Laserfiche WebLink
5HEATHING WRAP AND FLASHING: <br />THESE 5PECIFICATION5 MEET OR EXCEED THE REQUIREMENT5 OF: <br />SECTION R103.1.3 WATER-RE515TIVE 5ARRIER5 <br />ALL 5HEATHING WRAP MUST BE INTEGRATED WITH FLASHING <br />MATERIALS. IT'S NOT ENOUGH TO WRAP A HOU5E, AND THEN TO <br />51MPLY X-CUT THE OPENING5 AND FOLD THE FLAP5 IN51DE. <br />FOLLOW THE GUIDELINE5 FROM THE DETAIL SHEETS WHEN <br />IN5TALLING ANY 5HEATHING WRAP. <br />ASPHALT -SATURATED FELT: <br />COMMONLY AVAILABLE IN TWO WEI6HT5, ASPHALT FELT, OR <br />"BLACK PAPER," 15 MADE FROM CORRUGATED PAPER5 MIXED <br />WITH 5AWDU5T AN[) AN ASPHALT RE51N. <br />WHEN CH005ING NO. 15 FELT, LOOK FOR MATERIAL RATED 45TM <br />D4869 OR 45TM D22(o STANDARD, WHICH EN6URE5 A WEIGHT OF <br />AT LEAST 11.5 L55. PER SQUARE, <br />PLASTIC HOU5E WRAP: <br />PLASTIC HOU5EWRAP5 TYPICALLY MADE OF POLYOLEFIN <br />FABRIC- EITHER POLYETHYLENE OR POLYPROPYLENE, THE <br />PRIMARY DIFFERENCE IN HOU5EWRAP5 15 WHETHER OR NOT THEY <br />ARE PERFORATED: <br />l.) PERFORATED PRODUCT5 ARE MADE FROM A VAPOR -TIGHT <br />PLA5TIC, AND THEN NEEDLE -PUNCHED TO ALLOW THE WRAP TO <br />"BREATHE" (ALLOW VAPOR TO PA55 THROUGH). UNFORTUNATELY, <br />THE5E HOLES AL50 ALLOW LIQUID WATER TO SEEP THROUGH, <br />PARTICULARLY WHEN THE 51DING 15 PRE55ED TIGHT AGAINST IT, <br />THE HOU5EWRAP WILL 5LOW THE 5EEPAGE BUT WILL NOT BLOCK <br />IT ENTIRELY. <br />2J NON -PERFORATED HOU5EWRAP5 ARE MADE FROM PLA5TIG <br />FIBER THAT ALLOW5 VAPOR TO PASS BETWEEN THE FIBERS. <br />THESE GENERALLY PERFORM MUCH BETTER THEN PERFORATED <br />PRODUCT5 AT RE515TING LIQUID WATER, WHICH 5HOULD BE <br />CON5IDERED THEIR PRIMARY TA5K <br />LEACHING: <br />HOU5EWRAP6 ARE 5U5CEPTIBLE TO DAMAGE FROM <br />EXTRACTIVES THAT CAN LEACH FROM WOOD 51DING MATERIAL5, <br />PARTICULARLY CEDAR AND REDWOOD. TH15 CAN BE <br />PREVENTED IN TWO WAY5: <br />I.) IN5TALL 51DING ON BATTEN5 TO CREATE AN AIR GAP, WHICH <br />REDUCE5 CONTACT BETWEEN THE 5HEATHING WRAP AND SIDING, <br />2.) BACK -PRIME ALL WOOD SIDING MATERIAL5. TH15 REDUCE5 <br />LEACHING AND BLOCKS M015TURE FROM MOVING THROUGH THE <br />51DING AND BL15TERING THE FIN15H. <br />INSTALLING 5HEATHING WRAP <br />THE PRIMARY PURP05E OF HOU5E WRAP 15 TO STOP WATER <br />AIR-5EALING AND VAPOR CONTROL ARE 5ECONDARY. <br />I.) U5E 5HEATHING WRAP OR FELT PAPER ON ALL HOUSES, NO <br />MATTER WHAT KIND OF 51DING 15 USED, <br />2.) THE WRAP SHOULD BE CONTINUOU5: AVOID A PATCHWORK OF <br />5MALL PIECE5. REVIEW FLA5HING DETAILS, A5 50ME FLA5HING5 <br />(5UCH A5 TN05E AROUND ELECTRICAL FIXTURE5, MECHANICAL <br />PENETRATIONS, ETC.) SHOULD BE IN5TALLED CONCURRENT WITH <br />5HEATHING WRAP. <br />3.) LAP UNDER COUR5E5 OF HOU5EWRAP OVER LOWER COUR5E5 <br />4 INCH AND LAP VERTICAL 5EAM5 12 INCHE5. CODE REQUIRE5 A <br />HORIZONTAL LAP OF 6 INCNE5, <br />4.) DO NOT X-GUT 5HEATHING WRAP AT OPENINGS. IN5TEAD, I -GUT <br />THE 5HEATHING WRAP, RUNNING THE KNIFE ALONG THE ROUGH <br />OPENING AT THE HEAD OF THE 51LL, AND THEN 5LITTING <br />VERTICALLY IN THE CENTER OF THE OPENING. <br />5J IF THE WALL5 ARE LAPPED WHILE THEY ARE LYING ON THE <br />DECK BEFORE 5TANDING THEM UP, BE 5URE TO ADD A COURSE <br />OF 5HEATHING WRAP TO COVER THE RIM J015T. REMEMBER, TH15 <br />COUR5E MUST LAP UNDER THE 5NEATNING WRAP ABOVE IT. <br />6.) ALWAY5 WRAP GABLE END5. TH15 PART OF A HOU5E 5EE5 A <br />LOT OF EXP05URE TO WIND -DRIVEN WATER. <br />1) ADD A 5ECOND LAYER OF 5HEATHING WRAP ALONG IN51DE <br />AND OUT5I1DE HOU5E CORNER5, LAPPING AT LEAST 9 IN. (AN <br />EVEN MULTIPLE OF 36-IN. WIDE A5PHALT FELT) ON EACH WALL, <br />8.) CONTROL 5PLA5HBACK BY SLOPING THE GRAPE AROUND <br />THE HOU5E AN KEEPING 51DING AT A5T 8 INCHE5 ABOVE E E D KEEP D LE E B E <br />GRADE. AT DECKS AND 5TOOP5 WHERE 5PLA5HBACK MAY BE <br />A PROBLEM, U5E A WIDE PEEL-AND-5TICK FLASHING MEMBRANE <br />MAKE 5URE THE MEMBRANE LAP5 UNDER THE 5HEATHING WRAP <br />ABOVE IT, <br />9.) ALL FLA5HING (FOR WINDOW5, DOORS, DECK LEDGER5, <br />ELECTRICAL FIXTURE5, VENT, PIPE5, AND CANTILEVERED <br />BEAM5) MUST LAP UNDER THE 5HEATHING WRAP ABOVE IT, DO <br />NOT RELY ON TAPE TO 5EAL THE FLASHING. <br />TAPING HOUSE WRAP: <br />MANUFACTURE5 OF PLASTIC HOU5EWRAP RECOMMENDED TAPING <br />ALL 5EAM5 TO BLOCK AIR LEAKAGE THROUGH WALL5, <br />TAPE SHOULD BE TYPE RECOMMENDED BY "51NGLE <br />5OURCE"5Y5TEM. <br />50ME TAPE 15 U5EFUL FOR 5TOPPING WATER LEAKS BY <br />REPAIRING RIP5 (PARTICULARLY TEARS AROUND 5TAPLE5) AND <br />FOR 5ECURING THE WRAP TO FLA5HING BEFORE THE SDING 15 IN <br />PLACE. <br />DO NOT PATCH OVER HOU5EWRAP AND RELY ON THE <br />5TICKINE55 OF THE TAPE TO 5EAL THE PATCH. ALWAY5 LAP <br />HOU5EWRAP AND FLA5HING5 UNDER THE PIECE OF 5HEATHING <br />WRAP ABOVE. <br />DRAINAGE PLANE: <br />WEEP 5GREED5 AND CONTROL JOINT5 CONTINUED: <br />FINISH -COAT THICKNE55: <br />ALL 5TUCCO 5Y5TEM5 APPLIED OVER FRAMED <br />OVER THE INTER5ECTION BETWEEN DIFFERENT TYPE5 OF <br />THE FIN15H COAT 15 ONLY ABOUT I/E INCH THICK, IT <br />5UB5TRATE5 5NALL INCORPORATE A DRAINAGE PLANE <br />CONSTRUCTION, SUCH A5 THE JOINT BETWEEN WOOD <br />5HOULD BE APPLIED A5 EVENLY AS P0551BLE TO <br />FRAMING AND A BLOCK WALL. <br />EN5URE UNIFORM DRYING, <br />5HEATHING WRAP FOR STUCCO: <br />ON TALL WALLS AND LONG RUNS, APPLIED VERTICALLY <br />OR HORIZONTALLY TO BREAK UP WALL AREA5 INTO <br />ALL STUCCO 5Y5TEM5 REQUIRE 5HEATHING WRAP - THE <br />5MALLER 5ECTION5 (LE55 THAN IS FEET). <br />MIX PROPORTION5: <br />PREFERRED WAY 15 DOUBLE LAYER5 OF HOU5E WRAP <br />51MILARLY, CA51NG BEAD AND CORNER BEAD HELP TO <br />UNDER 5ELF-FURRED LATH. PAPER BACKED LATH <br />CREATE EXPAN51ON JOINT5 AT CRITICAL INTER5ECTION5: <br />INCON515TENT MIXING WILL RE5ULT IN OBVIOU5 <br />COULD BE U5ED A5 THE SECOND LAYER, <br />OUT5IDE CORNER5 ARE BEST DETAILED WITH CORNER <br />DIFFERENCES IN COLOR, TEXTURE, AND STRENGTH WHICH <br />PAPER -BACKED LATH SHOULD NOT BE CONSIDERED A <br />BEAD. <br />CAN CAUSE THE BATCHES TO FAIL. MAKE EVERY EFFORT <br />5UB5TITUTE FOR WELL -DETAILED 5HEATHING WRAP. <br />TO KEEP MIX PROPORTIONS AND TIMES BETWEEN COATS <br />LAP LOWER COUR5E5 OF 5HEATHING WRAP UNDER UPPER <br />INSIDE CORNER5 SHOULD BE FLA5HED WITH TWO LAYERS <br />GON5I5TENT. <br />COUR5E5 50 WATER WILL DRAIN DOWN AND OUT, AND <br />OF 5HEATHING WRAP OR FLEXIBLE FLASHING, AND THEN <br />FL45H ALL OPENINGS, FOLLOWING THE FLASHING <br />CASING BEAD SHOULD BE APPLIED VERTICALLY TO <br />MIX IN A MECHANICAL MIXER FOR 3-5 MINUTE5 AFTER THE <br />GUIDELINE5 PER THE 6th EDITION (2011) FLORIDA <br />CREATE AN EXPAN51ON JOINT. WHILE THE FLASHING <br />ADDITION OF THE LAST INGREDIENTS. <br />BUILDING COPE-RE5IDENTIAL. <br />5ERVE5 A5 THE M05T IMPORTANT WATER SEALING <br />PROTECTION, THE JOINT BETWEEN THE TWO CA51NG BEAD5 <br />CURING AND TIME BETWEEN 5TUCCO COATS: <br />SHOULD HAVE BACKER ROD AND CAULKED WITH <br />IN5TALLATION: <br />NIGH -QUALITY URETHANE 5EALANT, A5 A FIR5T LINE OF <br />PROVIDE 5UFFICIENT M015TURE IN THE PLASTER MIX OR <br />WHERE METAL PLASTER BA5E WITH BACKING 15 U5ED, THE <br />DEFENSE. <br />BY M015T OR FOG CURING TO PERMIT CONTINUOUS <br />HYDRATION OF THE CEMENTITIOU5 MATERIAL5. THE M05T <br />VERTICAL AND HORIZONTAL LAP JOINT5 5NALL BE WRB TO <br />APPLY GA51NG BEAD (ALSO CALLED "J" BEAD), AT THE <br />EFFECTIVE PROCEDURE FOR CURING AND TIME BETWEEN <br />WRB AND LATH TO FLANGE, LATH 5NALL BE APPLIED WITH <br />JOINT BETWEEN ANY D1551MIL4R MATERIAL5 - AROUND <br />COAT5 WILL DEPEND ON CLIMATIC AND JOB CONDITIONS, <br />THE LONG DIMEN51ON AT RIGHT ANGLES TO THE 5UPPORT5, <br />WINDOW FLANGE5, WHERE STUCCO MEET5 A BRICK <br />UNLE55 OTHERWISE 5PECIFIED. <br />CHIMNEY, OR AT THE TOP OF A WALL WHERE STUCCO <br />5UFFICIENT TIME BETWEEN COATS 5NALL BE ALLOWED TO <br />LATH 5NALL NOT BE GONTINUOU5 THROUGH CONTROL JOINTS <br />MEET5 A SOFFIT OR FRIEZE BOARD. U5E CONTROL JOINT <br />PERMIT EACH COAT TO CURE OR DEVELOP ENOUGH <br />BUT SHALL BE 5TOPPED AND TIED AT EACH 5IDE. LATH <br />OR EXPAN51ON JOINT AT M45ONRY/FRAME WALL <br />RIGIDITY TO RE515T CRACKING OR OTHER PHY5ICAL <br />5NALL BE ATTACHED TO FRAMING MEMBERS WITH <br />CONNECTIONS, <br />DAMAGE WHEN THE NEXT COAT 15 APPLIED, <br />ATTACHMENT5 SPACED NOT MORE THAN 1 INCHE5 ON <br />CENTER5 ALONG 5UPPORT5. <br />THE TIMING BETWEEN COAT5 WILL VARY WITH CLIMATIC <br />FOUNDATION WEEP 5CREED 5NALL BE IN5TALLED AT THE <br />TEXTURED FINISH OVER MA50NRY: (STUCCO FIN15H) <br />CONDITION5 AND TYPE5 OF PLASTER BASE. <br />BOTTOM OF ALL FRAMED EXTERIOR WALL5, BELOW THE <br />TEMPERATURE AND RELATIVE HUMIDITY EXTEND OR <br />FLOOR LINE. WHERE WALL 15 SUPPORTED BY A FLOOR OR <br />TEXTURED FIN15N 5Y5TEM5 APPLIED IN ACCORDANCE <br />REDUCE THE TIME BETWEEN CON5ECUTIVE OPERATION5. <br />FOUNDATION, GROUND OF WEEP 5CREED 5HOULD BE MIN. I" <br />WITH A5TM C 926 AND C 1063. <br />COLD OR WET WEATHER LENGTHEN5 AND HOT OR DRY <br />OR MAX. 2" BELOW F.F.E.. <br />WEATHER 5HORTEN5 THE TIME PERIOD, MODERATE <br />LATH ATTACHMENT: <br />EXTERIOR PLASTER: <br />THE5E 5PECIFICATION5 MEET OR EXCEED THE REQUIREMENT5 OF: <br />CHANGES IN TEMPERATURE AND RELATIVE HUMIDITY CAN <br />THESE 5PECIFICATION5 MEET OR EXCEED THE REQUIREMENT5 OF: <br />5ECTION R103.12 PLASTER <br />BE OVERCOME BY PROVIDING ADDITIONAL HEATING <br />5ECTION R103.1.1 LATH <br />MATERIAL5 DURING COLD WEATHER AND BY REDUCING <br />RE515TANCE TO RAIN PENETRATION 15 IMPROVED WHERE <br />THE AB5ORPTION OF THE 5A5E BY PRE -WETTING DURING <br />I. 51DE LAP5 OF METAL PLA5TER BA5E5 5NALL BE WIRE TIED. <br />PLASTER H45 BEEN ADEQUATELY DEN5IFIED DURING <br />HOT OR DRY WEATHER <br />THEY 5NALL BE ATTACHED BETWEEN 5UPPORT5 AT INTERVAL5 <br />APPLICATION AND PROPERLY CURED, PLASTER 5NALL <br />NOT MORE THAN 9 INCNE5, <br />NOT, HOWEVER, BE CONSIDERED TO BE "WATERPROOF". <br />IN ORDER TO PROVIDE MORE INTIMATE CONTACT AND <br />PREFABRICATED CONTROL JOINT MEMBERS SHALL BE <br />BOND BETWEEN COATS AND TO REDUCE RAPID WATER <br />i <br />2, EXPANDED METAL LATH 5NALL BE LAPPED/ INCHE5 (12.7 mm) <br />INSTALLED PRIOR TO THE APPLICATION OF PLA5TER <br />L055, THE SECOND COAT SHOULD BE APPLIED A5 SOON <br />MIN, AT THE 51DE5. LAP METAL LATH I INCH (25 mm) AT END5. <br />THE CREATION OF A GROOVE OR CUT IN PLA5TER 5NALL <br />45 THE FIR5T COAT 15 5UFFICIENTLY RIGID TO RE515T <br />WHERE END LAP5 OCCUR BETWEEN THE FRAMING MEMBERS, THE <br />NOT BE CON5IDERED A CONTROL OR EXPAN51ON JOINT, <br />CRACKING, THE PRE55URE5 OF THE 5ECOND COAT <br />END5 OF THE 5NEET5 OF ALL METAL PLA5TER BA5E5 5NALL BE <br />APPLICATION, AND THE LEVELING PROCE55. <br />LACED OR WIRE TIED. <br />5TUCCO; (THREE COAT) <br />THE AMOUNT OF WATER AND THE TIMING FOR CURING <br />3, WHERE METAL PLASTER BA5E WITH BACKING 15 USED, THE <br />PORTLAND CEMENT PLA5TER WILL VARY WITH THE <br />VERTICAL AND HORIZONTAL LAP JOINT5 5NALL BE WRB TO WRB <br />TRADITIONAL THREE -COAT 5TUCCO CON515T5 OF THREE <br />CLIMATIC CONDITION5, THE TYPE OF 5A5E, AND U5E OR <br />AND LATH TO FLANGE, <br />5EPARATE LAYER5 OF CEMENT PLASTER MATERIALS: <br />NON U5E OF WATER -RETENTIVE ADMIXTURE5. <br />A TROWEL -APPLIED 5CRATCN COAT, WHICH 15 APPLIED <br />4, BACKING 5NALL BE LAPPED NOT LE55 THAN 2 INCHE5 (50 mm). <br />OVER LATH AND GROOVED TO PROVIDE A KEY WAY FOR <br />50ME M015TURE MU5T BE RETAINED IN OR ADDED BACK <br />ON WALL5, THE BACKING 5NALL BE LAPPED 50 WATER WILL <br />THE NEXT COAT: A 5AND-FINI5HED BROWN COAT, WHICH <br />TO FRESHLY APPLIED PORTLAND DEMENT -BASED <br />FLOW TO THE EXTERIOR. BACKING 5NALL NOT BE PLACED <br />KEYS INTO THE 5CRATCN COAT: AND A FINISH, OR COLOR <br />PLA5TER IF THE RELATIVE HUMIDITY 15 RELATIVELY HIGH <br />BETWEEN PLASTER BASE (LATH) AND FLANGE5 OF <br />COAT. <br />(ABOVE 15 %), THE FREQUENCY FOR RE -WETTING A <br />ACCESSORIES. METAL LATH TO METAL FLANGE CONTACT 5NALL <br />THE FIR5T TWO COATS OF A THREE COAT 5Y5TEM ARE <br />5URFACE MAY BE REDUCED. IF IT 15 HOT, DRY, AND <br />BE REQUIRED TO EN5URE THAT FLANGE5 ARE MECHANICALLY <br />MADE OF A 51TE-MIXED CEMENT PLA5TER. EACH BATCH <br />WINDY, THE FREQUENCY OF RE -WETTING MUST BE <br />LOCKED TOGETHER. <br />CONTAIN5 MEA5URED AMOUNTS OF STUCCO CEMENT, <br />INCREA5ED, <br />5. OF ATTACHMENTS FOR METAL PLASTER <br />5AND AND POTABLE WATER. <br />TO HELP REDUCE THE CRACKING THAT 15 <br />CON5IDER THE PHY5ICAL CHARACTERI5TIC5 OF THE <br />5E5 T <br />ATTACHMENTS FOR SECURING METAL PLASTER BA5E5 TO <br />ATTACH <br />BA <br />B E COMMON WITH STUCCO, THE MIX CAN BE MODIFIED <br />5TRUCTURE A5 WELL A5 THE PREVIOU5LY MENTIONED <br />FRAMING MEMBER5 5NALL BE 5PACED NOT MORE THAN 6 <br />WITH LIQUID POLYMER AE5, WHICH INCREASE <br />CONDITION5 WHEN SELECTING THE METHOD OF CURING. <br />INCHE5 O.C. INTO THE FRAMING MEMBERS, FOR DIAMOND MESH <br />STRENGTH AND IMPROVE CURING, AND WITH CHOPPED <br />THE METHOD CAN BE ONE OR A COMBINATION OF THE <br />AND FLAT RIB LATHS AND AT EACH RIB FOR % INCH (95 mm) <br />FIBERGLA55 FOR REINFORCEMENT. <br />FOLLOWING: <br />RIB LATH. <br />(1) MOIST CURING 15 ACCOMPLISHED BY APPLYING A FINE <br />6.LATH 5NALL BE APPLIED WITH THE LONG DIMEN510N AT RIGHT <br />5CRATCN COAT: <br />FOG 5PRAY OF WATER A5 FREQUENTLY 45 REQUIRED, <br />ANGLE5 TO THE 5UPPORT5, UNLE55 OTHERWISE 5PECIFIED. <br />GENERALLY TWICE DAILY IN THE MORNING <br />THE 5CRATCH COAT 15 APPLIED DIRECTLY TO A CLEAN <br />AND EVENING. CARE MU5T BE EXERCI5ED TO AVOID <br />1. END5 OF ADJOINING PLA5TER B45E5 5NALL BE 5TAGGERED. <br />BLOCK WALL OR, ON WOOD 5TRUCTURE5 OVER WRB AND <br />ER05ION DAMAGE TO PORTLAND CEMENT-BA5ED <br />GALVANIZED METAL LATH. A METAL 5CARIFING TOOL 15 <br />PLA5TER 5URFACE5. <br />USED TO CREATE "SCRATCH" LINES IN THE STILL WET <br />WEEP SCREEDS AND CONTROL JOINTS: <br />5URFACE. THE FURROW5 CREATE A ROUGH 5URFACE INTO <br />(2) PLASTIC FILM, WHEN TAPED OR WEIGHTED DOWN <br />WHICH THE BROWN COAT CAN KEY FOR A GOOD BOND. <br />AROUND THE PERIMETER OF THE PLA5TERED AREA, CAN <br />A WEEP 5CREED AT THE BOTTOM OF THE WALL AND <br />5CRATCHING SHOULD ALWAYS BE HORIZONTAL AND <br />PROVIDE A VAPOR BARRIER TO RETAIN THE M015TURE <br />OVER OPENINGS 5ERVE5 TWO IMPORTANT PURPO5E5 - IT <br />5HOULD BE 1/4 INCH DEEP. <br />BETWEEN THE MEMBRANE AND PLASTER. CARE MUST BE <br />PROVIDES A 5CREED THAT HELP5 EN5URE UNIFORM <br />EXERCI5E1) IN PLACING THE FILM: IF TOO 500N, THE FILM <br />COAT TNICKNE55, AND IT PROVIDE5 A PLACE FOR WATER <br />5CRATCN-COAT TNICKNE55: <br />MAY DAMAGE 5URFACE TEXTURE: IF TOO LATE, THE <br />THAT LEAK5 INTO THE WALL TO E5CAPE, <br />M015TURE MAY HAVE ALREADY ESCAPED, <br />THE 5CRATCN COAT SHOULD BE APPROXIMATELY 3/8 <br />FOUNDATION WEEP SCREED AT FRAME WALL5: <br />INCH TO 1/2 INCH THICK - THICK ENOUGH TO JUST COVER <br />(3) CANVA5, CLOTH, OR 5NEET MATERIAL BARRIERS CAN <br />THE5E 5PECIFICATION5 MEET OR EXCEED THE REQUIREMENT5 OF: <br />THE WIRE. <br />BE ERECTED TO DEFLECT 5UNLIGNT AND WIND, BOTH OF <br />5ECTION R103.1.2.1 WEEP SCREEDS <br />WHICH WILL REDUCE THE RATE OF EVAPORATION. IF THE <br />BROWN COAT: <br />HUMIDITY 15 VERY LOW, TH15 OPTION ALONE MAY NOT <br />ACCESSORY USED TO TERMINATE PORTLAND CEMENT BA5ED <br />PROVIDE ADEQUATE PROTECTION. <br />STUCCO AT THE BOTTOM OF EXTERIOR WALLS. TH15 ACCE55ORY <br />THE BROWN COAT (WHICH 15 ACTUALLY GRAY, LIKE <br />5NALL HAVE A 5LOPED GROUND OR 5CREED FLANGE TO <br />OTHER CEMENT 5TUCCO), 15 A 5MOOTH COAT, U5UALLY <br />PAINTING STUCCO: <br />FACILITATE THE REMOVAL OF MOISTURE FROM THE WALL CAVITY <br />RODDED WITH STRAIGHT EDGES AND WOODEN FLOATS. <br />AND A VERTICAL ATTACHMENT FLANGE NOT LE55 THAN 3 1/2 <br />IT 15 APPLIED A5 SOON A5 THE 5CRATCN COAT <br />NEWLY APPLIED STUCCO SHOULD BE ALLOWED ABOUT <br />INCHE5 LONG. <br />REACHE5 5UFFICIENT RIGIDITY TO CARRY THE BROWN <br />30 DAY5 TO CURE BEFORE PAINTING, DEPENDING ON THE <br />INSTALLATION OF EXTERIOR LATH AND FRAMING 5NALL COMPLY <br />COAT. TH1515 U5UALLY AT "THUMB PRINT HARD" AND <br />WEATHER CONDITION5 - TESTING THE PH LEVEL 15 THE <br />WITH THE APPLICATION REQUIREMENT5 OF 45TM C 1063, <br />CAN BE DONE ON THE 5AME DAY. <br />5E5T WAY TO DETERMINE PAINT READINE55, PAINT <br />MANUF. HAVE A MAX. PH LEVEL (APPROX.10). <br />STUCCO CONTROL JOINT5: <br />BROWN COAT TNICKNE55: <br />EXISTING STUCCO 5URFACE5 5HOULD BE POWER-WA5HED <br />AND ALLOWED TO THOROUGHLY DRY BEFORE PAINTING, <br />CONTROL JOINTS ALLOW FOR THE THERMAL EXPAN51ON <br />THE BROWN COAT 15 COMP05ED OF SLIGHTLY MORE <br />DO NOT U5E A WATER BLASTER, A5 THE FRE55URE CAN <br />AND CONTRACTION OF THE PLASTER MEMBRANE. <br />5AND THAN THE 5CRATCN COAT MIXTURE, AND <br />DO 5EVERE DAMAGE TO THE 5TUCCO. <br />CONTROL JOINT SHOULD BE APPLIED OVER THE METAL <br />THEREFORE IT 15 MORE MANAGEABLE BUT 5LIGNTLY <br />STUCCO 5HOULD BE PAINTED ONLY WITH <br />LATH AT EITHER A MAXIMUM D15TANCE OF IS LINEAR FEET <br />WEAKER, IT 5HOULD BE APPLIED 1/4 To 3/8 INCH THICK, <br />ACRYLIC-BA5ED PAINT5 WITH ADEQUATE VAPOR <br />OR A MAXIMUM OF 144 5QUARE FEET OF STUCCO 5URFACE. <br />APPLY THE BROWN GOAT EVENLY A5 P05515LE. AN <br />TRAN51115510N CHARACTERI5TIC5, A5 THE5E PREVENT <br />UNEVEN BROWN COAT CAN LEAD TO AN INCON515TENT <br />NEW M015TURE-RELATED PROBLEM5 WITHIN THE HOU5E. <br />THE DEPTH OF THE GROUND OF THE CONTROL JOINT <br />TNICKNE55 IN THE FINISH COAT, CAU5ING 50ME ARE45 OF <br />CONTROL JOINT BACKER ROD: <br />5HOULD BE DE5IGNED TO FIN15H FLUSH WITH THAT OF THE <br />THE FIN15H COAT TO DRY BEFORE OTHER5. THE RE5ULT5 <br />WEEP 5CREED5 AND PL45TER5TOP5. <br />15 A SPLOTCHY OR "MOTTLED" COLOR COAT AND <br />BACKER ROD 5HOULD BE U5ED TO FILL LARGE GAPS <br />EXCE55IVE HAIRLINE CRACKING. <br />AND CONTROL THE DEPTH . M05T BACKER ROD5 TODAY <br />LATH SHALL BE D15CONTINUED BEHIND THE CONTROL <br />ARE MADE OF FOAM AND COME IN DIAMETER5 FROM 1/4 <br />JOINT. <br />FINISHED COAT: <br />INCH TO 2 INCH AND UP, CH005E A BACKER ROD THAT 15 <br />JUST A LITTLE LARGER THAN THE JOINT 50 IT WILL 5TAY <br />OVER THE RIM J015T AT THE INTER5ECTION BETWEEN <br />AFTER THE CURING PERIOD, A FIN15H COAT CAN BE <br />IN PLACE AND ALLOW YOU TO CONTROL THE DEPTH OF <br />FLOOR5 TO ACCOMMODATE SHRINKAGE IN THE FLOOR <br />APPLIED, <br />THE SEALANT. <br />JOIST, <br />APPLYING SEALANT: <br />FLA5HING VENT PIPE PENETRATIONS: <br />APPLY TO CLEAN DRY 6URFACE5. APPLICATION <br />VENT PIPE5 ON WOOD AND ASPHALT ROOF5 ARE <br />TEMPERATURE: 40 DEGREE5 TO 80 DEGREES. PREPARE <br />U5UALLY FLA5HED USING A PRE A55EMBLED METAL PAN <br />THE 5URFACE U51NG THE FOLLOWING STRATEGIES: <br />WITH A RUBBER BOOT, ORDER THE UNIT ACCORDING TO <br />SCRAPE, CHIP, OR BRU5H WITH A 5TIFF-BRI5TLE BRU5H, <br />THE OUTSIDE DIAMETER OF THE VENT PIPE. FOR SLATE <br />AND DUST THE IN51DE OF THE JOINT, OR BLOW IT OUT WITH <br />AND TILE ROOFS A MALLEABLE LEAD JACKET WILL L45T <br />COMPRE55ED AIR, <br />LONGER, <br />WIPE THE 5URFACE WITH A STRONG 50LVENT, 5UCH A5 <br />ACETONE OR METHYL ETHYL KETONE, THESE 5OLVENT5 <br />FLEXIBLE FLASHING MATERIAL5: <br />EVAPORATE WATER AND D155OLVE GREA5Y 5U55TANCE6 <br />THAT CAN RETARD ADHE510N. <br />FLEXIBLE FLASHING- 5ELF-ADHERING BITUMINOU5 <br />TOOL EVERY CAULK JOINT. THE BEST TOOL 15 A STEEL <br />TAPE -SHOULD BE U5ED TO FLASH ALL OF THE FOLLOWING: <br />5PATULA THAT 15 SLIGHTLY 5MALLER THAN THE WIDTH OF <br />EXTERIOR DOOR 51LL5: DECK LEDGER5: IN510E AND OUTSIDE <br />THE JOINT, ACHIEVE A SMOOTH, EVEN APPEARANCE <br />CORNER5 OF WALL 5HEATHING: 5TUCCO 5HELVE5 AND <br />WITHOUT 5QUEEZE-OUT ON THE 51DE5. <br />PARAPETS: BELOW GRADE CONCRETE CRACKS: AND WALL <br />CUT THE NOZZLE OF THE TUBE AT AN ANGLE SLIGHTLY <br />AREA 5UBJECT TO 5PLA5HBACK. <br />5MALLER THAN THE 51ZE OF THE JOINT. <br />IN COLD WEATHER, KEEP THE CAULK WARM. AL50 IT MAY <br />FLEXIBLE FLA5HING5 COME IN 5EVERAL VARIETIE5, INCLUDING <br />BE NECE65ARY TO NEAT THE 5URFACE WITH A NEAT GUN. <br />"PEEL -AND 5TICK" PRODUCT5, A5 WELL A5 NON-STICK <br />TAKE CARE TO NOT 5TRIP THE PAINT OF START A FIRE. <br />PRODUCT5. <br />ROOFING: FLA5HING: <br />RUBBERIZED FLA5HING5: <br />LENGTH. <br />5ELF-ADHE5IVE, RUBBERIZED ARE MADE FROM THE SAME <br />MATERIAL5 A5 THE EAVES MEMBRANES U5ED TO PREVENT ICE <br />TO AVOID EXCE551VE EXPANSION AND CONTRACTION, <br />DAM LEAKS. TYPICALLY AVAILABLE IN ROLL5 FROM 4-12 IN. <br />USE 8 FOOT TO 10 FOOT LENGTHS OF METAL, MAXIMUM, <br />WIDE (BUT 50METIME5 AVAILABLE UP TO 36 N. WIDE), THESE <br />FOR VALLEY FLASHING. AVOID U51NG ALUMINUM, WHICH <br />FLEXIBLE FLA5HING5 CAN BE APPLIED DIRECTLY TO THE <br />EXPAND5 AT A GREATER RATE THAN OTHER METAL5. <br />5HEATHING, A5 LONG A5 THE SURFACE 15 WARM AND <br />LAP SECTION5 8 INCHE5 MINIMUM. <br />RELATIVELY CLEAN. <br />VALLEY CENTERLINE: <br />TNICKNE55 VARIE5 FROM 25- TO 60-MIL5. THE THINNER THE <br />MATERIAL, THE E451ER IT CAN BE FOLDED AND TUCKED <br />WHEN A STEEP ROOF INTER5ECT5 A 5HALLOW ONE, WATER <br />BENEATH 51DING, BUT AL50 THE EA51ER IT WILL TEAR AND <br />CA5CADING DOWN THE 5TEEP ROOF CAN OVER5HOOT <br />DEGRADE IN THE 5UNLIGNT. <br />THE VALLEY AND RUN UP BENEATH THE 5NINGLE5 ON THE <br />SHALLOW ONE. ROOF5 LIKE THIS NEED A VALLEY <br />CLIMATE CAUTIONS: <br />FLASHING WITH A CRIMPED CENTERLINE. THE 5TEEPER <br />THE ROOF THE MORE CRITICAL THE CRIMP WILL BE. <br />IN WARM TEMPERATURE5, WHEN RUBBERIZED ASPHALT 15 THE <br />5TICKIE5T, IT 15 NEARLY IMP0551BLE TO REP051TION IT ONCE <br />EDGE TREATMENT5: <br />THE FLA5HING HA5 TOUCHED THE SURFACE. MAKE SURE TO <br />DRY -FIT BEFORE PULLING THE RELEASE PAPER IT 15 AL50 <br />LIKE ALL ROOF FLASHING, VALLEY FLA5HING SHOULD <br />VERY DIFFICULT TO HANDLE ALONE WHEN IT 15 5TICKY, <br />HAVE HEMMED EDGES. NOT ONLY DO THE5E 5HED WATER <br />MORE EFFECTIVELY, BUT HOLDING THE, 5HINGLE AWAY <br />IN NOT TEMPERATURE5, RUBBERIZED ASPHALT TEND5 TO OOZE, <br />FROM THE FLA5HING, THEY PREVENT CAPILLARY 5UCTION <br />MAKING IT ME55Y TO HANDLE, IN 5UNBELT AREA5 (OR <br />FROM DRAWING THE WATER UP UNDER THE 5HINGLE. <br />WHEREVER 5URFACE TEMPERATURE5 MAY EXCEED 180T), AVOID <br />U51NG WITH METAL FLA5HING5: THE FLA5HING5 WILL COOK AND <br />RIDGE TREATMENT: <br />THE A5PHAULT 50ON DRIE5 OUT, <br />VALLEYS THAT MEET AT A RIDGE 5HOULD BE SOLDERED <br />IN COLD WEATHER, 5ELF-ADHEREING FLA5HING5 OFTEN DON'T <br />TO ONE ANOTHER. HOWEVER TH15 CONNECTION MAY <br />STICK WELL. CHECK THE MANUFACTURER'S MINIMUM APPLICATION <br />BREAK WHEN THE VALLEY METAL EXPANDS AND <br />TEMPERATURE. 50ME STICK IN TEMPERATURE5 BELOW 25' F, BUT <br />CONTRACTS. BEST PRACTICE CALL5 FOR COVERING THE <br />M05T REQUIRE 5URFACE TEMPERATURE5 OF 40T OR GREATER. <br />CONNECTION AT THE RIDGE WITH A MOLDABLE PIECE OF <br />LEAD FLASHING. <br />COMPATIBILITY: <br />FA5TENER: <br />DO NOT U5E RUBBERIZED A5PHALT AND BUTYL TAPES <br />TOGETHER, ON CONCRETE, MA50NRY, OR 058, RUBBERIZED <br />METAL VALLEY CAN BE FASTENED WITH NAILS OR CLEATS <br />FLA5HING5 MAY NOT 5TICK WELL UNLE55 A PRIMER 15 APPLIED. <br />AT 2 FEET ON CENTER. CLEAT5 ARE BETTER± THEY WILL <br />ON THESE SURFACES, A BUTYL FLASHING WORK5 BETTER, <br />NOT BECOME FATIGUED AND 5HEAR WHEN THE METAL <br />EXPANp5 AND CONTRACTS. <br />POLY V5. FOIL: RUBBERIZED FLA5HING5 TYPICALLY COME WITH <br />WHEN U51NG NAILS, PLACE THEM AT LEAST 5 INCHE5 AWAY <br />A POLYETHYLENE OR FOIL COVERING TO PROTECT THEM FROM <br />FROM THE VALLEY CENTER TO PREVENT LEAKS. <br />SUNLIGHT. POLY -COVERED PRODUCTS NEED TO BE COVERED <br />FROM 5UNLIGNT WITHIN 30 TO 90 DAYS± FOIL -COVERED TAPES <br />VALLEY TREATMENT: <br />HAVE NO EXACT EXF05URE LIMITATION5 BUT EVENTUALLY WILL <br />DRY OUT AND BECOME BRITTLE, ANY 5HIFT IN 5URFACE <br />METAL VALLEYS SHOULD BE FABRICATED FROM NO LE55 <br />MOVEMENT WILL PULL AT THE BOND UNTIL EITHER THE BOND <br />THAN NO.28-GAUGE CORROSION 5NEET METAL. <br />FAIL5 OR THE MEMBRANE CRACK5. <br />45PHALT 5NINGLE5, VALLEY FLA5HING MU5T EXTEND AT <br />LEA5T 8 INCHE5 ON EITHER 5IDE OF THE CENTERLINE. <br />EXP05ED APPLICATION5: IN PERMANENTLY EXP05ED <br />WOOD 5NINGLE5, THE WING OF THE VALLEY MU5T EXTEND <br />APPLICATIONS, U5E AN EPDM FLA5HING TAPE INSTEAD OF AN <br />10 INCHE5 EACH 5IDE OF CENTERLINE. <br />INEXPENSIVE FLEXIBLE FLASHING MATERIAL. THE DRAWBACK <br />5LATE, TILE, AND WOOD 5HAKE5, A VALLEY MUST EXTEND <br />WITH EPDM TAPE 15 THAT IT'5 EXPENSIVE, A5 WELL A5 QUITE <br />11 INCHE5 EACH 5IDE OF CENTERLINE. <br />THICK ( ABOUT 10-MIL), MAKING IT AWKWARD TO FOLD INTO <br />5MALL AREA5. <br />SECTION OF ROOF FLA5HING MUST HAVE AN END LAP OF <br />AT LEAST 4 INCHE5 FOR WOOD 5NINGLE5 AND 5HAKE5, <br />BUTYL RUBBER FLA5HING5: <br />AND AT LEA5T 6 INCHE5 FOR 5LATE AND TILE ROOFS, <br />DO NOT USE BUTYL FLASHING NEAR ANY ASPHALT -BASED <br />PRODUCT5. THE BUTYL AND THE 45PHALT PRODUCT5 <br />FRONT WALL FLA5HING: <br />WILL BOTH DRY OUT FASTER AND L005E THEIR ADHESION. <br />IN5TALL UP THE ROOF UNTIL YOU REACH THE BA5E OF <br />NONSTICK FLA5HING5: <br />THE VERTICAL WALL. ADJU5T THE EXP05URE OF THE LAST <br />FEW COUR5E5, IF NECE55ARY, 50 THE LAST COURSE 15 AT <br />NOT ALL FLEXIBLE FLA5HING5 ARE SELF -ADHERING. 50ME MU5T <br />LEA5T 8 INCHE5 WIDE, <br />BE SECURED WITH 5TAPLE5 OR ROOFING NAIL5. WHILE <br />CUT AND BEND A CONTINUOU5 METAL FLASHING 5TRIP <br />GENERALLY THINNER AND THE QUICKEST WAY TO DETERIORATE <br />THAT EXTEND5 AT LEAST 5 INCHE5 UP THE VERTICAL <br />IN SUNLIGHT, THESE ARE OFTEN THE BEST CHOICE FOR APPLYING <br />WALL AND AT LEA5T 4 INCHE5 OVER THE LA5T 5HINGLE <br />BENEATH 51DING AND TRIM IN CON515TENTLY COLD <br />COUR5E. <br />TEMPERATURE5, OR WHEN THE 5URFACE 15 ROUGH AND <br />WHEN IN5TALLING THE METAL FLASHING 5TRIP OVER THE <br />DIRTY-FACTOR5 THAT CAN DIMIN15H THE BOND OF <br />L45T 5NINGLE5, EMBED IT IN ROOFING CEMENT AND NAIL <br />PEEL-AND-5TICK FLA5HNG5. COVER NONSTICK FLASHING A5 <br />IT TO THE ROOF ONLY. <br />50ON A5 P05518LE TO PROTECT IT FROM 5UNLIGHT. <br />DO NOT NAIL THE FLASHING 5TRIP TO THE WALL. <br />APPLY AN ADDITIONAL ROW OF 5NINGLE5 - TRIMMED TO <br />DRAINAGE PLANE: <br />THE WIDTH OF THE FLASHING - OVER THE FLA5HING AND <br />EMBEDDED IN A51PIHALT PLASTIC ROOFING CEMENT. <br />AN AIR SPACE BEHIND THE 51DING (1/4-TO 3/8-INCNE5 I5 <br />ENOUGH) WILL ALLOW WATER TO DRAIN AND THE BACKSIDE OF <br />61DEWALL FLASHING: <br />51DING TO DRY, <br />SHINGLE ROOFS (ASPHALT, 5LATE, OR WOOD) THAT BUTT <br />WELL DRAINED WALL 5Y5TEM5: <br />AGAINST VERTICAL WALL5 ARE BEST PROTECTED BY <br />METAL STEP FLA5HING PLACED OVER THE END OF EACH <br />DIFFERENT 51DING5 CALL FOR DIFFERENT DRAINAGE DETAIL5, <br />5HINGLE COURSE, <br />TYPICAL DETAIL5 FOR WELL -DRAINING WALLS ARE 5HOWN FOR <br />DIFFERENT TYPE5 OF 51DING: <br />CUT 5TEP FLA514ING PIECE5 TO BE 10 INCHE5 LONG AND 2 <br />INCHE5 WIPER THAN THE 5HINGLE EXP05URE E.G.1 <br />BOARD 51DING, SNAKE AND 5HINGLE 51DIING AND VINYL SIDING. <br />INCHE5 FOR ROOF 5NINGLE5 WITH A 5 INCH EXP05URE. <br />IN EACH CASE, AN AIR SPACE MU5T BE CREATED BEHIND THE <br />BEND THE 10 INCH LENGTH TO EXTEND 5 INCHE5 OVER <br />51DING AND AN EXIT PROVIDED FOR THE WATER TO DRAIN OUT, <br />THE ROOF DECK AND 5 INCHE5 UP THE WALL 5URFACE, <br />FLASHING DETAIL5: <br />I.) NEVER RELY ON THE 5TICKINE55 OF PEEL-AND-5TICK <br />FLA5HING5 FOR 5HEATHIN6: THE BOND 15 UNLIKELY TO LA5T <br />OVER THE LIFE -SPAN OF THE HOU5E, <br />2.) ALWAY5 LAP FLASHING UNDER THE SHEATHING WRAP ABOVE. <br />FLA5HING WINDOW5: <br />DO NOT X-GUT 5HEATHING WRAP AT OPENINGS, IN5TEAD I -CUT <br />THE 5HEATHING WRAP, RUNNING THE KNIFE HORIZONTALLY ALONG <br />THE ROUGH OPENING AT THE HEAD OF THE SILL, THEN 5LITTING <br />VERTICALLY IN THE CENTER OF THE OPENING. TH15 WAY, THE <br />WINDOW FLANGE CAN BE 5LIPPED UNDER THE 5HEATHING WRAP <br />WHEN IN5TALLING THE WINDOW. <br />SILL DETAIL5: INSTALL A BEVELED CANT 5TRIP OR NARROW <br />DAM 5TRIP TO THE ROUGH OPENING 51LL, THEN WRAP THE 51LL <br />WITH 5HEATHING WRAP OR A FLEXIBLE FLASHING MEMBRANE. <br />MAKE 5URE TH15 MEMBRANE DRAPE5 OVER THE 5HEATHING <br />WRAP BELOW, <br />ALL 5HEATHING WRAPS MU5T BE INTEGRATED WITH FLASHING <br />MATERIAL5. IT'5 NOT ENOUGH TO WRAP A HOU5E, AND THEN <br />51MPLY X-CUT THE OPENINGS AND FOLD THE FLAP5 INSIDE, <br />FOLLOW THE GUIDELINE5 FROM THE DETAIL 5NEET5 WHEN <br />IN5TALLING ANY 5HEATHING WRAP, <br />WINDOW AND DOOR 5PLINE5: <br />WINDOW5 AND DOORS 5HOULD BE FLASHED WITH FELT PAPER <br />OR FLEXIBLE FLASHING 5PLINE5. THE 5PLINE5 5HOULD BE <br />INSTALLED AFTER THE SILL FLASHING, AND THE 5HEATHING WRAP <br />SHOULD GO ON AFTERWARD5 OR BE SLIT 50 IT LAPS OVER THE <br />5PLINE5. <br />FLANGED WINDOW HEAD5 DO NOT NEED ADDITIONAL FLA5HING. <br />THE NAILING FIN WILL DO A GOOD JOB SEALING THE HEAD IF IT <br />CAN BE TUCKED BENEATH THE 5HEATHING WRAP WHEN THE <br />WINDOW 15 INSTALLED. LEAVE A 1/4-IN. GAP BETWEEN THE <br />51DING AND THE WINDOW ALONG THE HEAD, BUT DO NOT CAULK <br />TH15 GAP: OTHERWISE, WATER THAT RUN5 BEHIND THE 51DING <br />ABOVE WON'T HAVE A PLACE TO DRAIN. <br />IF THE FLANGE CANNOT BE TUCKED UNDER THE 5HEATHING WRAP <br />WHEN THE WINDOW 15 INSTALLED, 5LIT THE WRAP AND ADD HEAD <br />FLASHING. <br />UNFLANGED WINDOW5 WILL NEED A ADDITIONAL METAL <br />Z-FLA5HING ABOVE THE HEAD CA51NG OR BRICK MOLD. MAKE <br />SURE TH15 Z-FLA5HING LAP5 UNDERNEATH THE 5HEATHING WRAP. <br />MULLED WINDOW5 AND WINDOW WALLS MU5T HAVE A CONTINUOU5 <br />HEAD FLASHING: THE MANUFAGTURER'5 MULLION COVER WILL <br />NOT PREVENT WATER FROM RUNNING BETWEEN THE WINDOW UNIT5 <br />FROM ABOVE. <br />ROUND -TOP WINDOW5 5HOULD BE FLASHED WITH <br />PEEL-AND-5TICK FLEXIBLE FLASHING. 5LIT THE 5HEATHING <br />WRAP AND SLIP IT UNDERNEATH, LETTING IT DRAPE OVER THE <br />WINDOW TOP. THEN CUT THE FLASHING TO CONFORM TO THE <br />NAILING FIN. RELY ON PROPER LAPPING OF THE FLASHING, NOT <br />ON CAULK, <br />FLA5HING DOOR5: <br />OVER WOOD FLOOR5, DOOR THRE5HOLD5 SHOULD BE FLASHED <br />WITH A METAL PAN OR Z-FLASHING. 5LA55 5HOULD BE FORMED <br />WITH A "5EAT" TO HOLD THE THRE5HOLD. <br />FLASHING LEDGER5 AND BEAM5: <br />LEDGER FLASHING NEEDS TO BE MORE THAN A Z-FLA5HING <br />RUNNING ALONG THE TOP EDGE OF THE LEDGER BOARD. USE <br />METAL COIL 5TOCK SLIPS UNDER THE 5HEATHIN6 WRAP ABOVE <br />THE LEDGER, AND DRAPE5 OVER THE 5HEATHING WRAP BELOW <br />THE LEDGER <br />ALTERNATIVELY, BUILD A DECK COMPLETELY FREE-5TANDING <br />FROM THE WALL, OR IN5ERT 5PACER5 BETWEEN THE LEDGER <br />BOARD AND THE WALL, 50 IT 5TAND5 OUT AND ALLOW5 WATER <br />TO DRAIN FREELY, <br />CANTILEVERED DECK OR BALCONY J015T5 THAT PROTECT <br />THROUGH THE WALL FRAMING ARE TROUBLE 5POT5. FLA5H WITH <br />TWO-PIECE FLASHING MEMBRANE. <br />FLA5HING WALL PENETRATION5 <br />FIXTURE5: IN5TA ELECTRICAL OX 5 AN <br />ELECTRICAL RE LL ELE R L B E D <br />LIGHTING FIXTURE5 ON HEMMED METAL FLA5HING5 PLATE. DO <br />NOT TAPE THE PLATE OVER THE 5HEATHING WRAP{ 5LIT THE <br />5HEATHING WRAP AND TUCK IT BENEATH. <br />MECHANICAL PENETRATION5: GA5 LINE, CONDUIT, WATER <br />5PIGOT5, AND SMALL PENETRATION5 5HOULD BE FLA5HED WITH <br />TWO-PIECE METAL FLASHING PLATE. 5EAL THE TWO PLATE5 WITH <br />"LOW MODULE5" URETHANE CAULK. <br />51DEWALL FL45HING: <br />5ECAU5E OF THE VOLUME OF WATER THAT CAN POUR DOWN A <br />5LOPED ROOF, ONE OF THE M05T CRITICAL FLASHING DETAIL5 <br />OCCURS WHERE A ROOF INTER5ECT5 A 51DEWALL. THE ROOF <br />SHOULD BE FLASHED WITH A 5TEP FLASHING. WHERE THE ROOF <br />TERMINATE5, INSTALL A KICK -OUT TO DEFLECT WATER AWAY <br />FROM THE 51DING, THOUGH NOT ALWAYS P0551BLE IN THE <br />SCHEDULE, IT'5 BE5T TO INSTALL A FULL 36-IN. PIECE OF <br />RUBBERIZED A5PHALT FLASHING ON THE WALL BEFORE THE <br />5U5FA5CIA AND TRIM BOARDS ARE NAILED IN PLACE, AND THEN <br />COME BACK TO INSTALL THE KICKOUT. <br />DAVIS BEWS <br />DESIGN GROVP <br />150 STATE STREET EAST <br />OLDSMAR, FLORIDA 34677 <br />813.925.1300 TEL <br />813.925.1800 FAX <br />W W W.DAVLSBEWS.C,OM <br />TAMI'A • DENVER <br />�-� EST. 1994 <br />0 <br />zC) <br />N <br />0�o <br />Fes+ Ln M O <br />0 j ro Ln <br />a U) <br />LJ�u� <br />CL <br />a' U Q 00 <br />00 <br />z� z < E <br />w wo <br />J O <br />d- <br />M <br />oZ <br />o <br />w� <br />za <br />z� <br />�a <br />wa�� <br />� oago <br />H �=yozz <br />¢ O C J <br />LI <br />OL1J N <br />w Iwo <br />oL0 <br />Q ZZ <br />rQ <br />�z <br />z <br />Z g <br />D O U� <br />o U aJ <br />Q <br />� Z <br />p� O w <br />oC <br />Lu <br />z Q�W <br />z <br />Lu <br />z U z z O <br />OU <br />w z <br />� O �z <br />z Q Lu <br />ca z 2 �, <br />0 g F m <br />SCALE : AS NOTED <br />DATE : 10-19-2018 <br />VERSION NO. <br />ino <br />SHEET NO. <br />DT6 <br />