LIFT BEAM PLAN
<br />SCALE: 1/4" = V-O'
<br />GENEMI NOTES
<br />CODES
<br />1.1 FLOPoDI BIMDNG=.M EDiigN, 2017 RE347EM1ALSECTKxVS RW22aR&56.
<br />12 FLORIN BUaDHGC00E.BMEIX7KKI, ZIH7 BIAlDRtG, SECiKl11519lH2aT107.
<br />1.9 BIrLOWO CODE AEQUaiOEMSFOR RENFORCED CONCRETE NCI31a-14�
<br />I BMDNG FADE REOUIREMEMS MDSPECFMTION FORMASONRY STRI1C1IxES N(T
<br />63P13aacISM.1-t31
<br />1S OTHER
<br />THCNx FlNG3EERS MHMYDESIGN LOADS FOR BIA
<br />DTHOINGS A70
<br />ER SIRLN;TIIRES NSDE
<br />T.)2.1 CRETE:
<br />2.1 CONCRETE CA4ARE331VE SiTEMTR1AT 230AYS:
<br />T.12 PREL WM"STARD IE6FORCEEElifJ000P3IMN
<br />2.12 PREi:AST WIPRESTAESS RE2FONCEAEM4xl3p P5,
<br />2.1.3G TPEAASTM N-3050PSIW/MNL3I3'M,GI+ECAW,CTO11'S1A2.F.
<br />22 RElSp3C•4G BARS:
<br />2.2.1 STEEL PLACED 4V PTECAST LINTEL AT TIME OF FABRIGTKNd ASTM A815IGRADE 63)
<br />222 STEEL IN LINTEL AND KNDCKOUT BLOCK (RACED W FELD) ASTM A315 (GRADE Q0
<br />28 PRESNiE&431FM MTMM167--W- iRESSRELEVED
<br />2.6 MMzE 4q
<br />RERFORCEAEMIN ACCtNiOANCE WTMAC1315.
<br />25 CONCRETNA's OPERATxx1S SWJ.L COMI+LY WRH ACI STANDAT4)3.
<br />2.6 DI.S WNE PER A3TM A13&
<br />3)MASONRY:
<br />31 CONCREt m-IwVUNR3(CMU)911ALLC0lFORM TO ASIM C90. NORMK WEIGIiT WDH
<br />MN mNEf AR EA COMPRESSNESTRENGTH2O00PSI.
<br />32 MORTAR BHKLCONII TOA6TMGT10 TYPEMOR-S'
<br />3.3 FIAL MOMAR JOINTS ARE REDUIED
<br />SA MRAMUM AGORE(NTE28-DAY COMPRES3NE STRENGTH OF CMUAND YOMAR SHALL NOi
<br />BE LESSTWI FL= 2033 PSI. MSONRY STRENGTH SHALL BE ESTABL5IEO er THE 1MR
<br />STRENGTHIAETIIOD'OR, ALTEANABY THE'PRC3MTEST METYpD'WHEREl�1
<br />REQUIREMENTS HAVE NOT BEEN MET.ET,
<br />4.1 SAFE LOAD VKIESARE BASEDDN lN1EL31NVNGABEAIBROOF B'(WIfHA MIiB1M
<br />ACCEPTABLE BEARINGOF d'PER FLORMBM."T" CODE ME111TpN, 20t7 PESIpENN1
<br />SECTION R603.8.3IXi FLORIN BMDPoG CODE BIH EpTION.21H7 BULp3K:, 9ECTx)N 21w.1
<br />42 SAFE LOA 1-EV UA TE OHMTgNCLMI 1-0 AN1LYSi3PERAC131a ANDAGSM
<br />4.3 DE=ATMYEVAUN SW:NIGN NT-I FRaI TIE IXIT ADWAY BY
<br />CALCULATING ANXRIUTA RESISTING MOAEM AND SNEARAT4 DISTANCE AWAY RxOM THE
<br />FACEIN THE SIPPORI.
<br />4A FORLMELI (1)M AT 64T ORGREATER VERTICAL CELLFLLED SOLD Wl GROIITAND
<br />M3VN4UM ONE AI FS VERTICAL RESAR M REQURFD AT EACH FNDOF THE LTi
<br />4.5 IVrtELS THAT ARE GREATER THAN 16'47 CLEAR SPAN MUSTBE PROWDEDTEMPORARY
<br />SUPPx1RT, NOT BE REMOVED UMa 2 DAYS AFTET3 GROUT PLACEMENT'.
<br />FRAMING NOTES:
<br />1 U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE
<br />CONCRETE TO WOOD ROOF. SIMPSON HETA16 W/ (9) 10d x 1 1/2- HOG NAILS.
<br />CONCRETE TO WOOD FLOOR-
<br />SIMPSON LTA2 W/ (8) 10d x 1 1/7 HDG NAILS, WOOD TO WOOD:
<br />SIMPSON H10A OR LGT2 W/ i Dd x 1 1/2" HDG NAILS, FILL ALL HOLES,
<br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER
<br />SCHEDULE.
<br />1 ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE
<br />METING THE REQUIREMENTS OF AFC-01 AND APPLIED IN ACCORDANCE WITH
<br />MANUFACTURER'S SPECIFICATIONS.
<br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS
<br />ARE TO BE GALVANIZED,
<br />S. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE,
<br />CONNECTERS ARE TO BE GALVANIZED.
<br />5. UNTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CREI-E
<br />CONCRETE LINTELS.
<br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND
<br />CLEAR SPAN OPENINGS.
<br />7. LINTELS SHALL HAVE 4' NOMINAL BEARING (4•).
<br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE
<br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE
<br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS
<br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEERS REVIEW AND
<br />APPROVAL.
<br />9. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES
<br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED
<br />FASTENER, ZF 72 P8S36.1T7' - x 2 7/8' LONG, WITH WASHER Q 16" O.C.
<br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END
<br />UNLESS OTHERWISE SHOWN DIFFERENT.
<br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON
<br />RATIONAL ANALYSIS.
<br />12, ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS
<br />NOTED OTHERWISE.
<br />HEADER SCHEDULE
<br />MARK
<br />REMARK
<br />DESCRRPi70N
<br />10
<br />(2) 2X12
<br />BEAM SCHEDULE
<br />INDICATES OPENING BELOW I T.O.B. = TOP OF BEAM / B.O.L. = BOTTOM OF LINTEL/T.O.A. = TOP OF ARCH I T.O.S = TOP OF SLAB
<br />ABBREVIATIONS
<br />E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT
<br />MARK
<br />DESCRIPTION
<br />(PZE yl)
<br />�xH,
<br />REINFORCEMENT
<br />STIRRUPS
<br />REMARKS
<br />BTM.1;1;
<br />SIZE
<br />SPACING
<br />BB1
<br />MASONRY
<br />3000
<br />8"XV
<br />GROUTED SOLID
<br />GRAVITYLOADS
<br />8'XB" RECESS 1•©OR
<br />LOADS
<br />�•• R HEADEr
<br />®®®®�®
<br />m
<br />GRAVITY & UPLIFT SAFE LOADS (PLF)
<br />8•xl6• RECESS DOOR HEADESR
<br />GRAVITY & UPLIFT SAFE LOADS (PLF)
<br />8"x32" RECESS DOOR HEADER
<br />, svn
<br />au
<br />,M
<br />�'
<br />wlpu Plt
<br />mwstWE
<br />mNoa
<br />mwswwr
<br />mw>a
<br />cAeT
<br />12Aw.ax1AE
<br />mH>.s
<br />mw.4WE
<br />mw3
<br />m w.sr.Ia
<br />mw
<br />mwaMw
<br />mHs
<br />mwaMxE
<br />m1�
<br />sives
<br />mw.aNUE
<br />PST
<br />m w.sM1�
<br />m 3
<br />aMx
<br />mwsswraE
<br />mla.a
<br />mw.aMKE
<br />msa_3
<br />41a
<br />14w71mwawRE
<br />IZI N>3
<br />m w.arnAe
<br />al w.4
<br />,e>8
<br />1m
<br />mwawRE
<br />mHa..
<br />V)MA
<br />alwsWwE
<br />mwa MP>:
<br />1-
<br />mwswRa
<br />1w4
<br />"CAST-CRETE"
<br />SAFE LOAD TABLES
<br />SAFE GRAVITY LOADS
<br />FOR
<br />8" PRECAST
<br />& PRESTRESSED
<br />U-LINTELS
<br />SAFE LATERAL
<br />8" PRECAST & PRESTRESSED
<br />LOADS
<br />FOR
<br />U-LINTELS
<br />SAFE UPLIFT LOADS
<br />FOR 8'
<br />PRECAST
<br />& PRESTRESSED
<br />U-LINTELS
<br />4-4-SAFE
<br />LOAD
<br />- POUNDS
<br />PER
<br />LINEAR
<br />FOOT
<br />0
<br />SAFPi
<br />F
<br />I
<br />SAFE
<br />LOAD
<br />- POUNDS
<br />PER
<br />LINEAR
<br />FOOT
<br />TYPE
<br />&M
<br />ws
<br />sa-111
<br />4Ftss
<br />41P,Stl
<br />s,•s
<br />aF%%
<br />�
<br />aPm/9
<br />MM®
<br />•PM-M
<br />sassLENGTH
<br />raa,6
<br />LENGTH
<br />RE
<br />BFB
<br />LENGTH
<br />Riar
<br />mImrr
<br />"af
<br />a ulw
<br />WA-V
<br />searNaarMM
<br />(42� P�CASf
<br />2231
<br />af•
<br />61M
<br />4Mi
<br />MM
<br />w•N
<br />S$ (4� PRECAST
<br />1025
<br />1024
<br />is"
<br />3'$ (42-) PRECAST
<br />,m
<br />al Of
<br />3M
<br />4 14
<br />AN
<br />Haa
<br />i66,3'$
<br />MM
<br />4106
<br />nu
<br />tea
<br />Im
<br />law
<br />MM
<br />am
<br />3m
<br />4m
<br />am
<br />eat
<br />7M,4,-0„2M
<br />PREC16T
<br />1986
<br />2151
<br />3m
<br />4m
<br />7DD4
<br />n07
<br />W-V (4r) PRECAST
<br />7O
<br />789
<br />1309
<br />r4r on PRECAST
<br />,m
<br />2m
<br />301D
<br />3a/6
<br />4m
<br />em
<br />4mt45")
<br />4106
<br />n7/
<br />Ma
<br />1mf
<br />t/1M
<br />113M
<br />MM
<br />MM
<br />Mt6
<br />4M
<br />A3
<br />M79
<br />4•$ PRECAST
<br />1539
<br />21W
<br />2M/
<br />3m
<br />5w
<br />aa4
<br />4'$ (5P) PRECJW87'
<br />!MQ
<br />591
<br />7079
<br />4'$ (54') PRECJIST
<br />iM/
<br />am
<br />vw
<br />33M
<br />4m
<br />4711
<br />MAt547
<br />21M
<br />4376
<br />0113
<br />"a
<br />,MM
<br />,im
<br />,Mi
<br />200
<br />2W
<br />3m
<br />400
<br />4Mi
<br />Mil
<br />W-C (64•) PRECAST
<br />1217
<br />,3•
<br />,4w
<br />,a11
<br />m
<br />a110
<br />4m
<br />W-V PRECAST
<br />411
<br />411
<br />745
<br />BJ• l54') PRECAST
<br />me
<br />>A
<br />2 M
<br />3300
<br />am
<br />4m
<br />MM
<br />7Mr(54•)
<br />1010
<br />im
<br />2a76
<br />2m
<br />33M
<br />alll
<br />4m5--15'
<br />PRECAST
<br />1032
<br />ttM
<br />1173
<br />Im
<br />MM
<br />MM
<br />I
<br />34m
<br />B-1P (70') PRECAST
<br />910
<br />398
<br />878
<br />E-10 (7� PRECJIBT
<br />aM
<br />2m
<br />na
<br />MM
<br />41Mp0•)
<br />Mn
<br />Mm
<br />eM
<br />rm7pt
<br />m1
<br />m
<br />,Mr
<br />200
<br />MM
<br />am
<br />MM
<br />4133
<br />5$.,m
<br />P59 PRECAST
<br />908
<br />2m
<br />31M
<br />am
<br />tlM
<br />Mn
<br />S$ � PRECAST
<br />SDI
<br />721
<br />490
<br />5$ (M PRECAST
<br />m
<br />,
<br />a ll
<br />371
<br />m
<br />ua
<br />SM
<br />2m
<br />27M
<br />37n
<br />SM
<br />r$ le0•) PRECA4T
<br />743
<br />,oll
<br />17M
<br />am
<br />m6
<br />am
<br />am
<br />T$ Ig01 PRECAST
<br />124
<br />634
<br />988
<br />r$ l PRECAST
<br />m
<br />,n,
<br />t7M
<br />2M7
<br />31M
<br />MM
<br />$472
<br />7n
<br />taa4
<br />tm
<br />2aa
<br />24M
<br />2Ba
<br />101
<br />9-C 77 PRECAST
<br />( �)
<br />56t
<br />m
<br />tm
<br />7m
<br />2M6
<br />21M
<br />MM
<br />V-4' (112D PRECAST
<br />325
<br />512
<br />230
<br />9'4' (712•) PREfJ181'
<br />m
<br />7M
<br />1
<br />2M7
<br />7M
<br />72M
<br />,m
<br />2M4
<br />M10
<br />m
<br />m
<br />t3M
<br />Ma
<br />,m
<br />2M4
<br />2M10'$
<br />1
<br />475
<br />m
<br />m
<br />1w
<br />am
<br />21M
<br />2m
<br />70$ (1287 PRECAST
<br />2AN
<br />401
<br />150
<br />,a$ (7287 PRECAST
<br />m
<br />m
<br />m
<br />,
<br />2n,(PREC118'T
<br />m
<br />WE
<br />tm
<br />Ill
<br />mm
<br />,faD
<br />"u
<br />17M
<br />aw114•
<br />1 nos
<br />1
<br />( 3r) PRECAST
<br />362
<br />tiMea
<br />tm
<br />n9
<br />4m
<br />11-W (198•) PRECAST
<br />200
<br />452
<br />154
<br />17'-4• (135) PRECAST
<br />a4
<br />m
<br />m
<br />m7
<br />,27
<br />M
<br />17M
<br />m
<br />m
<br />tm
<br />,m
<br />2423
<br />am
<br />4m
<br />4M
<br />as
<br />t37Z
<br />tm
<br />,new
<br />eta
<br />12'$ (1447 PRECAST
<br />9S7
<br />m
<br />m
<br />Im
<br />""
<br />2m
<br />am
<br />MM
<br />17-W ('"") PRECAST
<br />2N
<br />402
<br />137
<br />12$ 11441 PRECAST
<br />4M
<br />m
<br />7x
<br />m
<br />,
<br />1m
<br />m
<br />m
<br />1=4
<br />,m
<br />2m
<br />2m
<br />31M
<br />476
<br />m
<br />m
<br />13M
<br />7
<br />am
<br />( SD") PRL CAN'T
<br />13•-4• 1
<br />298
<br />471
<br />m
<br />we
<br />t4M
<br />tm
<br />MM
<br />am
<br />ISW (1W) PRECAST
<br />217
<br />924
<br />110
<br />1ST• (150D PRECAST
<br />ue
<br />m
<br />•M
<br />rea
<br />m
<br />,
<br />tm
<br />471
<br />iM
<br />,m
<br />�1
<br />tm
<br />am
<br />3m
<br />m.
<br />40
<br />m
<br />„M
<br />'Al
<br />,Mi
<br />tR4r (I
<br />(� PRECAST
<br />278
<br />424
<br />IN
<br />MM
<br />,m
<br />a"
<br />2727
<br />2m
<br />$ (15BD PRECAST
<br />205
<br />2W
<br />100
<br />14'$ (11BD PRECAST
<br />m
<br />Ma
<br />m
<br />7L
<br />m
<br />1m
<br />4a
<br />m
<br />MM
<br />im
<br />,m
<br />am
<br />am
<br />4M
<br />4M
<br />'m
<br />iM
<br />tm
<br />1" 0757 PRESTRESSED
<br />NR
<br />m
<br />NR
<br />NR
<br />NR
<br />Mr
<br />I NR
<br />NR
<br />(175•) PRESTRESSEDN.R.
<br />234
<br />91
<br />14'$ (17n PRESIAFSSED
<br />m
<br />m
<br />m
<br />m
<br />mart
<br />m
<br />m
<br />m
<br />mJ
<br />Iftej
<br />ItM
<br />17M
<br />1 m
<br />m
<br />INTO
<br />tm
<br />all,
<br />In7
<br />2m14•$
<br />16'4• (184') PRES1RE88ED
<br />NR
<br />m
<br />Nit
<br />NR
<br />in
<br />at
<br />I NR
<br />at
<br />IS-C (1841) PIiESIRE881�
<br />N.R.
<br />259
<br />83
<br />164• (184') P
<br />m
<br />m
<br />na
<br />m
<br />m
<br />n6
<br />m
<br />m
<br />7a1
<br />n,
<br />,m
<br />412
<br />710
<br />1m
<br />nM
<br />WillnX
<br />ally
<br />ir$ MIT) PRESTO
<br />HR
<br />NR
<br />W
<br />at
<br />NR
<br />M4
<br />NR
<br />NR
<br />PM PREHI
<br />NR
<br />19t
<br />M
<br />try' C20B7 PIrETlE58®
<br />/a
<br />nt
<br />m
<br />m
<br />4M
<br />IN
<br />m
<br />740
<br />m
<br />IMj
<br />70
<br />UMj
<br />as
<br />,m
<br />m
<br />m
<br />m
<br />1326
<br />,m
<br />,m
<br />ma,R4'
<br />I" (2329 P
<br />NR
<br />NR
<br />NR
<br />NR
<br />NR
<br />4M
<br />NR
<br />IF-4- (2 n PRE
<br />N.R.
<br />148
<br />52
<br />1s< (?H2•) PRESTRESSED
<br />,M
<br />m
<br />m
<br />m
<br />m
<br />40
<br />4a
<br />In
<br />fie
<br />841
<br />as
<br />7a
<br />12a
<br />2M
<br />m
<br />7aa
<br />all
<br />1m
<br />7n6
<br />/7M
<br />21' 4'(787 PRESTRESSED
<br />NR
<br />NR
<br />NR
<br />Il
<br />Ml
<br />NR
<br />R
<br />N
<br />�'�GM PRESTRESSED
<br />NR
<br />�Y6PRESTRESSED
<br />u
<br />M
<br />mtmp
<br />wr
<br />373
<br />m
<br />m
<br />m
<br />,mm
<br />,M
<br />340
<br />m
<br />m
<br />,lu
<br />two
<br />uM
<br />22'$ 00C) P
<br />N
<br />IN
<br />NR
<br />R
<br />a
<br />NR
<br />m
<br />27-0" PHI P
<br />NR
<br />116
<br />ti2542
<br />40
<br />2T$ 254) PRE$TREmm
<br />w
<br />m,ua4
<br />m
<br />us
<br />m
<br />m
<br />m
<br />m
<br />m
<br />n6
<br />m
<br />M,Da
<br />tm
<br />,m
<br />On PRESTRESSED
<br />N.R.
<br />m
<br />NR
<br />Ha
<br />W$ RS) PRESTRESSED
<br />N.R.
<br />W-W 25) PRESTRESS®
<br />aMu
<br />4M
<br />m
<br />4M2P$
<br />7M
<br />M,M
<br />m
<br />tM
<br />2m
<br />m
<br />m4
<br />m
<br />tm
<br />(#) THE NUMBERS IN PARENTHESIS
<br />REDUCTIONS FOR GRADE
<br />40 FIELD
<br />ARE
<br />ADDED
<br />PERCENT
<br />RESAR.
<br />M) THE
<br />REDUCTIONS
<br />NUMBERS
<br />IN
<br />FOR GRADE
<br />PARENTHESIS
<br />40
<br />FIELD ADDED
<br />ARE PERCENT
<br />REBAR.
<br />-ALL VALIES TAKEN FROM •&WEE LOAD TABLES' BYCASTCREIE MAY 2015 EDMON - PRECAST PRODUCTS BY OTHERS TO MST OR EXCEED VALUES STATED ABOVE
<br />ALL PRECAST PRODUCTS ARE TO BE INSTALLED PER MANUFACTURES SPECIFICATIONS - PROVIDE W49AN Ir OF BEARING PAST EACH SIDE OF VMDOW OPENING
<br />PRODUCT CONTROL NOTICE OF ACCEPTANCE F.E.C.P. CORPORATION-CASTE-CRETE
<br />DIVISION ACCEPTANCE M 16-0126.03
<br />A E C E I T E C T i
<br />6
<br />GrowoW
<br />1441 N. RONALD REAGAN BLVD.
<br />LONGWOOD, FL 32750
<br />PH: 407-7748078
<br />FAX: 407-774.4078
<br />www.abdesigngroup.com
<br />AA S: 0003325
<br />1:
<br />yq
<br />i
<br />b
<br />v
<br />O
<br />�p
<br />4
<br />R
<br />xTymIr i. a LOT.
<br />SILVERADO
<br />LOT #11
<br />BLK #13
<br />plioinm#
<br />03719.000-11132
<br />acoasu
<br />"2045-LANTANA"
<br />aA1tAas awa�a:
<br />RIGHT
<br />pAGM
<br />LIFT BEAM
<br />PLAN
<br />150 MPH EXP. B
<br />ap � 6/17/20
<br />sCAUM 1/4"=1'-0"
<br />sign=
<br />s2
<br />
|