TO 5PLA5HBACK <br />SMALLER THAN THE 51ZE OF THE JOINT. <br />IN COLD WEATHER, KEEP THE CAULK WARM. AL50 IT MAY <br />FLEXIBLE FLA5HING5 COME IN SEVERAL VARIETIES, INCLUDING <br />BE NECESSARY TO HEAT THE SURFACE WITH A HEAT GUN. <br />"PEEL -AND STICK" PRODUCTS, AS WELL AS NON-STICK <br />TAKE CARE TO NOT STRIP THE PAINT OF START A FIRE. <br />PRODUCTS. <br />ROOFING: FLASHING: <br />RUBBERIZED FLA5HING5: <br />LENGTH. <br />SELF-ADHESIVE, RUBBERIZED ARE MADE FROM THE SAME <br />MATERIALS AS THE EAVES MEMBRANES USED TO PREVENT ICE <br />TO AVOID EXCE551VE EXPANSION AND CONTRACTION, <br />DAM LEAKS. TYPICALLY AVAILABLE IN ROLLS FROM 4-12 IN. <br />USE 8 FOOT TO 10 FOOT LENGTHS OF METAL, MAXIMUM, <br />WIDE (BUT SOMETIMES AVAILABLE UP TO 36 IN. WIDE), THESE <br />FOR VALLEY FLASHING. AVOID USING ALUMINUM, WHICH <br />FLEXIBLE FLA5HING6 CAN BE APPLIED DIRECTLY TO THE <br />EXPANDS AT A GREATER RATE THAN OTHER METALS. <br />SHEATHING, AS LONG A$ THE SURFACE 15 WARM AND <br />LAP SECTIONS 8 INCHES MINIMUM, <br />RELATIVELY CLEAN. <br />VALLEY CENTERLINE: <br />THICKNESS VARIES FROM 25- TO 60-MIL5. THE THINNER THE <br />MATERIAL, THE EASIER IT CAN BE FOLDED AND TUCKED <br />WHEN A STEEP ROOF INTERSECTS A SHALLOW ONE, WATER <br />BENEATH SIDING, BUT AL50 THE EA51ER IT WILL TEAR AND <br />CASCADING DOWN THE STEEP ROOF CAN OVERSHOOT <br />DEGRADE IN THE SUNLIGHT, <br />THE VALLEY AND RUN UP BENEATH THE SHINGLES ON THE <br />SHALLOW ONE. ROOFS LIKE THIS NEED A VALLEY <br />CLIMATE CAUTIONS: <br />FLASHING WITH A CRIMPED CENTERLINE. THE STEEPER <br />THE ROOF THE MORE CRITICAL THE CRIMP WILL BE. <br />IN WARM TEMPERATURES, WHEN RUBBERIZED ASPHALT IS THE <br />STICKIEST, IT IS NEARLY IMP0551BLE TO REP051TION IT ONCE <br />EDGE TREATMENTS: <br />THE FLASHING HAS TOUCHED THE SURFACE. MAKE SURE TO <br />DRY -FIT BEFORE PULLING THE RELEASE PAPER IT 15 AL50 <br />LIKE ALL ROOF FLASHING, VALLEY FLASHING SHOULD <br />VERY DIFFICULT TO HANDLE ALONE WHEN IT 15 STICKY, <br />PAVE HEMMED EDGES, NOT ONLY DO THESE SHED WATER <br />MORE EFFECTIVELY, BUT HOLDING THE SHINGLE AWAY <br />IN HOT TEMPERATURES, RUBBERIZED ASPHALT TENDS TO OOZE, <br />FROM THE FLASHING, THEY PREVENT CAPILLARY SUCTION <br />MAKING IT ME55Y TO HANDLE. IN SUNBELT AREAS (OR <br />FROM DRAWING THE WATER UP UNDER THE SHINGLE. <br />WHEREVER SURFACE TEMPERATURES MAY EXCEED 180T), AVOID <br />U51Z WITH METAL FLA5HING5: THE FLA5HING5 WILL COOK AND <br />RIDGE TREATMENT: <br />THE ASPHAULT SOON DRIES OUT, <br />VALLEYS THAT MEET AT A RIDGE SHOULD BE SOLDERED <br />IN COLD WEATHER, SELF-ADHEREING FLA5HING5 OFTEN DON'T <br />TO ONE ANOTHER HOWEVER THIS CONNECTION MAY <br />STICK WELL. CHECK THE MANUFACTURER'S MINIMUM APPLICATION <br />BREAK WHEN THE VALLEY METAL EXPANDS AND <br />TEMPERATURE. SOME STICK IN TEMPERATURES BELOW 25' F, BUT <br />CONTRACTS. BEST PRACTICE CALLS FOR COVERING THE <br />M05T REQUIRE SURFACE TEMPERATURES OF 40°F OR GREATER <br />CONNECTION AT THE RIDGE WITH A MOLDABLE PIECE OF <br />LEAD FLASHING, <br />COMPATIBILITY: <br />FASTENER: <br />DO NOT USE RUBBERIZED ASPHALT AND BUTYL TAPES <br />TOGETHER ON CONCRETE, MASONRY, OR 055, RUBBERIZED <br />METAL VALLEY CAN BE FASTENED WITH NAILS OR CLEATS <br />FLA5PING5 MAY NOT STICK WELL UNLE55 A PRIMER 15 APPLIED, <br />AT 2 FEET ON CENTER CLEATS ARE BETTER± THEY WILL <br />ON THESE SURFACES, A BUTYL FLASHING WORKS BETTER <br />NOT BECOME FATIGUED AND SHEAR WHEN THE METAL <br />EXPANDS AND CONTRACTS. <br />POLY VS. FOIL: RUBBERIZED FLA5PING5 TYPICALLY COME WITH <br />WHEN USING NAILS, PLACE THEM AT LEAST 5 INCHES AWAY <br />A POLYETHYLENE OR FOIL COVERING TO PROTECT THEM FROM <br />FROM THE VALLEY CENTER TO PREVENT LEAKS. <br />SUNLIGHT. POLY -COVERED PRODUCTS NEED TO BE COVERED <br />FROM SUNLIGHT WITHIN 30 TO 90 DAYS± FOIL -COVERED TAPES <br />VALLEY TREATMENT: <br />HAVE NO EXACT EXPOSURE LIMITATIONS BUT EVENTUALLY WILL <br />DRY OUT AND BECOME BRITTLE, ANY SHIFT IN SURFACE <br />METAL VALLEYS SHOULD BE FABRICATED FROM NO LESS <br />MOVEMENT WILL PULL AT THE BOND UNTIL EITHER THE BOND <br />THAN NO.28-GAUGE CORROSION SHEET METAL. <br />FAILS OR THE MEMBRANE CRACKS, <br />ASPHALT SHINGLES, VALLEY FLASHING MUST EXTEND AT <br />LEAST 8 INCHES ON EITHER SIDE OF THE CENTERLINE. <br />EXP05ED APPLICATIONS: IN PERMANENTLY EXP05ED <br />WOOD SHINGLES, THE WING OF THE VALLEY MUST EXTEND <br />APPLICATIONS, USE AN EPDM FLASHING TAPE INSTEAD OF AN <br />10 INCHES EACH 51DE OF CENTERLINE, <br />INEXPENSIVE FLEXIBLE FLASHING MATERIAL, THE DRAWBACK <br />SLATE, TILE, AND WOOD SHAKES, A VALLEY MUST EXTEND <br />WITH EPDM TAPE 15 THAT IT'5 EXPENSIVE, AS WELL AS QUITE <br />II INCHES EACH 51DE OF CENTERLINE. <br />THICK ( ABOUT 10-MIL.), MAKING IT AWKWARD TO FOLD INTO <br />SMALL AREAS. <br />SECTION OF ROOF FLASHING MUST HAVE AN END LAP OF <br />AT LEAST 4 INCHES FOR WOOD SHINGLES AND SHAKES, <br />BUTYL RUBBER FLA5HING5: <br />AND AT LEAST 6 INCHES FOR SLATE AND TILE ROOFS. <br />DO NOT USE BUTYL FLASHING NEAR ANY ASPHALT -BASED <br />PRODUCTS. THE BUTYL AND THE ASPHALT PRODUCTS <br />FRONT WALL FLASHING: <br />WILL BOTH DRY OUT FASTER AND LOOSE THEIR ADHESION. <br />INSTALL UP THE ROOF UNTIL YOU REACH THE BASE OF <br />NONSTICK FLASHING& <br />THE VERTICAL WALL. ADJUST THE EXP05URE OF THE LAST <br />FEW COURSES, IF NECESSARY, 50 THE LAST COURSE 15 AT <br />NOT ALL FLEXIBLE FLA5HING5 ARE SELF -ADHERING. 50ME MUST <br />LEAST 8 INCHES WIDE. <br />BE SECURED WITH STAPLES OR ROOFING NAILS. WHILE <br />CUT AND BEND A CONTINUOUS METAL FLASHING STRIP <br />GENERALLY THINNER AND THE QUICKEST WAY TO DETERIORATE <br />THAT EXTENDS AT LEAST 5 INCHES UP THE VERTICAL <br />IN 5UNLIGPT, THESE ARE OFTEN THE BEST CHOICE FOR APPLYING <br />WALL AND AT LEAST 4 INCHES OVER THE LAST SHINGLE <br />BENEATH 51DING AND TRIM IN CON515TENTLY COLD <br />COURSE. <br />TEMPERATURES, OR WHEN THE SURFACE 15 ROUGH AND <br />WHEN INSTALLING THE METAL FLASHING STRIP OVER THE <br />DIRTY -FACTORS THAT CAN DIMINISH THE BOND OF <br />LAST SHINGLES, EMBED IT IN ROOFING CEMENT AND NAIL <br />PEEL -AND -STICK FLA5HING5. COVER NONSTICK FLASHING AS <br />IT TO THE ROOF ONLY. <br />SOON AS P0551BLE TO PROTECT IT FROM SUNLIGHT. <br />DO NOT NAIL THE FLASHING STRIP TO THE WALL. <br />APPLY AN ADDITIONAL ROW OF SHINGLES - TRIMMED TO <br />DRAINAGE PLANE: <br />THE WIDTH OF THE FLASHING - OVER THE FLASHING AND <br />EMBEDDED IN ASPHALT PLASTIC ROOFING CEMENT. <br />AN AIR SPACE BEHIND THE SIDING (1/4-TO 3/8-INCHES 15 <br />ENOUGH) WILL ALLOW WATER TO DRAIN AND THE BACKSIDE OF <br />51DEWALL FLASHING: <br />51DING TO DRY. <br />SHINGLE ROOFS (ASPHALT, SLATE, OR WOOD) THAT BUTT <br />WELL DRAINED WALL SYSTEMS: <br />AGAINST VERTICAL WALLS ARE BEST PROTECTED BY <br />METAL STEP FLASHING PLACED OVER THE END OF EACH <br />DIFFERENT SIDINGS CALL FOR DIFFERENT DRAINAGE DETAILS. <br />SHINGLE COURSE. <br />TYPICAL DETAILS FOR WELL -DRAINING WALLS ARE SHOWN FOR <br />DIFFERENT TYPES OF 51DING: <br />CUT STEP FLASHING PIECES TO BE 10 INCHES LONG AND 2 <br />INCHES WIDER THAN THE SHINGLE EXP05URE E.G.1 <br />BOARD SIDING, SHAKE AND SHINGLE SIDING AND VINYL SIDING. <br />INCHES FOR ROOF SHINGLES WITH A 5 INCH EXPOSURE. <br />IN EACH CASE, AN AIR SPACE MUST BE CREATED BEHIND THE <br />BEND THE 10 INCH LENGTH TO EXTEND 5 INCHES OVER <br />51DING AND AN EXIT PROVIDED FOR THE WATER TO DRAIN OUT. <br />THE ROOF DECK AND 5 INCHES UP THE WALL SURFACE. <br />FLASHING DETAILS: <br />I.) NEVER RELY ON THE STICKINESS OF PEEL -AND -STICK <br />FLA5HING5 FOR SHEATHING: THE BOND 15 UNLIKELY TO LAST <br />OVER THE LIFE -SPAN OF THE HOUSE. <br />2.) ALWAYS LAP FLASHING UNDER THE SHEATHING WRAP ABOVE. <br />FLASHING WINDOWS: <br />DO NOT X-CUT SHEATHING WRAP AT OPENINGS. INSTEAD I -CUT <br />THE SHEATHING WRAP, RUNNING THE KNIFE HORIZONTALLY ALONG <br />THE ROUGH OPENING AT THE HEAD OF THE SILL, THEN SLITTING <br />VERTICALLY IN THE CENTER OF THE OPENING. TH15 WAY, THE <br />WINDOW FLANGE CAN BE SLIPPED UNDER THE SHEATHING WRAP <br />WHEN INSTALLING THE WINDOW. <br />SILL DETAILS: INSTALL A BEVELED CANT STRIP OR NARROW <br />DAM STRIP TO THE ROUGH OPENING SILL, THEN WRAP THE SILL <br />WITH SHEATHING WRAP OR A FLEXIBLE FLASHING MEMBRANE. <br />MAKE SURE THIS MEMBRANE DRAPES OVER THE SHEATHING <br />WRAP BELOW, <br />ALL SHEATHING WRAPS MUST BE INTEGRATED WITH FLASHING <br />MATERIALS. IT'S NOT ENOUGH TO WRAP A HOUSE, AND THEN <br />SIMPLY X-CUT THE OPENINGS AND FOLD THE FLAPS INSIDE, <br />FOLLOW THE GUIDELINES FROM THE DETAIL SHEETS WHEN <br />INSTALLING ANY SHEATHING WRAP. <br />WINDOW AND DOOR SPLINES: <br />WINDOWS AND DOORS SHOULD BE FLASHED WITH FELT PAPER <br />OR FLEXIBLE FLASHING SPLINES. THE SPLINES SHOULD BE <br />INSTALLED AFTER THE SILL FLASHING, AND THE SHEATHING WRAP <br />SHOULD GO ON AFTERWARDS OR BE SLIT 50 IT LAPS OVER THE <br />SPLINES. <br />FLANGED WINDOW HEADS DO NOT NEED ADDITIONAL FLASHING. <br />THE NAILING FIN WILL DO A GOOD JOB SEALING THE HEAD IF IT <br />CAN BE TUCKED BENEATH THE SHEATHING WRAP WHEN THE <br />WINDOW 15 INSTALLED. LEAVE A 1/4-IN. GAP BETWEEN THE <br />SIDING AND THE WINDOW ALONG THE HEAD, BUT DO NOT CAULK <br />TPI5 GAP: OTHERWISE, WATER THAT RUNS BEHIND THE 51DING <br />ABOVE WON'T HAVE A PLACE TO DRAIN. <br />IF THE FLANGE CANNOT BE TUCKED UNDER THE SHEATHING WRAP <br />WHEN THE WINDOW 15 INSTALLED, SLIT THE WRAP AND ADD HEAD <br />FLASHING. <br />UNFLANGED WINDOWS WILL NEED A ADDITIONAL METAL <br />Z-FLASHING ABOVE THE HEAD CA51NG OR BRICK MOLD. MAKE <br />SURE TH15 Z-FLASHING LAP5 UNDERNEATH THE SHEATHING WRAP, <br />MULLED WINDOWS AND WINDOW WALLS MUST HAVE A CONTINUOUS <br />HEAD FLASHING: THE MANUFACTURER'S MULLION COVER WILL <br />NOT PREVENT WATER FROM RUNNING BETWEEN THE WINDOW UNITS <br />FROM ABOVE. <br />ROUND -TOP WINDOWS SHOULD BE FLASHED WITH <br />PEEL -AND -STICK FLEXIBLE FLASHING. SLIT THE SHEATHING <br />WRAP AND SLIP IT UNDERNEATH, LETTING IT DRAPE OVER THE <br />WINDOW TOP. THEN CUT THE FLASHING TO CONFORM TO THE <br />NAILING FIN. RELY ON PROPER LAPPING OF THE FLASHING, NOT <br />ON CAULK <br />FLASHING DOORS: <br />OVER WOOD FLOORS, DOOR THRESHOLDS SHOULD BE FLASHED <br />WITH A METAL PAN OR Z-FLA5HING. 5LA55 SHOULD BE FORMED <br />WITH A "SEAT" TO HOLD THE THRESHOLD, <br />FLASHING LEDGERS AND BEAMS: <br />LEDGER FLASHING NEEDS TO BE MORE THAN A Z-FLASHING <br />RUNNING ALONG THE TOP EDGE OF THE LEDGER BOARD. USE <br />METAL COIL STOCK SLIPS UNDER THE SHEATHING WRAP ABOVE <br />THE LEDGER, AND DRAPES OVER THE SHEATHING WRAP BELOW <br />THE LEDGER <br />ALTERNATIVELY, BUILD A DECK COMPLETELY FREE-STANDING <br />FROM THE WALL, OR INSERT SPACERS BETWEEN THE LEDGER <br />BOARD AND THE WALL, SO IT STANDS OUT AND ALLOWS WATER <br />TO DRAIN FREELY. <br />CANTILEVERED DECK OR BALCONY JOISTS THAT PROTECT <br />THROUGH THE WALL FRAMING ARE TROUBLE SPOTS. FLASH WITH <br />TWO-PIECE FLASHING MEMBRANE. <br />FLASHING WALL PENETRATIONS: <br />ELECTRICAL FIXTURES: INSTALL ELECTRICAL BOXES AND <br />LIGHTING FIXTURES ON HEMMED METAL FLA5HING5 PLATE. DO <br />NOT TAPE THE PLATE OVER THE SHEATHING WRAP'- SLIT THE <br />SHEATHING WRAP AND TUCK IT BENEATH. <br />MECHANICAL PENETRATIONS: GAS LINE, CONDUIT, WATER <br />SPIGOTS, AND SMALL PENETRATIONS SHOULD BE FLASHED WITH <br />TWO-PIECE METAL FLASHING PLATE. SEAL THE TWO PLATES WITH <br />"LOW MODULES" URETHANE CAULK <br />SIDEWALL FLASHING: <br />BECAUSE OF THE VOLUME OF WATER THAT CAN POUR DOWN A <br />SLOPED ROOF, ONE OF THE MOST CRITICAL FLASHING DETAILS <br />OCCURS WHERE A ROOF INTERSECTS A SIDEWALL. THE ROOF <br />SHOULD BE FLASHED WITH A STEP FLASHING. WHERE THE ROOF <br />TERMINATES, INSTALL A KICK -OUT TO DEFLECT WATER AWAY <br />FROM THE SIDING. THOUGH NOT ALWAYS P0551BLE IN THE <br />SCHEDULE, IT'S BEST TO INSTALL A FULL 36-IN. PIECE OF <br />RUBBERIZED ASPHALT FLASHING ON THE WALL BEFORE THE <br />5UBFA5CIA AND TRIM BOARDS ARE NAILED IN PLACE, AND THEN <br />COME BACK TO INSTALL THE KICKOUT. <br />DAMS BEws <br />DESIGN GROVP <br />lso srnre srR�er ensT <br />ot.DSMn�, riARron ��n <br />813.92.5.130o TEL <br />$13 . 9?S . 1800 FAX <br />W W W.DAVISBEW&CAM <br />T�NiPA • L7EIWER. <br />-�-�,� FST. 1994 ��-- <br />0 <br />zLl o <br />N <br />ko <br />0+�o <br />� LA M <br />j co Ln <br />� O Ln <br />Q o- LL <br />M <br />Q v a00 <br />.� <br />Z <br />w wo <br />0 <br />d' <br />0z <br />�o <br />W <br />zap <br />Waa� <br />vz�0 <br />J z�� <br />H z <br />z <br />>- 0 in <br />o � d g <br />w o8N® <br />°z <br />zz <br />ru <br />fz <br />z zCL <br />_ <br />O �3 <br />O Q Q <br />oC <br />z <br />0 Cie i <br />W <br />LL. 0 <br />7� Lu <br />< Z Q 0 W <br />Q 0 <br />Lu <br />z U Z z o <br />OV <br />Lu O 0 z <br />z a W 0 <br />Z <br />rn O CL w � m <br />SCALE : AS NOTED <br />DATE : 10-19-2018 <br />VERSION NO. <br />loo <br />SHEET NO. <br />DT6 <br />