Laserfiche WebLink
AVALANAMM <br />WE LD BE TAKEN IN KEEPING TIE VENTPROPERLY <br />4', B' AND 10' <br />ALIGNED. VENT PIPE IS SEALED IF UTILIZED. NML IN PLACE <br />- <br />SNONNIN 1'GALVAMZED <br />USING I.1/4' NAILS AT EACH CORNER, RGOFING CEMENT <br />SHOULD BE APPLIED TO ALL SHINGLE EDGES NEAR THE <br />OUTER EDGE AND AROUND THE ENTIRE PERIMETER AS <br />CUT TIE GODS ENECK VENT OPENINGIN TIIEROOF <br />RECOANENDED VNJITHER COASTAL <br />SHEATSNG.SIZE THEOPENING IN ACCORDANCE TFATI1E <br />CHAR TSHOWN.INTHEEVEN VENT FAN19 <br />ZONES. <br />CONSTRUCTION ZONES. <br />USED, SIZE THEVENT REWINGNGOONNE"ONNTTI <br />INAGO I <br />VENT FAN MANUFACTURES PIPING CONNECTION <br />INSTRUCTIONS. <br />INTOTRUSSE3 OR RAFTERS WHEN CUTTING THE <br />OP KING IN <br />OP�RENINQQG IN TiE ROOF. <br />R�tOVE INTERFERING SHINGLE NAILS AROUND THE <br />PERIMETER OF THE OPEwNG 50 TUT THE NAILING FLANGE <br />OF THE VENT LAY9 FLAT TO THE ROOF SMEATi1NG. SLIDE <br />HE <br />TOP AND SIDE Ol THE3 OF TIE VENTFL AND UNDER <br />LLOWTHEBOTTON VENTFLANGES TOIAY ON <br />SNNTOP <br />OF <br />THE TOP OF THE SwNGLE3. <br />ROOF HOOD <br />VENT DETAIL <br />SCALER NT8 <br />AOff <br />T M I rom <br />III <br />.TUCK FLAP LHOEM <br />Lwousm�SEOLSR WEAD <br />LINE OF WAIDOS <br />OFBNNG FOLD HOME~ <br />M AT JAYOS . SILL <br />\ I <br />APPROVED HOUSELLRAP \ <br />OVER SHEATHBIG OVER <br />UD STUD STALL SLOPE SILL RD. TO EXTERIOR <br />STEP 1 STEP 2 <br />INSTALL 6' <br />SELF-A"101,16 <br />R.ABIMG OVER <br />VINYL HEAD <br />R.ASMNG (NTH END <br />DAYS) NAILING, <br />FLAJ OE <br />INSTALL S' <br />EXTEND <br />SELF-APHIMR <br />I <br />&ELF-ADH RN6 <br />PLASHING OVER <br />4.PLASHStl <br />\ �& <br />1' MIN <br />NAILING FLANGE AT <br />BEYOND JAMB <br />JA E16 <br />PLASHING <br />INSTALL VINYL DARE <br />CAP <br />EXTEND I'LA64M6 MM <br />1' IWLCU &ILL <br />FLEXIBLE FLASNRIfi <br />DO NOT SEAL BOTTOM <br />RN <br />STEP 6 <br />PIPE AND OVER FLANGE <br />ALIGN! PLASH216 <br />W/ W. EDGE OF <br />SILL RD. <br />MECHANICALLY <br />FASTEN FANICD <br />EDGES.(CAP <br />NAILS, STAFLES) <br />INSTALL DIF'ONT <br />FLEMBRAP AS TH <br />PLASHN6 AT TIM <br />FOLD HCUONP.AP <br />COIN . TAPE <br />DIA04NAL CUT . <br />ACROSS HEAD OF <br />WNDOW <br />PLUMBING VENT DETAILS <br />SCALE, T8 <br />INSTALL a' W0E ADil61VE - <br />BAaaD ILEXIBLE R.A614HO <br />MATERIAL OVER DRIP CAP <br />JOINT(FROTECTO-SRAP <br />BT-20XL - EQUIV) <br />STEP 7 "hQI1, STEP 8 <br />WINDOW FLASHING <br />INSTALLATION DETAILS <br />12 (FULL WRAP) <br />SCALE: NTS <br />STEP 9 <br />FLASHING <br />OVER JOINT <br />WN9DE 1. YFLASHING <br />50t OR HEAVIER FELT <br />UNDERAYIAENT 1 <br />ASPHALT <br />ROOFING <br />CEMENT <br />FASTNERSNITBN <br />B-DF CENTERLINE <br />II TRA FAST I IN <br />END OF SHINGLE <br />ND ENO SNNGLE <br />AT LEAST 12-BEYOND <br />VALLEY CENTERLINE <br />/-CLIPPEDOFF <br />_ CORNER ATI DEGREE <br />- SBHINGLES TRIMMED 2' BACK <br />FROM VALLEY CENTERLINE <br />ROOF VALLEY DETAIL <br />,ozE, we <br />APPLY 061 mu (O <br />EMAIL) SEALANT . <br />EINDOWK7"N JOINT. <br />PLWO APPLIm <br />FLASHNG(LANCO <br />UNITE -SEAL RC-" <br />OR EQUAL). <br />SLOPE SILL TO EX <br />L IT 16 THE CONTACTORS RESPONBIBILTY TO VERIFY <br />THE COMPATIBILITY OF ALL PRODUCTS NCLUOMG <br />H�, SEALANTS . SELF -ADHERING <br />PLA6HW. MATERIALS USED DURING. CONST1tlICilON <br />2. INSTALL ALL MATERIALS PER MANIFACTURERS <br />WRITTEN SRCIFICATIONS <br />WAR NW, SEALANTS MAY REACT ADVERSELY F NOT <br />COMPATIBLE <br />rRIOR <br />N AND SEAL JAMB TO SILL JOINTS WITH <br />IM FOLLOWING COMPLETION OF <br />RETROFIT WORK <br />REPAIR <br />SCHEME SHOWN SHALL ONE <br />IMPLEMENTED AT ALL WINDOWS WITH <br />EVIDENCE OF WATER INTRUSION ISELOW THE <br />WINDOW OPENING <br />8EAL1 INTERIOR PERIMETER OF WINDOW WITH <br />SEALANT <br />L IT 16 THE CONTACTORS RROPICO (SILTY TO VERIFY <br />THE COMPATIBILITY OF ALL PRODUCTS INCLUDSI6 <br />SEALANTS . 6ELF-ADFlMI6 PLA6NMG MATERIALS <br />ump DURING CCNSTRUCTION. <br />2. FLASHING AT EXTERIOR &RNDOEB AND DOOR <br />OMENIN56 SHALL BE INSTALLED IN ACCORDANCE <br />WITH MANFACTUENS INSTALLATION N6TRICTIONS <br />AND APPROVED METHOD IA OF FCC "SA <br />U N ACCORDANCE WTN PBESTRATION I <br />MANIFACTUPWX6 N6TALLAT4 A1D PLASH U <br />INSTRUCTIONS. <br />WAMM& SEALANTS MAY REACT ADVERSELY IF NOT <br />COMPATIBLE. 1. <br />WALL FLASHING INSTALLATION <br />DETAIL (MASONRY) <br />SCALE, INTO <br />1441 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL32750 <br />PH: 407-7746078 <br />FAX: 407-774-4078 <br />www.abdesigngroup.com #: 0003325 <br />SEE <br />a <br />C <br />d <br />a <br />BvsaIV. Ae LOT: <br />ABBOTT PARK <br />LOT #20 <br />BLK. #9 <br />PROJECT# <br />0418 .000-20091 <br />MODEL <br />4EBB <br />"1828-CALI" <br />GARAGE SWING: <br />LEFT <br />PAGE: <br />WALL <br />ASSEMBLY <br />DETAILS <br />160 MPH W. C <br />2021 <br />SCALE: 1/4"=1'— 0" <br />8HEET <br />WA5 <br />