Laserfiche WebLink
TIE VERTICAL REBAR <br />c <br />TO HORIZONTAL Z � <br />REBAR W/ 10' HOOK z <br />- GROUTED BOND BEAM <br />VARIES PER ELE� <br />f <br />a. <br />.I >a <br />a <br />CLEAN OUT REQUIRED <br />4g <br />FOR INSPECTION <br />ca <br />,I <br />n - TIETVERTICAL REBAR <br />a TO HORIZONTAL <br />REBAR W/ 10' HOOK <br />BAR SIZE 48 BAR DIA. <br />Z #3 18. <br />0 #4 24' <br />U #5 30' <br />#8 1. <br />#7 42- <br />HORIZONTALNERTICAL <br />REINFORCING <br />G) SCALE: 3T4'=1'-O' <br />OFFSET METHOD CONTINUOUS BAR SIZE 48 BAR DIA. <br />#3 18, <br />METHOD #4 24' <br />HORIZONTAUVERTICAL #5 30' <br />REINFORCING #8 ' <br />2 #7 4242' <br />SCALE: 3/4'=1'A' <br />#5 BARS <br />FE-3 <br />CMU UNIT DIMENSIONS <br />ARE NOMINAL SIZES <br />MASONRY SYMBOLS <br />LLmuWOVU, PL az f *u <br />PH: 407-774-6078 <br />FAX 407-774.4076 <br />www.abdeaigngroup.com <br />AA S: 0003325 <br />DRAFTING BY: <br />A.B. DESIGN GROUP <br />DRAFTING INC. <br />5439 BEAUMONT CENTER BLVD. <br />SUITE 1004 <br />TAMPA, FLORIDA 33634 <br />PH: 813b86.2628 <br />FAX: 813-886.2802 <br />