Laserfiche WebLink
FLOOR DECK <br />2X6 T TERMINATION <br />2x4STRONGBACKSECURED TO BLOCKING SECURED TO WALL <br />EACH TRUSS W/ (3)16d COMMON W/ (6) 3116" x 4 TAPCONS <br />NAILS PROVIDE 2-TRUSS LAP <br />SPLICE LOCATED EITHER TOP OR <br />B OTTOM OF FLOOR TRUSS, <br />TYPICALLY VY-Y'BUT REFER TO <br />TRUSS ENGINEERING <br />2x4 STRONGBACK, <br />r,"� FLOOR BRACING <br />SCALE: 31,V=TZ' <br />SIMPSONH6W/ <br />(8)8d COMMON NAILS 2x ST DS <br />SIMPS NH6W/(8)8d EACH E D <br />COMMON NAILS, EACH <br />END EVERY STUD OR ON <br />EACH END OF "BUNDLE" <br />OF STUDS <br />PLYWOOD FLOOR <br />SHEATHING <br />T <br />2s <br />SIMPSON SPH41SPH6 TM <br />FLOOR TRUSS OR PLATE STRAPS W/ 1 Od x I <br />GIRDER TRUSS 112, HOG NAILS <br />WALL FLOOR FRAMING, <br />TRUSS PARALLEL TO WALL <br />DEL PT 216 BLK*NG BETWEEN <br />TRUSSES W/ 10d 0 YOC. STPLY <br />INTO LEDGER AND 10d 0 4 C, <br />S AGGERED UPPER PLY INTO 2x6 <br />T <br />El ELOW <br />8" CMU WALL <br />REINF PER PLAN <br />PER ELEVATION 1� , <br />N <br />0 I I <br />zo- <br />O_ <br />0 <br />EER ELEVATION <br />1X2 FIRE -STOP <br />P <br />T <br />"WOOD SOR WS <br />WO D So R <br />0 E W <br />x Z'LON. a ��!O C; <br />2 L 0 N G a 0 <br />S T G E RED F F <br />STAGGERED OFF <br />A G 0 <br />E R <br />C ENTERLINE OFF 2x6; <br />C E N T LIN 0 F F <br />3, 4 A S S Ho <br />3/4" AS SHOWN <br />I 0 A2 <br />SIMPSON A23 AL <br />S M P N <br />E A T R U S <br />EA. TRUSS /4" <br />—ke <br />NAILING PATTERN <br />PRE �IENGINEERED WOOD <br />FLOOR TRUSSES (SEE <br />FRAMING PLAIN) <br />DBIL 2X_ LEDGER <br />CHE TI UE <br />SEE S DU <br />SECTION DETAIL <br />AT TRUSSES BEARING <br />r.,_`�ON EXTERIOR WALL <br />2x STUDS PER PLANS <br />2x STUDS PER PLANS <br />20 BLOCKING BETWEEN TRUSSES <br />DBIL PT Z(6 BLK'NG BETWEEN <br />Z� N <br />(2) 2X4 No.2 SYP DIAG. WHERE X-BRACING IS PRESENT AT <br />TRUSSES W/ 10d C 3" 0 C, 1ST PLY <br />FLOOR DECK <br />2x4 CONT. W/ (4) 16d NAILS <br />IN S <br />A G <br />TH <br />BRACE W1 (3) 12d 0 E& 4--g- O,C. (AT SHEATHING SEAMS) <br />4' 0 C A T S HEA BE A M <br />INTO LEDGER AND 10d @ 3" O� C <br />#13WOODSCREWS <br />2x4 BLOCKING @ EA. BRACE <br />NOTE: <br />0 TOP OF FLR TRUSS <br />TRUSS (DIAG. BRACE TO 7 <br />STAGGERED UPPER PLY INTO Z16 <br />x Z'LONG @ a- OC, <br />TOENAIL INTO TRUSS W1 (4)16d <br />STRUCTURAL SHEATHING <br />(TOP 2X4 SUPPORTS BT <br />COVER 5 TRUSSES) <br />BELOW <br />S OFF <br />NAILS @ EA. END <br />MUST NOT BREAK ITHIN <br />W <br />PLATE OF 2ND FUR) <br />CTAGGERED <br />ENTERLINE OFF 2�6. <br />1-4" MIN. FROM 2ND. FUR. <br />FLOOR DECK <br />AC E <br />0, -0" TO 30'-0" (1)'X" BRACE <br />314" AS SHOWN <br />t <br />2X4 BRACE 0 4W' O.C. W/ (5) 12d <br />LINE <br />IAC E <br />30--l" TO W-0 (3) X" BRACE PRE-ENG GABLE TRUSS <br />PRE-ENG GABLE TR US <br />-D6L2X8UEDGER <br />NAILS EA. END <br />Z16 CONT� W/ (8) 16d NAILS <br />R <br />0� 'K' BRACE @ CENTER <br />TO CMU W/ I/7'EXP. BOLT 411 <br />8d RING SHANK NAILS C C <br />@ BT. OF FLOOR TRUSS <br />U <br />(2 X'SRACE DIVIDED EQUALLY STIFFBACK AT 2x SUB -BAND <br />E. ALLY STI FF-A K T ALL <br />ALL <br />8* CMU WALL <br />'ALL: <br />// AT 16" O.C� AND 8!'FROM <br />INTO BLOCKING <br />(BT AT6 IS FOR WALL <br />SHE 2XHING NAILER) <br />FROM CENTER TO END. OV G H <br />UPRIGHTS ER4-�l). H7G. <br />UPRIGHT OVER 4. -1. H <br />ER PLAIN <br />REINF PER PLAN <br />END W/ MIN 5-1/2'EMBED, <br />6d NAILS 0 8!' O,C, MAX <br />1X2 FIRE -STOP <br />(A PER TR S ENG) <br />(AS PER TRUSS EN <br />-3 U <br />VATI.N <br />PER ELEVATION <br />FLOOR DEC /4" <br />4,FER ELEVATION PE ELEVATION I-L <br />IV <br />OD SH THING, SE <br />SEE <br />P" <br />0 <br />"ROOF/WALUFLOOR <br />NAILING PATTERN <br />SHEATHING <br />3: Ps <br />FASTENER SCHEDULE" <br />0 < <br />SEE TYP. TRUSS CONNECTOR <br />PER ELEVATION gjb; <br />OL PER ELEVATION PER ELEVATION <br />DETAIL FOR STRAPPING INFO. <br />PRE-ENGINEERED WOOD <br />RE -ENGINEERED WOOD <br />Z �C�O N PER <br />I C N ER <br />lx2,2KWO DFASCIA 'UINECTIO <br />R S_ T P <br />MFG <br />T , MFG� <br />2X4PJ CEILING <br />FLOOR TRUSSES (SEE <br />FLOOR TRUSSE (SEE <br />SEE ARCHOI <br />TE TURAL <br />C <br />NAILER W1 <br />FRAMING PLAN) <br />PRE-ENGINEERED WOOD <br />FRAMING PLAN)S <br />2x SECURED W/ D <br />(3) 16d ENGINEEREDWOOD <br />MASONRY NAILS <br />@ 12' Q.0 <br />FLOOR TRUSSES (SEE <br />SEE SCHEDULE FOR SEE SCHEDULE FOR <br />SIMPSON HETA-16 @ <br />GALV. COMMON NAILS TRUSSES @ 24" O/C, <br />lx2 SECURE SUBMIT SHOP DRAWINGS <br />DWI 10d <br />REPAIR DETAIL IF <br />FRAMING PLAN) <br />BOND BEAM REO BOND BEAM REQ. <br />EVERY TRUSS (VERIFY <br />COM V <br />GALV. MON NAILS FOR REVIEW CONT. 2.4 RAT RUN <br />1X2 FIRE -STOP <br />LEDGER INSTALLED TOO LOW <br />SIMPSON HETA 16 <br />N HETA-16 <br />W/ TRUSS PLAN) <br />12" O/C AND APPROVAL <br />D Pp OV L S C W, )I <br />SECURED W1 (2)12d'. <br />AT TRUSSES PARALLEL <br />2'. O,C MAX. <br />(VERIFYWITRUSS <br />SECTION DETAIL <br />r <br />, T .. <br />MASONRY BOND BEAM' EACH TRUSS <br />EXTERIOR WALL <br />PLAN) <br />AT PARALLEL / PERPENDICULAR <br />SEE SCHEDULE <br />GABLE END PRE-ENG'D TRUSS <br />,/'�TO <br />O_GABLE <br />7 SCALE 314"=T-0" <br />r,��PRE-ENG FLOOR TRUSSES <br />W/ HIP RETURN <br />W/ HI P <br />PRE-ENG GABLE TRUSS <br />2x4 BLOCKING BETWEEN.TRUSSES <br />STRAP TRUSS TO PL. <br />PRE -ENG <br />AT FIRST TWO BAYS 4'-(Y OC ( AT <br />PRE-ENG'D <br />WOOD <br />SEE SCHEID. BELOW <br />ROOFTRUSS <br />SHEATHING EAMS) (BLOCKIN <br />S G <br />TRUSS (TYP) <br />@ 24- O,C, <br />NOT SHOWN FOR CLARITY) <br />MAX <br />PER EL VATION <br />FOR STRAPPING <br />I <br />VERIFY <br />PRE-ENG ROOF TRUSS <br />SECURE 2K6 PT, PLATE TO BILK <br />W, TRUSS PLAN <br />TRUSS TO TOP PLATE <br />:ITIRENGSUM BOARD OR ItZ'HIGH <br />r1l6d <br />Wl 1/2" DIA ANCHOR BOLTW/21 <br />A -SIMPSON MTS12 <br />TH.LG <br />-TRENG BOARD <br />4x4/4x6 SYP NO, 2 <br />S <br />WASHER ETINHIGH <br />U � 990 LBS 14) 10d <br />W1 <br />CU <br />SECURE TRUSS TO TOP PLATE W (2) <br />WOOD POST TO <br />STRENGTH EPDXY 6'MIN. <br />GALV. NAILS. <br />TOENAILS <br />SLAB SEE <br />EMBED. AT 32' OC MAX <br />B - (2) SIMPSON MTS12 <br />DOUBLE TOP PLATE <br />SCHEDULE <br />SECURE GABIE To 2x8 PJ <br />U � 1420 LBS W/ (14) 10d <br />BELOWFOR <br />PLATE Wl 12d S'O C, MAX <br />GALV. NAILS EA. STRAP <br />2x4 OR 2K6 WOOD BEARING <br />CONNECTION <br />WAULWISYP No2 STUDS SEE <br />FL#1 7239 <br />PLANS FOR SPACING. SINGLE <br />C ONC.POURED <br />BTM. PLATE TO BE PT. <br />LINTEL COURSE <br />PROVIDE DBL. TOP PLATE <br />PROVIDE BLOCKING <br />ih <br />S MPSON SPH4 OR SPHS BTM <br />E <br />1/2" GYP. WIL. D <br />:0: <br />AND TOP PLATE ANCHORS W' <br />j.., 1,,, COMMON NAILS <br />SECURE BT PLATE TO SLAB W/ <br />CONT 2x4 SECURED W/ (2) 10d's Q EACH <br />FILL ALL HOLES, DO NOT USE <br />10d 3" <br />la'xV WEDGEANCHORW12' <br />WASHER SET IN HIGH STRENGTH <br />I <br />TRUSSMOOD POST CONNECTIONS <br />TRUSS TO BE INSTALLED @ 10'-0" O.C. <br />MAX, <br />x <br />EPDXY 5-1/Z'EMBED. MIN. 16" <br />10a 10b 10c <br />S8(�l <br />OC MAX. <br />SCALE 314"=T-0". <br />s <br />GABLE END BRACING W/ PRE-ENG <br />GABLE TRUSS @ CMU WALL <br />4 <br />ECTION <br />990 LES W/ (14) 10d GA V. NAILS. <br />: <br />B -SIMPSON HTS-20 1310 LBS Wl (20) 10d GALV NAILS <br />C - 2-PLY-SIMPSON VGT/HDU4 U � 4565 USS VGT TO TRUSS W/ (16) <br />1/4"W"SIDS, (1) 519'* A T.R. TO HDU4 AND (10) 1/4" X 2 1/Z'SDS TO POST <br />_"�TRUSS CONNECTION @ L.B.W. <br />POST TO SLAB DONNEcnON <br />A&B - S I MPSON AB U44Z POST BASE <U: 1, 900 G:5,660 W/ 5/8 DIA x 6'EXP, BOLT <br />SIMPSON ABU46Z POST BASE �U:2,300 G:10,335W/518 DIA. x6'EXP. BOLT <br />C_ SIMPSON HTTSPOSTON SILAS <U:4,565W/5/8"A.B. WTH MIN. T' <br />EMBEDMENT TO SLAB & (26) 16d x 2-IrZ'NAILS TO POST <br />A It C H IT E C TS <br />6 <br />G r ZDesign <br />ous;Ov..!. <br />Al N. RONALD REAGAN BLVD, <br />LONGWOOD, FIL 32760 <br />PH: 407-774-6078 <br />FAX: 407-774-4078 <br />www.abdesigngroup.com <br />AA #:0003325 <br />ounDiv. se <br />SILVERADO <br />LOT #3 <br />BLK #1011 <br />PROJECT# <br />03719.001-03101 <br />MODEL. <br />"2045-LANTAN,C <br />GARAGE VnNC;: <br />RIG7 <br />PAGE: <br />DETAILS <br />150 MPH EXP. B <br />mm*14 <br />"p 08/18/2, <br />SCAL,Z: 1/4"=l'-0" <br />s*mET <br />S3. I Bj <br />