Laserfiche WebLink
TIE VERTICAL RESAR <br />/�-O <br />ONAL <br />HOOK <br />ROUTED BOND BEAM <br />TIE VERTK;AL REBAR � VARIES PER ELEV. <br />TO HORIZONTAL <br />RESAR W/ f0' HOOK Z ° - 9. _ <br />a q <br />GROUTED BOND BEAM £i <br />— VARIES PER ELEV. ° <br />Z q <br />1441 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL 32750 <br />PH: 407-774-6078 <br />• i`eF g a FAX 407-7744078 <br />www.abdesigngroup.com <br />4 0 <br />� A5 BARS <br />cr <br />m <br />v <br />m <br />■ <br />8' <br />10' HOOK <br />m <br />_a <br />a <br />• -• �.,_ <br />�1a. <br />_• <br />q <br />a <br />0 <br />Q <br />CLEAN OUT REQUIRED <br />FOR INSPECTION <br />O <br />m <br />ma' <br />0'-0' FIN. FLR. <br />TIE ERTICAL <br />mFo <br />ID <br />i `0. <br />O <br />-��,53 <br />M <br />TO HORIZONTALAL <br />• q <br />REBAR W/ 10' HOOK <br />/�1� <br />-L <br />1 •_O• <br />g <br />a <br />q. <br />OI <br />I <br />MEIN <br />Jj <br />6: <br />ti <br />BAR SIZEI 48 BAR DI0.�c <br />Z W 03 18' CMU UNIT DIMENSIONS <br />O #5 Q 24- ARE NOMINAL SIZES <br />x6 36' <br />OFFSET METHOD CONTINUOUS BARSIZE 488ARDIA <br />kT 42' METHOD « 24' a MASONRY SYMBOLS <br />HORIZONTAUVERTICAL HORIZONTAUVERTICAL #5 30' 3 SCALE: 3/4'=7'-0' <br />RRCING �1 REINFORCING 42- <br />SCALEEINFO' L SCALE: 3/4'=1'•0' Frr-k-;-t <br />Z <br />g STEEL REINFORCING IN GROUTED <br />¢ a CELL SEE PLAN FOR SIZE AND <br />} SPACING REQUIREMENTS <br />Q <br />mW <br />ym J <br />0 Z 8• CMU WALL <br />TOP OF SLAB q TOP OF SLAB <br />SEE SLAB SCHEDULE Z W <br />'q <br />EXT. PORCH SLAB 4' CHAMFER (1SBAR SIZE 48 BAR DIA > -STORY) p3 18' OU q <br />W/ 1/2' ISOLATION 6- CHAMFER (2STORY) <br />JOINT (WHERE N4 1. <br />APPLICABLE) Z MATCH STEEL q5 30' <br />e•PVC CHASE REINFORCEMENT 3. <br />PER SCHEDULE 6' PVC CHASE THRU FOOTING <br />THRU FOOTING p7 42' <br />ammm aLo p <br />ABBOTT PARK <br />LOT #31 <br />BLK #9 <br />PROJECTp <br />04181.000-31091 <br />MODEL- <br />3EAB <br />1504— ALLEX" <br />GARAGE SIVMG: <br />RIGHT <br />PAGE: <br />DETAILS <br />160 PH EXP. C <br />MATCH STEEL <br />SEE SCHEDULE REINFORCEMENT <br />FOR WXD, BAR SIZE PER SCHEDULE cz <br />AND BAR QUANTITY PVC CHASE <br />THRU FOOTING JANLUL <br />4 SCALE: 3/4'=1'-0' <br />D � 01/19/21 <br />SCAXX- 1/4"=1'-0" <br />SHEET <br />jl s1.2A <br />