Laserfiche WebLink
STEEL REINFORCING IN GROUTED <br />CELL SEE PLAN FOR SIZE AND <br />3 <br />SPACING REQUIREMENTS <br />MIN. 10" T EAD W/ 1" NOSE <br />" <br />o <br />8"CMU WALL <br />PAVERS <br />N4 REBAR (TYP.) <br />w <br />w <br />70P OF 8LA8 <br />--.— TOP— OFF <br />,/ <br />N <br />( SEE SLAB SCHEDULE <br />O <br />Z 1/Y' RADIUS OR <br />+ CHAMFER <br />IL Z .._ .'• <br />° a•L_ <br />w0 <br />w F <br />SEE SCHEDULE <br />FOR BAR BAR SIZE <br />AND BAR QUANTITY <br />w i 3 w <br />j O <br />a•' <br />'� �;. ; ' <br />•� <br />°0 O <br />EQ. <br />EQ. SEE SCHEDULE <br />—lk <br />FOR WxD, BAR SIZE <br />AND BAR QUANTITY <br />TRENCH FOOTING <br />EXTERIOR STAIR DETAIL <br />INTERIOR CURB FOUNDATION CMU WALL <br />1 <br />n <br />G <br />q <br />`� <br />AT ALL PAVER AREAS SCALE: 1/2"=1'-0" <br />SCALE: 1/2"=1'-0 <br />SCALE: 3/4'=T-0" <br />LAP TOP PLATE A MIN. OF 48'-----_� <br />AND NAIL W/ 16d COMMON <br />VERIFY <br />NAILS, 2-ROWS, 4" O/C BTM. HEIGHT <br />LAP TO OCCUR OVER STUD OF WALL PLAN <br />Z <br />2x4 OR 2(6 WOOD BEARING PROVIDE BLOCKING <br />STEEL REINFORCING IN GROUTED <br />CELL SEE PLAN FOR SIZE AND <br />WALL W/ SVP No 2 STUDS SEE <br />0}- <br />SPACING REQUIREMENTS <br />PLANS FOR SPACING. SINGLE SECURE PLATE TO SLAB W/ <br />C <br />BTM. PLATE TO BE PT. BT. <br />WEDGE ANCHOR W/ 2' <br />K <br />STEEL REINFORCING IN GROUTED <br />PROVIDE DBL. TOP PLATE 122 61' <br />Ip U <br />CELL SEE PLAN FOR SIZE AND <br />WASHER SET IN HIGH STRENGTH <br />Z SPACING REQUIREMENTS <br />EPDXY 5-1/P' EMBED. MIN. ® 16' <br />SIMPSON SPH4 OR SPH6 OC MAX. <br />Z <br />8" CMU WALL <br />d " <br />BTM AND TOP PLATE <br />O g <br />B"CMU WALL <br />ANCHORS W/ 10d x 1 Jr <br />�- " <br />10 <br />w <br />COMMON NAILS FILL ALL <br />r~ <br />TOP OF SLAB <br />4' TOP OF SLAB <br />m O <br />HOLES, DO NOT USE tOd <br />x 3" SEE SLAB SCHEDULE <br />f../ <br />► <br />•�.. <br />Z <br />• -. <br />.4• <br />y SEE SLAB SCHEDULE <br />.' <br />SEE SLAB SCHEDULE <br />BAR SIZE 48 SAR DIA <br />w <br />> <br />°�•� ;.•6. <br />O <br />- <br />EXT. PORCH SLAB <br />4" CHAMFER (15TORY) <br />1B„ <br />O <br />: 4 <br />° <br />0-0' <br />TOP OF SLAB .'°• <br />W/ 1/2" ISOLATION <br />6' CHAMFER (2STORY) <br />t. <br />. <br />TOP OF SLAB <br />JOINT (WHERE <br />04 21V <br />•. <br />°� • y <br />APPLICABLE) <br />Z <br />MATCH STEEL <br />REINFORCEMENT„ <br />#5 3U' <br />°� <br />8. <br />6' PVC CHASE <br />PER SCHEDULE <br />THRU FOOTING <br />07 42 <br />B" PVC CHASE THRU FOOTING <br />E E SCHEDULE <br />SEE SCHEDULE <br />FOR WxD, BAR SIZE <br />FOR WxD, BAR SIZE <br />MATCH STEEL <br />AND BAR QUANTITY <br />AND BAR QUANTITY <br />SEE SCHEDULE <br />REINFORCEMENT <br />FOR WxD, BAR SIZE <br />PER SCHEDULE <br />AND BAR QUANTITY <br />PVC CHASE <br />INTERIOR FOUNDATION CMU WALL <br />INTERIOR FOUNDATION WOOD WALL <br />THRU FOOTING <br />4 SCALE: 3/4" 1'4' <br />J SCALE: 3/4"=1'-0' �� UPLIFT) <br />G <br />V <br />SCALE:34"=1'-0' <br />1441 N. RONALD REAGAN BL <br />LONGWOOD, FL 32750 <br />PH: 407-774.6078 <br />FAX 407-7744078 <br />www.a bdesigngrou p.com <br />AA k: 0003326 <br />orXi <br />musarv. as L074 <br />ABBOTT PARK <br />LOT #19 <br />BLK #9 <br />PROJRCT <br />04181.006-19091 <br />MODRU <br />2554- E301- <br />"DARWIN" <br />GARAGM 9WII96: <br />RIGHT <br />PAGR: <br />DETAILS <br />160 MPH EXP <br />