Laserfiche WebLink
41) SIMPSON HETA16 TRUSS ANCHOR WITH <br />(9) 10d x 1 }" NAILS TO TRUSS <br />42) SIMPSON HETA16 TRUSS ANCHOR WITH <br />(12)16d x 1 �' NAILS TO TRUSS <br />DBL STRAP, 1 EACH SIDE WRAPS UP AND <br />OVER TRUSS (NOT SHOWN) <br />.0) SIMPSON LGT2 GIRDER TIEDOWN WITH <br />(16) 10d x 3}" NAILS TO GIRDER AND <br />(2) SIMPSON HETA16 TRUSS ANCHORS <br />WITH (12)16d x 3 J' NAILS TO GIRDER <br />?, 2x WOOD FASCIA <br />E ARCHITECTURAL <br />SECURED W/ (3) 16d <br />,LV. COMMON NAILS. <br />? SECURED W/ 10d <br />,LV. COMMON NAILS <br />O/C <br />MASONRY BOND BEAM <br />SEE SCHEDULE <br />PLYWOOD SHEATHING, SEE <br />"ROOFNJALL/FLOOR <br />SHEATHING <br />FASTENER SCHEDULE" <br />NOTE: APT SYP 027'x 4", <br />6', W x 4'-0" MAY BE ADDED <br />W/ 10d NAILS, 2 ROWS, 3" <br />O/C TO FACILITATE ONE <br />ADDITIONAL PLY MAX. TO <br />ACCOMMODATE TRUSS <br />ANCHOR REQUIREMENTS. <br />ENGINEERED WOOD <br />TRUSSES Q 24" O/C, <br />SUBMIT SHOP DRAWINGS <br />FOR REVIEW <br />AND APPROVAL <br />A ALLOWABLE UPLIFT = U:1810 LBS, L770 LBS (1 PLY) <br />B ALLOWABLE UPLIFT = U:2365 LBS, L 1430 LBS (2 OR 3 PLY) <br />C ALLOWABLE UPLIFT = U:2705 LBS (2 PLY) <br />SSS-D'PICAL' <br />RUSS/ <br />GIRDERCONNECTOR(S) BD =01 <br />SERIES <br />BACKER BLOCK <br />THICKNESS <br />00 <br />3/4" WOOD PANELS <br />00 <br />160 <br />(2) IF WOOD PANELS <br />(2) 17WOOD PANELS <br />2x LUMBER <br />3/4" T & G SUBFLOOR GLUED AND <br />SCREWED AS PER SCHEDULE <br />PRE-ENG I -JOIST <br />SW GYPSUM BOARD OR 1/2" HIGH <br />STRENGTH CLG. BOARD <br />SECURE I -JOIST TO TOP PLATE <br />w/ (2)12d TOENAILS <br />DOUBLE TOP PLATE <br />20 OR 2x6 WOOD BEARING <br />WALL W/ SYP No 2 STUDS SEE <br />PLANS FOR SPACING. SINGLE <br />BTM. PLATE TO BE PT. <br />PROVIDE DEL. TOP PLATE <br />PROVIDE BLOCKING <br />1R" GYP. WL. BD. <br />� WOIST CONNECTION @ L.B.W. <br />II,'* SCALE:3/4"=1'-0" (NO UPLIFT) <br />OUTER 1/3 ( <br />SPAN ONLY <br />BTM-- <br />PLATE <br />DEPTH 1/4•13 <br />—HOLE EDGE >5/6' <br />—HOLE DIAMETER <br /><2/5•D SGL. STUD <br />STUD NOTCHING <br />AND BORING LIMITS <br />8 SCALE: 1 1/2"=1'-0' <br />EDGE >5/8" <br />HOLE DIAMETER <br />< 3/5'D DBL. STUD <br />ENGINEERED WOOD TRU <br />® 24" O/C, SUBMIT SHOP <br />DRAWINGS FOR REVIEW <br />AND APPROVAL <br />(1) SIMPSON HETA16 -� <br />TRUSS ANCHOR WITH <br />(9)10d x 1 J' NAILS TO <br />GIRDER. PROVIDE 5' <br />MINIMUM CONCRETE <br />EMBEDMENT, USED IN <br />CONJUNCTION WITH <br />HEAVY UPLIFT <br />CONNECTOR <br />tx2, 2x WOOD FASCIA - <br />SEE ARCHITECTURAL <br />2x SECURED W/ (3)16d <br />Z <br />GALV. COMMON NAILS. <br />lx2 SECURED W/ 10d <br />MASONRY BOND <br />GALV. COMMON NAILS <br />BEAM <br />1T O/C <br />SEE SCHEDULE <br />PLYWOOD SHEATHING, SEE <br />"ROOF/WALUFLOOR <br />SHEATHING <br />FASTENER SCHEDULE" <br />NOTE: APT SYP *22'x 4", <br />IT', &' x 4'-0' MAY BE ADDED <br />W/ 10d NAILS, 2 ROWS, 3" <br />O/C TO FACILITATE ONE <br />ADDITIONAL PLY MAX. TO <br />ACCOMMODATE GIRDER <br />TIEDOWN REQUIREMENTS. <br />A41) SIMPSON LGT3-SDS2.5 GIRDER TIEDOWN <br />WITH (4)#" x 5' TITEN HD TO CMU AND (12) SDS <br />*' x 2}" TO GIRDER <br />B-(1) SIMPSON FGTR GIRDER TIEDOWN WITH <br />(2) J' x 5' TITEN HD TO CMU AND (IS) SOS }" x <br />3" TO GIRDER <br />C-(2) SIMPSON FGTR GIRDER TIEDOWNS WITH <br />(2) k' x 5TITEN HD TO CMU AND (18) BIDS }" x 3" <br />SCREWS TO GIRDER (EACH TIEDOWN) <br />ENSURE THAT CELLS ARE GROUTED <br />SOLID, W EACH WAY OF BOLTS <br />A ALLOWABLE UPLIFT = 3285 LBS (2 OR 3 PLY) <br />B ALLOWABLE UPLIFT = 4725 LBS (2 PLY MIN.) <br />C ALLOWABLE UPLIFT = 8885 LBS (2 PLY MIN.) <br />2A 2B 2C TYPICAL ROOF <br />GIRDER CONNECTOR(S) _' <br />LSTA12 20 GAUGE <br />W/ 10dxl/2 HOG COMMON NAILS. <br />® EACH END TOTAL OF 10 <br />S <br />BACIO:RSLOD( <br />TF OMM <br />4500 <br />3/4"WOOD PANELS <br />0000 <br />(2)1/2" WOOD PANELS <br />80 <br />(2) ill' WOOD PANELS <br />90 <br />2x LUMBER <br />LVLAJOIST WITH <br />BACKER BLOCK <br />HTT4 W/ 5/8" AB. WITH <br />MIN.�EEMBEDMENT <br />TO & (18)2-1/ILS TO POST., <br />POSSIT DIRECTLY <br />ON SLAB <br />/a' a <br />1 f e • . -•.o. <br />LVL/WOOD POST CONNECTIONS <br />rJ SCALE: 3/4"=T-O" <br />A- SIMPSON HUS28 G < 1200 LBS, U < 1280 LBS W/ (1) 3/4"° SIMPSON TITEN BOLT/J-BOLT, 5" MIN. <br />EMBED (22) 16d GALV. COMMON NAILS AND (8)16d GALV. COMMON NAILS. <br />B - SIMPSON HUS28 G 1 <br />2400 LBS, U < 1425 LBS W/ (2) 31#1 SIMPSON TITEN BOLT/J-BOLT, 5" MIN. <br />EMBED (22)16d GALV. COMMON NAILS AND (10) 16d GALV. COMMON NAILS. <br />C - SIMPSON HGUS28-2 G < 2400 LBS, U < 1810 LBS W/ (2) 314V' SIMPSON TITEN BOLT/J-BOLT, 5" <br />MIN. EMBED (36)16d GALV. COMMON NAILS AND (12) 16d GALV. COMMON NAILS. <br />D - SIMPSON HGUS28-2 G <4800 LBS, U < 1810 LBS W/ (4) 3/4" SIMPSON TITEN BOLT/J-BOLT, 5" <br />MIN. EMBED (36)16d GALV. COMMON NAILS AND (12) 16d GALV. COMMON NAILS. <br />E - SIMPSON HGUS28-3 G < 4800 LBS, U < 1810 LBS W/ (4) 3/4- SIMPSON TITEN BOLT/J-BOLT, 5" <br />MIN. EMBED (36)16d GALV. COMMON NAILS AND (12)16d GALV. COMMON NAILS. <br />WOOD LEDGER <br />9 ATTACHMENT DETAIL <br />SCALE: 3/4"=T-O" <br /># 1100 UPLIFT SIMPSON <br />HTSM20 W/1010d TO <br />TRUSS AND (4)1/4" x 21W <br />TITEN 2 ANCHORS TO <br />CONT POURED LINTEL <br /># 1900 UPLIFT (2) SIMPSON <br />HTSM20 INSTALLED ON <br />OPPOSITE FACES OF <br />BLOCK WALL W/1010d TO <br />TRUSS AND (4)1/4" x 214' <br />TITEN 2 ANCHORS TO <br />CONT POURED LINTEL <br />PRE-ENG TRUSS <br />CONTINUOUS BOND BEAM <br />TITEN 2 ANCHORS MIN. <br />7' COVER & 2' APART <br />REPAIR OF MULTIPLE <br />MISPLACED EMBEDDED TRUSS ANCHOR <br />3 SCALE: 3l4„=1'-0" <br />2x4 BLOCKING BETWEEN TRUSSES <br />(2) 2X4 No.2 SYP DIAG. WHERE X-BRACING IS PRESENT AT <br />BRACE W/ (3) 12d (0 EA. 4'-0' O.C. (AT SHEATHING SEAMS) <br />TRUSS (DIAG. BRACE TO <br />COVER S TRUSSES) <br />0-0" TO 30'-0" (1) "X" BRACE <br />30'-1"TO 60'-0(3)'W BRACE 0)'PRE-ENG GABLE TRUSS <br />7(" BRACE 0 CENTER <br />(2) .1 BRACE DIVIDED EQUALLY STIFFBACK AT ALL 2z SUB-B <br />FROM CENTER TO END. UPRIGHTS OVER 4'-10' HIGH <br />(AS PER TRUSS ENG) <br />PLYWOOD SHEATHING, SEE <br />"ROOFANAUUFLOOR <br />SHEATHING <br />FASTENER SCHEDULE" <br />SEE TYP. TRUSS CONNECTOR <br />DETAIL FOR STRAPPING INFO. <br />1x2, 2x WOOD FASCIA <br />CONNECTION PER <br />SEE ARCHITECTURAL <br />TRUSS MFG. <br />2x SECURED W/ (3)16d <br />ENGINEERED WOOD <br />GALV. COMMON NAILS. <br />TRUSSES 0 24" OIC, <br />1x2 SECURED W/ 10d <br />SUBMIT SHOP DRAWINGS <br />GALV. COMMON NAILS <br />FOR REVIEW CONT. 2x4 RAT RUN <br />17, O/C <br />AND APPROVAL SECURED W/ (2) 12d's Q <br />MASONRY BOND BEAM <br />EACH TRUSS <br />SEE SCHEDULE <br />GABLE END PRE-ENG'D TRUSS <br />" <br />W/ HIP RETURN SCALE:3/4"=l'-a' <br />6 EDGE CENTRAL <br />SPACING SPACING <br />SEE SEE <br />.PgHEDUL SCHEDULE SEE FRAMING PLAN <br />SEE SCHEDULE FOR BOLT SIZE SEE LEDGER SCHEDULE W <br />51/2' MIN. EMBED. (TYP) <br />1. ENSURE THAT EXP. BOLTS/JBOLTS ARE <br />PLACED INTO GROUTED CELLS, 6' ALL AROUND <br />BOLT. <br />Z 2. END OF FRONT AND REAR LEDGER SHOULD <br />�o LAP A MIN OF 4'4'. <br />3. ALL BOLTS TO HAVE WASHERS <br />Z 4. EXP. BOLTS/J-BOLTS SHOULD NOT BE ANY <br />CLOSER THAN 6' O/C. <br />5. IN LIEU OF HILTI PAPS SIMPSON TITEN 1/4" <br />(2) - PT DIA. x 3" MASONRY SCREWS MAY BE USED, <br />ceuc coenwn ocro iiccucut <br />LEDGER SCHEDULE <br />MARK <br />SIZE <br />BOLT SIZE <br />6EDGESPACING <br />CENTRALWAGNG <br />A <br />DOUBLE 2x8 <br />1/7' <br />8" O/C <br />16" O/C <br />B <br />DOUBLE 2x8 <br />3/4" <br />8" O/C <br />24" O/C <br />C <br />DOUBLE Z(10 <br />1/2' <br />8" O/C <br />16, O/C <br />D <br />DOUBLE 2x10 <br />3W <br />8" O/C <br />24" O/C <br />E <br />DOUBLE 2x10 <br />11. <br />6' O/C <br />16" O/C <br />F <br />DOUBLE 2x12 <br />3/4" <br />6' O/C <br />12" O/C <br />10 WOOD LEDGER DETAIL <br />SCALE: 3/4"=T-0" <br />(2) 2X4 No.2 SYP DIAG. - <br />BRACE W/ (3) 12d a EA. <br />TRUSS (DIAG. BRACE TO <br />COVER 5 TRUSSES) <br />0'-0' TO 30-0" (1) "X" BRACE <br />30'-l" TO 60'-0 (3) "X" BRACE <br />(1):W BRACE®CENTER <br />(2) W: BRACE DIVIDED EQUALLY <br />FROM CENTER TO END. <br />2x WOOD FASCIA, - <br />SEE ARCHITECTURAL <br />PRE-ENG GABLE TRUSS <br />STIFFBACK (ASPER—� <br />TRUSSENG) <br />SEE SCHEDULE FOR <br />BOND BEAM REQ. <br />2x4 BLOCKING BETWEEN <br />TRUSSES WHERE <br />X-BRACING IS PRESENT AT <br />4'-W O.C. (AT SHEATHING <br />SEAMS) <br />SECURE 2x8 PT. PLATE <br />TO BLK W/ 1/Z' DIA. <br />ANCHOR BOLT W/ 7' <br />WASHER SET IN HIGH <br />STRENGTH EPDXY 6' <br />MIN. EMBED. AT 32' OC <br />MAX. <br />SECURE GABLE TO Zx8 <br />P.T. PLATE W/ 12d's 8" <br />O.C. MAX <br />CONT. 2x4 SECURED W/ <br />(2) 10dS 0 EACH TRUSS <br />TO BE INSTALLED <br />101-al O.C. MAX. <br />BLOCK WALL W/ GABLE END <br />PRE-ENG'D TRUSS �:34"=1'-0" <br />THE USE OF ALTERNATE MATERIALS MAY BE <br />USED SO LONG AS THEY CONFORM TO THE <br />FOLLOWING <br />1. METAL STRAPS FOR ROOF AND FLOOR CONNECTIONS <br />A) AN ALTERNATE STRAP MAY BE USED SO LONG AS THE NEW STRAP HAS <br />EQUIVALENT OR GREATER UPLIFT AND LATERAL (Fl AND F2) LOAD CAPACITIES <br />AS THE ONE SPECIFIED, CONCURRENTLY. IT SHOULD BE NOTED FLOOR AND <br />ROOF TRUSSES ARE SUBJECT TO LATERAL LOADS DUE TO WIND AND REQUIRE <br />THE CONNECTIONS INDICATED. A FLAT OR TWIST STRIP IS NOT EQUIVALENT TO <br />A SIMPSON H10A OR LGT2. ROOF TRUSSES ARE SUBJECT TO UPLIFT, F1, AND F2 <br />FORCES ALL AT THE SAME TIME. FLOOR TRUSSES NOT EXPOSED TO WIND ARE <br />SUBJECT TO Ft AND F2 FORCES. <br />11 ALTERNATE MATERIALS <br />SCALE: 3/4"=V-0" <br />A R C N I T E C T a <br />6 <br />Design <br />GIFou ln.. <br />41 N. RONALD REAGAN BL) <br />LONGWOOD, FL 32780 <br />PH: 407-7744W78 <br />FAX: 407-7744078 <br />www.abdesigngroup.com <br />AA #: 0003325 <br />EItn3mv. , LOTS <br />SILVERADO <br />LOT #5 <br />BLK #13 <br />PROJwcT#S <br />03719,000-05131 <br />MoaEla <br />02558-HATMORNE" <br />0ARAGE S7►DM- <br />LEFT <br />PAOM <br />DETAILS <br />150 MPH EXP. B <br />