Laserfiche WebLink
INSTALL 6' SELF -ADHERING <br />MEMBRANE FLASHING OVER <br />O <br />TOP, SIDE(S) AND BOTTOM <br />FINISH <br />FLANGES OF NON -MOVABLE <br />FRAME OF THE EXHAUST. <br />(D' SELF ADHESIVE <br />sEcLO CE OF FLASHING TO BE, <br />1. BOTTOM. 2. 8I218. b. TOP <br />OVER TOP t SIDES <br />X VENT CAP IS TO BE SET IN BED <br />SELF <br />?D SHEATHING <br />OF SEALANT AT TOP AND <br />FLASHING <br />LAYER -1, <br />61DES ONLY. SEALANT IS TO BE <br />UNIT <br />STUCCO WRAP <br />I . TOOLED SO AS TO DEFLECT <br />I WATER AWAY FROM JOINTS. <br />LAYER 7, FORTIFIBER <br />1441 <br />RL327 BLVD <br />4, <br />PREMANLIF. DRYER <br />BUILDING PAPER <br />O GWOORONALD <br />LONOWOOD, FL 32780 <br />X, BEAD ALL AROWD <br />VENT -APPLY <br />VENT -APPLY SEALANT ALL <br />T VENT GAP (SET M <br />METAL LATH <br />PH:407-7748078 <br />r JOINTS AND INTERSECTIONS <br />CONT. SEALANT) <br />WOOD Tom, TEXTURED <br />-FINISH 0 WOOD <br />FAX:407-7744078 <br />www.abdeslgrkgroup.com <br />APPLY SEALANT AT PERIMETER O= <br />BACKER ROD NON -MOVABLE FRAME AND STUCCO <br />z <br />CONSTRUCTION <br />FASTEN TO WOOD STRUGNRAL <br />MEMBER • T' O.G. MAX <br />AA *: 0003325 <br />ON ALL BIDES,A CAULKING • JOINT <br />ALL AROUNDSrind <br />SEALANT s <br />a Cm <br />I I <br />TOP t SIDES <br />%• rolf• MIO.waL� <br />PER SECTION <br />UIEP BCIIED <br />plS <br />EtdaTfor kthMa ataRlRq <br />pla <br />BACKER ROD Exterior use of d cement plaster <br />shall comply withth the the application <br />6 B DRYER VENT (BLOCK) <br />+ f <br />requirements of ASTM C 926.12A. <br />:Y. <br />6' WIDE STRIP SELF <br />R. ADHESIVE RASH11! CLEAN <br />k Installation of exterior lathing and framing <br />shall comply with ASTM C 1063-12A. <br />i <br />MAaOINRY BEFORE APPLYING <br />WRB LAYER M, <br />WRAP �X' <br />MASONRYSTUCCO <br />HOODED VENT <br />BUILDING PAPER <br />OVER 'QUICK <br />FLASH' r — — — —1 <br />HORIZONTAL WEEP SCREED <br />i•THICIC3COAT CEMENT <br />PLASTER <br />— <br />(FRAME TO BLOCK <br />METAL LATH <br />- - <br />WRB LAYER 7, FOFrr FIBER <br />PIPE THROUGH <br />WALL <br />BUILDING PAPER <br />WOOD SHEATHING <br />14 <br />v <br />41 <br />6• SELF ADHESIVE <br />V DRYER VENT (FRAME <br />FLASHING (INSTALL <br />g <br />PER MANUF. SPECS-) {r <br />BUILDING PAPER <br />UNDER 'CUICK FLASH' <br />WRB LAYER °I, <br />CUT OPENING; IN STUCCO WRAP <br />APPROVED HOUSEWRAP <br />;IE <br />FOR BOX INSTALLATION %; <br />CUT 'X' INTO <br />VENT PENETRATION WRB LAYER 'I, SELF -ADHERING <br />STUCCO WRAP MEMBRANE FLASHING <br />SCALE: NITS. <br />APPLY SELF -ADHERING <br />WOOD SHEATHING MEMBRANE FLASHING <br />OVER BOX AND OVER <br />L9 <br />APPROVED WR5 LAYER <br />M <br />STEP #1 <br />STEP <br />#2 <br />APPROVED <br />HOUSEWRaP <br />BELOW <br />tim LAYER 01, <br />STUCCO WRAP <br />ELEC. METER FIELD <br />I <br />VERIFY LOCATION <br />ELEC, METER FIELD <br />VERIFY LOCATION <br />CUT SUCH THAT <br />9 <br />APPLY 6m MIN <br />SELF -ADHERING <br />NO MEMBRANE <br />GRADE 'D' FELT <br />® <br />MEMBRANE FLASHING <br />ENTERS BOX, <br />- <br />OVER <br />APPLY STUCCO SCRATCH COAT <br />APPLY TO FACE <br />SELF -ADHERING <br />AND ONE (1) LAYER OF PAINT <br />EDGE <br />R APROVED <br />PRIOR TO INSTALLING ELEC. <br />?; .... <br />;? <br />NOUSEWRAP <br />Ilk- <br />METER <br />WRB LAYER'1, FORTIFIBER <br />BUILDING PAPER <br />CAVITY TO BE FILLED <br />STEP #3 <br />WITH RIGID POLYMERIC <br />6TEP <br />#4 <br />LEGEND <br />ISOCYANOTE-POLYBLEND FOAM <br />('GREAT STUFF' OR SIMILAR) <br />APPLY A SILICON <br />ELASTOMERIC <br />DRAINAGE PLANE (WRB <br />BASE SEALANT AT POINT <br />COATING OVER <br />STUCCO/ C.V. FINISH <br />LAYER al STUCCO WRAP) <br />THAT ELEC WIRE PENETRATES <br />(8EE TYPICAL WALL <br />ac7Haly. tk LOT <br />SILVERADO <br />LOT #41 <br />BLK #18 <br />PROJECT* <br />04128.002-411 1 <br />MCDZI s <br />4EBB <br />"1828—CALI" <br />GARAGE BIIITTG: <br />RIGHT <br />PAGE: <br />WALL <br />ASSEMBLY <br />DETAILS <br />150 MPH EXP. B <br />APPLY E-2 BEAD— <br />OVERo.o.e ° SECTION) <br />WRB LAYER a2 (FORTIFIBER — - — — — — GRADE DMIN <br />BUILDING PAPER) AREA TO RECEIVE FELT -PROVIDE METAL LATH <br />STUCCO SCRATCH COAT SEALANT AT ALL <br />METAL LATH X—X—X—X 4 1 COAT OF PAINT W/SACK- JOINTS AND <br />ROLL PRIOR TO INTERSECTIONS ° ...... <br />STUCCO ELEC. METER INSTALLATION PROVIDE STUCCO SCRATCH <br />COAT LARGER THAN THE ELEC. <br />WOOD SHEATHING ® METER CAN OR METER CAN <br />COMBO OR METER CAN AND 23 <br />SELF-ADHESIVE FLASHING — — — — — DISCONNECT STEP 05 STEP 4*6 <br />OT : DATW. 07/27/20 <br />METAL LATH: LATH TO BE PER SECTION ELECTRICAL CONDUIT OELECTRICAL RECEPTACLE ECALE:1/4"=V-0" <br />R103.1.1 / ASTM C-841-OS, MIN. 2.5 LBS. O PENETRATION °HEFT <br />PER 50. YARD (UTILITY OR NOMINAL WA2 <br />LATH DOES NOT MEET SPECIFICATIONS) <br />