My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
35621 Burma Reed Dr
Zephyrhills
>
Building Department
>
Building Plans
>
35621 Burma Reed Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 10:16:51 AM
Creation date
2/19/2025 12:24:47 PM
Metadata
Fields
Template:
Building Plans
Street #
35621
Location
Burma Reed Dr
Contractor
DR Horton
Building Plans - Permit #
387
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#5 CORNER BAR W/ 30' LAP FOR EACH <br />COURSE OF BOND BEAM <br />VERTICAL REBAR W! 10' HOOK <br />TYPICAL <br />BAR IN BOND BEAM <br />REINFORCING OF BOND BEAM <br />NOTES TO THE INSPECTOR/CONTRACTOR TYP 8'XB• <br />1. PLACE LINTEL ACROSS TOP OF OPENING. BOND BEAM <br />2. IF BOTTOM STEEL IS REQUIRED PLACE #5 BAR IN LINTEL. B+ <br />3. PLACE MASONRY UNITS AS REWIRED TO ACHIEVE THE REQUIRED BEARING <br />PLACE STEEL HEIGHT. <br />�OF REINFORCING (12) 4. THE LAST COURSE WILL BE A BOND BEAM WITH (1) #5 BAR CONTINUOUS AROUND <br />AS DEPICTED HEREIN. STRUCTURE. A DOUBLE BOND BEAM MAY BE SPECIFIED SO THAT THEN THE LAST 1#5 <br />J \Y TWO COURSES ARE BOND BEAMS WITH A #5 BAR IN EACH COURSE. TYR 8'xt6' o <br />CWR ELOFBONDBEAMBSOMITTEDANDAILDINTE ISAPLNCED.THESOTEOM BOND BEAM <br />REINFORCING FOR THE BOTTOM BOND BEAM IS TO BE CONTINUOUS THROUGH THE 1 #5 <br />/ TOP OF THE LINTEL. �" g <br />pYAS� �\ P'�O 6. UN0 COMPOSITE MASONRY BEAM IS TO BE NOT LESS THAN IS'DEEP. <br />ND TOP OF <br />BxEAM W/ (B #5 BARU BOND BEAM <br />'\Q� a EACH COURSE <br />8x8 BOND BEAM T <br />• �OQ�G�\ W/(1)#S BARF = FILLED W/ GR.30" <br />I .\\\ UNFILLED GROUT SOLID FROM OF OPENING <br />NOMILINTEL TO TOP OF BONWIDTH /#OF #5'S, IN 2ND BONDBEAM,IF FILLED LINTEL#5 <br />BEAM OQURSESEE NOTE5 <br />T/1 M/OB B�PRE-CAST CONCRELINTEL W/ (1) s BAR(L2LENGTH OF BAR - WIDTMASONRY <br />Q' HEIGHT # OF WS, TOPCORNER 9 OPENING -2'IT IS THIS ENGINEEfl'9 #YTENT BOND BEAMCWRSE ORBEAM DESIGNATION <br />THATXFXX-tT/iMroBINOIGATESADDUBLE BOND BEAM #OF #55, BOTTOM 8x8 PRE CAST CONCREAND XFXX- 1TAMmB INDICATES A SINGLE BOND BEAM PLACED IN LINTEL LINTEL, W/O STEEL(LI) IT IS THIS ENGINEER'S INTENT ANDXU1IX - 1TAM/OB INDICATES A DOUBLE BOND BEAM ABOVE UNFILLED TO PLAN FOR LOCATK) <br />UNTEL OF OPENING <br />AND XUX( -1TPoMNB INDICATES ASINGLE BOND BEAM ABOVE UNRLLED LINTEL <br />PRECAST HEADER(MIN) <br />DBL. BOND BEAM <br />AT HIGHER ELEVATION <br />2x4 (MIN 2 X 3) 1-3116 <br />TAPCON OR DRIVE PIN (MIN <br />SHANK SIZE.145 MIN HEAD <br />DBL. BOND BEAM <br />SIZE.300 MIN EMBEDMENT 1 <br />AT LOWER ELEVATION <br />WINDOW <br />1/4') 8' FROM EACH END AND <br />18' O.C. MAX. MIN 1-1/4' <br />96 BAR BENT <br />AS SHOWN <br />EMBEDMENT <br />2z6 2 X 3) 2-3/16 TAPCON <br />(MIN <br />OR DRIVE PIN (MIN SHANK <br />PRECAST"a 1 M' <br />SIZE.145 MIN HEAD SIZE .300 <br />WINDOW <br />MIN EMBEDMENT 1 1/4') 8- <br />70, 'LID <br />SILL <br />FROM EACH END AND 18' <br />a SLOPE <br />O.C. MAX. MIN 4' <br />o <br />m <br />EMBEDMENT <br />2z8 (MIN2X 3, 2. S <br />OPEN FACE SHELL SO <br />- <br />TAPCON OR DRIVE PIN (MIN <br />AS TO ALLOW BENT <br />SHANK SIZE.145 MIN HEAD <br />BAR TO BE PLACED IN <br />SIZE .300 MIN EMBEDMENT 1 2X4 SOLID BLOCKING <br />UPPER AND LOWER #5 MIN. REQUIRED IN <br />1e' FROM EACH END AND SECURE TO BREATHING WI <br />/7116"OSS <br />BOND BEAM EACH CELL HOOKED IN <br />8' O.C. MAX. MIN 1-1/4' MIN. 2-12d PER BLK. EA. END <br />VCMU <br />TOP BOND BEAM W/ <br />EMBEDMENT <br />EMBEDMENT <br />STANDARDACI HOOK <br />SHEATHING <br />CORNER BARS <br />TYPICAL MASONRY WINDOW <br />WALL <br />AT CORNER STEP <br />SILL CONSTRUCTION <br />ARCHWAY FRAMING DETAIL <br />3 <br />w <br />4 <br />G <br />`� SCALE: 3l4'=1'-0' <br />SCALE: 3/4'=1'-0' <br />BCALE:11/2'=1'-0' <br />PROVIDE 3' DIA. HOLE IN <br />LINTEL SO THAT VERT. <br />REINF. BAR CONTINUES <br />THROUGH LINTEL. <br />I <br />> I <br />I <br />SINGLE #5 CORNER <br />4 <br />BAR, 30x30 TURNED UP <br />OR TURNED DOWN INTO STEEL REINF. OF <br />FILLED CELL BONG. BEAM <br />SxB CMU PIER <br />PROVIDE #5 BAR <br />W/ SINGLE OR DOUBLE REINF. SARIS), <br />AT EACH S <br />IDE <br />p <br />SEE PLAN. <br />I) / <br />STEEL REINF. OF OF ELEVATION <br />ENSURE THAT PIER GROUTS BENEATH <br />BOND. BEAM CHANGE <br />'1 ' LINTEL. <br />CHANGE IN <br />//�fU1y <br />ELEVATION OF BOND BEAM <br />7 SCALE: <br />3/4'=V-0' <br />SINGLE LINTEL, MULTIPLE OPENINGS <br />6 SCALE: 3/4'=1'-0' <br />1 N. RONALD REAGAN BL <br />LONGWOOD, FL 32750 <br />PH: 407-7746078 <br />FAX: 407-7744078 <br />www.abdesigngroup.com <br />AA R: 0003325 <br />Q <br />sz <br />b <br />C <br />BL lmm ae L.OT <br />SILVERADO <br />LOT #16 <br />BLK #19 <br />PitOJECT# <br />04128.002-16191 <br />MODEL• <br />4EAB <br />"1672—ARIA" <br />OARAOE 81IINO: <br />RIGHT <br />PAGE: <br />DETAILS <br />150 MPH EXP. B <br />DRINT <br />A 06/30/20 <br />9CAL.E: 1/4"=1'-0" <br />SKEET <br />S2.1A <br />
The URL can be used to link to this page
Your browser does not support the video tag.