Laserfiche WebLink
AVARAIRA SEES <br />WE sHGULD SE TAKEN IN HEEPINO THE VENTPROPERLV <br />4-, S' AND 10' <br />WGNED. VENT PIPE IS SEALED IF URL2ED. NAIL IN PLACE <br />SHORN IN 1 V—ED <br />USING i-1l/' NNLS AT EACH CORNER. ROOFING CEMENT <br />SHOULD BE —ED M ALL SNNGIE EDGES NEAR TIE <br />OUTER EDGE AND AROUND THE ENRRE PERNETER AS <br />C MTARGOOSENEM VENT OPENING IN THE ROOF <br />RECONMENlED—EVER EWEATIERCOA3TAL <br />SHEATHING. SIZE THE OPENING IN ACCORDANCE KITH TIE <br />OONBTRUCTICNZONFS. <br />CHART SHOWN. IN THE EVENT A MECHANICAL VENT FAN IS <br />USED, SIZE THE VENT OPENING IN ACCORDANCE WITH <br />VENTFAN MANUFACTURE'S PIPING CONNECTION <br />INsraucTlorve. <br />DON INTO TRUSSES Oil RAFTERSYAEN CUTTING TIE <br />J <br />OPENINGm IN IN THE ROOF. <br />REMOVE INTERFERING SHINGLE NAILS AROUNDTHE <br />i--` <br />PERBAETER OF THE OPENNG SO THAT THE WALING FLANGE <br />OF TIE VENT LAYS FLAT M THE ROOF SHEATHING. SUDS <br />THE <br />AND <br />TOP SIDE FLANGES OF THE VENT UPAND WINGER <br />SHNGUEGLES.ALLOWTIE BOT-fOIA VENT FLANGES TOUV ON <br />I <br />TE TOP OF TIE 8MNGLEB. <br />IF F�o� <br />ROOF HOOD <br />VENT DETAIL <br />ITT NOU6ESRMP <br />AT,*'ANSLE <br />w• <br />mwrw -I. Off <br />T* <br />N woum TRAP <br />LINE of IIMIIDQU <br />oFteNNs <br />\ <br />\ <br />AFPRDVED NOUSW~ <br />OVBR SIEATINS OVER <br />w arm WILL <br />STEP <br />1 <br />INSTALL S— <br />OUP-ADHP.IEEIOI <br />PLASHNS OVER <br />NAILNS FLAIWS <br />JAMBS <br />I XTIMMLC GILL MIN <br />I' AXIBL GILL \7/\ 1LEXISIL! PLAANMS <br />DO NOT am BOTTOM � <br />FN <br />STEP 6 <br />TWIFORARRY <br />POLD-111E N am <br />INOU6lYRAP (a <br />7000 FLAP LINE: <br />AL HEAD <br />FOLD HOLISM <br />N AT JAME6 I <br />OLD" 61LL R <br />VINYL HEAD <br />PLASHNS(WITH <br />DAMS) NAILNBI <br />PLANES <br />SELF-ADIEPft <br />RLASHNS I' MN <br />BEYOND JAMB <br />PLASIMM <br />RtlTALL VNTL <br />MAP <br />ASRHILLT—TICCEMENT <br />MDIOEDAROUNDSASE OF <br />WIPE AND OVER A.ANGE <br />ALM PILAGHNS <br />UP INT. EDSE OF <br />SILL R.O. <br />fine: UCALLY <br />PASTEN FANNED <br />BDOeG.(CAP <br />NAILS, STARES) <br />INSTALL CPA-' MT <br />FLM.X~ AS TH <br />R.AGHINS AT THE <br />FOLD IIOUSBMMP <br />COW N TAPE <br />DIA00 NAL CUT 4 <br />ACROSS HEAD or <br />WINDOW <br />*T. <br />PLUMBING VENT DETAILS <br />INSTALL W UUDe ADHESIVE - <br />SAQP= PLeXNkA R.ASHNS <br />MATERIAL OVER DRIP CAP <br />JONT(PROTECTO-WRAP <br />BT-JO)CL aF 90") <br />STEP 7 STEP 8 <br />WINDOW FLASHING <br />INSTALLATION DETAILS <br />12 ( FULL WRAP) <br />SCALE: NTS <br />36 WIDE VALLEY FIASNNG <br />fi3FaA HEAVIER FELT <br />UNOERUYMENT 1 <br />ASPHALT <br />ROOFING <br />CEMENT <br />NO FASTNERE NMN <br />6. OF CENTERLINE <br />-EXTRAF HI ERS IN <br />ENO OF SHINGLE <br />--ETM ENOSNNGLE <br />AT LEAST IY BEY010 <br />VALLEY CENTERIINE <br />—IPPED— <br />_ _�DEOREES <br />2 <br />ROOF VALLEY DETAIL <br />SGAI-11, NTS <br />APPLY 061 Ku (O <br />EOLAL) SEALANT A <br />UMFlOpIAT:MEJ JOINT, <br />RWD AF'I-LED <br />PL.ASNM (LAWO <br />U NITS -SEAL Rc-N <br />OR w—'.. <br />SLOPS GILL TO Ex <br />I. IT 16 THE CONTACTORS MOP-ON61DILTY TO VBWY <br />TE CO"ATIOML" 01- ALL FlCDUOT6 NCWDNd <br />NO1,111IMPA,T. SEALANTS A SELF-ADFEPWa <br />FL.ASNNS MATERIALS USED DUISMS CONSTIN CTWK <br />2. INSTALL ALL MATERIALS FER MANPACiiSPERS <br />SMITTEN SPSIMPICATIOFM <br />whydwk SEALANTS MAY REACT ADAMBLY P NOT <br />COMPATIBLE. <br />NOTE, AND BEAL JAMB TO BILL JOINTS WITH <br />DOW it" FOLLOWING COMPLETION OF <br />EXTERIOR RETROFIT WORK <br />REPAIR SCHEME SHOWN SHALL ISE <br />IMPLEMENTED AT ALL WINDOWS WITH <br />EVIDENCE OF WATER INTPSOION BELOW THE <br />WINDOW OPENMG <br />SEAL INTERIOR PERIMETER OF WINDOW WITH <br />ALANT <br />L ft TE C.CWAOTOISG REGPONSI NLTY TO VERIFY <br />TIE OCMTATBILITY OF ALL PRODUCTG NCLUDNS <br />SEALANT6 4 SELF-ADNWK R.ASNNS MATERIALS <br />USED OIS11INS O"I'mICTION. <br />2. PLASMA AT EXTERIOR SANDOW6 AND DOOR <br />OPENN66 GHALL SE INSTALLED N ACCORDANCE <br />WITH MANRACTWE" INSTALLATION SETTSIOTION6 <br />AND APPROVED METIOD IJ OF PEIC R108A <br />W N ACCORDANCE UMTN PBE6TRATION <br />MAMPACTUPMS INSTALLATION AND PLAGIRM <br />0 <br />67 <br />14 <br />UOTION& <br />YIARItlOt SEALANTS MAY REACTADVERSELY P NOT <br />COI'TATE%JL. <br />WALL FLASHING INSTALLATION <br />DETAIL (MASONRY) <br />SCALE. NT6 <br />1441 N. RONALD REAGAN BLVD <br />LONGWOOD, FL 32750 <br />PH: 407-774,6078 <br />FAX: 407-7744078 <br />www.abdesigngroup.Dom <br />AA #: 0003325 <br />1� <br />g9 <br />9 <br />mm <br />elUBDIV. Ae LOT <br />ABBOTT PARK <br />LOT #17 <br />BLK. #9 <br />PItOJECTAF <br />04181. 00-17091 <br />MODEU <br />3EEB <br />L'2260-ELSTON" <br />GARAGE eMTiO: <br />RIGHT <br />PACE: <br />WALL <br />ASSEMBLY <br />DETAILS <br />60 MPH EXP. <br />I 19 LFiJ <br />DATE : 05 24 21 <br />DATE <br />aCALE: 1/4"=1'-0" <br />WA5 <br />